SD FTNP 10(9), Dillon Pass Embankment Repairs - 6982AF20B000005
Pre-Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- 6982AF20B00005
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Interior, South Dakota 57750, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks contractors to perform embankment repairs at three locations in South Dakota. The Department of Transportation Federal Highway Administration will administer the contract for repair and reconstruction work at two sites in Badlands National Park, along with mill, overlay, and slurry seal work at the Minuteman Missile Visitors Center. The solicitation number is 6982AF20B00005 and will be posted in December 2019, with questions accepted until November 18th. Evaluation will consider technical qualifications, past performance, and price.
There is no set-aside designation. The primary NAICS code is 237110 for the heavy construction component, while the PSC code covers highway and street construction. The incumbent contractor is Morris, Inc., which submitted the lowest bid of $5,060,100 for Schedule A work. Option X adds embankment and asphalt work with a lowest bid of $1,229,511 from Simon Contractors of SD, Inc., and Option Y involves slurry seal with a lowest bid of $105,180. Key quantities include over 8,100 cubic yards of embankment construction and 3700 tons of asphalt paving for Schedule A.
Notice text
This project includes two locations in Badlands National Park and one location at the Minuteman Missile Visitors Center. The type of work includes mill and overlay, reconstruction for the two Badlands locations, and slurry seal for the Minuteman Missile Visitors Center. The project is broken into the main schedule and 2 options; Schedule A that includes Dillon Pass and Bigfoot Pass work, Option X that includes a fill repair and roadway reconstruction on the west end of the Dillon Pass work, and Option Y that includes the slurry seal at the Minuteman location.
SIGNIFICANT QUANTITIES
(Schedule A): 8100 cubic yards of Embankment Construction, 6000 cubic yards of Embankment Construction (shallow reinforced soil slope), 4069 cubic yards of Embankment Construction (reinforced soil slope), 3700 tons of Asphalt Concrete Paving, 33,000 square yards of Asphalt Milling, 130 feet of 72-inch Pipe Culvert (concrete), 10,600 feet of Concrete Curb (18 inch), 26,000 square yards of Rolled Erosion Control Product (Type 4), and 2,200 Hours of Temporary Traffice Control, Flagger.
(Option X): 3,300 cubic yards of Embankment Construction, 7,000 cubic yards of Embankment Construction (reinforced soil slope), 330 tons of Asphalt Concrete Pavement, Type 1, 270 feet of 24-inch Pipe Culvert (HDPE) and 500 hours of Temporary Traffic Control, Flagger.
(Option Y): 8,000 square yards of Micro Surfacing, Type 2, 3,000 lineal feet of Pavement Markings, Type B, Solid, and Lump Sum Temporary Traffic Control.
Files
| File | Type | Posted |
|---|---|---|
| Bid Tabs.pdf | ||
| Questions and Answers - SD FTNP 10(9), Dillon Pass Embankment Repairs 11182019.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| SD FTNP 10(9), Dillon Pass Embankment Repairs | Award Notice | |
| SD FTNP 10(9), Dillon Pass Embankment Repairs | Award Notice | |
| SD FTNP 10(9), Dillon Pass Embankment Repairs | Solicitation | |
| This notice | Pre-Solicitation | |
| SD FTNP 10(9), Dillon Pass Embankment Repairs | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| ND NP THRO 204(1) Buck Hill Road | Federal Highway Administration | No set-aside | |
| Asphalt Repair at Carl Sandburg Historic Site | Interior Business Center | Total Small Business | |
| Construct North Unit Visitor Center at BADL | National Park Service | No set-aside | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity