Schriever Air Force Base Single Award Task Order IDIQ Contract
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- FA255021R0019
- Agency
- Air Force Space Command Air Force, Department of Defense
- Responses due
- Set-aside
- HUBZone
Opportunity facts
- NAICS code
- 236210 Industrial Building Construction
- Place of performance
- Colorado Springs, Colorado 80912, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
This is DRAFT Request for Proposal for the Schriever AFB SATOC. This is neither a formal Request for Proposal (RFP) nor an Invitation for Bid (IFB). This notice should not be construed as an actual Request for Proposal, and no proposal submissions will be accepted as a result of this Draft Notice. This Draft RFP is posted for INFORMATIONAL USE only, to outline the preliminary approach of the Government Acquisition Team. This notice is to solicit ONLY questions or comments in regards to the acquisition approach. Questions are due NLT 1630 MST 30 Jun 21. An official Request for Proposal will be posted at a later date. The issuance date for this solicitation is projected to be on/about 15 Jul 2021 and it is anticipated that Offerors will have 30 days to submit a proposal from solicitation release.
The 50th Contracting Squadron, Schriever AFB, CO intends to issue a solicitation for the Construction Single Award Task Order Contract (SATOC) for performance at Schriever AFB, CO 80912. The contract will be a single award, Indefinite Delivery Indefinite Quantity, Firm-Fixed-Price contract. The North American Industry Classification System (NAICS) code for this project is 236210 with a size standard of $36.5M.
The Contractor shall furnish all management, supervision, labor, materials, equipment, and incidentals required to construct facilities requirements that need design and engineering services incidental to construction. In some instances, the contractor will construct a facility requirement that is 100% designed. In this instance, the successful offeror is not required to provide any additional design and engineering services. The total performance period is for a period of three (3) years. All work, equipment, and materials required for this contract is staged in an area coordinated with the Contracting Officer. The Contractor shall return all areas affected by construction activities, both within and outside the scope of this project, to their previous existing condition, to include site cleanup, repair of damaged real property, restoration and establishment of native vegetation, and removal of any and all construction refuse generated. The contract shall conform to all applicable Federal, State and local laws, regulations and base-specific standards and applicable Unified Facilities Criteria (UFC). Where there is a conflict between the referenced standards, the most stringent shall take precedence. All work accomplished by the Contractor shall comply with these criteria unless a waiver is obtained from the Air Force when conditions warrant such consideration. All construction work shall be subject to stoppages and delays due to critical SAFB mission requirements. All work shall be coordinated with Base Civil Engineering (BCE) personnel, namely the assigned Construction Manager and/or Project Manager, via the Contracting Officer.
The ordering period for this SATOC is anticipated to be 30 Sep 2021 – 29 Sep 2024, and will contain no options. Task Orders issued under the SATOC will have a magnitude ranging from $2,000 to $2,000,000 and could be design-build in nature containing 35% and 65% design. The maximum limit for this SATOC will be $9,000,000.
This contract will be awarded in accordance with FAR Part 15, Contracting by Negotiation. Additionally, FAR Part 19, Small Business Programs will be utilized. This effort will be set aside for all responsible SBA-Certified HUBZone sources who may submit a proposal, which shall be considered by the agency.
Physical copies of the solicitation and all accompanying specifications will not be provided. All documents for this project will be uploaded to https://www.beta.SAM.gov.
Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
Update #1 ·
The Contractor shall furnish all management, supervision, labor, materials, equipment, and incidentals required to construct facilities requirements that need design and engineering services incidental to construction. In some instances, the contractor will construct a facility requirement that is 100% designed. In this instance, the successful offeror is not required to provide any additional design and engineering services. The total performance period is for a base contract of 1-year with 4 option years in one year increments. All work, equipment, and materials required for this contract is staged in an area coordinated with the Contracting Officer. The Contractor shall return all areas affected by construction activities, both within and outside the scope of this project, to their previous existing condition, to include site cleanup, repair of damaged real property, restoration and establishment of native vegetation, and removal of any and all construction refuse generated. The contract shall conform to all applicable Federal, State and local laws, regulations and base-specific standards and applicable Unified Facilities Criteria (UFC). Where there is a conflict between the referenced standards, the most stringent shall take precedence. All work accomplished by the Contractor shall comply with these criteria unless a waiver is obtained from the Air Force when conditions warrant such consideration. All construction work shall be subject to stoppages and delays due to critical SAFB mission requirements. All work shall be coordinated with Base Civil Engineering (BCE) personnel, namely the assigned Construction Manager and/or Project Manager, via the Contracting Officer.
Attachments
| File | Type | Posted |
|---|---|---|
| Attachment 1-SATOC General RequirementsV2.pdf | ||
| Attachment 6-WD CO20210008 01-01-2021 HIGHWAY.pdf | ||
| Attachment 9-SATOC_CRM.xlsx | XLSX spreadsheet | |
| Attachment 10-Key Personnel Resume Template.docx | DOCX document | |
| Attachment 11-TO Specific Tech Requirements 17-4401.pdf | ||
| Draft Solicitation - FA255021R0019.pdf | ||
| Attachment 3-Div01Specifications.pdf | ||
| Attachment 7-WD CO20210022 01-15-2021 BUILDING.pdf | ||
| Attachment 8-Submittal_Register_Template.xls | XLS spreadsheet | |
| Attachment 12-Past Performance Questionnaire.docx | DOCX document | |
| Attachment 14-TO Specific Price Proposal.xlsx | XLSX spreadsheet | |
| Attachment 13-SATOC Fee Proposal.xlsx | XLSX spreadsheet | |
| Attachment 2-SATOC Design Guide.pdf | ||
| Attachment 5-WD CO20210004 03-05-2021 RESIDENTIAL.pdf | ||
| Attachment 4-WD CO20210002 03-05-2021 HEAVY.pdf |
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| Schriever Space Force Base Single Award Task Order IDIQ Contract | Award Notice | |
| Schriever Space Force Base Single Award Task Order IDIQ Contract | Solicitation | |
| Schriever Air Force Base Single Award Task Order IDIQ Contract | Pre-Solicitation | |
| Schriever Air Force Base Single Award Task Order IDIQ Contract | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity