EWP - Emergency Watershed Protection Measures - Jasper County, Texas

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
12FPC219B0004
Agency
Farm Production and Conservation Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Jasper County, Texas, United States

Notice details come from SAM.gov. Updated .

Notice text

The USDA Farm Production and Conservation (FPAC) Operations Branch, Acquisition Division is preparing to issue a solicitation on behalf of USDA Natural Resources Conservation Service (NRCS) for work authorized under the Emergency Watershed Protection Program to relieve hazards to life and property due catastrophic damage impacting Jasper County, Texas as a result of Hurricane Harvey in 2017.


The project consists of providing all labor, equipment, materials and supervision as necessary to construct the emergency watershed protection measures on 30 sites within Jasper County, Texas to include constructing timber headwalls around culverts to protect the roads from erosion caused by turbulence at the inlet and outlet of culverts; placing rock riprap armoring and sand-cement bags along the edges of roads to protect the road banks and surface from erosion; and placing rock armoring along stream banks and drainage ditches to protect county roads from channel erosion.


The solicitation will be a Total Small Business set-aside. Interested contractors must be registered as Active, and must complete the annual representations and certifications electronically via the System for Award Management (SAM) at http://www.sam.gov in order to be eligible for award.


A firm fixed price construction contract is anticipated under Sealed Bidding procedures, FAR Part 14.


A bid guarantee, in the amount of 20% of the bid, is required to be submitted with each bid. Sureties should use SF-24 Bid Bond form.


Performance (SF-25) and Payment (SF-25A) Bonds, in the amount of 100% will be required within 5 calendar days of award of contract. All necessary permits and land rights have been acquired.


The solicitation package, construction drawings and specifications will be posted and available from this site on Monday, March 11, 2019. Bids will be due on Wednesday, April 10, 2019 at 12 noon. A site showing to review the site will be held on Monday, March 25, 2019 at 10:00 a.m. Interested contractors should plan to meet at the Jasper County USDA Service Center, 714 W. Gibson Street, Jasper, TX 75951.


Performance time will be calendar 132 days.


Magnitude of proposed construction = $1,000,000 - $5,000,000.


.

Attachments

Files attached to this notice, newest first
File Type Posted
Amend_002_-_SF30_and_attachments.pdf PDF
Amend_001_-_12FPC219B0004.pdf PDF
JasperCo_Specs_signed_2-20-2019.pdf PDF
Jasper_Co_EWP_Construction_Drawings_2-20-2019.pdf PDF
Solicitation_Package_12FPC219B0004.pdf PDF
Construction_Wage_Determination_TX190091.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
EWP - Emergency Watershed Protection Measures - Jasper County, TX Award Award Notice
EWP - Emergency Watershed Protection Measures - Jasper County, Texas This notice · Latest pre-solicitation Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity