Payette NF SO

Award Notice Posted

Solicitation number
AG-0261-S-13-0049
Agency
Awarded
to Kreizenbeck LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-0261-C-13-0017 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
The project site is located within the city of McCall Idaho at 500 North Mission Street on Forest Service Property (Krassel Yard). It is within the Payette National Forest in Valley County. Located, 8, T18N., R.3E., section 16, Boise Meridian. McCall, Idaho, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Added: May 29, 2013 10:38 am Modified: Jul 08, 2013 8:40 amTrack Changes This project is still valid and will be avaliable on FBO on 3 July 2013. the close date is set for 5 Aug 2013 at 1PM local time, Boise, ID. A site visit / pre-proposal conference has been set for 15 July 2013 in McCall at 11 am.
Any questions or comments are due by 19 July 2013.

This Project consists of constructing a new Supervisor's Office with new utility service connections and a new asphalt aggregate parking area. The new Supervisor's Office is located on Forest Service owned property (Krassel Yard).
1. Demolition Work includes the following:
Pulverizing and stockpiling the existing asphalt road and parking areas. The material shall be reused as road base on the project.
Removing designated signs and culverts
Demolition and removal of existing dumpster enclosure.
2. New Construction work includes the following:
Construct a new 13,445 Square foot Payette Supervisor's Office, including the following amenities
The Building project shall meet the Green Building Initiative standards of a minimum of 2 Green Globes.
The building shall be built as directed in the drawings and specifications.
Reconstruction of portions of the entrance and all loop roads, including the installation of new aggregate and asphalt roads and parking areas, culverts and signs, landscape materials, plantings, seeding, irrigation system, site furniture, dumpster pads, concrete sidewalks, chain link security fence, and other work as described in the plans and specifications.
Installing new water, sewer, and electrical utility connections including water lines/laterals, fire hydrant, water meter, pressure reducing valves, back flow prevention device, curb valve and boxes, concrete manhole, and modifications to the existing system.


The Magnitude of this project is estimated between $1,000,000 and $5,000,000

The solicitation will be available on FBO on or around 3 July 2013.

Update #4 ·

Added: May 29, 2013 10:38 am Modified: Jul 02, 2013 3:27 pmTrack Changes This project is still valid and will be avaliable on FBO on 3 July 2013. the close date is set for 5 Aug 2013 at 1PM local time, Boise, ID. A site visit and pre-proposal conference has been set for 15 July 2013 in McCall at 11 am.
Any questions or comments are due by 19 July 2013

This Project consists of constructing a new Supervisor's Office with new utility service connections and a new asphalt aggregate parking area. The new Supervisor's Office is located on Forest Service owned property (Krassel Yard).
1. Demolition Work includes the following:
Pulverizing and stockpiling the existing asphalt road and parking areas. The material shall be reused as road base on the project.
Removing designated signs and culverts
Demolition and removal of existing dumpster enclosure.
2. New Construction work includes the following:
Construct a new 13,445 Square foot Payette Supervisor's Office, including the following amenities
The Building project shall meet the Green Building Initiative standards of a minimum of 2 Green Globes.
The building shall be built as directed in the drawings and specifications.
Reconstruction of portions of the entrance and all loop roads, including the installation of new aggregate and asphalt roads and parking areas, culverts and signs, landscape materials, plantings, seeding, irrigation system, site furniture, dumpster pads, concrete sidewalks, chain link security fence, and other work as described in the plans and specifications.
Installing new water, sewer, and electrical utility connections including water lines/laterals, fire hydrant, water meter, pressure reducing valves, back flow prevention device, curb valve and boxes, concrete manhole, and modifications to the existing system.


The Magnitude of this project is estimated between $1,000,000 and $5,000,000

The solicitation will be available on FBO on or around 3 July 2013.

Update #3 ·

Added: May 29, 2013 10:38 am Modified: Jun 26, 2013 11:37 amTrack Changes This Presolicitation is Canceled.








This Project consists of constructing a new Supervisor's Office with new utility service connections and a new asphalt aggregate parking area. The new Supervisor's Office is located on Forest Service owned property (Krassel Yard).
1. Demolition Work includes the following:
Pulverizing and stockpiling the existing asphalt road and parking areas. The material shall be reused as road base on the project.
Removing designated signs and culverts
Demolition and removal of existing dumpster enclosure.
2. New Construction work includes the following:
Construct a new 13,445 Square foot Payette Supervisor's Office, including the following amenities
The Building project shall meet the Green Building Initiative standards of a minimum of 2 Green Globes.
The building shall be built as directed in the drawings and specifications.
Reconstruction of portions of the entrance and all loop roads, including the installation of new aggregate and asphalt roads and parking areas, culverts and signs, landscape materials, plantings, seeding, irrigation system, site furniture, dumpster pads, concrete sidewalks, chain link security fence, and other work as described in the plans and specifications.
Installing new water, sewer, and electrical utility connections including water lines/laterals, fire hydrant, water meter, pressure reducing valves, back flow prevention device, curb valve and boxes, concrete manhole, and modifications to the existing system.


The Magnitude of this project is estimated between $1,000,000 and $5,000,000

The solicitation will be available on FBO on or around 13 June 2013.

Update #2 ·

Added: May 29, 2013 10:38 am Modified: May 31, 2013 8:36 amTrack Changes This Project consists of constructing a new Supervisor's Office with new utility service connections and a new asphalt aggregate parking area. The new Supervisor's Office is located on Forest Service owned property (Krassel Yard).
1. Demolition Work includes the following:
Pulverizing and stockpiling the existing asphalt road and parking areas. The material shall be reused as road base on the project.
Removing designated signs and culverts
Demolition and removal of existing dumpster enclosure.
2. New Construction work includes the following:
Construct a new 13,445 Square foot Payette Supervisor's Office, including the following amenities
The Building project shall meet the Green Building Initiative standards of a minimum of 2 Green Globes.
The building shall be built as directed in the drawings and specifications.
Reconstruction of portions of the entrance and all loop roads, including the installation of new aggregate and asphalt roads and parking areas, culverts and signs, landscape materials, plantings, seeding, irrigation system, site furniture, dumpster pads, concrete sidewalks, chain link security fence, and other work as described in the plans and specifications.
Installing new water, sewer, and electrical utility connections including water lines/laterals, fire hydrant, water meter, pressure reducing valves, back flow prevention device, curb valve and boxes, concrete manhole, and modifications to the existing system.


The Magnitude of this project is estimated between $1,000,000 and $5,000,000

The solicitation will be available on FBO on or around 13 June 2013.

Update #1 ·

Added: May 29, 2013 10:38 am This Project consists of constructing a new Supervisor's Office with new utility service connections and a new asphalt aggregate parking area. The new Supervisor's Office is located on Forest Service owned property (Krassel Yard).
1. Demolition Work includes the following:
Pulverizing and stockpiling the existing asphalt road and parking areas. The material shall be reused as road base on the project.
Removing designated signs and culverts
Demolition and removal of existing dumpster enclosure.
2. New Construction work includes the following:
Construct a new 13,445 Square foot Payette Supervisor's Office, including the following amenities
The Building project shall meet the Green Building Initiative standards of a minimum of 2 Green Globes.
The building shall be built as directed in the drawings and specifications.
Reconstruction of portions of the entrance and all loop roads, including the installation of new aggregate and asphalt roads and parking areas, culverts and signs, landscape materials, plantings, seeding, irrigation system, site furniture, dumpster pads, concrete sidewalks, chain link security fence, and other work as described in the plans and specifications.
Installing new water, sewer, and electrical utility connections including water lines/laterals, fire hydrant, water meter, pressure reducing valves, back flow prevention device, curb valve and boxes, concrete manhole, and modifications to the existing system.


The Magnitude of this project is estimated between $1,000,000 and $5,000,000