INSTRUCTIONS FOR COMPLETING AF FORM 3052
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to |
| permit itemizing of all direct costs. |
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square |
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). |
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be |
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will |
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. |
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. |
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. |
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. |
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract |
| and of significant dollar value. |
| Col 10 Line Total. Self-explanatory. |
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last |
| page as follows. |
FOR OFFICIAL USE ONLY
TOTAL MATERIAL COSTS $ 0.00
TOTAL LABOR COSTS $ 0.00
TOTAL OTHER DIRECT COSTS $ 0.00
TOTAL DIRECT COSTS $ 0.00
OVERHEAD % $ 0.00
PROFIT % $ 0.00
NMGRT % $ 0.00
TOTAL PRICE $ 0.00
DATE : FIRM NAME :
| TITLE : | BY : | |
| (Signature) |
INSTRUCTIONS TO OFFERORS
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and |
| estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from |
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data |
| (see ASPR 3-807.3(e) and 3-807.4) |
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this |
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and |
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of |
| a. The existing, verifiable data. |
| b. The judgmental factors applied in projecting from known data to the estimate, and |
| c. The contingencies used by the offeror in his proposed price. |
| In short, the offeror's estimating process itself needs to be disclosed. |
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), |
| and made available to the contracting officer or his authorized representative upon request. |
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate |
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection |
| with any negotiations prior to contract award. |
(Reverse of AF Form 3052., AUG 93)
BREAKDOWN
| FOR OFFICIAL USE ONLY | ||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 1 | OF | 1 | ||||
| CONTRACTOR | ADDRESS | |||||||
| KAFB | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE |
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION : | ||||||||
| MHMV971927A | H1002 | |||||||||
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE | UNIT COSTS | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| SPRINKLER REPLACEMENT | ||||||||||
| 1 | Sprinkler System Components, sprinkler cabinets, 12 head capacity | EA | $0.00 | $0.00 | $0.00 | |||||
| 2 | Sprinkler System Components, sprinkler head escutcheons, standard, chrome, brass, 1" size | EA | $0.00 | $0.00 | $0.00 | |||||
| 3 | Sprinkler System Components, sprinkler head escutcheons, recessed type, chrome or white enamel, 1" size | EA | $0.00 | $0.00 | $0.00 | |||||
| 4 | Sprinkler System Components, sprinkler heads, standard spray, pendent or upright, brass, 135 to 286 degrees F, 1/2" NPT, 1/2" orifice, excludes supply piping | EA | $0.00 | $0.00 | $0.00 | |||||
| 5 | Sprinkler System Components, sprinkler heads, sidewall, brass, 135 to 286 degrees F, 1/2" NPT, 1/2" orifice, excludes supply piping | EA | $0.00 | $0.00 | $0.00 | |||||
| 6 | Piping system identification labels/paint, pipe markers, single coat, indicate contents, plastic snap around, 1-4" pipe | LF | $0.00 | $0.00 | $0.00 | |||||
| 7 | Fire Protection, sprinklers, wet pipe system, pipe schedule method, steel, black, Sch 40 pipe, light/ordinary hazard | SF | $0.00 | $0.00 | $0.00 | |||||
| 8 | Fire Protection, sprinklers, as-built plans | LOT | $0.00 | $0.00 | $0.00 | |||||
| 9 | Pipe, steel, black, threaded, 1" diameter, schedule 40, Spec. A-53, includes hangers and bracing, seismic | LF | $0.00 | $0.00 | $0.00 | |||||
| 10 | Pipe, steel, black, threaded, 1-1/4" diameter, schedule 40, Spec. A-53, includes hangers and bracing, seismic | LF | $0.00 | $0.00 | $0.00 | |||||
| 11 | Hangar Free Zone phasing requirements, 1 month | LOT | $0.00 | $0.00 | $0.00 | |||||
| 12 | Remove eggcrate lay-in ceiling, incl. grid and bracing, patch gypbd ceiling | SF | $0.00 | $0.00 | $0.00 | |||||
| 13 | HAZMAT Remediation, abatement, removal, sampling & testing, asbestos, lead | LOT | $0.00 | $0.00 | $0.00 | |||||
| 14 | Pipe testing, nondestructive hydraulic pressure test, isolate, 2 hour hold, 1" to 4" pipe, 1000 - 3000 L.F. | EA | $0.00 | $0.00 | $0.00 | |||||
| STANDPIPE | ||||||||||
| 15 | Sprinkler System Components, valves, check, swing, cast iron body, brass fittings, auto. Ball drip, 4" size | EA | $0.00 | $0.00 | $0.00 | |||||
| 16 | Fire Valves, roof manifold, horizontal, brass, without valves and caps, (2) 2-1/2" x 4" | EA | $0.00 | $0.00 | $0.00 | |||||
| 17 | Standpipe connections, FDC, wall, with plugs and chains, single, flush, brass, 2-1/2"x2-1/2" | EA | $0.00 | $0.00 | $0.00 | |||||
| 18 | Fire Hose Valves, angle, non pressure adjust/restricting, polished barss, 2-1/2" | EA | $0.00 | $0.00 | $0.00 | |||||
| 19 | Piping system identification labels/paint, pipe markers, single coat, indicate contents, plastic snap around, 2-4" pipe | LF | $0.00 | $0.00 | $0.00 | |||||
| 20 | Piping system identification labels, valve tags, identifying legend, brass/aluminum w/chain | EA | $0.00 | $0.00 | $0.00 | |||||
| 21 | Pipe, steel, black, threaded, 4" diameter, schedule 40, Spec. A-53, includes hangers and bracing, seismic | LF | $0.00 | $0.00 | $0.00 | |||||
| 22 | Pipe, steel, black, threaded, 2-1/2" diameter, schedule 40, Spec. A-53, includes hangers and bracing, seismic | LF | $0.00 | $0.00 | $0.00 | |||||
| 23 | Sleeve, pipe, steel with water stop, 12" long, 5" dia for 3" carrier pipe, includes link seal | EA | $0.00 | $0.00 | $0.00 | |||||
| 24 | Valves, brass, OS&Y, chain & lock, 150 lb., 4", threaded | EA | $0.00 | $0.00 | $0.00 | |||||
| 25 | Pipe testing, nondestructive hydraulic pressure test, isolate, 2 hour hold, 1" to 4" pipe, 1000 - 3000 L.F. | EA | $0.00 | $0.00 | $0.00 | |||||
| 26 | Pipe testing, nondestructive flow test, isolate, 5 min., each riser, 1" to 4" pipe, 1000 - 3000 L.F. | EA | $0.00 | $0.00 | $0.00 | |||||
| 27 | Air control, air/vacuum valve, 1" diameter, includes float | EA | $0.00 | $0.00 | $0.00 | |||||
| 28 | HAZMAT Remediation, abatement, removal, sampling & testing, asbestos, lead | LOT | $0.00 | $0.00 | $0.00 | |||||
| 29 | Hangar Free Zone phasing requirements, 1 month | LOT | $0.00 | $0.00 | $0.00 | |||||
| 30 | TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| (AF Form 3052., AUG 93) |