Cloquet River Bridge Emergency Repair SOI.pdf

PDF 27 KB Posted

Attached to
Superior National Forest Bridge Repair
Solicitation number
12445525Q0004
Issued by

About this file

This document is a Schedule of Items for an emergency repair project on the Cloquet River Bridge located in the Superior National Forest in Minnesota. The project is a small business set-aside under NAICS code 237310 with an estimated project value between $25,000 and $100,000. The bridge suffered major damage from a June 2024 storm event that caused severe scour and undermining of the center pier. The project is intended to stabilize the bridge until a replacement can be funded and constructed. The Schedule of Items lists two line items: Mobilization and Grout Bag(s) and Grout, with a total estimated amount. No specific response or award dates are provided. The federal agency involved is the Department of Agriculture Forest Service.

View the file

Other files

File Type Posted
12445525Q0004 Clauses.docx DOCX document
12445525Q0004.pdf PDF
mn221.txt TXT text file
Cloquet River Bridge Emergency Repair SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

FR 122 - Cloquet River Bridge

SECTION B – SERVICES AND PRICES

Larentian Ranger District

Superior National Forest

B- 1 - SCHEDULE OF ITEMS (Government Estimate)

ITEM EST. UNIT EST.

NO. DESCRIPTION QTY. UNIT PRICE AMOUNT

15101 Mobilization

1 LS

55216 Grout Bag(s) and Grout

1 LS

TOTAL

File details come from the government source that posted it. Updated .