Foster Oil Spill Prevention System
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W9127N21R0008
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KA Maintenance Of Dams
- Place of performance
- OR 97345, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Portland District intends to solicit construction firms for a firm-fixed-price contract to install an Oil Spill Prevention System at Foster Dam in Linn County, Oregon. The objectives of the project are to introduce a reliable and efficient system to prevent oil discharges and comply with upcoming NPDES permit requirements. Proposals will be evaluated using Best Value/Trade Off procedures outlined in the forthcoming RFP. The anticipated period of performance is September 2021 to May 2022.
This is a 100% set-aside for small businesses utilizing NAICS code 237990 for other heavy civil engineering construction with a size standard of $36.5M. The pre-solicitation notice estimates the project cost to be between $1,000,000 to $5,000,000. Responses to the anticipated May 18th solicitation will be due on or around June 18th, 2021. Questions should be directed to the named Contract Specialist and point of contact.
Notice text
SYNOPSIS: The U.S. Army Corps of Engineers (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This announcement is for Foster Oil Spill Prevention System , located in Linn County, Oregon.
PROJECT DESCRIPTION:
Foster Dam is a rock-fill structure with a concrete gated spillway and was completed with Green Peter Dam in 1968. Foster Dam is used to regulate power-generating water releases from Green Peter Dam and regulate flows from the south Santiam River. It has two generators capable of producing 10 megawatts each. The dam works in coordination with Green Peter Dam for flood risk management, hydropower, water quality improvement, irrigation, fish and wildlife habitat, and recreation.
The current sump configuration at Foster Dam has limited ability to prevent oil discharges to the tailrace with the current equipment and systems. The system will alarm if a large amount of oil accumulates in the sump which will trigger a response by Operations personnel. However, there are no downstream oil separation or containment features and the release of oil remains a high risk with the current system because the pumps are setup to pump whether the liquid is water, oil, grease, or a mixture thereof.
The objectives of this project are to introduce a reliable, efficient, and easily maintainable Oil Spill Prevention System (OSPS) at Foster Powerhouse to assure compliance with the requirements of a future National Pollutant Discharge Elimination System (NPDES) permit and continued compliance with 40 CFR 112 including SPCC rules. These efforts mitigate the risk of oil and other hydrocarbons from negatively impacting the environment.
The period of performance from contract award is estimated to be September 2021 with a final construction physical completion date in May 2022.
Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. The Government will include options in the RFP. This acquisition will result in a single firm-fixed-price contract.
Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.
Set Asides and Codes: This is a 100% Small Business set-aside, utilizing other than full and open procedures. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.
Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Jordan Quantock at Jordan.m.quantock@usace.army.mil. Email is the preferred method for receiving responses to this pre-solicitation notice.
Proposal Period: The solicitation is scheduled for release on or about 18 May 2021. The tentative date for receipt of proposals is on or about 18 June 2021.
For Small Business questions, please contact Mrs. Carol A. McIntyre at Carol.A.McIntyre@usace.army.mil or via phone at 503-808-4602.
THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON FBO ON OR ABOUT 8 APRIL 2019. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS AND PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED.
THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEBORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRE-SOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Foster Oil Spill Prevention System | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning | ENDIST Portland | Total Small Business | |
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 | ENDIST Portland | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity