Text version
Here is the standard wording in the 401 permit which applies to the contractor:
TECHNICAL CERTIFICATION CONDITIONS:
In addition to the above standard conditions, the Applicant shall satisfy the following:
Except for activities permitted by the United States Army Corps of Engineers under Section 404 of the Clean Water Act, soil, silt, or other organic materials shall not be placed where such materials could pass into surface water or surface water drainage courses.
The Applicant shall maintain a copy of this Certification and supporting documentation (Project Information Sheet) at the Project site during construction for review by site personnel and agencies. All personnel (employees, contractors, and subcontractors) performing work on the proposed Project shall be adequately informed and trained regarding the conditions of this Certification.
Table 1:
Parameter
Unit
Type of Sample Minimum Sampling Frequency
Required Analytical Test
Method
Turbidity
NTU
Grab(1)
Every 4 hours during in-water work ·
(2, 4)
Settleable Material mL/L
Grab(1)
Every 4 hours during in-water work
(2)
Visible·construction related pollutants (3)
Observations
Visual
Inspections
Continuous throughout the construction period
(1) Grab samples shall not be collected at the same time each day to get a complete representation of variations in the receiving water.
(2) Pollutants shall be analyzed using the analytical methods described in 40 Code of Federal Regulations Part 136; where no methods are specified for a given pollutant, the method shall be approved by Central Valley Water Board staff.
(3) Visible construction-related pollutants include oil, grease, foam, fuel, petroleum products, and construction-related, excavated, organic or earthen materials.
(4) A hand-held field meter may be used, provided the meter utilizes a USEPA-approved algorithm/method and is calibrated and maintained in accordance with the manufacturer's instructions. A calibration and maintenance log for each meter used for monitoring shall be maintained onsite.
Surface water sampling shall occur at mid-depth. A surface water monitoring report shall be submitted within two weeks of initiation of in-water construction, and every two weeks thereafter. In reporting the sampling data, the Applicant shall arrange the data in tabular form so that the sampling locations, date, constituents, and concentrations are readily discernible. The data shall be summarized in such a manner to illustrate clearly whether the project complies with Certification requirements. The report shall include surface water sampling results, visual observations, and identification of the turbidity increase in the receiving water applicable to the natural turbidity conditions specified in the turbidity criteria below.
If no sampling is conducted, the Applicant shall submit a written statement stating, "No sampling was required." within two weeks of initiation of in-water construction, and every two weeks thereafter.
The Central Valley Water Board adopted a Water Quality Control Plan for the Sacramento River and San Joaquin River Basins, Fourth Edition, revised October 2011 (Basin Plan) that designates beneficial uses, establishes water quality objectives, and contains implementation programs and policies to achieve those objectives for all waters addressed through the plan. Turbidity and settleable matter limits are based on water quality objectives contained in the Basin Plan and are part of this Certification as follows:
During planned in-water work or during the entire duration of temporary water diversions, any discharge(s) to waters of the state shall conform to the following water quality standards:
a. Waters shall not contain oils, greases, waxes, or other materials in concentrations that cause nuisance, result in a visible film or coating on the surface of the water or on objects in the water, or otherwise adversely affect beneficial uses.
b. Activities shall not cause turbidity increases in surface water to exceed:
I. where natural turbidity is less than 1 Nephelometric Turbidity Units (NTUs), controllable factors shall not cause downstream turbidity to exceed 2 NTU;
II. where natural turbidity is between 1 and 5 NTUs, increases shall not exceed 1
NTU;
III. where natural turbidity is between 5 and 50 NTUs, increases shall not exceed 20 percent;
IV. where natural turbidity is between 50 and 100 NTUs, increases shall not exceed
10 NTUs;
V. where natural turbidity is greater than 100 NTUs, increases shall not exceed 10 percent.
In determining compliance with the above limits, appropriate averaging periods may be applied provided that beneficial uses will be fully protected. Averaging periods may only be used with prior permission of the Central Valley Water Board Executive Officer.
For Folsom Lake and American River (Folsom Dam to Sacramento River), except for periods of storm runoff, the turbidity shall be less than or equal to 10 NTUs. To the extent of any conflict with the general turbidity objective, the more stringent applies.