Addendum 1.pdf

PDF 96 KB Posted

Attached to
Repair Sprinkler System
Solicitation number
FA9401-12-R-0020
Issued by

About this file

Attachment 2a. (Addendum No. 1)

View the file

Other files

File Type Posted
FA9401-12-R-0020 Amendment 4.pdf PDF
Amendment 3 FA9401-12-R-0020.pdf PDF
Addendum 1 FP2.pdf PDF
Addendum 1 FP1.pdf PDF
4b. floorplan 1002.pdf PDF
3c.sample results lead on doors.pdf PDF
2c. Lead sample results.pdf PDF
5c. Pictures.pdf PDF
Amendment 2 FA9401-12-R-0020.pdf PDF
4a. Lead Sample Results.pdf PDF
3d. floorplan 1002.pdf PDF
2e. Copy of floor plan island c first floor.pdf PDF
3b. sample results lead.pdf PDF
1. ASB-1002.pdf PDF
2b. floorplan.pdf PDF
2a. Asbestos sample results.pdf PDF
3a. Sample results asbestos.pdf PDF
2d. floorplan.pdf PDF
5b. floorplan 1002.pdf PDF
5a. Sample Results.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Amendment 1 FA9401-12-R-0020.pdf PDF
12. Past Performance Information Form.pdf PDF
h. Construction AF Form 66.pdf PDF
MHMV971927A AF Form 3052 Blank Contractor Proposal Form.xlsx XLSX spreadsheet
f. Free Zone Layout.pdf PDF
Statement of Work-MHMV971927A.pdf PDF
c. DRAWINGS - H1002 REPAIR SPRINKLER SYSTEM.pdf PDF
e. Fire Truck Pumper Specifications.pdf PDF
FA9401-12-R-0020.pdf PDF
d. SPECIFICATIONS - H1002 REPAIR SPRINKLER SYSTEM.pdf PDF
AF_3000.pdf PDF
AF 3064-Progress Schedule.xls XLS spreadsheet
Permit Requirements Memo.pdf PDF
General Decision Number NM120040 NM40.pdf PDF
AF 3065 Progress Report.pdf PDF
13. KAFB Map for Site Visit Location —
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

377TH CIVIL ENGINEER DIVISION (AFMC)

17 July 2012

ADDENDUM No. 1

MHMV971927A - Repair Sprinkler Systems, H1002

Drawings

1. Delete sheet FP1 dated 18 APR 2012. Add sheet FP1 dated 17 JUL 2012 attached.

2. Delete sheet FP2 dated 18 APR 2012. Add sheet FP2 dated 17 JUL 2012 attached.

3. Sheet FP6, FP7 and FP8, Add keyed note 5 as follows:

“5. The penthouse walls contain transite/asbestos panels. If penetrations are made through these panels, test, sample and abate as required.”

3. Sheet FP6 and FP8, Add keyed note 6 as follows:

“6. The roof surrounding this stairwell/penthouse is under warranty by Viking

Roofing & Construction. They shall be given “first right of refusal” for all roof-related work. All work is to be performed in full compliance with the National

Roofing Contractors’ Association (NRCA) Roofing and Waterproofing Manual, latest edition.”

4. Sheet FP7, Add keyed note 6 as follows:

“6. The roof surrounding this stairwell/penthouse is currently under construction and will be warranteed by Commercial Roofing. The roof approximately 3’ to the

South of the stairwell/penthouse is under warranty by Viking Roofing &

Construction. “First right of refusal” shall be given to the contractor owning the warranty for all roof-related work. All work is to be performed in full compliance with the National Roofing Contractors’ Association (NRCA) Roofing and

Waterproofing Manual, latest edition.””

End of Addendum No. 1

This Addendum has been provided by 377MSG/CEPC and has been vetted through

377MSG/CEYE if signed below:

//Signed//

Jason Underwood

FAS Technical Representative

File details come from the government source that posted it. Updated .