FCC COLEMAN, - Rinnai Tankless Rack System Water Heater's

Cancelled Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
15B30224Q00000001
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Coleman, Florida, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation from the Department of Justice Bureau of Prisons seeks to replace water heaters at the Federal Correctional Complex in Coleman, Florida. The procurement requires vendors to supply Rinnai Tankless Rack System water heaters in three models, as well as neutralization tanks, mounting systems, communication cables, and incidentals to complete the order. A single award will be made based on the ability of the bidder to meet specifications and deliver the exact items by January 31, 2024 to the institution warehouse between 7 am and 2 pm on weekdays.

This is a total small business set-aside posted on February 1, 2024 with proposals due February 7, 2024. The procurement involves one unit each of models TRS05CUiN, TRS04CUiN, and TRS06CUiN water heaters, along with three neutralization tanks, three mounting systems, and fifteen cables. The place of performance is the Coleman, Florida facility, with no budget or incumbent information provided. Preference will be given to bidders that can meet the primary criteria of specifications and delivery date over lowest price.

Notice text

3 versions

Update #3 · Latest ·

DESCRIPTION OF REQUIREMENT

**PARTS ONLY NO SERVICE IS NEEDED. **

VENDORS SHALL ENSURE THEY READ ALL ATTACHMENTS, TERMS AND CONDITIONS, AND PROVIDE ALL INFORMATION REQUESTED WITH THEIR QOUTE. FAILURE TO DO SO MAY EXCLUDE YOU FROM COMPETITION.

Please submit proposals to jrosagarcia@bop.gov, include Project 23Z3AL1 in your subject line  please.

FEDERAL CORRECTIONAL COMPLEX, COLEMAN, FLORIDA

PROJECT 23Z3AL1 REPLACE WATER HEATERS

January 31, 2024

1. DESCRIPTION OF REQUIREMENT / SPECIFICATIONS

A. INTRODUCTION

The Federal Bureau of Prisons (FBOP), Federal Correctional Complex, Coleman, Florida (FCC Coleman) located at 846 NE 54th Terrace, Coleman, Florida in Sumter County intends to make a single award to a responsible entity that will provide all necessary equipment and delivery costs for the purchase of domestic water heaters as described within this Description of Requirement. Supply, procurement, and contracting shall comply with Federal, state, and local regulations, codes, and standards. This contract will consist of supply only.

B. BACKGROUND INFORMATION

The FCI Low component of the FCC Coleman complex is in need of a new water heater to replace failed domestic water heaters in the A Unit. The FPC component of the FCC Coleman complex is in need of a new water heater to replace failed domestic water heaters in F Unit lower level.

C. GOVERNMENT FURNISHED PROPERTY

FCC Coleman will only provide a loading dock for the receipt of the materials in order for this Description of Requirement to be achieved. All other items and expenses should be included with the vendor’s quote.

D. DESCRIPTION OF REQUIREMENT

FCC Coleman requires the vendor awarded this contract to provide the following equipment:

· 1 ea. - Rinnai Tankless Rack System, commercial water heater, model # TRS05CUiN, 5-unit free standing rack, natural gas;

· 1 ea. – Rinnai Tankless Rack System, commercial water heater, model # TRS04CUiN, 4-unit free standing rack, natural gas; and

· 1 ea. – Rinnai Tankless Rack System, commercial water heater, model # TRS06CUiN, 6-unit free standing rack, natural gas.

· 3 ea. - Commercial Neutralization Tank w/ media, model # 103000067.

· 3 ea. - TRS Rack Mounting System, model # R-BMS-102.

· 15 ea. – BMS Communication Cable, model # R-BMS-CABLE-3M

· Water heaters shall be as identified above or approved equal that meets or exceeds the requirements below:

o Tankless with 300,000 BTUH minimum, 3,980,000 BTUH maximum

o Natural gas

o Water heater shall be rack mounted.

o First Hour Delivery up to 551 gallons @ 100(degrees)F

o T 97% Thermal efficient CU199

o Ultra-Low NOX compliant

o Temperature range of 98°F - 185°F

o Recovery rate at 100°F ∆T 459 gph or greater

o ENERGY STAR tank design produces no thermal stress on tank

o Optimized pump design for increased flow and faster recovery

o DuoSmart(TM) Digital Controller for temperature precision and recirculation control -- no aquastat required.

o Gas Swivel Flex Line rotates 360 (degrees) allowing 36" long, 180(degrees) radius to connect to gas supply line.

o Factory installed gas dirt leg, electrical access, and preassembled condensate drain.

o AHRI certified UEF up to 0.93 efficiency

o Standard integrated controller MCC-91-2US

o Recover Pump shall be Grundfos UPS 26-150 (S)F; 3 speed.

o Shall include a water flow sensor, electronic water control and bypass control.

o Electrical requirements shall be 120V, 60Hz.

o Certified AHRI, ANSI Z21.10.3, CSA 4.3 and Energy Star®

o Required safety devices included on the unit shall be:

§ Flame Failure-Flame Rod

§ Boiling Protection

§ Combustion fan RPM Check

§ Over Current-Glass Fuse

§ Remaining Flam (OHS)

§ Automatic Freeze Protection

o Provide eight-year warranty on the heat exchanger; six-year warranty on the tank, and five-year warranty on all parts.

o Water heaters to have built-in redundancy so as not to be completely without hot water should one of the units fail.

o Water heater shall be assembled in the USA

· All incidentals, material, and equipment to complete the supply order described herein shall be included in the vendor’s bid. Any materials or equipment needed to complete this supply order, not specifically identified, shall be provided by the vendor at no additional cost to the Government.

· Final payment will not be processed until all items have been received at FCC Coleman by the Complex Facility Manager.

· Delivery of materials shall be between the hours of 7:00 a.m. and 2:00 p.m., Monday through Friday, excluding Federal holidays at the institution warehouse.

Update #2 ·

DESCRIPTION OF REQUIREMENT

**PARTS ONLY NO SERVICE IS NEEDED. **

VENDORS SHALL ENSURE THEY READ ALL ATTACHMENTS, TERMS AND CONDITIONS, AND PROVIDE ALL INFORMATION REQUESTED WITH THEIR QOUTE. FAILURE TO DO SO MAY EXCLUDE YOU FROM COMPETITION.

Please submit proposals to jrosagarcia@bop.gov, include Project 23Z3AL1 in your subject line  please.

FEDERAL CORRECTIONAL COMPLEX, COLEMAN, FLORIDA

PROJECT 23Z3AL1 REPLACE WATER HEATERS

January 31, 2024

1. DESCRIPTION OF REQUIREMENT / SPECIFICATIONS

A. INTRODUCTION

The Federal Bureau of Prisons (FBOP), Federal Correctional Complex, Coleman, Florida (FCC Coleman) located at 846 NE 54th Terrace, Coleman, Florida in Sumter County intends to make a single award to a responsible entity that will provide all necessary equipment and delivery costs for the purchase of domestic water heaters as described within this Description of Requirement. Supply, procurement, and contracting shall comply with Federal, state, and local regulations, codes, and standards. This contract will consist of supply only.

B. BACKGROUND INFORMATION

The FCI Low component of the FCC Coleman complex is in need of a new water heater to replace failed domestic water heaters in the A Unit. The FPC component of the FCC Coleman complex is in need of a new water heater to replace failed domestic water heaters in F Unit lower level.

C. GOVERNMENT FURNISHED PROPERTY

FCC Coleman will only provide a loading dock for the receipt of the materials in order for this Description of Requirement to be achieved. All other items and expenses should be included with the vendor’s quote.

D. DESCRIPTION OF REQUIREMENT

FCC Coleman requires the vendor awarded this contract to provide the following equipment:

· 1 ea. - Rinnai Tankless Rack System, commercial water heater, model # TRS05CUiN, 5-unit free standing rack, natural gas;

· 1 ea. – Rinnai Tankless Rack System, commercial water heater, model # TRS04CUiN, 4-unit free standing rack, natural gas; and

· 1 ea. – Rinnai Tankless Rack System, commercial water heater, model # TRS06CUiN, 6-unit free standing rack, natural gas.

· Water heaters shall be as identified above or approved equal that meets or exceeds the requirements below:

o Tankless with 300,000 BTUH minimum, 3,980,000 BTUH maximum

o Natural gas

o Water heater shall be rack mounted.

o First Hour Delivery up to 551 gallons @ 100(degrees)F

o T 97% Thermal efficient CU199

o Ultra-Low NOX compliant

o Temperature range of 98°F - 185°F

o Recovery rate at 100°F ∆T 459 gph or greater

o ENERGY STAR tank design produces no thermal stress on tank

o Optimized pump design for increased flow and faster recovery

o DuoSmart(TM) Digital Controller for temperature precision and recirculation control -- no aquastat required.

o Gas Swivel Flex Line rotates 360 (degrees) allowing 36" long, 180(degrees) radius to connect to gas supply line.

o Factory installed gas dirt leg, electrical access, and preassembled condensate drain.

o AHRI certified UEF up to 0.93 efficiency

o Standard integrated controller MCC-91-2US

o Recover Pump shall be Grundfos UPS 26-150 (S)F; 3 speed.

o Shall include a water flow sensor, electronic water control and bypass control.

o Electrical requirements shall be 120V, 60Hz.

o Certified AHRI, ANSI Z21.10.3, CSA 4.3 and Energy Star®

o Required safety devices included on the unit shall be:

§ Flame Failure-Flame Rod

§ Boiling Protection

§ Combustion fan RPM Check

§ Over Current-Glass Fuse

§ Remaining Flam (OHS)

§ Automatic Freeze Protection

o Provide eight-year warranty on the heat exchanger; six-year warranty on the tank, and five-year warranty on all parts.

o Water heaters to have built-in redundancy so as not to be completely without hot water should one of the units fail.

o Water heater shall be assembled in the USA

· 3 ea. - Commercial Neutralization Tank w/ media, model # 103000067.

· 3 ea. - TRS Rack Mounting System, model # R-BMS-102.

· 15 ea. – BMS Communication Cable, model # R-BMS-CABLE-3M

· All incidentals, material, and equipment to complete the supply order described herein shall be included in the vendor’s bid. Any materials or equipment needed to complete this supply order, not specifically identified, shall be provided by the vendor at no additional cost to the Government.

· Final payment will not be processed until all items have been received at FCC Coleman by the Complex Facility Manager.

· Delivery of materials shall be between the hours of 7:00 a.m. and 2:00 p.m., Monday through Friday, excluding Federal holidays at the institution warehouse.

Update #1 ·

DESCRIPTION OF REQUIREMENT

VENDORS SHALL ENSURE THEY READ ALL ATTACHMENTS, TERMS AND CONDITIONS, AND PROVIDE ALL INFORMATION REQUESTED WITH THEIR QOUTE. FAILURE TO DO SO MAY EXCLUDE YOU FROM COMPETITION.

FEDERAL CORRECTIONAL COMPLEX, COLEMAN, FLORIDA

PROJECT 23Z3AL1 REPLACE WATER HEATERS

January 31, 2024

1. DESCRIPTION OF REQUIREMENT / SPECIFICATIONS

A. INTRODUCTION

The Federal Bureau of Prisons (FBOP), Federal Correctional Complex, Coleman, Florida (FCC Coleman) located at 846 NE 54th Terrace, Coleman, Florida in Sumter County intends to make a single award to a responsible entity that will provide all necessary equipment and delivery costs for the purchase of domestic water heaters as described within this Description of Requirement. Supply, procurement, and contracting shall comply with Federal, state, and local regulations, codes, and standards. This contract will consist of supply only.

B. BACKGROUND INFORMATION

The FCI Low component of the FCC Coleman complex is in need of a new water heater to replace failed domestic water heaters in the A Unit. The FPC component of the FCC Coleman complex is in need of a new water heater to replace failed domestic water heaters in F Unit lower level.

C. GOVERNMENT FURNISHED PROPERTY

FCC Coleman will only provide a loading dock for the receipt of the materials in order for this Description of Requirement to be achieved. All other items and expenses should be included with the vendor’s quote.

D. DESCRIPTION OF REQUIREMENT

FCC Coleman requires the vendor awarded this contract to provide the following equipment:

· 1 ea. - Rinnai Tankless Rack System, commercial water heater, model # TRS05CUiN, 5-unit free standing rack, natural gas;

· 1 ea. – Rinnai Tankless Rack System, commercial water heater, model # TRS04CUiN, 4-unit free standing rack, natural gas; and

· 1 ea. – Rinnai Tankless Rack System, commercial water heater, model # TRS06CUiN, 6-unit free standing rack, natural gas.

· Water heaters shall be as identified above or approved equal that meets or exceeds the requirements below:

o Tankless with 300,000 BTUH minimum, 3,980,000 BTUH maximum

o Natural gas

o Water heater shall be rack mounted.

o First Hour Delivery up to 551 gallons @ 100(degrees)F

o T 97% Thermal efficient CU199

o Ultra-Low NOX compliant

o Temperature range of 98°F - 185°F

o Recovery rate at 100°F ∆T 459 gph or greater

o ENERGY STAR tank design produces no thermal stress on tank

o Optimized pump design for increased flow and faster recovery

o DuoSmart(TM) Digital Controller for temperature precision and recirculation control -- no aquastat required.

o Gas Swivel Flex Line rotates 360 (degrees) allowing 36" long, 180(degrees) radius to connect to gas supply line.

o Factory installed gas dirt leg, electrical access, and preassembled condensate drain.

o AHRI certified UEF up to 0.93 efficiency

o Standard integrated controller MCC-91-2US

o Recover Pump shall be Grundfos UPS 26-150 (S)F; 3 speed.

o Shall include a water flow sensor, electronic water control and bypass control.

o Electrical requirements shall be 120V, 60Hz.

o Certified AHRI, ANSI Z21.10.3, CSA 4.3 and Energy Star®

o Required safety devices included on the unit shall be:

§ Flame Failure-Flame Rod

§ Boiling Protection

§ Combustion fan RPM Check

§ Over Current-Glass Fuse

§ Remaining Flam (OHS)

§ Automatic Freeze Protection

o Provide eight-year warranty on the heat exchanger; six-year warranty on the tank, and five-year warranty on all parts.

o Water heaters to have built-in redundancy so as not to be completely without hot water should one of the units fail.

o Water heater shall be assembled in the USA

· 3 ea. - Commercial Neutralization Tank w/ media, model # 103000067.

· 3 ea. - TRS Rack Mounting System, model # R-BMS-102.

· 15 ea. – BMS Communication Cable, model # R-BMS-CABLE-3M

· All incidentals, material, and equipment to complete the supply order described herein shall be included in the vendor’s bid. Any materials or equipment needed to complete this supply order, not specifically identified, shall be provided by the vendor at no additional cost to the Government.

· Final payment will not be processed until all items have been received at FCC Coleman by the Complex Facility Manager.

· Delivery of materials shall be between the hours of 7:00 a.m. and 2:00 p.m., Monday through Friday, excluding Federal holidays at the institution warehouse.

Files

File Type Posted
PDFRetrieverpr000168.pdf PDF
Selective Factors.pdf PDF
9 -23Z3AL1_DoR_JAN 2024 ORDER.pdf PDF

Notice history

Notice Type Posted
FCC COLEMAN, - Rinnai Tankless Rack System Water Heater's Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Heater, water, electric NAICS 332323 Construction and Equipment Total Small Business
FPC bryan, TX - replace HVAC system ICC building Texas 77803, United States · NAICS 333415 Federal Correctional Institution Beckley Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity