Missouri River Bank Stabilization & Navigation (BSNP) South Structures Repair
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- W9128F20B0021
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KB Construction Of Canals
- Place of performance
- Ne Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for repair work on structures along the Missouri River Bank Stabilization and Navigation Project (BSNP) between River Miles 563 to 498 in Nebraska, Iowa and Missouri that were damaged in 2019 floods. The U.S. Army Corps of Engineers, Omaha District will rehabilitate and rebuild damaged BSNP structures including revetments, dikes, kickers, L-head dikes and vanes through the addition of stone material. Proposals are due by July 7, 2020 and the selected contractor will complete repairs within 450 calendar days while utilizing stone placement from a barge. The estimated value of the construction work is between $5 million to $10 million.
This opportunity is set aside for total small businesses only and utilizes NAICS codes 237990 and PSC code C512. The estimated value of construction is between $5 million to $10 million to be performed along the Missouri River in Nebraska, Iowa and Missouri. An amendment extended the deadline for proposals to July 7, 2020 at 2:00 pm at the U.S. Army Engineer District, Omaha office in Omaha, Nebraska. The selected contractor must complete repairs within 450 calendar days utilizing stone placement from a barge.
Notice text
Invitation for Bid (IFB) for Missouri River Bank Stabilization and Navigation Project (BSNP) – South Structures Repair.
This solicitation will close on 7 July 2020. This IFB is restricted to Small Businesses.
The 2019 floods caused significant damage to the Missouri River BSNP structures. The damaged structures include revetments, dikes, kickers, L-head dikes and vanes. These structures are critical to maintaining a navigation channel on the Missouri River. The damaged BSNP structures will be rehabilitated by adding stone to replace areas of deterioration. In areas with substantial loss of structural material, the work will effectively rebuild parts of the structure. The quantity of stone for each site is intended to bring the structures, it is anticipated that the stone will be placed from a barge. The BSNP South project location extends from River Mile 563 to 498 on the Missouri River in Nebraska, Iowa, and Missouri. Construction duration will be 450 Calendar Days.
Estimated Magnitude of Construction is between $5,000,000 and $10,000,000
Find solicitation announcement in Beta SAM.gov (beta.sam.gov).
1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.
2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’.
All responsible sources may submit a bid which shall be considered by the agency
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Missouri River Bank Stabilization & Navigation (BSNP) South Structures Repair | Award Notice | |
| Missouri River Bank Stabilization & Navigation (BSNP) South Structures Repair | Special Notice | |
| This notice | Solicitation | |
| Missouri River Bank Stabilization & Navigation (BSNP) South Structures Repair | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Mississippi River Basin Bettendorf, Iowa Local Flood Protection Bettendorf, Iowa 2024 Event PL84-99 Flood Repairs | ENDIST Rock Island | Service-Disabled Veteran-Owned Small Business | |
| Lower brule north shoreline stabilization and ecosystem restoration, element 2 | ENDIST Omaha | Total Small Business | |
| Belle Fountain Ditch Cleanout Phase 2 | ENDIST Memphis | Service-Disabled Veteran-Owned Small Business | |
| St Francis Town Levee Renovation | ENDIST Memphis | No set-aside | |
| Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement | ENDIST Portland | Total Small Business |