Sac RM 71. 3R Erosion Protection

Award Notice Posted

Solicitation number
W91238-17-R-0034
Agency
Awarded
to James Fisher
Set-aside
HUBZone

Opportunity facts

Contract number
W9123817C0021 Federal contract award
PSC
Not on record
Place of performance
Sacramento River Mile 71.3 Right Bank approximately seven miles east of Woodland adjacent to County Road 117. Sacramento, California 95814, United States

Notice details come from SAM.gov. Updated .

Notice text

7 versions

Update #7 · Latest ·

**The RFP due date will be extended from 10 JUL 2017 no sooner than 18 JUL 2017. Look for SF30 Amendment 0003 to be posted to FBO for new date and time for the response to the RFP. Revised SPECS will be posted with Amendment 0003.**

**The RFP due date will be extended from 3 JUL 2017 no sooner than 7 JUL 2017. Look for SF30 Amendment to be posted to FBO for new date and time for the response to the RFP. Offerors are highly encouraged to read RFIs on ProjNet.**


JOB DESCRIPTION:

The Sacramento District of the U.S. Army Corps of Engineers has an upcoming acquisition to establish a contract to implement erosion protection measures at Sacramento River (Sac) River Mile (RM) 71.3 right bank (R) approximately seven miles east of Woodland adjacent to County Road 117. This erosion area is approx. 520 linear feet of shore-line. The erosion protection measure is to place quarry stone, soil-filled quarry stone, and non-woody vegetation on the existing erosion site. The erosion repair includes the construction of a low riparian bench. Construction will consist of quarry stone placed above and below the mean summer water elevation (MSWE) and a layer of soil placed on top of soil-filled quarry stone above the MSWE. A wetland bench will be constructed below the MSWE. Work includes trimming and clearing of vegetation, placing quarry stone on the lower slopes, and soil-filled quarry stone on the upper slopes of the erosion site. This contract also includes erosion control seeding.


Acquisition Information:


This acquisition is proceeding as a HubZone set-aside.


Estimated Cost Range is between ($1,000,000 $5,000,000). FAR 36.204(f)


Period of Performance (POP) for Construction: All levee work excluding the Temporary Storm Water Pollution Control (TSWPC) is Notice to Proceed (NTP) to 10/31/2017. The POP for TSWPC is NTP to 05/15/2018.


This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. The size standard for this code is $36,500,000. All questions should be directed to the Contract Specialist, Deanna C. Zemovich e-mail Deanna.C.Zemovich@usace.army.mil.


It is anticipated that the RFP will be issued on or about May 15, 2017, for downloading at the Government's website at http://www.fedbizopps.gov/. No paper copies will be issued.


The specific date and time will be identified in the solicitation.


OFFERORS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.


ORDERING SOLICITATION: Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the RFP is issued. Viewing/downloading documents from FedBizOpps will require prior registration in System for Award Management (www.sam.gov). If you are a first-time FedBizOpps user, you will also be required to register in FedBizOpps (www.fbo.gov) before accessing the RFP documents. To register, click on the Register Now button in the Vendors Block and follow the instructions. The following information will be required: System for Award Management (SAM) Marketing Partner Identification Number (MPIN); DUNS Number or Cage Code; Telephone Number; and E-mail Address. Once registered with FedBizOpps, interested parties will then be able to log in and access the RFP documents.


Important Note: Solicitation documents can be accessed ONLY via FedBizOpps. Please note that ALL contractors who want to register with FedBizOpps must be registered in SAM, and have a MPIN, DUNS number or Cage code. For further information, please click on the FedBizOpps homepage link and the Vendor User Guide. The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the ‘ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: (Prime/Sub) XYZ Construction, or XYZ Construction (Prime/Sub). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION.



**The RFP due date will be extended from 3 JUL 2017 no sooner than 7 JUL 2017. Look for SF30 Amendment to be posted to FBO for new date and time for the response to the RFP. Offerors are highly encouraged to read RFIs on ProjNet

Update #6 ·

Amendment 0002 Extend Sac RM 71.3R Erosion Protection

Update #5 ·

**The RFP due date will be extended from 3 JUL 2017 no sooner than 7 JUL 2017. Look for SF30 Amendment to be posted to FBO for new date and time for the response to the RFP. Offerors are highly encouraged to read RFIs on ProjNet.**

Update #4 ·

**The RFP due date will be extended from 3 JUL 2017 no sooner than 7 JUL 2017. Look for SF30 Amendment to be posted to FBO for new date and time for the response to the RFP. Offerors are highly encouraged to read RFIs on ProjNet.**

JOB DESCRIPTION:

The Sacramento District of the U.S. Army Corps of Engineers has an upcoming acquisition to establish a contract to implement erosion protection measures at Sacramento River (Sac) River Mile (RM) 71.3 right bank (R) approximately seven miles east of Woodland adjacent to County Road 117. This erosion area is approx. 520 linear feet of shore-line. The erosion protection measure is to place quarry stone, soil-filled quarry stone, and non-woody vegetation on the existing erosion site. The erosion repair includes the construction of a low riparian bench. Construction will consist of quarry stone placed above and below the mean summer water elevation (MSWE) and a layer of soil placed on top of soil-filled quarry stone above the MSWE. A wetland bench will be constructed below the MSWE. Work includes trimming and clearing of vegetation, placing quarry stone on the lower slopes, and soil-filled quarry stone on the upper slopes of the erosion site. This contract also includes erosion control seeding.


Acquisition Information:


This acquisition is proceeding as a HubZone set-aside.


Estimated Cost Range is between ($1,000,000 $5,000,000). FAR 36.204(f)


Period of Performance (POP) for Construction: All levee work excluding the Temporary Storm Water Pollution Control (TSWPC) is Notice to Proceed (NTP) to 10/31/2017. The POP for TSWPC is NTP to 05/15/2018.


This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. The size standard for this code is $36,500,000. All questions should be directed to the Contract Specialist, Deanna C. Zemovich e-mail Deanna.C.Zemovich@usace.army.mil.


It is anticipated that the RFP will be issued on or about May 15, 2017, for downloading at the Government's website at http://www.fedbizopps.gov/. No paper copies will be issued.


The specific date and time will be identified in the solicitation.


OFFERORS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.


ORDERING SOLICITATION: Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the RFP is issued. Viewing/downloading documents from FedBizOpps will require prior registration in System for Award Management (www.sam.gov). If you are a first-time FedBizOpps user, you will also be required to register in FedBizOpps (www.fbo.gov) before accessing the RFP documents. To register, click on the Register Now button in the Vendors Block and follow the instructions. The following information will be required: System for Award Management (SAM) Marketing Partner Identification Number (MPIN); DUNS Number or Cage Code; Telephone Number; and E-mail Address. Once registered with FedBizOpps, interested parties will then be able to log in and access the RFP documents.


Important Note: Solicitation documents can be accessed ONLY via FedBizOpps. Please note that ALL contractors who want to register with FedBizOpps must be registered in SAM, and have a MPIN, DUNS number or Cage code. For further information, please click on the FedBizOpps homepage link and the Vendor User Guide. The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the ‘ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: (Prime/Sub) XYZ Construction, or XYZ Construction (Prime/Sub). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION.

Update #3 ·

UPDATED JOB DESCRIPTION:

The Sacramento District of the U.S. Army Corps of Engineers has an upcoming acquisition to establish a contract to implement erosion protection measures at Sacramento River (Sac) River Mile (RM) 71.3 right bank (R) approximately seven miles east of Woodland adjacent to County Road 117. This erosion area is approx. 520 linear feet of shore-line. The erosion protection measure is to place quarry stone, soil-filled quarry stone, and non-woody vegetation on the existing erosion site. The erosion repair includes the construction of a low riparian bench. Construction will consist of quarry stone placed above and below the mean summer water elevation (MSWE) and a layer of soil placed on top of soil-filled quarry stone above the MSWE. A wetland bench will be constructed below the MSWE. Work includes trimming and clearing of vegetation, placing quarry stone on the lower slopes, and soil-filled quarry stone on the upper slopes of the erosion site. This contract also includes erosion control seeding.

Update #2 ·

JOB DESCRIPTION:

The Sacramento District of the U.S. Army Corps of Engineers has an upcoming acquisition to establish a contract to implement erosion protection measures at Sacramento River (Sac) River Mile (RM) 71.3 right bank (R) approximately seven miles east of Woodland adjacent to County Road 117. This erosion area is approx. 520 linear feet of shore-line. The erosion protection measure is to place quarry stone, soil-filled quarry stone, and non-woody vegetation on the existing erosion site. The erosion repair includes the construction of a low riparian bench. Construction will consist of quarry stone placed above and below the mean summer water elevation (MSWE) and a layer of soil placed on top of soil-filled quarry stone above the MSWE. A wetland bench will be constructed below the MSWE. Work includes trimming and clearing of vegetation, placing quarry stone on the lower slopes, and soil-filled quarry stone on the upper slopes of the erosion site. This contract also includes erosion control seeding and one year plant establishment maintenance.


Acquisition Information:


This acquisition is proceeding as a HubZone set-aside.


Estimated Cost Range is between ($1,000,000 $5,000,000). FAR 36.204(f)


Period of Performance (POP) for Construction: All levee work excluding the Temporary Storm Water Pollution Control (TSWPC) is Notice to Proceed (NTP) to 10/31/2017. The POP for TSWPC is NTP to 05/15/2018.


This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. The size standard for this code is $36,500,000. All questions should be directed to the Contract Specialist, Deanna C. Zemovich e-mail Deanna.C.Zemovich@usace.army.mil.


It is anticipated that the RFP will be issued on or about May 15, 2017, for downloading at the Government's website at http://www.fedbizopps.gov/. No paper copies will be issued.


The specific date and time will be identified in the solicitation.


OFFERORS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.


ORDERING SOLICITATION: Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the RFP is issued. Viewing/downloading documents from FedBizOpps will require prior registration in System for Award Management (www.sam.gov). If you are a first-time FedBizOpps user, you will also be required to register in FedBizOpps (www.fbo.gov) before accessing the RFP documents. To register, click on the Register Now button in the Vendors Block and follow the instructions. The following information will be required: System for Award Management (SAM) Marketing Partner Identification Number (MPIN); DUNS Number or Cage Code; Telephone Number; and E-mail Address. Once registered with FedBizOpps, interested parties will then be able to log in and access the RFP documents.


Important Note: Solicitation documents can be accessed ONLY via FedBizOpps. Please note that ALL contractors who want to register with FedBizOpps must be registered in SAM, and have a MPIN, DUNS number or Cage code. For further information, please click on the FedBizOpps homepage link and the Vendor User Guide. The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the ‘ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: (Prime/Sub) XYZ Construction, or XYZ Construction (Prime/Sub). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION.

Update #1 ·

JOB DESCRIPTION:

The Sacramento District of the U.S. Army Corps of Engineers has an upcoming acquisition to establish a contract to implement erosion protection measures at Sacramento River (Sac) River Mile (RM) 71.3 right bank (R) approximately seven miles east of Woodland adjacent to County Road 117. This erosion area is +/- 520 linear feet of shore-line. The erosion protection measure is to place quarry stone, soil-filled quarry stone, and non-woody vegetation on the existing erosion site. The erosion repair includes the construction of a low riparian bench. Construction will consist of quarry stone placed above and below the mean summer water elevation (MSWE) and a layer of soil placed on top of soil-filled quarry stone above the MSWE. A wetland bench will be constructed below the MSWE. Work includes trimming and clearing of vegetation, placing quarry stone on the lower slopes, and soil-filled quarry stone on the upper slopes of the erosion site. This contract also includes erosion control seeding and one year plant establishment maintenance.


Acquisition Information:


This acquisition is proceeding as a HubZone set-aside.


Estimated Cost Range is between ($1,000,000 $5,000,000). FAR 36.204(f)


Period of Performance (POP) for Construction: All levee work excluding the Temporary Storm Water Pollution Control (TSWPC) is Notice to Proceed (NTP) to 10/31/2017. The POP for TSWPC is NTP to 05/15/2018.


This Procurement will be conducted under PSC CODE: Y1PZ, NAICS Code: 237990. The size standard for this code is $36,500,000. All questions should be directed to the Contract Specialist, Deanna C. Zemovich e-mail Deanna.C.Zemovich@usace.army.mil.


It is anticipated that the RFP will be issued on or about May 15, 2017, for downloading at the Government's website at http://www.fedbizopps.gov/. No paper copies will be issued.


The specific date and time will be identified in the solicitation.


OFFERORS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.


ORDERING SOLICITATION: Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the RFP is issued. Viewing/downloading documents from FedBizOpps will require prior registration in System for Award Management (www.sam.gov). If you are a first-time FedBizOpps user, you will also be required to register in FedBizOpps (www.fbo.gov) before accessing the RFP documents. To register, click on the Register Now button in the Vendors Block and follow the instructions. The following information will be required: System for Award Management (SAM) Marketing Partner Identification Number (MPIN); DUNS Number or Cage Code; Telephone Number; and E-mail Address. Once registered with FedBizOpps, interested parties will then be able to log in and access the RFP documents.


Important Note: Solicitation documents can be accessed ONLY via FedBizOpps. Please note that ALL contractors who want to register with FedBizOpps must be registered in SAM, and have a MPIN, DUNS number or Cage code. For further information, please click on the FedBizOpps homepage link and the Vendor User Guide. The only PLAN-HOLDER'S/BIDDER'S LIST now available is via FedBizOpps. When viewing the Synopsis/Pre-solicitation Notice, you will click on the ‘ADD ME TO INTERESTED VENDORS' to enter your information. This function does not, however, allow you to identify yourself as a Prime or Sub. It is recommended that you identify your category in parentheses at either the beginning or end of your company name. For example: (Prime/Sub) XYZ Construction, or XYZ Construction (Prime/Sub). IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK FEDBIZOPPS FREQUENTLY FOR ANY AMENDMENTS OR CHANGES TO THE SOLICITATION.

Files

Show all 19

Notice history

Notice Type Posted
Sac RM 71. 3R Erosion Protection Latest Award Notice
This notice Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity