Payette_SO_Construction_Cost_Estimate_Breakdown.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Payette NF SO
- Solicitation number
- AG-0261-S-13-0049
About this file
Cost worksheet Attach 5
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-0261-S-13-0049_00002.pdf | ||
| AG-0261-S-13-0049_0001.pdf | ||
| Site_Visit_Sign_in_Sheet.pdf | ||
| Payette_SO_Construction_Cost_Estimate_Breakdown_Excel_97-03.xls | XLS spreadsheet | |
| Corrected_1442_AG-0261-S-13-0049.pdf | ||
| PayetteSO.Drawings.Final.0612013.Signatures.pdf | ||
| GD_ID130023_05-24-2013.pdf | ||
| DETERMINATION_OF_RESPONSIBILITY_LETTER.doc | DOC document | |
| AG-0261-S-13-0049.pdf | ||
| Past_Performance_Questionnaire.docx | DOCX document | |
| PayetteSO.Spec.Final.061313.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PAYETTE SUPERVISORS OFFICE PROPOSED CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION McCall, ID
| MATERIAL COST | LABOR COSTS | ||||||||||
| METHOD | UNIT | OTHER | |||||||||
| LINE | ITEM | OF | OF | QUANTITY | UNIT | TOTAL | MANHOUR | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASUREMENT | MEASURE | MANDAYS | RATE | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| Base Item | |||||||||||
| 000501 | Payette Supervisor's Office Building | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 010250 | Construction Staking | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 011900 | Mobilization | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 024102 | Removal and Disposal of Existing Structures | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 221100-1 | Pipeline, 2" HDPE, Including Trench and Fittings | DQ | LF | 250 | 0.00 | 0.00 | 0.00 | ||||
| 221100-2 | Pipeline, 6" PVC, C900, Including Trench and Fittings | DQ | LF | 250 | 0.00 | 0.00 | 0.00 | ||||
| 221100-3 | Connection to Existing Water Main | LSQ | LS | 2 | 0.00 | 0.00 | 0.00 | ||||
| 221100-4 | Fire Hydrant | AQ | EA | 1 | 0.00 | 0.00 | 0.00 | ||||
| 221102-1 | Curb Valve and Box - 2-Inch Metal | AQ | EA | 1 | 0.00 | 0.00 | 0.00 | ||||
| 221102-2 | Curb Valve and Box - 6-Inch Cast Iron | AQ | EA | 2 | 0.00 | 0.00 | 0.00 | ||||
| 221300-1 | Sewerline - Gravity, 6-Inch PVC, SDR 35, Including Trench and Fittings | DQ | LF | 50 | 0.00 | 0.00 | 0.00 | ||||
| 221300-2 | Sewerline - Gravity, 8-Inch PVC, SDR 35, Including Trench and Fittings | DQ | LF | 290 | 0.00 | 0.00 | 0.00 | ||||
| 221300-2 | Sewer Manholes - 48" Diameter Concrete | AQ | EA | 2 | 0.00 | 0.00 | 0.00 | ||||
| 221300-3 | Sewer Manholes - Raise Existing Lids | AQ | EA | 3 | 0.00 | 0.00 | 0.00 | ||||
| 260500-1 | Site Electrical - Electrical Distribution System | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 322706-1 | Pulverize Asphalt Pavement and Reuse - Area for Building Construction | DQ | CY | 120 | 0.00 | 0.00 | 0.00 | ||||
| Total Base Item | 0.00 | ||||||||||
| Optional Item #1 (Site Prep Grading ) | |||||||||||
| 221100-3 | Pipeline, 1.5" HDPE, Including Trench and Fittings | DQ | LF | 175 | 0.00 | 0.00 | 0.00 | ||||
| 312100 | Project Site Preparation and Grading (Excludes All Work within 5' of the Building Roof Line) | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 321204-1 | Crushed Aggregate Base Course - Grading "C" (For Under Roadways) | DQ | CY | 1,410 | 0.00 | 0.00 | 0.00 | ||||
| 321204-2 | Crushed Aggregate Surface Course - Grading "G" (For Aggregate Parking Lot) | DQ | CY | 150 | 0.00 | 0.00 | 0.00 | ||||
| 312010-1 | Select Borrow (For areas under roads and parking) | AQ | Ton | 200 | 0.00 | 0.00 | 0.00 | ||||
| 332228-1 | Culvert - 12-inch Galv. Currugated Metal Pipe (16 Gauge, 2 2/3"x1/2" Corrugations) | AQ | LF | 90 | 0.00 | 0.00 | 0.00 | ||||
| 332228-2 | Culvert - 12-inch PVC (Detention Basin Outlet) | AQ | LF | 60 | 0.00 | 0.00 | 0.00 | ||||
| 332228-3 | Outlet Control Structure - Storm Water System | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 322706-2 | Pulverize Asphalt Pavement and Reuse - Remaining Areas On-site | DQ | CY | 370 | 0.00 | 0.00 | 0.00 | ||||
| Total Optional Item #1 | 0.00 | ||||||||||
| Optional Item #2 (Site Work) | |||||||||||
| 026460-1 | Dumpster Pad and Screen Enclosure | AQ | EA | 1 | 0.00 | 0.00 | 0.00 | ||||
| 026460-2 | Recycle Dumpster Pad | AQ | EA | 1 | 0.00 | 0.00 | 0.00 | ||||
| 033545-1 | Concrete Curb & Gutter - 30" Wide | DQ | LF | 750 | 0.00 | 0.00 | 0.00 | ||||
| 033545-2 | Valley Gutter | DQ | LF | 57 | 0.00 | 0.00 | 0.00 | ||||
| 033545-3 | 4" Concrete - Sidewalks, Slabs; Includes Aggregate Base Material | DQ | SF | 5,250 | 0.00 | 0.00 | 0.00 | ||||
| 033545-4 | Concrete Accessible Ramp | AQ | EA | 3 | 0.00 | 0.00 | 0.00 | ||||
| 101400-1 | Regulatory Signs - Aluminum on Galv. Steel Tube Posts | AQ | EA | 19 | 0.00 | 0.00 | 0.00 | ||||
| 260500-2 | Site Electrical - Electrical Distribution System (Parking Lighting and Gate Electrical) | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 321200-1 | Hot Mix Asphalt Pavement | AQ | Ton | 1,270 | 0.00 | 0.00 | 0.00 | ||||
| 322640-1 | Pavement Markings - Parking Stall Lines 4" Solid Yellow Non Reflective | DQ | LF | 3,200 | 0.00 | 0.00 | 0.00 | ||||
| 322640-2 | Pavement Markings - Accessible Parking Symbol | AQ | EA | 7 | 0.00 | 0.00 | 0.00 | ||||
| 322640-3 | Directional Arrows (Reflectorized White) | AQ | EA | 1 | 0.00 | 0.00 | 0.00 | ||||
| Total Optional Item #2 | 0.00 | ||||||||||
| Optional Item #3 (Secure Parking Area) | |||||||||||
| 033545-5 | 4" Concrete - Sidewalks, Slabs; Includes Aggregate Base Material | DQ | SF | 200 | 0.00 | 0.00 | 0.00 | ||||
| 101400-2 | Regulatory Signs - Aluminum on Galv. Steel Tube Posts (Accessible Parking) | AQ | EA | 2 | 0.00 | 0.00 | 0.00 | ||||
| 321200-2 | Hot Mix Asphalt Pavement | AQ | Ton | 300 | 0.00 | 0.00 | 0.00 | ||||
| 323113-1 | Chain Link Fence | AQ | LF | 630 | 0.00 | 0.00 | 0.00 | ||||
| 323113-2 | Slide Gate - 22 Foot Wide Opening | AQ | EA | 1 | 0.00 | 0.00 | 0.00 | ||||
| 323113-3 | Vertical Pivot Gate - 18 Foot Wide Opening | AQ | EA | 1 | 0.00 | 0.00 | 0.00 | ||||
| 323113-4 | Pedestrian Gate - 5 Foot Wide Opening | AQ | EA | 1 | 0.00 | 0.00 | 0.00 | ||||
| 321713 | Bollards | AQ | EA | 4 | 0.00 | 0.00 | 0.00 | ||||
| 322640-4 | Pavement Markings - Parking Stall Lines 4" Solid Yellow Non Reflective | DQ | LF | 950 | 0.00 | 0.00 | 0.00 | ||||
| 322640-5 | Pavement Markings - Accessible Parking Symbol | AQ | EA | 2 | 0.00 | 0.00 | 0.00 | ||||
| Total Optional Item #3 | 0.00 | ||||||||||
| Optional Item #4 (Site Furnishings) | |||||||||||
| 129300-1 | Site Furnishings - Bicycle Rack | AQ | EA | 4 | 0.00 | 0.00 | 0.00 | ||||
| 129300-2 | Site Furnishings - Concrete Picnic Tables | AQ | EA | 2 | 0.00 | 0.00 | 0.00 | ||||
| 129300-3 | Site Furnishings - Flag Pole | AQ | EA | 1 | 0.00 | 0.00 | 0.00 | ||||
| Total Optional Item #4 | 0.00 | ||||||||||
| Optional Item #5 (Landscaping) | |||||||||||
| 328000 | Irrigation System | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | 0.00 | |||
| 329206 | Seeding | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 329310-1 | Exterior Plants and Landscape Boulders | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| 329310-2 | Planting Media Top Soil for Lawn Areas | DQ | CY | 132 | 0.00 | 0.00 | 0.00 | ||||
| 329400 | Landscape Stone, Wood Mulch, Weed Barrier & Steel Edging | LSQ | LS | 1 | 0.00 | 0.00 | 0.00 | ||||
| Total Optional Item #5 | 0.00 | ||||||||||
| Total all items | 0.00 | ||||||||||
| 0.00 | 0.00 | 0.00 | 0.00 |
OVERHEAD 0% $ - 0
SUBTOTAL 0.00
PROFIT 0% $ - 0
TOTAL PRICE $ - 0
AG-0261-S-13-0049 Payett SO &P&N
| INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN | ||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit | ||
| itemizing of all direct costs. | ||
| Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, | ||
| linear feet - LF, board feet - BF, each - EA, pound - LB). | ||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the | ||
| Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, | ||
| the contractor is responsible for determining quantity estimates. | ||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1. | ||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of | ||
| significant dollar value. | ||
| Col 10 Line Total. Self-explanatory. | ||
| NOTE: | In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |
| page as follows | ||
| TOTAL MATERIAL COSTS | $ |
TOTAL LABOR COSTS $
TOTAL OTHER DIRECT COSTS $
TOTAL DIRECT COSTS $
OVERHEAD % $
SUBTOTAL $
PROFIT % $
TOTAL PRICE $
DATE FIRM NAME
| TITLE | BY | |
| (Signature) |
| INSTRUCTIONS TO OFFERORS | ||
| 1. | The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract resulting from | ||
| this proposal the offeror may be required to submit a certificate of current cost or pricing data | ||
| 2. | In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |
| form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and | ||
| analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||
| a. | The existing, verifiable data. | |
| b. | The judgmental factors applied in projecting from known data to the estimate, and | |
| c. | The contingencies used by the offeror in his proposed price. | |
| In short, the offeror's estimating process itself needs to be disclosed. | ||
| 3. | When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |
| and made available to the contracting officer his authorized representative upon request. | ||
| 4. | By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate | ||
| evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection | ||
| with any negotiations prior to contract award. |