JasperCo_Specs_signed_2-20-2019.pdf
PDF 3 MB Posted
- Attached to
- EWP - Emergency Watershed Protection Measures - Jasper County, Texas Federal contract opportunity
- Solicitation number
- 12FPC219B0004
About this file
Construction and Material Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_002_-_SF30_and_attachments.pdf | ||
| Amend_001_-_12FPC219B0004.pdf | ||
| Jasper_Co_EWP_Construction_Drawings_2-20-2019.pdf | ||
| Solicitation_Package_12FPC219B0004.pdf | ||
| Construction_Wage_Determination_TX190091.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
=NRCS'°'
JASPER COUNTY EMERGENCY WATERSHED PROTECTION
JASPER COUNTY, TEXAS
SPONSORED BY:
JASPER COUNTY COMMISSIONERS COURT
COO PERA TING WITH
NATURAL RESOURCES CONSERVATION SERVICE
OFTHE
U.S. DEPARTMENT OF AGRICULTURE
JULY 2018
7. Items of Work and Construction Details
Items of work to be performed in conformance with this specification and the construction details therefore are:
a. Subsidiary Item, Traffic Control
(1)
(2)
(3)
(4)
Where roads are to remain open, the Contractor shall provide a traffic control system that routes traffic through the construction area without excessive delay. These roads shall remain in a condition suitable for cars to pass through at all times. Designation of the roads to remain open has been made on the construction drawings.
As a part of this item the Contractor shall furnish, install and maintain all barricades, warning signs, traffic control devices, etc. necessary to control traffic and provide for public safety. The Contractor's traffic control system shall comply with the requirements of the Texas Manual on Uniform Traffic Control Devices for Streets and Highways, as well as the requirements of Jasper County, Texas.
The Contractor's written plan for traffic control shall be approved prior to the start of construction operations. Written plan shall at a minimum include the area(s) or extents proposed for use at each site, duration of road closures, temporary barricades and signage, and coordination with local officials. Sites located along the same road shall not be planned or constructed concurrently to minimize the disruption of local traffic.
Construction of multiple sites in close vicinity shall not prohibit landowner access between sites.
(5) Separate payment will not be made for this item of work. Compensation of this item will be included in the payment for the bid item Mobilization and Demobilization.
NRCS-6/19/2018 9-3
TX- JASPER COUNTY EWP
File details come from the government source that posted it.