Bid Tabs.pdf

PDF 151 KB Posted

Attached to
SD FTNP 10(9), Dillon Pass Embankment Repairs - 6982AF20B000005
Solicitation number
6982AF20B00005
Issued by

About this file

This bid tabulation report summarizes bids received for the SD FTNP 10(9) Dillon Pass Embankment Repairs project. The project includes mill and overlay work at two locations in Badlands National Park, along with reconstruction and slurry seal work. Schedule A covers work at Dillon Pass and Bigfoot Pass, including over 8,100 cubic yards of embankment construction, 6,000 cubic yards of reinforced embankment, and 3700 tons of asphalt paving. Option X adds work on the west end of Dillon Pass, with 3,300 cubic yards of embankment and 330 tons of asphalt. Option Y provides a slurry seal for the Minuteman Missile Visitors Center. Three contractors provided bids, with Morris, Inc. submitting the lowest bid of $5,060,100 for Schedule A. For additional options, Simon Contractors of SD, Inc. provided the lowest bids of $1,229,511 for Option X and $105,180 for Option Y. The report provides line item details for all bid amounts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 01/13/20

1 out of 30Source Selection Information - See FAR 2.101 & 3.104

Project No: SD FTNP BADL 10(9)

Project Name: Dillon Pass Embankment Repairs

Contractor Responsive?

Engineer's Estimate

American Civil Constructors

Morris, Inc.

Simon Contractors of SD, Inc.

Base Schedule A

$4,530,000.00

$6,309,560.00

$5,060,100.00

$6,528,087.50

Option: X

$1,080,000.00

$1,253,289.00

$1,090,312.50

$1,229,511.00

Option: Y

$100,000.00

$136,460.00

$135,225.00

$105,180.00

Contractor Responsive?

Engineer's Estimate

American Civil Constructors

Morris, Inc.

Simon Contractors of SD, Inc.

Total Base Schedule A and Option(s): X

$5,610,000.00

$7,562,849.00

$6,150,412.50

$7,757,598.50

Total Base Schedule A and Option(s): XY

$5,710,000.00

$7,699,309.00

$6,285,637.50

$7,862,778.50

Total Base Schedule A and Option(s): Y

$4,630,000.00

$6,446,020.00

$5,195,325.00

$6,633,267.50

R eport D ate: 01/13/20 2 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Solcitation N o: 6982A

F19B 000005

D ivision: C entral Federal Lands

State: SD C ounty: Jackson, Pennington

Federal Land: B adlands N ational Park O pened at: Lakew ood, C

O

O pened by: Josephine H elm s

D ate: 01/09/20

I certify that this B id Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

D ate:

C ontract A w arded to:

A w ard D ate:

C ontractor

C om m ent

B id A m ount

R esponsive

M orris, Inc.

$5,060,100.00 P.O

. B ox 1162

Pierre, SD 57501

A m erican C ivil C onstructors $6,309,560.00

4901 S. W inderm ere St.

Littleton, C

O 80120

Sim on C ontractors of SD , Inc.

$6,528,087.50

PO

B O

X

R apid C ity, SD 57702

Engineer's Estim ate

$4,530,000.00 eport D ate: 01/13/20 3 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

15101-0000 M

O B

ILIZA

TIO

N

M orris, Inc.

Lum p Sum

$635,000.00 A m erican C ivil C onstructors

Lum p Sum

$750,000.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $2,000,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $444,550.00

A

15206-0000

SLO

PE, R

EFER

EN

C

E, A N

D C

LEA

R

IN

G

A N

D G

R U

B B

IN

G

STA

K

E

M orris, Inc.

$9,000.00 $13,500.00

A m erican C ivil C onstructors $10,000.00

$15,000.00 Sim on C ontractors of SD

, Inc.

$8,250.00

$12,375.00 Engineer's Estim ate 1.500

M

ILE

$20,000.00 $30,000.00

A

15210-3000 C

EN

TER

LIN

E, V

ER

IFIC

A

TIO

N A

N D

STA

K

IN

G

M orris, Inc.

$13,500.00 $4,050.00

A m erican C ivil C onstructors $35,000.00

$10,500.00 Sim on C ontractors of SD

, Inc.

$29,000.00

$8,700.00 Engineer's Estim ate 0.300

M

ILE

$8,000.00 $2,400.00

A

15214-3000

SU

R V

EY

A

N D

STA

K

IN

G

, PA

R

K

IN

G A

R

EA

M orris, Inc.

Lum p Sum

$11,500.00 A m erican C ivil C onstructors

Lum p Sum

$3,000.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $2,500.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $4,000.00

A

15215-3000

SU

R V

EY

A

N D

STA

K

IN

G

, D R

A

IN

A G

E STR

U

C

TU

R E

M orris, Inc.

$4,000.00 $48,000.00

A m erican C ivil C onstructors $500.00

$6,000.00 Sim on C ontractors of SD

, Inc.

$355.00

$4,260.00 Engineer's Estim ate

EA

C

H $1,000.00

$12,000.00

A

15216-2000

SU

R V

EY

A

N D

STA

K

IN

G

, G R

A D

E FIN

ISH

IN

G

STA

K

ES

M orris, Inc.

$29,500.00 $2,950.00

A m erican C ivil C onstructors $175,000.00

$17,500.00 Sim on C ontractors of SD

, Inc.

$150,000.00

$15,000.00 Engineer's Estim ate 0.100

M

ILE

$10,000.00 $1,000.00 eport D ate: 01/13/20 4 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

15301-0000 C

O N

TR

A

C

TO

R Q

U A

LITY

C

O N

TR

O

L

M orris, Inc.

Lum p Sum

$155,000.00 A m erican C ivil C onstructors

Lum p Sum

$100,000.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $90,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $90,000.00

A

15401-0000 C

O N

TR

A

C

TO

R

TESTIN

G

M orris, Inc.

Lum p Sum

$206,500.00 A m erican C ivil C onstructors

Lum p Sum

$200,000.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $80,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $125,000.00

A

15501-0000 C

O N

STR

U

C

TIO

N

SC

H

ED

U

LE

M orris, Inc.

Lum p Sum

$10,000.00 A m erican C ivil C onstructors

Lum p Sum

$25,000.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $40,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $20,000.00

A

15703-1500

SO

IL ER

O

SIO

N

C O

N

TR

O

L, TEM

PO

R

A R

Y

SO

IL TA

C

K

IFIER

M orris, Inc.

$3,800.00 $34,200.00

A m erican C ivil C onstructors $3,000.00

$27,000.00 Sim on C ontractors of SD

, Inc.

$525.00

$4,725.00 Engineer's Estim ate 9.0

A C

R E

$3,500.00 $31,500.00

A

15705-1400

SO

IL ER

O

SIO

N

C O

N

TR

O

L, FIB

ER

R

O

LL

M orris, Inc.

$8.00 $88,000.00

A m erican C ivil C onstructors $4.00

$44,000.00 Sim on C ontractors of SD

, Inc.

$5.25

$57,750.00 Engineer's Estim ate 11,000

LN

FT

$4.00 $44,000.00

A

15706-1000

SO

IL ER

O

SIO

N

C O

N

TR

O

L, IN

LET PR

O

TEC

TIO

N

M orris, Inc.

$150.00 $4,050.00

A m erican C ivil C onstructors $180.00

$4,860.00 Sim on C ontractors of SD

, Inc.

$340.00

$9,180.00 Engineer's Estim ate

EA

C

H $170.00

$4,590.00 eport D ate: 01/13/20 5 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

15802-0000 W

A

TER

IN

G

FO

R

D U

ST C

O

N

TR

O L

M orris, Inc.

Lum p Sum

$26,500.00 A m erican C ivil C onstructors

Lum p Sum

$75,000.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $50,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $25,000.00

A

20101-0000 C

LEA

R

IN

G

A N

D G

R U

B B

IN

G

M orris, Inc.

$2,900.00 $46,400.00

A m erican C ivil C onstructors $3,000.00

$48,000.00 Sim on C ontractors of SD

, Inc.

$3,050.00

$48,800.00 Engineer's Estim ate 16.0

A C

R E

$2,500.00 $40,000.00

A

20301-0600 R

EM

O

V A

L O F C

A

TTLE G

U A

R D

(B

ISO

N G

A

TE)

M orris, Inc.

$1,000.00 $1,000.00

A m erican C ivil C onstructors $5,000.00

$5,000.00 Sim on C ontractors of SD

, Inc.

$862.00

$862.00 Engineer's Estim ate

EA

C

H $20,000.00

$20,000.00

A

20301-1400 R

EM

O

V A

L O

F IN

LET

M orris, Inc.

$1,000.00 $4,000.00

A m erican C ivil C onstructors $1,500.00

$6,000.00 Sim on C ontractors of SD

, Inc.

$1,030.00

$4,120.00 Engineer's Estim ate

EA

C

H $1,300.00

$5,200.00

A

20301-1900 R

EM

O

V A

L O

F PIPE C

U

LV

ER

T

M orris, Inc.

$1,000.00 $12,000.00

A m erican C ivil C onstructors $3,000.00

$36,000.00 Sim on C ontractors of SD

, Inc.

$1,876.00

$22,512.00 Engineer's Estim ate

EA

C

H $2,000.00

$24,000.00

A

20301-2800 R

EM

O

V A

L O

F STR

U C

TU

R

ES A

N

D O

B

STR

U C

TIO

N

S (SLU

R

R Y

FILL)

M orris, Inc.

$27,100.00 $27,100.00

A m erican C ivil C onstructors $150,000.00

$150,000.00 Sim on C ontractors of SD

, Inc.

$36,700.00

$36,700.00 Engineer's Estim ate

EA

C

H $60,000.00

$60,000.00 eport D ate: 01/13/20 6 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

20301-2800 R

EM

O

V A

L O

F STR

U C

TU

R

ES A

N

D O

B

STR

U C

TIO

N

S (G A

B

IO

N S)

M orris, Inc.

$6,500.00 $6,500.00

A m erican C ivil C onstructors $5,000.00

$5,000.00 Sim on C ontractors of SD

, Inc.

$1,282.00

$1,282.00 Engineer's Estim ate

EA

C

H $500.00

$500.00

A

20301-3400 R

EM

O

V A

L O F W

H

EELSTO

P

M orris, Inc.

$150.00 $1,500.00

A m erican C ivil C onstructors $110.00

$1,100.00 Sim on C ontractors of SD

, Inc.

$136.00

$1,360.00 Engineer's Estim ate

EA

C

H $40.00

$400.00

A

20302-0200 R

EM

O

V A

L O F C

U R

B

(TIM

B

ER

M orris, Inc.

$5.00 $2,625.00

A m erican C ivil C onstructors $8.00

$4,200.00 Sim on C ontractors of SD

, Inc.

$14.00

$7,350.00 Engineer's Estim ate

LN

FT

$4.00 $2,100.00

A

20302-0400 R

EM

O

V A

L O F C

U R

B , A

SPH

A

LT

M orris, Inc.

$6.50 $53,300.00

A m erican C ivil C onstructors $4.00

$32,800.00 Sim on C ontractors of SD

, Inc.

$6.25

$51,250.00 Engineer's Estim ate 8,200

LN

FT

$4.00 $32,800.00

A

20302-0500 R

EM

O

V A

L O F C

U R

B , C

O N

C R

ETE

M orris, Inc.

$10.00 $3,000.00

A m erican C ivil C onstructors $5.00

$1,500.00 Sim on C ontractors of SD

, Inc.

$22.50

$6,750.00 Engineer's Estim ate

LN

FT

$10.00 $3,000.00

A

20303-0000 R

EM

O

V A

L O

F STR

U C

TU

R

ES A

N

D O

B

STR

U C

TIO

N

S (R

IPR

A P)

M orris, Inc.

$20.00 $2,400.00

A m erican C ivil C onstructors $10.00

$1,200.00 Sim on C ontractors of SD

, Inc.

$71.00

$8,520.00 Engineer's Estim ate

SQ

Y

D $25.00

$3,000.00 eport D ate: 01/13/20 7 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

20303-1600 R

EM

O

V A

L O

F PA

V

EM

EN

T, A

SPH

A

LT

M orris, Inc.

$10.00 $7,000.00

A m erican C ivil C onstructors $10.00

$7,000.00 Sim on C ontractors of SD

, Inc.

$16.80

$11,760.00 Engineer's Estim ate

SQ

Y

D $12.00

$8,400.00

A

20303-3000 R

EM

O

V A

L O

F SID

EW

A

LK

, A

SPH

A

LT

M orris, Inc.

$10.00 $5,500.00

A m erican C ivil C onstructors $6.00

$3,300.00 Sim on C ontractors of SD

, Inc.

$13.15

$7,232.50 Engineer's Estim ate

SQ

Y

D $25.00

$13,750.00

A

20303-3200 R

EM

O

V A

L O

F SID

EW

A

LK

, C

O N

C R

ETE

M orris, Inc.

$20.00 $1,200.00

A m erican C ivil C onstructors $15.00

$900.00 Sim on C ontractors of SD

, Inc.

$18.50

$1,110.00 Engineer's Estim ate

SQ

Y

D $35.00

$2,100.00

A

20402-0000

SU

B

EX

C A

V A

TIO

N

M orris, Inc.

$55.00 $6,050.00

A m erican C ivil C onstructors $100.00

$11,000.00 Sim on C ontractors of SD

, Inc.

$123.00

$13,530.00 Engineer's Estim ate

C U

Y D

$40.00 $4,400.00

A

20420-0000

EM

B A

N K

M

EN

T C O

N

STR

U C

TIO

N

M orris, Inc.

$45.00 $373,500.00

A m erican C ivil C onstructors $70.00

$581,000.00 Sim on C ontractors of SD

, Inc.

$75.00

$622,500.00 Engineer's Estim ate 8,300

C U

Y D

$20.00 $166,000.00

A

20420-0000

EM

B A

N K

M

EN

T C O

N

STR

U C

TIO

N

(SH

A

LLO

W

R

EIN

FO

R

C

ED

SO

IL SLO

PE)

M orris, Inc.

$45.00 $270,000.00

A m erican C ivil C onstructors $100.00

$600,000.00 Sim on C ontractors of SD

, Inc.

$77.00

$462,000.00 Engineer's Estim ate 6,000

C U

Y D

$105.00 $630,000.00 eport D ate: 01/13/20 8 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

20420-0000

EM

B A

N K

M

EN

T C O

N

STR

U C

TIO

N

(R

EIN

FO

R

C

ED

SO

IL SLO

PE)

M orris, Inc.

$45.00 $171,000.00

A m erican C ivil C onstructors $110.00

$418,000.00 Sim on C ontractors of SD

, Inc.

$92.00

$349,600.00 Engineer's Estim ate 3,800

C U

Y D

$110.00 $418,000.00

A

20420-0000

EM

B A

N K

M

EN

T C O

N

STR

U C

TIO

N

(D

EEP PA

TC

H

M orris, Inc.

$45.00 $54,000.00

A m erican C ivil C onstructors $125.00

$150,000.00 Sim on C ontractors of SD

, Inc.

$86.00

$103,200.00 Engineer's Estim ate 1,200

C U

Y D

$110.00 $132,000.00

A

20425-1000 D

ITC

H

, EX

C

A V

A

TIO

N

M orris, Inc.

$30.00 $12,900.00

A m erican C ivil C onstructors $20.00

$8,600.00 Sim on C ontractors of SD

, Inc.

$24.00

$10,320.00 Engineer's Estim ate

LN

FT

$22.00 $9,460.00

A

21101-1000 R

O A

D W

A Y

O B

LITER

A

TIO

N

, M

ETH

O D

M orris, Inc.

$16.35 $42,510.00

A m erican C ivil C onstructors $15.00

$39,000.00 Sim on C ontractors of SD

, Inc.

$7.50

$19,500.00 Engineer's Estim ate 2,600

SQ

Y

D $8.00

$20,800.00

A

25101-2200

PLA

C

ED

R

IPR

A P, M

ETH

O

D B

, C

LA

SS 2

M orris, Inc.

$145.00 $31,900.00

A m erican C ivil C onstructors $200.00

$44,000.00 Sim on C ontractors of SD

, Inc.

$216.00

$47,520.00 Engineer's Estim ate

C U

Y D

$175.00 $38,500.00

A

25101-2400

PLA

C

ED

R

IPR

A P, M

ETH

O

D B

, C

LA

SS 4

M orris, Inc.

$145.00 $10,875.00

A m erican C ivil C onstructors $200.00

$15,000.00 Sim on C ontractors of SD

, Inc.

$230.00

$17,250.00 Engineer's Estim ate

C U

Y D

$200.00 $15,000.00 eport D ate: 01/13/20 9 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

30202-2000 R

O A

D W

A Y

A G

G R

EG

A

TE, M

ETH

O D

M orris, Inc.

$56.45 $73,385.00

A m erican C ivil C onstructors $50.00

$65,000.00 Sim on C ontractors of SD

, Inc.

$46.00

$59,800.00 Engineer's Estim ate 1,300

TO

N

$40.00 $52,000.00

A

40301-0100 A

SPH

A

LT C

O

N C

R

ETE PA

V

EM

EN

T, TY

PE 1

M orris, Inc.

$187.50 $693,750.00

A m erican C ivil C onstructors $200.00

$740,000.00 Sim on C ontractors of SD

, Inc.

$150.00

$555,000.00 Engineer's Estim ate 3,700

TO

N

$115.00 $425,500.00

A

40601-0000

FO

G

SEA

LM

orris, Inc.

$900.00 $18,000.00

A m erican C ivil C onstructors $1,700.00

$34,000.00 Sim on C ontractors of SD

, Inc.

$1,000.00

$20,000.00 Engineer's Estim ate

TO

N

$850.00 $17,000.00

A

41102-1000

PR

IM

E C

O A

T, M

ETH

O D

M orris, Inc.

$5.00 $5,500.00

A m erican C ivil C onstructors $9.00

$9,900.00 Sim on C ontractors of SD

, Inc.

$9.50

$10,450.00 Engineer's Estim ate 1,100

SQ

Y

D $2.50

$2,750.00

A

41201-0000

TA

C K

C O

A T

M orris, Inc.

$900.00 $18,000.00

A m erican C ivil C onstructors $1,700.00

$34,000.00 Sim on C ontractors of SD

, Inc.

$750.00

$15,000.00 Engineer's Estim ate

TO

N

$1,350.00 $27,000.00

A

41301-0200 A

SPH

A

LT PA

V

EM

EN

T M

ILLIN

G

, 1-IN

C H

D

EPTH

M orris, Inc.

$5.90 $194,700.00

A m erican C ivil C onstructors $5.00

$165,000.00 Sim on C ontractors of SD

, Inc.

$2.50

$82,500.00 Engineer's Estim ate 33,000

SQ

Y

D $2.50

$82,500.00 eport D ate: 01/13/20 10 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

60101-0000 C

O N

C R

ETE (H

D

PE TO

R

C P C

O N

N

EC

TIO

N

M orris, Inc.

$2,500.00 $5,000.00

A m erican C ivil C onstructors $1,500.00

$3,000.00 Sim on C ontractors of SD

, Inc.

$722.00

$1,444.00 Engineer's Estim ate

C U

Y D

$2,000.00 $4,000.00

A

60103-0140 C

O N

C R

ETE, H

EA

D W

A

LL FO

R

24-IN

C H

PIPE C

U

LV

ER

T

M orris, Inc.

$4,100.00 $8,200.00

A m erican C ivil C onstructors $5,700.00

$11,400.00 Sim on C ontractors of SD

, Inc.

$6,540.00

$13,080.00 Engineer's Estim ate

EA

C

H $5,000.00

$10,000.00

A

60103-0300 C

O N

C R

ETE, H

EA

D W

A

LL FO

R

72-IN

C H

PIPE C

U

LV

ER

T

M orris, Inc.

$22,500.00 $45,000.00

A m erican C ivil C onstructors $50,000.00

$100,000.00 Sim on C ontractors of SD

, Inc.

$21,300.00

$42,600.00 Engineer's Estim ate

EA

C

H $15,000.00

$30,000.00

A

60201-0600

18-IN

C H

PIPE C

U

LV

ER

T (C O

N C

R

ETE)

M orris, Inc.

$145.00 $18,850.00

A m erican C ivil C onstructors $120.00

$15,600.00 Sim on C ontractors of SD

, Inc.

$106.00

$13,780.00 Engineer's Estim ate

LN

FT

$120.00 $15,600.00

A

60201-0800

24-IN

C H

PIPE C

U

LV

ER

T (C O

N C

R

ETE)

M orris, Inc.

$195.00 $83,850.00

A m erican C ivil C onstructors $150.00

$64,500.00 Sim on C ontractors of SD

, Inc.

$110.00

$47,300.00 Engineer's Estim ate

LN

FT

$130.00 $55,900.00

A

60201-0800

24-IN

C H

PIPE C

U

LV

ER

T (H D

PE)

M orris, Inc.

$80.00 $30,400.00

A m erican C ivil C onstructors $205.00

$77,900.00 Sim on C ontractors of SD

, Inc.

$130.00

$49,400.00 Engineer's Estim ate

LN

FT

$100.00 $38,000.00 eport D ate: 01/13/20 11 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

60201-0900

30-IN

C H

PIPE C

U

LV

ER

T (C O

N C

R

ETE)

M orris, Inc.

$355.00 $28,400.00

A m erican C ivil C onstructors $200.00

$16,000.00 Sim on C ontractors of SD

, Inc.

$160.00

$12,800.00 Engineer's Estim ate

LN

FT

$120.00 $9,600.00

A

60201-1600

72-IN

C H

PIPE C

U

LV

ER

T (C O

N C

R

ETE)

M orris, Inc.

$485.00 $63,050.00

A m erican C ivil C onstructors $600.00

$78,000.00 Sim on C ontractors of SD

, Inc.

$550.00

$71,500.00 Engineer's Estim ate

LN

FT

$1,400.00 $182,000.00

A

60210-0600

EN

D

SEC

TIO

N

FO

R

18-IN

C

H

PIPE C

U

LV

ER

T (C

O N

C R

ETE)

M orris, Inc.

$2,500.00 $10,000.00

A m erican C ivil C onstructors $1,300.00

$5,200.00 Sim on C ontractors of SD

, Inc.

$1,550.00

$6,200.00 Engineer's Estim ate

EA

C

H $1,300.00

$5,200.00

A

60210-0800

EN

D

SEC

TIO

N

FO

R

24-IN

C

H

PIPE C

U

LV

ER

T (C

O N

C R

ETE)

M orris, Inc.

$3,000.00 $9,000.00

A m erican C ivil C onstructors $1,600.00

$4,800.00 Sim on C ontractors of SD

, Inc.

$1,605.00

$4,815.00 Engineer's Estim ate

EA

C

H $1,500.00

$4,500.00

A

60210-0800

EN

D

SEC

TIO

N

FO

R

24-IN

C

H

PIPE C

U

LV

ER

T (H

D

PE)

M orris, Inc.

$1,500.00 $4,500.00

A m erican C ivil C onstructors $1,500.00

$4,500.00 Sim on C ontractors of SD

, Inc.

$800.00

$2,400.00 Engineer's Estim ate

EA

C

H $550.00

$1,650.00

A

60210-0900

EN

D

SEC

TIO

N

FO

R

30-IN

C

H

PIPE C

U

LV

ER

T (C

O N

C R

ETE)

M orris, Inc.

$3,500.00 $3,500.00

A m erican C ivil C onstructors $2,100.00

$2,100.00 Sim on C ontractors of SD

, Inc.

$1,975.00

$1,975.00 Engineer's Estim ate

EA

C

H $1,600.00

$1,600.00 eport D ate: 01/13/20 12 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

60231-0000 D

ISSIPA

TO

R

, PIPE

M orris, Inc.

$3,000.00 $9,000.00

A m erican C ivil C onstructors $10,000.00

$30,000.00 Sim on C ontractors of SD

, Inc.

$6,410.00

$19,230.00 Engineer's Estim ate

EA

C

H $8,500.00

$25,500.00

A

60404-0000 C

A

TC

H B

A

SIN

M orris, Inc.

$6,500.00 $32,500.00

A m erican C ivil C onstructors $8,000.00

$40,000.00 Sim on C ontractors of SD

, Inc.

$3,450.00

$17,250.00 Engineer's Estim ate

EA

C

H $5,000.00

$25,000.00

A

60404-0000 C

A

TC

H B

A

SIN

(O V

ER

SIZED

M orris, Inc.

$8,500.00 $8,500.00

A m erican C ivil C onstructors $10,000.00

$10,000.00 Sim on C ontractors of SD

, Inc.

$3,900.00

$3,900.00 Engineer's Estim ate

EA

C

H $10,000.00

$10,000.00

A

60501-0000

STA

N D

A R

D U

N D

ER

D

R A

IN

SY

STEM

M orris, Inc.

$30.00 $6,000.00

A m erican C ivil C onstructors $110.00

$22,000.00 Sim on C ontractors of SD

, Inc.

$62.00

$12,400.00 Engineer's Estim ate

LN

FT

$55.00 $11,000.00

A

60707-0500

LIN

IN

G

24-IN

C

H

PIPE C

U

LV

ER

T

M orris, Inc.

$60.00 $12,000.00

A m erican C ivil C onstructors $340.00

$68,000.00 Sim on C ontractors of SD

, Inc.

$435.00

$87,000.00 Engineer's Estim ate

LN

FT

$350.00 $70,000.00

A

60901-1700 C

U R

B , C

O N

C R

ETE, 18-IN

C

H D

EPTH

M orris, Inc.

$45.60 $483,360.00

A m erican C ivil C onstructors $48.00

$508,800.00 Sim on C ontractors of SD

, Inc.

$52.50

$556,500.00 Engineer's Estim ate 10,600

LN

FT

$30.00 $318,000.00 eport D ate: 01/13/20 13 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

60915-1000 W

H

EELSTO

P, C O

N C

R

ETE

M orris, Inc.

$350.00 $2,800.00

A m erican C ivil C onstructors $300.00

$2,400.00 Sim on C ontractors of SD

, Inc.

$350.00

$2,800.00 Engineer's Estim ate

EA

C

H $200.00

$1,600.00

A

61501-0100

SID

EW

A

LK

, C

O N

C R

ETE

M orris, Inc.

$160.00 $96,000.00

A m erican C ivil C onstructors $130.00

$78,000.00 Sim on C ontractors of SD

, Inc.

$140.00

$84,000.00 Engineer's Estim ate

SQ

Y

D $80.00

$48,000.00

A

61502-1000 D

R

IV

E PA

D

, C O

N C

R

ETE

M orris, Inc.

$240.00 $33,120.00

A m erican C ivil C onstructors $140.00

$19,320.00 Sim on C ontractors of SD

, Inc.

$210.00

$28,980.00 Engineer's Estim ate

SQ

Y

D $220.00

$30,360.00

A

61504-1000 A

C C

ESSIB

ILITY

R A

M P, C

O N

C R

ETE

M orris, Inc.

$925.00 $2,775.00

A m erican C ivil C onstructors $700.00

$2,100.00 Sim on C ontractors of SD

, Inc.

$810.00

$2,430.00 Engineer's Estim ate

SQ

Y

D $500.00

$1,500.00

A

62201-0250 D

U M

P TR

U

C K

, 10 C U

B

IC

Y A

R D

M

IN

IM

U

M C

A

PA

C

ITY

M orris, Inc.

$165.00 $3,300.00

A m erican C ivil C onstructors $100.00

$2,000.00 Sim on C ontractors of SD

, Inc.

$150.00

$3,000.00 Engineer's Estim ate

H O

U R

$135.00 $2,700.00

A

62201-0950 W

H

EEL LO

A D

ER

, 3 C

U B

IC

Y

A R

D M

IN

IM

U M

R A

TED

C

A

PA

C

ITY

M orris, Inc.

$195.00 $3,900.00

A m erican C ivil C onstructors $120.00

$2,400.00 Sim on C ontractors of SD

, Inc.

$165.00

$3,300.00 Engineer's Estim ate

H O

U R

$160.00 $3,200.00 eport D ate: 01/13/20 14 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

62201-2850 M

O

TO

R G

R A

D

ER

, 12 FO

O

T M

IN

IM

U

M B

LA

D

E

M orris, Inc.

$215.00 $4,300.00

A m erican C ivil C onstructors $140.00

$2,800.00 Sim on C ontractors of SD

, Inc.

$170.00

$3,400.00 Engineer's Estim ate

H O

U R

$175.00 $3,500.00

A

62201-3300 H

Y D

R A

U

LIC

EX

C

A V

A

TO

R , 3/4 C

U B

IC

Y

A R

D M

IN

IM

U M

C A

PA

C

ITY

M orris, Inc.

$195.00 $3,900.00

A m erican C ivil C onstructors $190.00

$3,800.00 Sim on C ontractors of SD

, Inc.

$225.00

$4,500.00 Engineer's Estim ate

H O

U R

$155.00 $3,100.00

A

62301-0000 G

EN

ER

A

L LA

B O

R

M orris, Inc.

$75.00 $1,500.00

A m erican C ivil C onstructors $30.00

$600.00 Sim on C ontractors of SD

, Inc.

$50.00

$1,000.00 Engineer's Estim ate

H O

U R

$50.00 $1,000.00

A

62302-1000

SPEC

IA

L LA

B O

R , H

IR

ED

TEC

H

N

IC

A

L SER

V

IC

ES

M orris, Inc.

$180.00 $3,600.00

A m erican C ivil C onstructors $140.00

$2,800.00 Sim on C ontractors of SD

, Inc.

$150.00

$3,000.00 Engineer's Estim ate

H O

U R

$110.00 $2,200.00

A

62302-1100

SPEC

IA

L LA

B O

R , H

IR

ED

SU

R

V

EY

SER

V

IC

ES

M orris, Inc.

$210.00 $4,200.00

A m erican C ivil C onstructors $180.00

$3,600.00 Sim on C ontractors of SD

, Inc.

$165.00

$3,300.00 Engineer's Estim ate

H O

U R

$160.00 $3,200.00

A

62406-0300

PLA

C

IN

G C

O N

SER

V

ED

TO

PSO

IL, 4-IN

C H

D

EPTH

M orris, Inc.

$5,500.00 $49,500.00

A m erican C ivil C onstructors $13,000.00

$117,000.00 Sim on C ontractors of SD

, Inc.

$5,250.00

$47,250.00 Engineer's Estim ate 9.0

A C

R E

$3,500.00 $31,500.00 eport D ate: 01/13/20 15 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

62501-0000

TU

R

F ESTA

B

LISH

M

EN

T (B

IO

TIC

SO

IL A

M

EN

D

M

EN

T)

M orris, Inc.

$7,500.00 $67,500.00

A m erican C ivil C onstructors $2,100.00

$18,900.00 Sim on C ontractors of SD

, Inc.

$3,900.00

$35,100.00 Engineer's Estim ate 9.0

A C

R E

$5,000.00 $45,000.00

A

62510-1000

SEED

IN

G

, D R

Y M

ETH

O

D

M orris, Inc.

$4,000.00 $36,000.00

A m erican C ivil C onstructors $3,600.00

$32,400.00 Sim on C ontractors of SD

, Inc.

$400.00

$3,600.00 Engineer's Estim ate 9.0

A C

R E

$2,000.00 $18,000.00

A

62515-2000 M

U

LC

H

IN

G , H

Y D

R A

U

LIC

M

ETH

O D

M orris, Inc.

$6,000.00 $27,000.00

A m erican C ivil C onstructors $5,200.00

$23,400.00 Sim on C ontractors of SD

, Inc.

$2,400.00

$10,800.00 Engineer's Estim ate 4.5

A C

R E

$4,000.00 $18,000.00

A

62901-1100 R

O

LLED

ER

O

SIO

N

C O

N

TR

O

L PR

O D

U C

T, TY

PE 4

M orris, Inc.

$3.30 $79,200.00

A m erican C ivil C onstructors $3.00

$72,000.00 Sim on C ontractors of SD

, Inc.

$3.00

$72,000.00 Engineer's Estim ate 24,000

SQ

Y

D $4.50

$108,000.00

A

63301-0000

SIG

N

SY

STEM

M orris, Inc.

$1,000.00 $3,000.00

A m erican C ivil C onstructors $1,000.00

$3,000.00 Sim on C ontractors of SD

, Inc.

$525.00

$1,575.00 Engineer's Estim ate

EA

C

H $500.00

$1,500.00

A

63401-0300

PA

V

EM

EN

T M

A R

K

IN

G

S, TY

PE B

, SO

LID

M orris, Inc.

$0.35 $24,500.00

A m erican C ivil C onstructors $0.30

$21,000.00 Sim on C ontractors of SD

, Inc.

$0.20

$14,000.00 Engineer's Estim ate 70,000

LN

FT

$0.35 $24,500.00 eport D ate: 01/13/20 16 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

63405-0850

PA

V

EM

EN

T M

A R

K

IN

G

S, TY

PE B

, A

C C

ESSIB

ILITY

SY

M

B O

L

M orris, Inc.

$500.00 $1,500.00

A m erican C ivil C onstructors $200.00

$600.00 Sim on C ontractors of SD

, Inc.

$160.00

$480.00 Engineer's Estim ate

EA

C

H $500.00

$1,500.00

A

63501-2000

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, TR

A

FFIC

SIG

N

A

L SY

STEM

M orris, Inc.

Lum p Sum

$35,000.00 A m erican C ivil C onstructors

Lum p Sum

$50,000.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $15,750.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $10,000.00

A

63502-0700

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, C

O N

E

M orris, Inc.

$50.00 $12,500.00

A m erican C ivil C onstructors $30.00

$7,500.00 Sim on C ontractors of SD

, Inc.

$30.00

$7,500.00 Engineer's Estim ate

EA

C

H $25.00

$6,250.00

A

63502-1300

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, D

R U

M

M orris, Inc.

$50.00 $12,500.00

A m erican C ivil C onstructors $30.00

$7,500.00 Sim on C ontractors of SD

, Inc.

$30.00

$7,500.00 Engineer's Estim ate

EA

C

H $30.00

$7,500.00

A

63502-1500

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, W

A R

N

IN

G

LIG

H

T TY

PE A

M orris, Inc.

$150.00 $1,200.00

A m erican C ivil C onstructors $90.00

$720.00 Sim on C ontractors of SD

, Inc.

$80.00

$640.00 Engineer's Estim ate

EA

C

H $80.00

$640.00

A

63502-1600

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, W

A R

N

IN

G

LIG

H

T TY

PE B

M orris, Inc.

$150.00 $600.00

A m erican C ivil C onstructors $90.00

$360.00 Sim on C ontractors of SD

, Inc.

$80.00

$320.00 Engineer's Estim ate

EA

C

H $100.00

$400.00 eport D ate: 01/13/20 17 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

A

63502-1700

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, W

A R

N

IN

G

LIG

H

T TY

PE C

M orris, Inc.

$150.00 $3,000.00

A m erican C ivil C onstructors $90.00

$1,800.00 Sim on C ontractors of SD

, Inc.

$80.00

$1,600.00 Engineer's Estim ate

EA

C

H $80.00

$1,600.00

A

63503-0700

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, PA

V

EM

EN

T M

A R

K

IN

G S

M orris, Inc.

$0.50 $8,500.00

A m erican C ivil C onstructors $0.30

$5,100.00 Sim on C ontractors of SD

, Inc.

$0.26

$4,420.00 Engineer's Estim ate 17,000

LN

FT

$1.00 $17,000.00

A

63504-1000

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, C

O N

STR

U

C

TIO

N

SIG

N

M orris, Inc.

$20.00 $8,000.00

A m erican C ivil C onstructors $12.00

$4,800.00 Sim on C ontractors of SD

, Inc.

$11.00

$4,400.00 Engineer's Estim ate

SQ

FT

$20.00 $8,000.00

A

63506-0500

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, FLA

G G

ER

M orris, Inc.

$50.00 $125,000.00

A m erican C ivil C onstructors $32.00

$80,000.00 Sim on C ontractors of SD

, Inc.

$50.00

$125,000.00 Engineer's Estim ate 2,500

H O

U R

$40.00 $100,000.00

A

63506-0600

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, PILO

T C A

R

M orris, Inc.

$65.00 $81,250.00

A m erican C ivil C onstructors $70.00

$87,500.00 Sim on C ontractors of SD

, Inc.

$56.00

$70,000.00 Engineer's Estim ate 1,250

H O

U R

$70.00 $87,500.00

A

65001-1000 C

O N

STR

U

C T A

N D

M A

IN

TA

IN

D

IV

ER

SIO

N

M orris, Inc.

Lum p Sum

$75,000.00 A m erican C ivil C onstructors

Lum p Sum

$100,000.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $30,600.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $35,000.00 eport D ate: 01/13/20 18 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: A

Schedule Type: B ase

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Total Schedule - A ll Item s

M orris, Inc.

$5,060,100.00 A m erican C ivil C onstructors

$6,309,560.00 Sim on C ontractors of SD

, Inc.

$6,528,087.50

Engineer's Estim

$4,530,000.00 eport D ate: 01/13/20 19 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: X

Schedule Type: O ptions

Solcitation N o: 6982A

F19B 000005

D ivision: C entral Federal Lands

State: SD C ounty: Jackson, Pennington

Federal Land: B adlands N ational Park O pened at: Lakew ood, C

O

O pened by: Josephine H elm s

D ate: 01/09/20

I certify that this B id Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

D ate:

C ontract A w arded to:

A w ard D ate:

C ontractor

C om m ent

B id A m ount

R esponsive

M orris, Inc.

$1,090,312.50 P.O

. B ox 1162

Pierre, SD 57501

Sim on C ontractors of SD , Inc.

$1,229,511.00

PO

B O

X

R apid C ity, SD 57702

A m erican C ivil C onstructors $1,253,289.00

4901 S. W inderm ere St.

Littleton, C

O 80120

Engineer's Estim

$1,080,000.00 eport D ate: 01/13/20 20 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: X

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

X

15101-0000 M

O B

ILIZA

TIO

N

M orris, Inc.

Lum p Sum

$210,500.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $100,000.00

A m erican C ivil C onstructors Lum p Sum $50,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $77,960.00

X

15206-0000

SLO

PE, R

EFER

EN

C

E, A N

D C

LEA

R

IN

G

A N

D G

R U

B B

IN

G

STA

K

E

M orris, Inc.

$25,000.00 $3,425.00

Sim on C ontractors of SD , Inc.

$14,500.00 $1,986.50

A m erican C ivil C onstructors $17,000.00

$2,329.00 Engineer's Estim ate 0.137

M

ILE

$20,000.00 $2,740.00

X

15215-3000

SU

R V

EY

A

N D

STA

K

IN

G

, D R

A

IN

A G

E STR

U

C

TU

R E

M orris, Inc.

$4,000.00 $8,000.00

Sim on C ontractors of SD , Inc.

$275.00 $550.00

A m erican C ivil C onstructors $300.00

$600.00 Engineer's Estim ate

EA

C

H $1,000.00

$2,000.00

X

15301-0000 C

O N

TR

A

C

TO

R Q

U A

LITY

C

O N

TR

O

L

M orris, Inc.

Lum p Sum

$38,500.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $30,000.00

A m erican C ivil C onstructors Lum p Sum $11,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $20,000.00

X

15401-0000 C

O N

TR

A

C

TO

R

TESTIN

G

M orris, Inc.

Lum p Sum

$30,500.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $7,500.00

A m erican C ivil C onstructors Lum p Sum $20,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $25,000.00

X

15501-0000 C

O N

STR

U

C

TIO

N

SC

H

ED

U

LE

M orris, Inc.

Lum p Sum

$5,000.00 Sim on C ontractors of SD

, Inc.

Lum p Sum $5,000.00

A m erican C ivil C onstructors Lum p Sum $5,000.00

Engineer's Estim ate

A

LL

LPSM

Lum

$3,000.00 eport D ate: 01/13/20 21 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: X

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

X

15703-1500

SO

IL ER

O

SIO

N

C O

N

TR

O

L, TEM

PO

R

A R

Y

SO

IL TA

C

K

IFIER

M orris, Inc.

$3,800.00 $5,700.00

Sim on C ontractors of SD , Inc.

$525.00 $787.50

A m erican C ivil C onstructors $3,000.00

$4,500.00 Engineer's Estim ate 1.5

A C

R E

$3,500.00 $5,250.00

X

15705-1400

SO

IL ER

O

SIO

N

C O

N

TR

O

L, FIB

ER

R

O

LL

M orris, Inc.

$8.00 $36,000.00

Sim on C ontractors of SD , Inc.

$5.25 $23,625.00

A m erican C ivil C onstructors $4.00

$18,000.00 Engineer's Estim ate 4,500

LN

FT

$4.00 $18,000.00

X

20101-0000 C

LEA

R

IN

G

A N

D G

R U

B B

IN

G

M orris, Inc.

$2,900.00 $7,250.00

Sim on C ontractors of SD , Inc.

$3,130.00 $7,825.00

A m erican C ivil C onstructors $2,800.00

$7,000.00 Engineer's Estim ate 2.5

A C

R E

$2,000.00 $5,000.00

X

20301-1900 R

EM

O

V A

L O

F PIPE C

U

LV

ER

T

M orris, Inc.

$1,000.00 $2,000.00

Sim on C ontractors of SD , Inc.

$1,875.00 $3,750.00

A m erican C ivil C onstructors $2,300.00

$4,600.00 Engineer's Estim ate

EA

C

H $2,000.00

$4,000.00

X

20302-0500 R

EM

O

V A

L O F C

U R

B , C

O N

C R

ETE

M orris, Inc.

$10.00 $3,300.00

Sim on C ontractors of SD , Inc.

$17.20 $5,676.00

A m erican C ivil C onstructors $7.00

$2,310.00 Engineer's Estim ate

LN

FT

$10.00 $3,300.00

X

20420-0000

EM

B A

N K

M

EN

T C O

N

STR

U C

TIO

N

M orris, Inc.

$45.00 $148,500.00

Sim on C ontractors of SD , Inc.

$75.00 $247,500.00

A m erican C ivil C onstructors $60.00

$198,000.00 Engineer's Estim ate 3,300

C U

Y D

$40.00 $132,000.00 eport D ate: 01/13/20 22 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: X

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

X

20420-0000

EM

B A

N K

M

EN

T C O

N

STR

U C

TIO

N

(SH

A

LLO

W

R

EIN

FO

R

C

ED

SO

IL SLO

PE)

M orris, Inc.

$45.00 $315,000.00

Sim on C ontractors of SD , Inc.

$82.00 $574,000.00

A m erican C ivil C onstructors $90.00

$630,000.00 Engineer's Estim ate 7,000

C U

Y D

$80.00 $560,000.00

X

25101-2200

PLA

C

ED

R

IPR

A P, M

ETH

O

D B

, C

LA

SS 2

M orris, Inc.

$145.00 $2,900.00

Sim on C ontractors of SD , Inc.

$200.00 $4,000.00

A m erican C ivil C onstructors $180.00

$3,600.00 Engineer's Estim ate

C U

Y D

$175.00 $3,500.00

X

30202-2000 R

O A

D W

A Y

A G

G R

EG

A

TE, M

ETH

O D

M orris, Inc.

$56.45 $2,822.50

Sim on C ontractors of SD , Inc.

$56.00 $2,800.00

A m erican C ivil C onstructors $50.00

$2,500.00 Engineer's Estim ate

TO

N

$40.00 $2,000.00

X

40301-0100 A

SPH

A

LT C

O

N C

R

ETE PA

V

EM

EN

T, TY

PE 1

M orris, Inc.

$187.50 $61,875.00

Sim on C ontractors of SD , Inc.

$150.00 $49,500.00

A m erican C ivil C onstructors $220.00

$72,600.00 Engineer's Estim ate

TO

N

$115.00 $37,950.00

X

40601-0000

FO

G

SEA

LM

orris, Inc.

$900.00 $1,800.00

Sim on C ontractors of SD , Inc.

$1,000.00 $2,000.00

A m erican C ivil C onstructors $2,000.00

$4,000.00 Engineer's Estim ate

TO

N

$900.00 $1,800.00

X

41201-0000

TA

C K

C O

A T

M orris, Inc.

$900.00 $1,800.00

Sim on C ontractors of SD , Inc.

$750.00 $1,500.00

A m erican C ivil C onstructors $2,000.00

$4,000.00 Engineer's Estim ate

TO

N

$1,350.00 $2,700.00 eport D ate: 01/13/20 23 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: X

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

X

41301-0200 A

SPH

A

LT PA

V

EM

EN

T M

ILLIN

G

, 1-IN

C H

D

EPTH

M orris, Inc.

$5.90 $17,700.00

Sim on C ontractors of SD , Inc.

$2.50 $7,500.00

A m erican C ivil C onstructors $5.00

$15,000.00 Engineer's Estim ate 3,000

SQ

Y

D $2.50

$7,500.00

X

60101-0000 C

O N

C R

ETE (H

D

PE TO

R

C P C

O N

N

EC

TIO

N

M orris, Inc.

$2,500.00 $2,500.00

Sim on C ontractors of SD , Inc.

$506.00 $506.00

A m erican C ivil C onstructors $2,000.00

$2,000.00 Engineer's Estim ate 1.0

C U

Y D

$3,000.00 $3,000.00

X

60201-0800

24-IN

C H

PIPE C

U

LV

ER

T (C O

N C

R

ETE)

M orris, Inc.

$195.00 $17,550.00

Sim on C ontractors of SD , Inc.

$93.00 $8,370.00

A m erican C ivil C onstructors $150.00

$13,500.00 Engineer's Estim ate

LN

FT

$130.00 $11,700.00

X

60201-0800

24-IN

C H

PIPE C

U

LV

ER

T (H D

PE)

M orris, Inc.

$80.00 $22,400.00

Sim on C ontractors of SD , Inc.

$91.00 $25,480.00

A m erican C ivil C onstructors $180.00

$50,400.00 Engineer's Estim ate

LN

FT

$100.00 $28,000.00

X

60210-0800

EN

D

SEC

TIO

N

FO

R

24-IN

C

H

PIPE C

U

LV

ER

T (C

O N

C R

ETE)

M orris, Inc.

$3,000.00 $3,000.00

Sim on C ontractors of SD , Inc.

$1,200.00 $1,200.00

A m erican C ivil C onstructors $1,500.00

$1,500.00 Engineer's Estim ate

EA

C

H $1,500.00

$1,500.00

X

60210-0800

EN

D

SEC

TIO

N

FO

R

24-IN

C

H

PIPE C

U

LV

ER

T (H

D

PE)

M orris, Inc.

$1,500.00 $1,500.00

Sim on C ontractors of SD , Inc.

$800.00 $800.00

A m erican C ivil C onstructors $1,000.00

$1,000.00 Engineer's Estim ate

EA

C

H $550.00

$550.00 eport D ate: 01/13/20 24 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: X

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

X

60231-0000 D

ISSIPA

TO

R

, PIPE

M orris, Inc.

$3,000.00 $3,000.00

Sim on C ontractors of SD , Inc.

$6,400.00 $6,400.00

A m erican C ivil C onstructors $8,600.00

$8,600.00 Engineer's Estim ate

EA

C

H $8,500.00

$8,500.00

X

60901-1700 C

U R

B , C

O N

C R

ETE, 18-IN

C

H D

EPTH

M orris, Inc.

$45.60 $18,240.00

Sim on C ontractors of SD , Inc.

$55.00 $22,000.00

A m erican C ivil C onstructors $56.00

$22,400.00 Engineer's Estim ate

LN

FT

$30.00 $12,000.00

X

62201-0250 D

U M

P TR

U

C K

, 10 C U

B

IC

Y A

R D

M

IN

IM

U

M C

A

PA

C

ITY

M orris, Inc.

$165.00 $3,300.00

Sim on C ontractors of SD , Inc.

$105.00 $2,100.00

A m erican C ivil C onstructors $90.00

$1,800.00 Engineer's Estim ate

H O

U R

$135.00 $2,700.00

X

62201-0950 W

H

EEL LO

A D

ER

, 3 C

U B

IC

Y

A R

D M

IN

IM

U M

R A

TED

C

A

PA

C

ITY

M orris, Inc.

$195.00 $3,900.00

Sim on C ontractors of SD , Inc.

$114.00 $2,280.00

A m erican C ivil C onstructors $120.00

$2,400.00 Engineer's Estim ate

H O

U R

$160.00 $3,200.00

X

62201-3300 H

Y D

R A

U

LIC

EX

C

A V

A

TO

R , 3/4 C

U B

IC

Y

A R

D M

IN

IM

U M

C A

PA

C

ITY

M orris, Inc.

$195.00 $3,900.00

Sim on C ontractors of SD , Inc.

$145.00 $2,900.00

A m erican C ivil C onstructors $190.00

$3,800.00 Engineer's Estim ate

H O

U R

$155.00 $3,100.00

X

62301-0000 G

EN

ER

A

L LA

B O

R

M orris, Inc.

$75.00 $1,500.00

Sim on C ontractors of SD , Inc.

$50.00 $1,000.00

A m erican C ivil C onstructors $25.00

$500.00 Engineer's Estim ate

H O

U R

$50.00 eport D ate: 01/13/20 25 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: X

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

X

62406-0300

PLA

C

IN

G C

O N

SER

V

ED

TO

PSO

IL, 4-IN

C H

D

EPTH

M orris, Inc.

$8,500.00 $12,750.00

Sim on C ontractors of SD , Inc.

$6,550.00 $9,825.00

A m erican C ivil C onstructors $12,000.00

$18,000.00 Engineer's Estim ate 1.5

A C

R E

$3,500.00 $5,250.00

X

62501-0000

TU

R

F ESTA

B

LISH

M

EN

T (B

IO

TIC

SO

IL A

M

EN

D

M

EN

T)

M orris, Inc.

$9,500.00 $14,250.00

Sim on C ontractors of SD , Inc.

$3,900.00 $5,850.00

A m erican C ivil C onstructors $4,500.00

$6,750.00 Engineer's Estim ate 1.5

A C

R E

$5,000.00 $7,500.00

X

62510-1000

SEED

IN

G

, D R

Y M

ETH

O

D

M orris, Inc.

$5,000.00 $7,500.00

Sim on C ontractors of SD , Inc.

$400.00 $600.00

A m erican C ivil C onstructors $3,800.00

$5,700.00 Engineer's Estim ate 1.5

A C

R E

$2,000.00 $3,000.00

X

62901-1100 R

O

LLED

ER

O

SIO

N

C O

N

TR

O

L PR

O D

U C

T, TY

PE 4

M orris, Inc.

$3.30 $23,100.00

Sim on C ontractors of SD , Inc.

$3.00 $21,000.00

A m erican C ivil C onstructors $3.00

$21,000.00 Engineer's Estim ate 7,000

SQ

Y

D $4.50

$31,500.00

X

63401-0300

PA

V

EM

EN

T M

A R

K

IN

G

S, TY

PE B

, SO

LID

M orris, Inc.

$0.35 $2,100.00

Sim on C ontractors of SD , Inc.

$0.20 $1,200.00

A m erican C ivil C onstructors $0.30

$1,800.00 Engineer's Estim ate 6,000

LN

FT

$0.35 $2,100.00

X

63502-0700

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, C

O N

E

M orris, Inc.

$50.00 $2,000.00

Sim on C ontractors of SD , Inc.

$30.00 $1,200.00

A m erican C ivil C onstructors $30.00

$1,200.00 Engineer's Estim ate

EA

C

H $25.00 eport D ate: 01/13/20 26 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: X

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

X

63502-1300

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, D

R U

M

M orris, Inc.

$50.00 $2,000.00

Sim on C ontractors of SD , Inc.

$30.00 $1,200.00

A m erican C ivil C onstructors $30.00

$1,200.00 Engineer's Estim ate

EA

C

H $30.00

$1,200.00

X

63504-1000

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L, C

O N

STR

U

C

TIO

N

SIG

N

M orris, Inc.

$20.00 $2,000.00

Sim on C ontractors of SD , Inc.

$11.00 $1,100.00

A m erican C ivil C onstructors $12.00

$1,200.00 Engineer's Estim ate

SQ

FT

$20.00 $2,000.00

X

63506-0500

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, FLA

G G

ER

M orris, Inc.

$50.00 $25,000.00

Sim on C ontractors of SD , Inc.

$50.00 $25,000.00

A m erican C ivil C onstructors $32.00

$16,000.00 Engineer's Estim ate

H O

U R

$40.00 $20,000.00

X

63506-0600

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O

L, PILO

T C A

R

M orris, Inc.

$65.00 $16,250.00

Sim on C ontractors of SD , Inc.

$56.00 $14,000.00

A m erican C ivil C onstructors $70.00

$17,500.00 Engineer's Estim ate

H O

U R

$70.00 $17,500.00

Total Schedule - A ll Item s

M orris, Inc.

$1,090,312.50 Sim on C ontractors of SD

, Inc.

$1,229,511.00

A m erican C ivil C onstructors $1,253,289.00

Engineer's Estim

$1,080,000.00 eport D ate: 01/13/20 27 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: Y

Schedule Type: O ptions

Solcitation N o: 6982A

F19B 000005

D ivision: C entral Federal Lands

State: SD C ounty: Jackson, Pennington

Federal Land: B adlands N ational Park O pened at: Lakew ood, C

O

O pened by: Josephine H elm s

D ate: 01/09/20

I certify that this B id Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

D ate:

C ontract A w arded to:

A w ard D ate:

C ontractor

C om m ent

B id A m ount

R esponsive

Sim on C ontractors of SD , Inc.

$105,180.00

PO

B O

X

R apid C ity, SD 57702

M orris, Inc.

$135,225.00 P.O

. B ox 1162

Pierre, SD 57501

A m erican C ivil C onstructors $136,460.00

4901 S. W inderm ere St.

Littleton, C

O 80120

Engineer's Estim

$100,000.00 eport D ate: 01/13/20 28 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: Y

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Y

15101-0000 M

O B

ILIZA

TIO

N

Sim on C ontractors of SD , Inc.

Lum p Sum

$31,500.00 M orris, Inc.

Lum p Sum $25,000.00

A m erican C ivil C onstructors Lum p Sum $12,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $25,750.00

Y

15301-0000 C

O N

TR

A

C

TO

R Q

U A

LITY

C

O N

TR

O

L

Sim on C ontractors of SD , Inc.

Lum p Sum

$1,000.00 M orris, Inc.

Lum p Sum $10,500.00

A m erican C ivil C onstructors Lum p Sum $5,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $3,500.00

Y

15401-0000 C

O N

TR

A

C

TO

R

TESTIN

G

Sim on C ontractors of SD , Inc.

Lum p Sum

$1,000.00 M orris, Inc.

Lum p Sum $5,000.00

A m erican C ivil C onstructors Lum p Sum $2,000.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $3,500.00

Y

15501-0000 C

O N

STR

U

C

TIO

N

SC

H

ED

U

LE

Sim on C ontractors of SD , Inc.

Lum p Sum

$1,000.00 M orris, Inc.

Lum p Sum $1,500.00

A m erican C ivil C onstructors Lum p Sum $500.00

Engineer's Estim ate

A

LL

LPSM

Lum p Sum $1,000.00

Y

20301-3400 R

EM

O

V A

L O F W

H

EELSTO

P

Sim on C ontractors of SD , Inc.

$50.00 $2,750.00

M orris, Inc.

$5.00 $275.00

A m erican C ivil C onstructors $20.00

$1,100.00 Engineer's Estim ate

EA

C

H $50.00

$2,750.00

Y

40901-1000 M

IC

R

O

SU

R

FA

C

IN

G

, TY

PE 1

Sim on C ontractors of SD , Inc.

$7.25 $47,125.00

M orris, Inc.

$8.30 $53,950.00

A m erican C ivil C onstructors $15.00

$97,500.00 Engineer's Estim ate 6,500

SQ

Y

D $5.00

$32,500.00 eport D ate: 01/13/20 29 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: Y

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Y

41401-2000 C

R A

C K

S, C

LEA

N

IN

G A

N D

SEA

LIN

G

Sim on C ontractors of SD , Inc.

$4.50 $4,500.00

M orris, Inc.

$15.00 $15,000.00

A m erican C ivil C onstructors $5.00

$5,000.00 Engineer's Estim ate 1,000

LN

FT

$5.00 $5,000.00

Y

60920-0000 R

ESET W

H

EELSTO

P

Sim on C ontractors of SD , Inc.

$125.00 $6,875.00

M orris, Inc.

$100.00 $5,500.00

A m erican C ivil C onstructors $50.00

$2,750.00 Engineer's Estim ate

EA

C

H $100.00

$5,500.00

Y

62301-0000 G

EN

ER

A

L LA

B O

R

Sim on C ontractors of SD , Inc.

$50.00 $1,000.00

M orris, Inc.

$75.00 $1,500.00

A m erican C ivil C onstructors $30.00

$600.00 Engineer's Estim ate

H O

U R

$50.00 $1,000.00

Y

63401-0300

PA

V

EM

EN

T M

A R

K

IN

G

S, TY

PE B

, SO

LID

Sim on C ontractors of SD , Inc.

$0.80 $4,800.00

M orris, Inc.

$1.25 $7,500.00

A m erican C ivil C onstructors $1.00

$6,000.00 Engineer's Estim ate 6,000

LN

FT

$0.50 $3,000.00

Y

63405-0850

PA

V

EM

EN

T M

A R

K

IN

G

S, TY

PE B

, A

C C

ESSIB

ILITY

SY

M

B O

L

Sim on C ontractors of SD , Inc.

$160.00 $480.00

M orris, Inc.

$500.00 $1,500.00

A m erican C ivil C onstructors $170.00

$510.00 Engineer's Estim ate

EA

C

H $500.00

$1,500.00

Y

63501-0000

TEM

PO

R

A R

Y

TR

A

FFIC

C O

N

TR

O L

Sim on C ontractors of SD , Inc.

Lum p Sum

$3,150.00 M orris, Inc.

Lum p Sum $8,000.00

A m erican C ivil C onstructors Lum p Sum $3,500.00

Engineer's Estim ate

A

LL

LPSM

Lum

$15,000.00 eport D ate: 01/13/20 30 out of 30

Source Selection Inform ation - See FA

R

2.101 &

3.104

Project N o: SD

FTN

P B

A D

L 10(9)

Project N am e: D illon Pass Em bankm ent R epairs

Schedule: Y

Schedule Type: O ptions

Line Item

Pay Item N o.

D escription Q uantity U nit U nit Price A m ount

N um ber

Total Schedule - A ll Item s

Sim on C ontractors of SD , Inc.

$105,180.00 M orris, Inc.

$135,225.00

A m erican C ivil C onstructors $136,460.00

Engineer's Estim

$100,000.00

File details come from the government source that posted it. Updated .