South park district office rehab

Closed Solicitation Posted

Solicitation number
1240LT25R0039
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2AA Repair Or Alteration Of Office Buildings
Place of performance
Fairplay, Colorado 80440, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service is seeking a contractor for the comprehensive rehabilitation of the South Park District Office in Fairplay, Colorado, under solicitation number 1240LT25R0039. The project encompasses extensive renovation work including the removal and installation of a new standing seam metal roof with associated components such as underlayment, flashing, gutters, and downspouts, plus an ice/snow melt system with electrical circuits. Additional scope includes interior modifications involving carpet tile replacement, acoustical panel and ceiling tile repairs, window sealing, and installation of eight communication outlets with electrical infrastructure. The contract will be evaluated based on past performance, technical approach, and pricing, with non-price factors considered more important than price. Proposals are due by August 29, 2025, at 10:00 a.m. Central Time, following multiple amendments that extended the original deadline and provided answers to contractor questions.

This opportunity is designated as a total small business set-aside under NAICS code 236220 with a size standard of $45 million. The contract is structured as a firm fixed-price construction agreement with a performance period from September 15, 2025, to November 15, 2025, providing a tight two-month window for completion. Key project specifications include 5,800 square feet of steel roofing panels, 167 square yards of carpet tile installation, and 225 square feet of ceiling tile replacement. An optional component includes the installation of 165 linear feet of chain link fencing with both pedestrian and motorized gates equipped with operators and keypads. The work will be performed at the South Park Ranger District facility located at 320 Highway 285, Fairplay, Colorado, at an elevation of approximately 9,953 feet above sea level, requiring the contractor to account for high-altitude construction challenges and seasonal weather constraints that limit roofing work to May through November.

Notice text

3 versions

Update #3 · Latest ·

SOUTH PARK DISTRICT OFFICE REHAB - FAIRPLAY, COLORADO - PSICC NF and NATIONAL GRASSLANDS

08/14/2025:  Amendment 00002 (A0002):  See and read the following in association with Amendment 0002:  Amendment 0002 (A0002) - read in its entirety as it includes the Summary of Changes with answers to contractor's questions and revsions to supporting solicitation documents.  Also included in this Amendment as an attachment is Updated Attach _3 Specifications_08.14.2025.  A0002 and the Updated Attachment are located in the Attachments/Links. 

07/31/2025:  Amendment 0001 (A0001):  See and read the following  in association with Amendment 0001:   Amendment 0001 (A0001) and the Updated Attachments 3 and 4 for updates to the Specifications and Drawings.  The Updated Attachments along with A0001 are located in the Attachments/Links. 

The project scope of work includes, but is not limited to, the following: Mobilization, quality control, removal and installation of  a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior  modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom.

Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. See the SOW, SOI, Specifications, and Drawings for more details. 

Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions. See the SOW, SOI, Specifications, and Drawings for more details. 

An upcoming amendment will provide answers to questions from vendors and include the site visit's attendee's list. 

Update #2 ·

SOUTH PARK DISTRICT OFFICE REHAB - FAIRPLAY, COLORADO - PSICC NF and NATIONAL GRASSLANDS

07/31/2025:  Amendment 0001 (A0001):  See and read the following  in association with Amendment 0001:   Amendment 0001 (A0001) and the Updated Attachments 3 and 4 for updates to the Specifications and Drawings.  The Updated Attachments along with A0001 are located in the Attachments/Links. 

The project scope of work includes, but is not limited to, the following: Mobilization, quality control, removal and installation of  a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior  modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom.

Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. See the SOW, SOI, Specifications, and Drawings for more details. 

Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions. See the SOW, SOI, Specifications, and Drawings for more details. 

An upcoming amendment will provide answers to questions from vendors and include the site visit's attendee's list. 

Update #1 ·

SOUTH PARK DISTRICT OFFICE REHAB - FAIRPLAY, COLORADO - PSICC NF and NATIONAL GRASSLANDS

The project scope of work includes, but is not limited to, the following: Mobilization, quality control, removal and installation of  a new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts, installation of roof, valley, gutter, and downspout ice/snow melt system including electrical circuits; interior and exterior  modifications including removal of carpet and installation of carpet tiles, replacing stained and damaged acoustical panels and ceiling tiles, and seal windows, installation of (8) additional communication outlets and associated electrical for telecom.

Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties. See the SOW, SOI, Specifications, and Drawings for more details. 

Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions. See the SOW, SOI, Specifications, and Drawings for more details. 

An upcoming amendment will provide answers to questions from vendors and include the site visit's attendee's list. 

Attachments

Files attached to this notice, newest first
File Type Posted
A0002.pdf PDF
Updated Attach_3 Specifications_08.14.2025.pdf PDF
A0001.pdf PDF
Updated Attach _3 Specifications_07.30.2025.pdf PDF
Updated Attach_ 4 Drawings_South Park_07.30.2025.pdf PDF
1240LTR250039_South Park Rehab.pdf PDF
Attach 5_WD CO20250026_07.18.2025.pdf PDF
Attach 1 SOW_South Park.pdf PDF
Attach 3_Specifications_South Park.pdf PDF
Attach 2_Schedule of Items_South Park.xlsx XLSX spreadsheet
Attach 4_Drawings_South Park.pdf PDF
Show all 11

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
South park district office rehab This notice · Latest solicitation Solicitation
South park district office rehab Pre-Solicitation
FCC Coleman - Q1 FY24 Kosher Menu - Kosher Coffee Award Award Notice
FCC Coleman - Q1 FY24 Kosher Menu - Kosher Coffee Original Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity