Ouray pond liners and kettle rehab
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140F0620R0011
- Agency
-
Fish and Wildlife Service
Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- 1380 South 2350 West, Vernal, UT 84078 USA
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Fish and Wildlife Service seeks to install new 45 mil reinforced flexible polypropylene pond liners in six ponds and reconfigure piping features at six catch basins at the Ouray National Fish Hatchery in Vernal, Utah. Offerors must meet specifications for materials, installation drawings, quality control, and provide submittals including schedules, samples, warranties and manuals. Proposals are due by May 26, 2020 with evaluation based on technical qualifications, past performance, and price.
Designated as a total small business set-aside, the opportunity falls under NAICS 237310 and PSC S206 with a budget between $500,000 to $1,000,000. The contract will be performed over 120 calendar days at the Ouray National Fish Hatchery located at 1380 S 2350 W, Vernal, UT 84078. Installation must be completed on all six ponds simultaneously within the performance period.
Notice text
3 versions
Update #3 · Latest ·
OURAY NFH POND LINERS AND KETTLE REHAB AMENDMENT 0002: Install new 45 mil reinforced flexible polypropylene (RPP) pond liners in six ponds as indicated in the project drawings. Reconfigure piping features at catch basin end of six ponds. Installation of reinforced concrete curb in existing catch basins and along kettle stair sections as shown in drawings. The point of contact for this effort is the contracting officer Tim Officer tim_officer@fws.gov or 303-236-4320.
Update #2 ·
OURAY NFH POND LINERS AND KETTLE REHAB AMENDMENT 0001: Install new 45 mil reinforced flexible polypropylene (RPP) pond liners in six ponds as indicated in the project drawings. Reconfigure piping features at catch basin end of six ponds. Installation of reinforced concrete curb in existing catch basins and along kettle stair sections as shown in drawings. The point of contact for this effort is the contracting officer Tim Officer tim_officer@fws.gov or 303-236-4320.
Update #1 ·
OURAY NFH POND LINERS AND KETTLE REHAB: Install new 45 mil reinforced flexible polypropylene (RPP) pond liners in six ponds as indicated in the project drawings. Reconfigure piping features at catch basin end of six ponds. Installation of reinforced concrete curb in existing catch basins and along kettle stair sections as shown in drawings. The point of contact for this effort is the contracting officer Tim Officer tim_officer@fws.gov or 303-236-4320.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Ouray NFH pond liners and kettle rehab | Award Notice | |
| This notice | Solicitation | |
| Ouray NFH pond liners and kettle rehab | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Bassie spring improvement project | Nevada Region | Total Small Business | |
| GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity