Attach 2_Schedule of Items_South Park.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
SOUTH PARK DISTRICT OFFICE REHAB Federal contract opportunity
Solicitation number
1240LT25R0039
Issued by
Department of Agriculture Forest Service

About this file

The document is an Independent Government Estimate (IGE) Schedule of Items for the South Park District Office Rehabilitation project in Fairplay, Colorado, managed by the Department of Agriculture Forest Service. The project involves comprehensive building renovation and optional security upgrades, with line items covering base and optional work including roof replacement, interior modifications, and fence installation. Specific base scope includes mobilization, selective demolition, waterproofing, weather barriers, steel roofing panels (5,800 sq ft), gutters, downspouts, roof snow/ice melt systems, interior thermal protection, ceiling tile replacement (225 sq ft), and carpet tile installation (167 sq yds).

Optional items include electrical and security enhancements such as security fencing, gate operators with keypads, 165 linear feet of chain link fence, and both pedestrian and vehicle chain link gates. The solicitation (Number 1240LT25R0039) requires the contractor to provide all labor, materials, scheduling, coordination, equipment, and delivery to complete the project in compliance with approved drawings and specifications. The project is located on Pike and San Isabel National Forests, Cimarron and Comanche National Grasslands, with the total estimated cost currently listed at $0.00, suggesting this is a preliminary estimate document.

View the file

Other files for this federal contract opportunity

Other files attached to SOUTH PARK DISTRICT OFFICE REHAB, newest first.
File Type Posted
A0002.pdf PDF
Updated Attach_3 Specifications_08.14.2025.pdf PDF
Updated Attach_ 4 Drawings_South Park_07.30.2025.pdf PDF
Updated Attach _3 Specifications_07.30.2025.pdf PDF
A0001.pdf PDF
1240LTR250039_South Park Rehab.pdf PDF
Attach 5_WD CO20250026_07.18.2025.pdf PDF
Attach 4_Drawings_South Park.pdf PDF
Attach 1 SOW_South Park.pdf PDF
Attach 3_Specifications_South Park.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE Summary

Schedule of Items
Pike and San Isabel National Forests, Cimarron and Comanche National Grasslands
South Park Ranger District - South Park District Office
Fairplay Office Rehab
ITEM NO.DESCRIPTIONQUANTITYMEATHOD OF MEASUREUNITUNIT PRICEAMOUNT
1 - BaseMobilization and bonding1LSQL.S.$0.00
2 - BaseSelective Demolition Thermal/Moisture1LSQL.S.$0.00
3 - BaseSheet Waterproofing1100AQSF$0.00
4 - BaseWeather Barriers58AQSQ$0.00
5 - BaseSteel Roofing Panels5800AQSF$0.00
6 - BaseGutters, Downspouts and Roof Curb1LSQL.S.$0.00
7 - BaseRoof Snow and Ice Melt System1LSQL.S.$0.00
8 - BaseInterior Thermal/Moisture Protection1LSQL.S.$0.00
9 - BaseSelective Demolition Interior1LSQL.S.$0.00
10 - BaseSuspended Acoustical Ceiling Tiles225AQSF$0.00
11 - BaseCarpet Tile167AQSY$0.00
12 - BaseWall and Ceilings, Interior1LSQL.S.$0.00
13 - BaseTelecom1LSQL.S.$0.00
CLIN 1001 - 14 - OptionalElectrical Materials and Methods, Security Fencing1LSQL.S.$0.00
CLIN 1002 - 15 - OptionalGate Operator and Keypad1LSQL.S.$0.00
CLIN 1003 - 16 - OptionalChain Link Fence165AQLF$0.00
CLIN 1004 - 17 - OptionalPedestrian Gate, Chain Link1AQEA$0.00
CLIN 1005 - 18 - OptionalVehicle Gate, Chain Link1AQEA$0.00
Total Base:$0.00
Total Optiona Items 14 - 18:$0.00
Total Price:$0.00
LSQ - Lump Sum Quantity
Insert the contractor's name:

COM Carrizo Dwelling Roof Replacement ER IGE Summary

File details come from the government source that posted it. Updated .