Attach 1 SOW_South Park.pdf
PDF 302 KB Posted
- Attached to
- SOUTH PARK DISTRICT OFFICE REHAB Federal contract opportunity
- Solicitation number
- 1240LT25R0039
- Issued by
- Department of Agriculture Forest Service
About this file
This Statement of Work (SOW) details a rehabilitation project for the South Park District Office in Fairplay, Colorado, located on the Pike National Forest. The project scope includes removing and installing a new standing seam metal roof with comprehensive components, installing an ice/snow melt system with electrical circuits, interior and exterior modifications (carpet replacement, ceiling repairs, window sealing), and adding eight communication outlets. An optional item involves installing a chain link fence with a motorized gate and associated electrical systems.
The project requires the contractor to provide all labor, materials, scheduling, and coordination, with specific performance constraints including: no weekend or holiday work, minimal disruption to government operations, roofing work limited to May through November, and no building closures permitted. Key deliverables include a construction schedule, material submittals, an Operations & Maintenance manual, and as-built drawings. The Contracting Officer's Representative is Samantha LaBella from the Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands, located in Pueblo, Colorado.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0002.pdf | ||
| Updated Attach_3 Specifications_08.14.2025.pdf | ||
| Updated Attach_ 4 Drawings_South Park_07.30.2025.pdf | ||
| Updated Attach _3 Specifications_07.30.2025.pdf | ||
| A0001.pdf | ||
| 1240LTR250039_South Park Rehab.pdf | ||
| Attach 5_WD CO20250026_07.18.2025.pdf | ||
| Attach 2_Schedule of Items_South Park.xlsx | XLSX spreadsheet | |
| Attach 4_Drawings_South Park.pdf | ||
| Attach 3_Specifications_South Park.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
South Park District Office Rehab – Fairplay, Colorado Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands
Pikes Peak Ranger District
Statement of Work
1. Project Location
i. The project is located at the South Park Ranger District Office on the Pike
National Forest, South Park Ranger District in South Park County, Colorado, directly north of the intersection of US Highway 285 and CO-9 in Fairplay, CO
ii. Address: 320 US Hwy 285, Fairplay, CO 80440
2. The project scope of work as specified in CSI specification 010150 General
Requirements includes, but is not limited to, the following:
i. Mobilization
ii. Quality control
iii. Remove and install new standing seam metal roof including underlayment, ridge vent, flashing, drip edge, roof curbs, crickets, gutters, and downspouts.
iv. Install roof, valley, gutter, and downspout ice/snow melt system including electrical circuits.
v. Interior and exterior modifications including remove carpet and install carpet tiles, replace stained and damaged acoustical panels and ceiling tiles, and seal windows.
vi. Install (8) additional communication outlets and associated electrical for telecom.
vii. Optional Item - Install chain link fence, personnel walk thru gate, motorized gate with operator and keypad, and associated electrical and safeties.
viii. Work for this project requires the contractor to be responsible for supplying all labor, materials, scheduling, coordination, equipment, utilities, miscellaneous items, freight, and delivery to complete contract requirements in compliance with approved final drawings, specifications and provisions.
ix. Refer to project plans and specifications for more information and requirements
a. A02_Fairplay_Rehab_SpecBinder100
b. A03_Fairplay_Rehab_DWGsBinder100
c. A04_Schedule of Items
3. Period of Performance
i. On-site mobilization shall not occur prior to NTP
ii. Construction shall be completed in accordance with the specifications and requirements as directed in this contract/SOW.
iii. Roofing work shall generally only be allowed May through November and shall be scheduled by the contractor to be completed during appropriate industry standard weather conditions.
4. Work Schedule
i. No weekend work or work on Federal Holidays shall be allowed.
ii. Project scheduling shall minimize impacts to government operations.
iii. Fairplay Office is occupied by government personnel at all times. Building closures to on-site government personnel shall not be allowed.
iv. Minimize the amount of time that the existing telecommunications system is non-operational, but in any event should not exceed two days.
Coordinate all proposed shutdowns with the Contracting Officer a minimum of two weeks in advance.
5. Temporary Facilities
i. Utilities, except for telephone, are available at the site for construction purposes.
ii. A trash abatement program shall be initiated during pre-construction phases of the project and shall continue through the duration of the project. All construction refuse shall be removed from the site and disposed of properly on a weekly basis and upon project completion.
6. Key Deliverables
Item No.
Deliverable Objective Due
1 Construction Schedule
Defining the responsibilities, timeline, risks, and milestones of contract objectives.
No later than the date of the prework conference
2 Material and Equipment Submittals
All material specifications, product data, manufacturer’s instructions, and material safety data sheets
During construction according to schedule
3 Operations & Maintenance (O&M) Manual
Binder including equipment manufacturer’s data, system schematics and descriptions, maintenance schedules, etc.
Prior to final inspection
4 As-built Drawings Drawings that recognize any changes in the plans, specifications, and/or approved submittal of equipment supplied
Prior to final inspection
7. Contracting Officer’s Representative (COR):
i. Samantha (Sami) LaBella
Samantha.LaBella@usda.gov
(719) 251-7182 Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands 2840 Kachina Drive Pueblo, CO 81008