Superior National Forest Bridge Repair

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
12445525Q0004
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Two Harbors, Minnesota 55616, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation is for the emergency repair of the Cloquet River Bridge located in the Superior National Forest in St. Louis County, Minnesota. The Department of Agriculture Forest Service is seeking a contractor to stabilize the bridge, which suffered major damage from a June 2024 storm event that caused severe scour and undermining of the center pier. The project's objective is to install grout bags and grout to prevent the bridge from collapsing until a replacement can be funded and constructed. The evaluation criteria include past performance, experience, and technical approach. Sealed offers are due by November 26, 2024, and the government will award the contract to the responsive offeror whose proposal is most advantageous.

This is a total small business set-aside under NAICS code 237310, with a size standard of $45 million. The magnitude of the project is estimated to be between $25,000 and $100,000. The bridge is currently closed to all traffic and will remain closed upon completion of the required work. The place of performance is Two Harbors, Minnesota.

Notice text

This is a total small business set-aside under NAICS Code 237310, size standard $45M. The magnatude of this project is between $25,000 and $100,000. 

The Cloquet River Bridge is located on Forest Road 122 in Township 56N, Range 12W, Section 25 (47.3099N, 91.7964W) in St Louis County MN.  The Cloquet River Bridge constructed in 1957, is 67 years old two span continuous concrete beam bridge with a center pier. 
Seasonal peak flow in the Cloquet River is typically between 1000-2000cfs. The June 18, 2024 Storm Event caused a peak flow of around 6000 cfs. The flooding appears to have overtopped road and bridge as the bridge deck was washed clean and there is debris on the road shoulder at bridge ends. There is major degradation and scour of the riverbed. There was a debris jam on the pier nose.  A dive investigation found severe scour at the pier. The center pier footer is completely undermined for about 2/3 of it's length. (See attached undermining sketch.) It is assumed that the reinforced concrete superstructure (continuous over the pier) is currently supporting the pier from rotating into the scour hole. Without repairing the undermining prior to spring flows, it is feared the scour will increase and the bridge will collapse.

This project is intended stabilize the bridge until a replacement bridge can be funded, designed and constructed.  The bridge is currently closed to all traffic and will remain closed to all traffic upon completion of the work.

Files

File Type Posted
mn221.txt TXT text file
12445525Q0004 Clauses.docx DOCX document
12445525Q0004.pdf PDF
Cloquet River Bridge Emergency Repair SOW.docx DOCX document
Cloquet River Bridge Emergency Repair SOI.pdf PDF

Notice history

Notice Type Posted
Superior National Forest Bridge Repair Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Cisco Branch Ontonagon River Bridge Replacement Watersmeet, Michigan 49969, United States · NAICS 237310 Forest Service Total Small Business
Acadia National Park Maine, United States · NAICS 237310 Federal Highway Administration Total Small Business
Stove Prairie Campground Gate Replacement Bellvue, Colorado, United States · NAICS 237990 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity