Cloquet River Bridge Emergency Repair SOI.pdf
PDF 27 KB Posted
- Attached to
- Superior National Forest Bridge Repair
- Solicitation number
- 12445525Q0004
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Schedule of Items for an emergency repair project on the Cloquet River Bridge located in the Superior National Forest in Minnesota. The project is a small business set-aside under NAICS code 237310 with an estimated project value between $25,000 and $100,000. The bridge suffered major damage from a June 2024 storm event that caused severe scour and undermining of the center pier. The project is intended to stabilize the bridge until a replacement can be funded and constructed. The Schedule of Items lists two line items: Mobilization and Grout Bag(s) and Grout, with a total estimated amount. No specific response or award dates are provided. The federal agency involved is the Department of Agriculture Forest Service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12445525Q0004 Clauses.docx | DOCX document | |
| 12445525Q0004.pdf | ||
| mn221.txt | TXT text file | |
| Cloquet River Bridge Emergency Repair SOW.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SCHEDULE OF ITEMS
FR 122 - Cloquet River Bridge
SECTION B – SERVICES AND PRICES
Larentian Ranger District
Superior National Forest
B- 1 - SCHEDULE OF ITEMS (Government Estimate)
ITEM EST. UNIT EST.
NO. DESCRIPTION QTY. UNIT PRICE AMOUNT
15101 Mobilization
1 LS
55216 Grout Bag(s) and Grout
1 LS
TOTAL
File details come from the government source that posted it. Updated .