North Fork Lake Creek Bridge Replacement
Awarded Award Notice Posted
- Solicitation number
- AG-82BH-S-13-0029
- Agency
- Region 2 - Rocky Mountain Region Forest Service, Department of Agriculture
- Awarded
- to Southwest Interface Solutions
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-82BH-C-12-0033 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Lake County Leadville, Colorado 80461, United States
Notice details come from SAM.gov. Updated .
Notice text
5 versions
Update #5 · Latest ·
Added: Jul 29, 2013 7:55 pm
Amendment 000001 is issued for the following reasons:
1. Provide Pre-Bid Meeting Notes, Questions & Answers
2. Provided revised SF1442 and revised solicitation continuation document.
3. Make corrections to specifications and changes to Drawing Notes.
See Attached Amenment Documents.
Acknowledgement of the amendment is required to be submitted with the proposal.
Update #4 ·
Added: Jun 28, 2013 1:37 pm
Modified: Jul 16, 2013 11:26 amTrack Changes
The San Isabel National Forest has a requirement for the North Fork Lake Creek Bridge Replacement. Work includes but is not limited to removal and disposal of existing bridge abutments and superstructure; construction of new concrete bridge abutments, wing walls, and retaining walls; furnishing and placement of new precast concrete bridge superstructure; and furnishing and placement of approach rails and bridge rails. Contractor shall furnish all materials, equipment, labor, transportation and supplies necessary to complete this project.
This requirement is the same as the previous canceled solicitation # AG-82X9-S-13-0001 titled "North Lake Creek Bridge Replacement".
SITE VISIT.PRE BID CONFERENCE IS SCHEDULED TO BE HELD 17 JULY 2013, @ 10:30AM (MT) AT THE PROJECT SITE AS SHOWN BELOW. SEE SOLICITATION for VERIFICATION OF SITE VISIT DATE & TIME.SITE VISIT.
Project Site: San Isabel National Forest, Leadville Ranger District, Lake County, Colorado. From Leadville, travel south on US Highway 24 for 14 miles to the junction of Colorado State Highway 82; travel west on CO Hwy 82 for approximately 15 miles to junction of National Forest System Road (NFSR)
391. There is a parking area at highway intersection; walk approximately 100 yards down NFSR 391 to the bridge site. Verify site visit date & time in solicitation.
Time for Performance: The contract time of 275 calendar days (approx 9 September 2013 thru 10 July 2014).
This solicitation is a total small business set aside. The NAICS code is 237310 with a size standard of $33.5M.
Price Range is between $250,000 and $500,000.
Solicitation will be available for download from this website on or about 12 July 2013. Interested offerors are responsible for monitoring this site for release of the solicitation package, changes in the date of the site visit and any other pertinent information including downloading their own copy of the solicitation package and amendments.
All questions pertaining to this solicitation shall be submitted in writing to Toinette Aranda (Toni) at tparanda@fs.fed.us
Update #3 ·
Added: Jul 15, 2013 3:07 pm
POSTING SOLICITATION - SEE ATTACHEMENTS
All questions must be submitted in writing via e-mail to tparanda@fs.fed.us
and mvarhus@fs.fed.us No Later Than 23 July 2013 @ 4:00pm Mountain.
Update #2 ·
Added: Jun 28, 2013 1:37 pm
Modified: Jul 03, 2013 1:54 pmTrack Changes
The San Isabel National Forest has a requirement for the North Fork Lake Creek Bridge Replacement. Work includes but is not limited to removal and disposal of existing bridge abutments and superstructure; construction of new concrete bridge abutments, wing walls, and retaining walls; furnishing and placement of new precast concrete bridge superstructure; and furnishing and placement of approach rails and bridge rails. Contractor shall furnish all materials, equipment, labor, transportation and supplies necessary to complete this project.
This requirement is the same as the previous canceled solicitation # AG-82X9-S-13-0001 titled "North Lake Creek Bridge Replacement".
SITE VISIT.PRE BID CONFERENCE IS SCHEDULED TO BE HELD 17 JULY 2013, THURSDAY, @ 10:30AM (MT) AT THE PROJECT SITE AS SHOWN BELOW. SEE SOLICITATION for VERIFICATION OF SITE VISIT DATE & TIME.SITE VISIT.
Project Site: San Isabel National Forest, Leadville Ranger District, Lake County, Colorado. From Leadville, travel south on US Highway 24 for 14 miles to the junction of Colorado State Highway 82; travel west on CO Hwy 82 for approximately 15 miles to junction of National Forest System Road (NFSR)
391. There is a parking area at highway intersection; walk approximately 100 yards down NFSR 391 to the bridge site. Verify site visit date & time in solicitation.
Time for Performance: The contract time of 275 calendar days (approx 9 September 2013 thru 10 July 2014).
This solicitation is a total small business set aside. The NAICS code is 237310 with a size standard of $33.5M.
Price Range is between $250,000 and $500,000.
Solicitation will be available for download from this website on or about 12 July 2013. Interested offerors are responsible for monitoring this site for release of the solicitation package, changes in the date of the site visit and any other pertinent information including downloading their own copy of the solicitation package and amendments.
All questions pertaining to this solicitation shall be submitted in writing to Toinette Aranda (Toni) at tparanda@fs.fed.us
Update #1 ·
Added: Jun 28, 2013 1:37 pm
The San Isabel National Forest has a requirement for the North Fork Lake Creek Bridge Replacement. Work includes but is not limited to removal and disposal of existing bridge abutments and superstructure; construction of new concrete bridge abutments, wing walls, and retaining walls; furnishing and placement of new precast concrete bridge superstructure; and furnishing and placement of approach rails and bridge rails. Contractor shall furnish all materials, equipment, labor, transportation and supplies necessary to complete this project.
This requirement is the same as the previous canceled solicitation # AG-82X9-S-13-0001 titled "North Lake Creek Bridge Replacement".
SITE VISIT.PRE BID CONFERENCE IS SCHEDULED TO BE HELD THURSDAY, 11 JULY 2013 @ 10:30AM (MT) AT THE PROJECT SITE AS SHOWN BELOW.
Project Site: San Isabel National Forest, Leadville Ranger District, Lake County, Colorado. From Leadville, travel south on US Highway 24 for 14 miles to the junction of Colorado State Highway 82; travel west on CO Hwy 82 for approximately 15 miles to junction of National Forest System Road (NFSR)
391. There is a parking area at highway intersection; walk approximately 100 yards down NFSR 391 to the bridge site. Verify site visit date & time in solicitation.
Time for Performance: The contract time of 275 calendar days (approx 9 September 2013 thru 10 July 2014).
This solicitation is a total small business set aside. The NAICS code is 237310 with a size standard of $33.5M.
Price Range is between $250,000 and $500,000.
Solicitation will be available for download from this website on or about 12 July 2013. Interested offerors are responsible for monitoring this site for release of the solicitation package, changes in the date of the site visit and any other pertinent information including downloading their own copy of the solicitation package and amendments.
All questions pertaining to this solicitation shall be submitted in writing to Toinette Aranda (Toni) at tparanda@fs.fed.us
Attachments
| File | Type | Posted |
|---|---|---|
| AG-82BH-S-13-0029_Rev_1_pgs_4-25.docx | DOCX document | |
| Attach_Soils_Report__N_Fork_Lake_Creek_Bridge.pdf | ||
| AG-82BH-S-13-0029_1442_pgs_1-3_rev_1.pdf | ||
| Attach_Bid_Schedule_Fill_In.docx | DOCX document | |
| SF_30_Cont_pgs_2-5_Summary_of_Changes.docx | DOCX document | |
| AG-82BH-S-13-0029_Amend_000001_SF30_pg_1.pdf | ||
| Attach_J.4_Drawings_2-18.pdf | ||
| Attach_J.3_Drawings_Title_Page_1.pdf | ||
| Attach_J.1_Supplemental_C_2_pages.pdf | ||
| AG-82BH-S-12-0029_1442_pgs_1-3.pdf | ||
| Attach_J.5_DOL_Wages.docx | DOCX document | |
| Attach_J.2_Specs_64_pages.pdf | ||
| Attach_J.6_Fire_Control_Plan.docx | DOCX document | |
| AG-82BH-S-12-0029_Sol_Cont_pgs_4-25.docx | DOCX document |
Show all 14
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity