About this file
Attach J.5 DOL Wages
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-82BH-S-13-0029_Rev_1_pgs_4-25.docx | DOCX document | |
| SF_30_Cont_pgs_2-5_Summary_of_Changes.docx | DOCX document | |
| AG-82BH-S-13-0029_Amend_000001_SF30_pg_1.pdf | ||
| Attach_Soils_Report__N_Fork_Lake_Creek_Bridge.pdf | ||
| AG-82BH-S-13-0029_1442_pgs_1-3_rev_1.pdf | ||
| Attach_Bid_Schedule_Fill_In.docx | DOCX document | |
| Attach_J.4_Drawings_2-18.pdf | ||
| Attach_J.3_Drawings_Title_Page_1.pdf | ||
| Attach_J.1_Supplemental_C_2_pages.pdf | ||
| AG-82BH-S-12-0029_Sol_Cont_pgs_4-25.docx | DOCX document | |
| AG-82BH-S-12-0029_1442_pgs_1-3.pdf | ||
| Attach_J.2_Specs_64_pages.pdf | ||
| Attach_J.6_Fire_Control_Plan.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attach J.5 General Decision Page 7 of 8 General Decision Number: CO130023 01/04/2013 CO23 Superseded General Decision Number: CO20120023 State: Colorado Construction Type: Highway
Counties: Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Rio Blanco, Routt and Summit Counties in Colorado.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 01/04/2013
CARP9901-009 10/01/2010
Rates Fringes
CARPENTER (Excludes Form Work)...$ 24.00 11.28
ELEC0068-017 03/01/2011
SUMMIT COUNTY
Rates Fringes
TRAFFIC SIGNALIZATION:
Traffic Signal Installation Zone 1......................$ 26.42 4.75%+8.68 Zone 2......................$ 29.42 4.75%+8.68
TRAFFIC SIGNAL INSTALLER ZONE DEFINITIONS
Zone 1 shall be a 35 mile radius, measured from the following addresses in each of the following cities: Colorado Springs - Nevada & Bijou Denver - Ellsworth Avenue & Broadway Ft. Collins - Prospect & College Grand Junction - 12th & North Avenue Pueblo - I-25 & Highway 50
All work outside of these areas shall be paid Zone 2 rates.
ELEC0111-004 03/01/2011
Rates Fringes
ELECTRICIAN (Boom Truck Operator)........................$ 20.91 3%+6.10
* ENGI0009-013 06/25/2012
Rates Fringes
POWER EQUIPMENT OPERATOR:
(3)- Drill Rig Caisson (smaller than Watson 2500 and similar)................$ 24.27 8.62 (5)-Drill Rig Caisson (Watson 2500 similar or larger).....................$ 24.57 8.62
IRON0024-006 07/01/2011
Garfield County Only
Rates Fringes
Ironworkers:.....................$ 23.80 18.07 Structural
SUCO2011-008 09/15/2011
Rates Fringes
CARPENTER (Form Work Only) Eagle, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit.......$ 15.92 5.38 Garfield....................$ 19.55 4.09
CEMENT MASON/CONCRETE FINISHER
Eagle.......................$ 17.59 2.85 Garfield....................$ 17.27 2.16 Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt...............$ 18.23 2.85 Summit......................$ 15.55 2.85
ELECTRICIAN
Excludes Traffic Signalization...............$ 28.06 8.76 Traffic Signalization Electrician Eagle, Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..$ 28.24 8.52 Traffic Signalization Groundsman Eagle, Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..$ 15.93 4.01 Summit.....................$ 16.75 4.10
GUARDRAIL INSTALLER
Eagle.......................$ 12.78 3.46 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit.......$ 12.78 3.31
HIGHWAY/PARKING LOT STRIPING:
Truck Driver (Line Striping Truck)...........................$ 14.60 3.49
HIGHWAY/PARKING LOT
STRIPING:Painter Eagle.......................$ 13.85 3.07 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summitt......$ 13.97 3.07
IRONWORKER, REINFORCING
(Excludes Guardrail Installation)....................$ 16.94 6.77
IRONWORKER, STRUCTURAL
(Excludes Guardrail Installation)....................$ 22.22 6.01
LABORER
Asphalt Raker Eagle......................$ 16.36 3.26 Garfield...................$ 18.66 3.53 Grand......................$ 17.90 3.02 Jackson, Lake, Moffat, Routt......................$ 17.75 3.75 Pitkin.....................$ 17.50 3.75 Rio Blanco.................$ 18.97 3.75 Summit.....................$ 16.77 3.26 Common or General Eagle, Garfield, Jackson, Lake, Moffatt, Pitkin, Rio Blanco. Routt, Summitt.$ 12.44 3.53 Grand......................$ 19.14 3.53 Concrete Saw (Hand Held)....$ 16.00 6.14 Landscape and irrigation Eagle......................$ 14.84 3.16 Landscape and Irrigation Garfield, Grand, Jackson, Lake, Moffatt, Rio Blanco, Routt..............$ 13.54 3.16 Pitkin.....................$ 14.16 3.16 Summit.....................$ 13.09 3.16 Mason Tender- Cement/Concrete Eagle, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summitt.$ 12.44 3.10 Garfield...................$ 14.87 3.10 Traffic Control (Flagger)...$ 9.42 3.21 Traffic Control (Sets Up/Moves Barrels, Cones, Install Signs, Arrow Boards and Place Stationary Flags)(Excludes Flaggers) Eagle, Garfield, Grand, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 12.39 3.20 Jackson....................$ 12.93 3.22
PAINTER (Spray Only) Eagle.......................$ 17.49 3.52 Garfield, Grand. Jackson, lake, Moffatt, Pitkin, Rio Blanco, Routt...............$ 17.54 3.52 Summit......................$ 19.96 3.52
POWER EQUIPMENT OPERATOR:
Asphalt Laydown Eagle, Summit..............$ 22.67 8.72 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Routt......................$ 24.09 7.93 Rio Blanco.................$ 23.67 9.22 Asphalt Paver...............$ 22.67 8.72 Asphalt Plant...............$ 19.27 4.47 Asphalt Roller Eagle......................$ 23.01 8.72 Garfield, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit......$ 23.15 8.07 Grand......................$ 22.67 8.72 Asphalt Spreader............$ 25.61 6.96 Backhoe/Trackhoe Eagle......................$ 22.56 7.02 Garfield...................$ 19.40 4.42 Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..............$ 22.92 6.15 Summit.....................$ 24.30 5.75 Bobcat/Skid Loader Eagle......................$ 18.25 4.32 Garfield...................$ 24.63 0.00 Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..............$ 21.04 5.18 Summit.....................$ 19.77 4.28 Broom/Sweeper Eagle......................$ 23.35 7.78 Garfield, Jackson, Lake, Moffatt, Pitkin, Routt.....$ 21.92 7.66 Grand......................$ 21.67 8.22 Rio Blanco.................$ 21.66 0.00 Summit.....................$ 22.67 8.72 Bulldozer...................$ 26.78 7.05 Chipper.....................$ 22.04 8.26 Crane.......................$ 23.82 9.22 Drill.......................$ 20.84 2.66 Forklift....................$ 18.30 5.01 Grade Checker...............$ 23.82 9.22 Grader/Blade................$ 23.05 6.45 Guardrail/Post Driver.......$ 16.07 4.41 Loader (Front End) Eagle......................$ 24.98 7.55 Garfield...................$ 21.93 9.22 Grand, Pitkin, Rio Blanco..$ 22.67 8.72 Jackson, Lake, Moffatt, Routt......................$ 24.07 7.92 Rio Blanco.................$ 23.67 9.22 Summit.....................$ 25.88 7.01 Mechanic Eagle, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 23.31 3.93 Garfield...................$ 19.80 4.20 Oiler Eagle......................$ 23.82 7.62 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 24.04 7.77 Roller/Compactor (Dirt and Grade Compaction) Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Routt..............$ 22.72 5.98 Rio Blanco.................$ 23.67 9.22 Summit.....................$ 24.38 6.11 Rotomill Eagle......................$ 18.86 4.41 Garfield, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt..............$ 20.70 4.41 Grand......................$ 23.48 4.41 Summit.....................$ 16.28 4.41 Scraper.....................$ 20.60 7.99 Screed Eagle......................$ 17.04 3.98 Garfield, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Summit.............$ 23.76 5.05 Grand......................$ 23.29 4.05 Tractor.....................$ 15.08 2.95
TRUCK DRIVER
Distributor Eagle, Garfield, Grand, Jackson, Lake, Moffat, Pitkin, Routt, Summit......$ 19.07 4.35 Rio Blanco.................$ 15.80 5.27 Dump Truck Eagle......................$ 16.17 3.83 Garfield...................$ 16.29 3.83 Grand, Jackson, Lake, Moffatt, Routt.............$ 17.79 4.02 Pitkin.....................$ 20.13 4.15 Rio Blanco.................$ 17.26 4.63 Summit.....................$ 15.27 5.27 Lowboy Truck Eagle......................$ 18.89 4.56 Garfield, Grand, Jackson, Lake, Moffatt, Pitkin, Rio Blanco, Routt, Summit..$ 18.43 4.56 Mechanic....................$ 17.79 3.51 Multi-Purpose Specialty & Hoisting Truck..............$ 14.60 3.49 Pickup and Pilot Car........$ 14.04 3.49 Semi........................$ 20.72 0.00 Water Truck Eagle......................$ 23.05 2.90 Garfield...................$ 21.00 5.88 Grand......................$ 21.19 3.01 Jackson, Lake, Moffatt, Ptikin, Routt, Summit......$ 20.39 3.43 Rio Blanco.................$ 17.25 3.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION