About this opportunity

The Department of Agriculture Forest Service awarded a small business contract (ID: d8bd90291f1c4f878d11d5f6315fc485) for emergency bridge repair on the Cloquet River Bridge in St. Louis County, Minnesota. The contract, valued at $30,800, addresses critical infrastructure damage from a June 18, 2024 storm event that caused significant riverbed scour and undermining of the bridge's center pier. The project, classified under NAICS Code 237310 with a size standard of $45M, aims to stabilize the 67-year-old bridge and prevent potential collapse before a full replacement can be designed and constructed. The bridge, located on Forest Road 122, remains closed to all traffic, and the repair work was awarded to MAYOINTHEMIX LLC on December 17, 2024, with the contract amount falling within the project's estimated range of $25,000 to $100,000.

Notice text

.

This is a total small business set-aside under NAICS Code 237310, size standard $45M. The magnatude of this project is between $25,000 and $100,000. 

The Cloquet River Bridge is located on Forest Road 122 in Township 56N, Range 12W, Section 25 (47.3099N, 91.7964W) in St Louis County MN.  The Cloquet River Bridge constructed in 1957, is 67 years old two span continuous concrete beam bridge with a center pier. 
Seasonal peak flow in the Cloquet River is typically between 1000-2000cfs. The June 18, 2024 Storm Event caused a peak flow of around 6000 cfs. The flooding appears to have overtopped road and bridge as the bridge deck was washed clean and there is debris on the road shoulder at bridge ends. There is major degradation and scour of the riverbed. There was a debris jam on the pier nose.  A dive investigation found severe scour at the pier. The center pier footer is completely undermined for about 2/3 of it's length. (See attached undermining sketch.) It is assumed that the reinforced concrete superstructure (continuous over the pier) is currently supporting the pier from rotating into the scour hole. Without repairing the undermining prior to spring flows, it is feared the scour will increase and the bridge will collapse.

This project is intended stabilize the bridge until a replacement bridge can be funded, designed and constructed.  The bridge is currently closed to all traffic and will remain closed to all traffic upon completion of the work

 

Awarded contract 12445525P0005 to MAYOINTHEMIX LLC for 30800.00 on 2024-12-17.

Notice history

Notice Type Posted
This notice Award Award Notice
Superior National Forest Bridge Repair Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity