Ouray pond liners and kettle rehab

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140F0620R0011
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
1380 South 2350 West, Vernal, UT 84078 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Fish and Wildlife Service seeks to install new 45 mil reinforced flexible polypropylene pond liners in six ponds and reconfigure piping features at six catch basins at the Ouray National Fish Hatchery in Vernal, Utah. Offerors must meet specifications for materials, installation drawings, quality control, and provide submittals including schedules, samples, warranties and manuals. Proposals are due by May 26, 2020 with evaluation based on technical qualifications, past performance, and price.

Designated as a total small business set-aside, the opportunity falls under NAICS 237310 and PSC S206 with a budget between $500,000 to $1,000,000. The contract will be performed over 120 calendar days at the Ouray National Fish Hatchery located at 1380 S 2350 W, Vernal, UT 84078. Installation must be completed on all six ponds simultaneously within the performance period.

Notice text

3 versions

Update #3 · Latest ·

OURAY NFH POND LINERS AND KETTLE REHAB AMENDMENT 0002: Install new 45 mil reinforced flexible polypropylene (RPP) pond liners in six ponds as indicated in the project drawings. Reconfigure piping features at catch basin end of six ponds. Installation of reinforced concrete curb in existing catch basins and along kettle stair sections as shown in drawings. The point of contact for this effort is the contracting officer Tim Officer tim_officer@fws.gov or 303-236-4320.

Update #2 ·

OURAY NFH POND LINERS AND KETTLE REHAB AMENDMENT 0001: Install new 45 mil reinforced flexible polypropylene (RPP) pond liners in six ponds as indicated in the project drawings. Reconfigure piping features at catch basin end of six ponds. Installation of reinforced concrete curb in existing catch basins and along kettle stair sections as shown in drawings. The point of contact for this effort is the contracting officer Tim Officer tim_officer@fws.gov or 303-236-4320.

Update #1 ·

OURAY NFH POND LINERS AND KETTLE REHAB: Install new 45 mil reinforced flexible polypropylene (RPP) pond liners in six ponds as indicated in the project drawings. Reconfigure piping features at catch basin end of six ponds. Installation of reinforced concrete curb in existing catch basins and along kettle stair sections as shown in drawings. The point of contact for this effort is the contracting officer Tim Officer tim_officer@fws.gov or 303-236-4320.

Files

Notice history

Notice Type Posted
Ouray NFH pond liners and kettle rehab Award Award Notice
This notice Latest solicitation Solicitation
Ouray NFH pond liners and kettle rehab Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Bassie spring improvement project NAICS 238990 Nevada Region Total Small Business
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah Beaver, Utah 84713, United States · NAICS 237990 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity