Attachment 14-TO Specific Price Proposal.xlsx
XLSX spreadsheet 87 KB Posted
- Attached to
- Schriever Air Force Base Single Award Task Order IDIQ Contract Federal contract opportunity
- Solicitation number
- FA255021R0019
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1-SATOC General RequirementsV2.pdf | ||
| Attachment 6-WD CO20210008 01-01-2021 HIGHWAY.pdf | ||
| Attachment 9-SATOC_CRM.xlsx | XLSX spreadsheet | |
| Attachment 10-Key Personnel Resume Template.docx | DOCX document | |
| Attachment 11-TO Specific Tech Requirements 17-4401.pdf | ||
| Draft Solicitation - FA255021R0019.pdf | ||
| Attachment 3-Div01Specifications.pdf | ||
| Attachment 7-WD CO20210022 01-15-2021 BUILDING.pdf | ||
| Attachment 8-Submittal_Register_Template.xls | XLS spreadsheet | |
| Attachment 12-Past Performance Questionnaire.docx | DOCX document | |
| Attachment 13-SATOC Fee Proposal.xlsx | XLSX spreadsheet | |
| Attachment 2-SATOC Design Guide.pdf | ||
| Attachment 5-WD CO20210004 03-05-2021 RESIDENTIAL.pdf | ||
| Attachment 4-WD CO20210002 03-05-2021 HEAVY.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Bid Format
Individual Task Order Bid Template
| Prepriced Line Items | |||||||
| Division | Material Cost | Equipment Cost | Labor-Hours | Prevailing Wage | Labor Cost | Total Cost | = Contractor Input |
| 01 - General Requirements | 0 | 0 | |||||
| 02 - Existing Conditions | 0 | 0 | |||||
| 03 - Concrete | 0 | 0 | |||||
| 04 - Masonry | 0 | 0 | |||||
| 05 - Metals | 0 | 0 | |||||
| 06 - Wood, Plastics, and Composites | 0 | 0 | |||||
| 07 - Thermal and Moisture Protection | 0 | 0 | |||||
| 08 - Openings | 0 | 0 | |||||
| 09 - Finishes | 0 | 0 | |||||
| 10 - Specialties | 0 | 0 | |||||
| 11 - Equipment | 0 | 0 | |||||
| 12 - Furnishings | 0 | 0 | |||||
| 13 - Special Construction | 0 | 0 | |||||
| 14 - Conveying Equipment | 0 | 0 | |||||
| 21 - Fire Suppression | 0 | 0 | |||||
| 22 - Plumbing | 0 | 0 | |||||
| 23 - HVAC | 0 | 0 | |||||
| 25 - Integrated Automation | 0 | 0 | |||||
| 26 - Electrical | 0 | 0 | |||||
| 27 - Communications | 0 | 0 | |||||
| 28 - Electronic Safety and Security | 0 | 0 | |||||
| 31 - Earthwork | 0 | 0 | |||||
| 32 - Exterior Improvements | 0 | 0 | |||||
| 33 - Utilities | 0 | 0 | |||||
| 34 - Transportation | 0 | 0 | |||||
| 35 - Waterway and Marine Transportation | 0 | 0 | |||||
| 40 - Process Interconnections | 0 | 0 | |||||
| 41 - Material Processing and Handling Equipment | 0 | 0 | |||||
| 42 - Process Heating, Cooling, and Drying Equipment | 0 | 0 | |||||
| 43 - Process Gas and Liquid Handling, Purification and Storage Equipment | 0 | 0 | |||||
| 44 - Pollution Control Equipment | 0 | 0 | |||||
| 45 - Industry Specific Manufacturing Equipment | 0 | 0 | |||||
| 46 - Water and Wastewater Equipment | 0 | 0 | |||||
| 48 - Electric Power Generation | 0 | 0 |
| Sub-Total #1 | 0 |
| City Cost Index (CCI) | 0 |
| Total #1 | 0 |
| Non-prepriced Line Items | ||||||||||||
| Division | Material Cost | Equipment Cost | Labor-Hours | Prevailing Wage | Labor Cost | Total Cost | 01 - General Requirements | |||||
| 0 | 0 | 02 - Existing Conditions | ||||||||||
| 0 | 0 | 03 - Concrete | ||||||||||
| 0 | 0 | 04 - Masonry | ||||||||||
| 0 | 0 | 05 - Metals | ||||||||||
| 0 | 0 | 06 - Wood, Plastics, and Composites | ||||||||||
| 0 | 0 | 07 - Thermal and Moisture Protection | ||||||||||
| 0 | 0 | 08 - Openings | ||||||||||
| 0 | 0 | 09 - Finishes | ||||||||||
| 0 | 0 | 10 - Specialties | ||||||||||
| 0 | 0 | 11 - Equipment | ||||||||||
| 0 | 0 | 12 - Furnishings | ||||||||||
| 13 - Special Construction | ||||||||||||
| Total #2 | 0 | 14 - Conveying Equipment | ||||||||||
| 21 - Fire Suppression | ||||||||||||
| Cost Summary - Construction | 22 - Plumbing | |||||||||||
| Total (Prepriced and Non-prepriced) | 0 | 1 | 0 | 23 - HVAC | ||||||||
| RA Coefficient if applicable | 1.025 | 1 | 1 | 25 - Integrated Automation | ||||||||
| Non-RA Coefficient if applicable | 2 | 2 | 26 - Electrical | |||||||||
| Total Construction Cost | 0 | 3 | 3 | 27 - Communications | ||||||||
| 4 | 4 | 28 - Electronic Safety and Security | ||||||||||
| Cost Summary - Design Fees | 5 | 31 - Earthwork | ||||||||||
| 6 | 32 - Exterior Improvements | |||||||||||
| Level of Effort (%) | Insert "Yes" or "No" from dropdown | Total Design Fee % | Total Design Cost | Yes | 7 | 33 - Utilities | ||||||
| 35% Level of Effort | Yes | 0 | 0 | No | 8 | 34 - Transportation | ||||||
| 9 | 35 - Waterway and Marine Transportation | |||||||||||
| 65% Level of Effort | No | 10 | 40 - Process Interconnections | |||||||||
| <$250k | Yes | 0 | 0 | 11 | 41 - Material Processing and Handling Equipment | |||||||
| $250k - $1M | No | 0 | 0 | 12 | 42 - Process Heating, Cooling, and Drying Equipment | |||||||
| >$1M | No | 0 | 0 | 13 | 43 - Process Gas and Liquid Handling, Purification and Storage Equipment | |||||||
| 14 | 44 - Pollution Control Equipment | |||||||||||
| Cost Summary - Grand Total | 15 | 45 - Industry Specific Manufacturing Equipment | ||||||||||
| Total Construction Cost | 0 | 16 | 46 - Water and Wastewater Equipment | |||||||||
| Total Design Cost | 0 | 17 | 48 - Electric Power Generation | |||||||||
| Grand Total | 0 | 18 | ||||||||||
| 19 | ||||||||||||
| 20 |
image1.png
File details come from the government source that posted it. Updated .