Project 655-22-202 Removal of UST and Replacement with AST
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 26C25023B0064
- Agency
-
Veterans Integrated Service Network 10
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Saginaw, Michigan 48602, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks bids for the complete demolition and removal of an existing underground storage tank and installation of new aboveground storage tank equipment for Building 19 at the Aleda E. Lutz VA Medical Center in Saginaw, Michigan. The Department of Veterans Affairs will solicit bids for all labor, materials, permits, tools, equipment, and other resources required as per the drawings and specifications. The period of performance is 120 calendar days from notice to proceed, with work to be done during normal business hours excluding federal holidays. The solicitation will be released on July 21, 2023, with award of a firm fixed-price contract to occur within 120 days of bid opening.
This is a 100% set-aside for verified Service-Disabled Veteran Owned Small Businesses registered in the Vendor Information Pages database. The NAICS code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors and the PSC code is R499 - Other Facility Related Services. The period of performance is 120 calendar days from notice to proceed for the demolition and removal of one underground storage tank and installation of new aboveground storage tank equipment in Building 19 at the Aleda E. Lutz VA Medical Center.
Notice text
Contractor shall completely prepare site for demolition and removal of exiting UST Tank and Install new AST equipment for Building 19, Construction contractor shall furnish labor and materials and perform work for Project 655-22-202 Removal of UST and Replacement with AST for Generator in Building 19 at the VA Saginaw Healthcare System’s (VASHCS) Aleda E. Lutz VA Medical Center (ALVAMC) as required by drawings and specifications. Period of Performance for this project is 120 Calendar days from the Notice to Proceed.
Files
| File | Type | Posted |
|---|---|---|
| PreSolicitation Notice 36C25023B0064.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| 655-22-202 Removal of UST and Replacement with AST | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z2DA--Renovate Space for Patient Care Improvements | Veterans Integrated Service Network 6 | Service-Disabled Veteran-Owned Small Business | |
| Z2DZ--520-27-102 Install Catwalks and Safety Railings for Aboveground Fuel Tanks | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| Z2NZ--Turn Key Chiller Equipment (Purchase and Install) | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| Z1ND--EL paso lift station piping repair | Veterans Integrated Service Network 17 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity