MHMV971927A AF Form 3052 Blank Contractor Proposal Form.xlsx

XLSX spreadsheet 43 KB Posted

Attached to
Repair Sprinkler System
Solicitation number
FA9401-12-R-0020
Issued by

About this file

Attachment 4.

View the file

Other files

File Type Posted
FA9401-12-R-0020 Amendment 4.pdf PDF
Addendum 1.pdf PDF
Amendment 3 FA9401-12-R-0020.pdf PDF
Addendum 1 FP2.pdf PDF
Addendum 1 FP1.pdf PDF
4b. floorplan 1002.pdf PDF
3c.sample results lead on doors.pdf PDF
2c. Lead sample results.pdf PDF
2b. floorplan.pdf PDF
2a. Asbestos sample results.pdf PDF
3a. Sample results asbestos.pdf PDF
2d. floorplan.pdf PDF
5b. floorplan 1002.pdf PDF
5a. Sample Results.pdf PDF
5c. Pictures.pdf PDF
Amendment 2 FA9401-12-R-0020.pdf PDF
4a. Lead Sample Results.pdf PDF
3d. floorplan 1002.pdf PDF
2e. Copy of floor plan island c first floor.pdf PDF
3b. sample results lead.pdf PDF
1. ASB-1002.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
Amendment 1 FA9401-12-R-0020.pdf PDF
12. Past Performance Information Form.pdf PDF
h. Construction AF Form 66.pdf PDF
f. Free Zone Layout.pdf PDF
AF 3065 Progress Report.pdf PDF
13. KAFB Map for Site Visit Location —
Statement of Work-MHMV971927A.pdf PDF
c. DRAWINGS - H1002 REPAIR SPRINKLER SYSTEM.pdf PDF
e. Fire Truck Pumper Specifications.pdf PDF
FA9401-12-R-0020.pdf PDF
d. SPECIFICATIONS - H1002 REPAIR SPRINKLER SYSTEM.pdf PDF
AF_3000.pdf PDF
AF 3064-Progress Schedule.xls XLS spreadsheet
Permit Requirements Memo.pdf PDF
General Decision Number NM120040 NM40.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY

INSTRUCTIONS FOR COMPLETING AF FORM 3052

Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to
permit itemizing of all direct costs.
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square
feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be
funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will
be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract
and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows.

FOR OFFICIAL USE ONLY

TOTAL MATERIAL COSTS $ 0.00

TOTAL LABOR COSTS $ 0.00

TOTAL OTHER DIRECT COSTS $ 0.00

TOTAL DIRECT COSTS $ 0.00

OVERHEAD % $ 0.00

PROFIT % $ 0.00

NMGRT % $ 0.00

TOTAL PRICE $ 0.00

DATE : FIRM NAME :

TITLE :BY :
(Signature)

INSTRUCTIONS TO OFFERORS

1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and
estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from
this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data
(see ASPR 3-807.3(e) and 3-807.4)
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this
form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and
analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of
a. The existing, verifiable data.
b. The judgmental factors applied in projecting from known data to the estimate, and
c. The contingencies used by the offeror in his proposed price.
In short, the offeror's estimating process itself needs to be disclosed.
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate),
and made available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the
purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate
evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection
with any negotiations prior to contract award.

(Reverse of AF Form 3052., AUG 93)

BREAKDOWN

FOR OFFICIAL USE ONLY
CONSTRUCTION COST ESTIMATE BREAKDOWNSHEET NO.1OF1
CONTRACTORADDRESS
KAFB
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION :
MHMV971927AH1002
UNIT OFMATERIAL COSTLABOR COST$$
LINEITEMMEASUREQUANTITY$$$$OTHERLINE
NOUNITTOTALMANHOURSAVERAGETOTALDIRECTTOTAL
RATEUNIT COSTS
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
SPRINKLER REPLACEMENT
1Sprinkler System Components, sprinkler cabinets, 12 head capacityEA$0.00$0.00$0.00
2Sprinkler System Components, sprinkler head escutcheons, standard, chrome, brass, 1" sizeEA$0.00$0.00$0.00
3Sprinkler System Components, sprinkler head escutcheons, recessed type, chrome or white enamel, 1" sizeEA$0.00$0.00$0.00
4Sprinkler System Components, sprinkler heads, standard spray, pendent or upright, brass, 135 to 286 degrees F, 1/2" NPT, 1/2" orifice, excludes supply pipingEA$0.00$0.00$0.00
5Sprinkler System Components, sprinkler heads, sidewall, brass, 135 to 286 degrees F, 1/2" NPT, 1/2" orifice, excludes supply pipingEA$0.00$0.00$0.00
6Piping system identification labels/paint, pipe markers, single coat, indicate contents, plastic snap around, 1-4" pipeLF$0.00$0.00$0.00
7Fire Protection, sprinklers, wet pipe system, pipe schedule method, steel, black, Sch 40 pipe, light/ordinary hazardSF$0.00$0.00$0.00
8Fire Protection, sprinklers, as-built plansLOT$0.00$0.00$0.00
9Pipe, steel, black, threaded, 1" diameter, schedule 40, Spec. A-53, includes hangers and bracing, seismicLF$0.00$0.00$0.00
10Pipe, steel, black, threaded, 1-1/4" diameter, schedule 40, Spec. A-53, includes hangers and bracing, seismicLF$0.00$0.00$0.00
11Hangar Free Zone phasing requirements, 1 monthLOT$0.00$0.00$0.00
12Remove eggcrate lay-in ceiling, incl. grid and bracing, patch gypbd ceilingSF$0.00$0.00$0.00
13HAZMAT Remediation, abatement, removal, sampling & testing, asbestos, leadLOT$0.00$0.00$0.00
14Pipe testing, nondestructive hydraulic pressure test, isolate, 2 hour hold, 1" to 4" pipe, 1000 - 3000 L.F.EA$0.00$0.00$0.00
STANDPIPE
15Sprinkler System Components, valves, check, swing, cast iron body, brass fittings, auto. Ball drip, 4" sizeEA$0.00$0.00$0.00
16Fire Valves, roof manifold, horizontal, brass, without valves and caps, (2) 2-1/2" x 4"EA$0.00$0.00$0.00
17Standpipe connections, FDC, wall, with plugs and chains, single, flush, brass, 2-1/2"x2-1/2"EA$0.00$0.00$0.00
18Fire Hose Valves, angle, non pressure adjust/restricting, polished barss, 2-1/2"EA$0.00$0.00$0.00
19Piping system identification labels/paint, pipe markers, single coat, indicate contents, plastic snap around, 2-4" pipeLF$0.00$0.00$0.00
20Piping system identification labels, valve tags, identifying legend, brass/aluminum w/chainEA$0.00$0.00$0.00
21Pipe, steel, black, threaded, 4" diameter, schedule 40, Spec. A-53, includes hangers and bracing, seismicLF$0.00$0.00$0.00
22Pipe, steel, black, threaded, 2-1/2" diameter, schedule 40, Spec. A-53, includes hangers and bracing, seismicLF$0.00$0.00$0.00
23Sleeve, pipe, steel with water stop, 12" long, 5" dia for 3" carrier pipe, includes link sealEA$0.00$0.00$0.00
24Valves, brass, OS&Y, chain & lock, 150 lb., 4", threadedEA$0.00$0.00$0.00
25Pipe testing, nondestructive hydraulic pressure test, isolate, 2 hour hold, 1" to 4" pipe, 1000 - 3000 L.F.EA$0.00$0.00$0.00
26Pipe testing, nondestructive flow test, isolate, 5 min., each riser, 1" to 4" pipe, 1000 - 3000 L.F.EA$0.00$0.00$0.00
27Air control, air/vacuum valve, 1" diameter, includes floatEA$0.00$0.00$0.00
28HAZMAT Remediation, abatement, removal, sampling & testing, asbestos, leadLOT$0.00$0.00$0.00
29Hangar Free Zone phasing requirements, 1 monthLOT$0.00$0.00$0.00
30TOTAL$0.00$0.00$0.00$0.00
(AF Form 3052., AUG 93)