Repair Sprinkler System

Award Notice Posted

Solicitation number
FA9401-12-R-0020
Agency
Awarded
to Complete Fire Protection, L.L.C.
Set-aside
Total Small Business

Opportunity facts

Contract number
FA9401-12-C-0039 Federal contract award
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Not on record
Place of performance
Kirtland AFB Albuquerque, New Mexico 87117, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Added: Jul 09, 2012 11:52 am Modified: Jul 12, 2012 3:26 pmTrack Changes Proposal Due Date and time added, (6-Aug-12 1:00PM)

Added Amendment #1 to Solicitation extending date for contractors to submit names for site visit attendance to 13 July.

Update #2 ·

Added: Jul 09, 2012 11:52 am Proposal Due Date and time added, (6-Aug-12 1:00PM)

Update #1 ·

Added: Jun 19, 2012 10:09 am General Information

Document Type: Pre-Solicitation Notice
Solicitation Number: FA9401-12-R-0020
Classification Code: J - Maintenance and Repair of Fire Control Equipment
Set Aside: Competitive 100% Total Small Business Set-Aside
NAICS Code: 238220 Plumbing, Heating, and Air-Conditioning Contractors, Fire sprinkler system installation


Contracting Office Address


AFNWC/PKOD
2050 Wyoming Blvd SE, Bldg. 20604
Kirtland AFB, NM 87117


Description


The AFNWC/PKOD will be soliciting a 100% Total Small Business set-a-side, Firm Fixed Price Contract to support the 377 MSG/CE mission at Kirtland AFB, New Mexico.


THIS IS AN UNFUNDED REQUIREMENT
Funds are not presently available for this requirement. The Government's obligation under this Pre-Solicitation and follow on Request for Proposals (RFP) is contingent upon the availability of appropriated funds from end of fiscal year funding. No legal liability on the part of the Government for payment of any money shall arise unless, and until, funds are made available to the Contracting Officer for this procurement and award has been made by the Contracting Officer.


Work under this project is comprised of providing 100% fire protection sprinkler coverage to all areas of Island "A" of Hangar 1002, and provide standpipe systems for the entire aircraft hangar. Major work to be accomplished includes, but is not limited to dropping existing sprinkler systems to existing lay-in ceilings; replacing old sprinkler heads with new sprinkler heads; removing egg crate ceilings and patching existing hard ceilings; extending coverage where additional heads are required; establishing final AutoCAD as-built drawings of the existing and new fire sprinkler system for Island "A" illustrating complete coverage for that area; and installing new standpipe systems for complete coverage of the entire facility. This project will require a Free Zone to perform the scope within the Restricted Area Flight Line. Fire protection shop drawings shall be stamped by a registered fire protection engineer in the state of New Mexico. Installer shall be certified by the National Institute for Certification in Engineering Technologies (NICET) as an engineering technician with minimum level III certification in the water based fire protection systems layout program. Estimated Period of Performance (POP) for requirement is 203 days. IAW FAR 36.204(d) the estimated price range for this requirement is between $250,000 and $500,000.


A Request for Proposal (RFP) is contemplated utilizing Lowest Price Technically Acceptable (LPTA) evaluations described in Federal Acquisition Regulation (FAR) 15.1 targeted toward a 100% Total Small Business set-a-side with a 30-day response time (offers due 30 days after issuing).


The offeror's proposal must convey to the Government that the offeror is capable, possess sufficient technical expertise and experience, possess sufficient resources, and is able to plan, organize, and use those resources in a coordinated and timely fashion such that the technical requirements shall be achieved and costs shall be controlled. Kirtland AFB plans to include the following factors:



1) Cost/Price
2) Past Performance
3) Technical Acceptability


Within the Past Performance Factor the following sub-factor will be used:


a) Filled out Past Performance Information Forms


Within the Technical Acceptability Factor the following sub-factors will be used:


a) Technical Approach Narrative
b) Proposed Progress Schedule


The Cost/Price factor will be afforded primary emphasis in the evaluation. All other evaluation factors other than Cost/Price, when combined, are approximately equal to cost/price.


The solicitation will be available in electronic format only. The RFP will be posted on the website at http://www.fbo.gov/ on or about 04 July 2012 and close on or about 30 calendar days thereafter. No hard copies will be provided. It is the contractor's responsibility to check the website for any and all amendments to this solicitation. Prospective contractors must be registered in the Central Contractor Registration (CCR) database before award of a government contract; failure to register in the CCR database may cause your firm to be ineligible for award.

Files

File Type Posted
FA9401-12-R-0020 Amendment 4.pdf PDF
Amendment 3 FA9401-12-R-0020.pdf PDF
Addendum 1 FP2.pdf PDF
Addendum 1 FP1.pdf PDF
Addendum 1.pdf PDF
2b. floorplan.pdf PDF
2a. Asbestos sample results.pdf PDF
3a. Sample results asbestos.pdf PDF
2d. floorplan.pdf PDF
5b. floorplan 1002.pdf PDF
5a. Sample Results.pdf PDF
5c. Pictures.pdf PDF
Amendment 2 FA9401-12-R-0020.pdf PDF
4a. Lead Sample Results.pdf PDF
3d. floorplan 1002.pdf PDF
2e. Copy of floor plan island c first floor.pdf PDF
3b. sample results lead.pdf PDF
1. ASB-1002.pdf PDF
4b. floorplan 1002.pdf PDF
3c.sample results lead on doors.pdf PDF
2c. Lead sample results.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Amendment 1 FA9401-12-R-0020.pdf PDF
12. Past Performance Information Form.pdf PDF
AF 3065 Progress Report.pdf PDF
13. KAFB Map for Site Visit Location —
Statement of Work-MHMV971927A.pdf PDF
c. DRAWINGS - H1002 REPAIR SPRINKLER SYSTEM.pdf PDF
e. Fire Truck Pumper Specifications.pdf PDF
FA9401-12-R-0020.pdf PDF
d. SPECIFICATIONS - H1002 REPAIR SPRINKLER SYSTEM.pdf PDF
AF_3000.pdf PDF
AF 3064-Progress Schedule.xls XLS spreadsheet
Permit Requirements Memo.pdf PDF
General Decision Number NM120040 NM40.pdf PDF
h. Construction AF Form 66.pdf PDF
MHMV971927A AF Form 3052 Blank Contractor Proposal Form.xlsx XLSX spreadsheet
f. Free Zone Layout.pdf PDF
Show all 38

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity