Entry Control Point Support
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- FA460021R0011
- Agency
- Air Combat Command Air Force, Department of Defense
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 561612 Security Guards and Patrol Services
- PSC
- S206 Housekeeping- Guard
- Place of performance
- Offutt AFB, Nebraska 68113, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks entry control point support services for a construction zone rebuild project at Offutt Air Force Base in Nebraska. The Air Force seeks to award a firm fixed price contract for a base period of 12 months plus four 3-month option periods. The contractor will provide entry control point monitoring services according to a performance work statement dated April 27, 2021. Proposals will be evaluated on technical capability and price, with submissions due by September 10, 2021.
This requirement has been set aside for service-disabled veteran-owned small businesses. The primary NAICS code is 561612 and PSC code is S206. There is no incumbent as this is a new requirement. Entry control point monitoring services will be needed for approximately 130 acres over a potential 16-month period. The place of performance is the construction zone located at Offutt Air Force Base in Nebraska.
Notice text
5 versions
Update #5 · Latest ·
In 2019, Offutt AFB suffered a historic flood causing irreparable damage to 137 facilities. The damaged facilities were those housing critical capabilities for the execution and protection of nuclear command, control, and communications (NC3); and intelligence, surveillance, and reconnaissance (ISR) missions. Post-flood assessments determined the 1.2M square feet of workspace was not salvageable and requires demolition and rebuild. This requirement consists of providing Entry Control Point (ECP) support monitoring for the rebuild construction zone located on Offutt AFB during the demolition phase. This contract is contemplated to be a Firm Fixed Price (FFP) contract with a period performance of a 12-month base period and four 3-month options. This requirement shall be performed IAW the terms and conditions set forth in the 55th Wing Construction Entry Control Point Support Performance Work Statement (PWS) dated 27 April 2021 and the contract. Please reference the attached documents for additional information.
Amendment 01:
* * * Please reference the updated Combined Synopsis and Solicitation titled "FA460021R0011 Amendment 01 Combined Synopsis and Solicitation." This amendment removed language referencing Past Performance will be considered in IAW DFARS 213.106-2 and updated the proposal due date from 16 July 2021 to 23 July 2021. Please submit all proposals in accordance with the FA460021R0011 Amendment 01 Combined Synopsis and Solicitation.
Amendment 02:
***Please reference the updated Combined Synopsis and Solicitation titled "FA460021R0011 Amendment 01 Combined Synopsis and Solicitation". This amendment updated the date of the Performance Work Statement (PWS) from 27 April 2021 to 07 July 2021 due to a PWS update. For PWS language being removed, this will be indicated with a strikethrough. For PWS language being added, this will be indicated by the yellow highlight. Please submit all proposals in accorance with the FA460021R0011 Amendment 02 Combined Synopsis and Solicitation and the updated 55th Wing Construction Entry Control Point Support PWS_07Jul2021.
***Solicitation Questions and Answers have been posted. Please refer to the excel Questions and Answers document with answers to questions received during the question submission time period.
Amendment 03:
***Solicitation Additional Questions and Answers have been posted. Please refer to the excel Questions and Answers document with answers to questions received.
Amendment 04:
***Please reference the updated Combined Synopsis and Solicitation tilted “FA460021R0011 Amendment 04 Combined Synopsis and Solicitation”. The amendment updated the following: estimated start date; updated CLIN language for Item No. 0001, 0002, 1001, 1002, 2001, 2002, 3001, 3002, 4001, and 4002; extended proposal due date; updated the proposal and pricing valid through date, and added clause FAR 52.232-18 Availability of Funds. All updates are highlighted in yellow. Please submit all proposals or proposal revisions in accordance with the FA460021R0011 Amendment 04 Combined Synopsis and Solicitation.
Reminder: Management Plans must address personnel, equipment, and compliance IAW the 55th Wing Construction Entry Control Point Support PWS dated 07 July 2021. Proposals and pricing shall be valid through January 31st, 2022.
Update #4 ·
In 2019, Offutt AFB suffered a historic flood causing irreparable damage to 137 facilities. The damaged facilities were those housing critical capabilities for the execution and protection of nuclear command, control, and communications (NC3); and intelligence, surveillance, and reconnaissance (ISR) missions. Post-flood assessments determined the 1.2M square feet of workspace was not salvageable and requires demolition and rebuild. This requirement consists of providing Entry Control Point (ECP) support monitoring for the rebuild construction zone located on Offutt AFB during the demolition phase. This contract is contemplated to be a Firm Fixed Price (FFP) contract with a period performance of a 12-month base period and four 3-month options. This requirement shall be performed IAW the terms and conditions set forth in the 55th Wing Construction Entry Control Point Support Performance Work Statement (PWS) dated 27 April 2021 and the contract. Please reference the attached documents for additional information.
Amendment 01:
* * * Please reference the updated Combined Synopsis and Solicitation titled "FA460021R0011 Amendment 01 Combined Synopsis and Solicitation." This amendment removed language referencing Past Performance will be considered in IAW DFARS 213.106-2 and updated the proposal due date from 16 July 2021 to 23 July 2021. Please submit all proposals in accordance with the FA460021R0011 Amendment 01 Combined Synopsis and Solicitation.
Amendment 02:
***Please reference the updated Combined Synopsis and Solicitation titled "FA460021R0011 Amendment 01 Combined Synopsis and Solicitation". This amendment updated the date of the Performance Work Statement (PWS) from 27 April 2021 to 07 July 2021 due to a PWS update. For PWS language being removed, this will be indicated with a strikethrough. For PWS language being added, this will be indicated by the yellow highlight. Please submit all proposals in accorance with the FA460021R0011 Amendment 02 Combined Synopsis and Solicitation and the updated 55th Wing Construction Entry Control Point Support PWS_07Jul2021.
***Solicitation Questions and Answers have been posted. Please refer to the excel Questions and Answers document with answers to questions received during the question submission time period.
Amendment 03:
***Solicitation Additional Questions and Answers have been posted. Please refer to the excel Questions and Answers document with answers to questions received.
Update #3 ·
In 2019, Offutt AFB suffered a historic flood causing irreparable damage to 137 facilities. The damaged facilities were those housing critical capabilities for the execution and protection of nuclear command, control, and communications (NC3); and intelligence, surveillance, and reconnaissance (ISR) missions. Post-flood assessments determined the 1.2M square feet of workspace was not salvageable and requires demolition and rebuild. This requirement consists of providing Entry Control Point (ECP) support monitoring for the rebuild construction zone located on Offutt AFB during the demolition phase. This contract is contemplated to be a Firm Fixed Price (FFP) contract with a period performance of a 12-month base period and four 3-month options. This requirement shall be performed IAW the terms and conditions set forth in the 55th Wing Construction Entry Control Point Support Performance Work Statement (PWS) dated 27 April 2021 and the contract. Please reference the attached documents for additional information.
Amendment 01:
* * * Please reference the updated Combined Synopsis and Solicitation titled "FA460021R0011 Amendment 01 Combined Synopsis and Solicitation." This amendment removed language referencing Past Performance will be considered in IAW DFARS 213.106-2 and updated the proposal due date from 16 July 2021 to 23 July 2021. Please submit all proposals in accordance with the FA460021R0011 Amendment 01 Combined Synopsis and Solicitation.
Amendment 02:
***Please reference the updated Combined Synopsis and Solicitation titled "FA460021R0011 Amendment 01 Combined Synopsis and Solicitation". This amendment updated the date of the Performance Work Statement (PWS) from 27 April 2021 to 07 July 2021 due to a PWS update. For PWS language being removed, this will be indicated with a strikethrough. For PWS language being added, this will be indicated by the yellow highlight. Please submit all proposals in accorance with the FA460021R0011 Amendment 02 Combined Synopsis and Solicitation and the updated 55th Wing Construction Entry Control Point Support PWS_07Jul2021.
***Solicitation Questions and Answers have been posted. Please refer to the excel Questions and Answers document with answers to questions received during the question submission time period.
Update #2 ·
In 2019, Offutt AFB suffered a historic flood causing irreparable damage to 137 facilities. The damaged facilities were those housing critical capabilities for the execution and protection of nuclear command, control, and communications (NC3); and intelligence, surveillance, and reconnaissance (ISR) missions. Post-flood assessments determined the 1.2M square feet of workspace was not salvageable and requires demolition and rebuild. This requirement consists of providing Entry Control Point (ECP) support monitoring for the rebuild construction zone located on Offutt AFB during the demolition phase. This contract is contemplated to be a Firm Fixed Price (FFP) contract with a period performance of a 12-month base period and four 3-month options. This requirement shall be performed IAW the terms and conditions set forth in the 55th Wing Construction Entry Control Point Support Performance Work Statement (PWS) dated 27 April 2021 and the contract. Please reference the attached documents for additional information.
* * * Please reference the updated Combined Synopsis and Solicitation titled "FA460021R0011 Amendment 01 Combined Synopsis and Solicitation." This ammendant removed language referencing Past Performance will be considered in IAW DFARS 213.106-2 updated the proposal due date from 16 July 2021 to 23 July 2021. Please submit all proposals in accordance with the FA460021R0011 Amendment 01 Combined Synopsis and Solicitation.
Update #1 ·
In 2019, Offutt AFB suffered a historic flood causing irreparable damage to 137 facilities. The damaged facilities were those housing critical capabilities for the execution and protection of nuclear command, control, and communications (NC3); and intelligence, surveillance, and reconnaissance (ISR) missions. Post-flood assessments determined the 1.2M square feet of workspace was not salvageable and requires demolition and rebuild. This requirement consists of providing Entry Control Point (ECP) support monitoring for the rebuild construction zone located on Offutt AFB during the demolition phase. This contract is contemplated to be a Firm Fixed Price (FFP) contract with a period performance of a 12-month base period and four 3-month options. This requirement shall be performed IAW the terms and conditions set forth in the 55th Wing Construction Entry Control Point Support Performance Work Statement (PWS) dated 27 April 2021 and the contract. Please reference the attached documents for additional information.
Attachments
| File | Type | Posted |
|---|---|---|
| FA460021R0011 Amendment 04 Combined Synopsis and Solicitation.pdf | ||
| FA460021R0011 Solicitation Additional Questions and Answers.xlsx | XLSX spreadsheet | |
| FA460021R0011 Solicitation Questions and Answers.xlsx | XLSX spreadsheet | |
| 55th Wing Construction Entry Control Point Support PWS_07Jul2021.pdf | ||
| FA460021R0011 Amendment 02 Combined Synopsis and Solicitation.pdf | ||
| FA460021R0011 Amendment 01 Combined Synopsis and Solicitation.pdf | ||
| Construction_ECP Map.pptx | PPTX presentation | |
| FA460021R0011 Combined Synopsis and Solicitation.pdf | ||
| Service Contract Act Wage Determination.pdf | ||
| 55th Wing Construction Entry Control Point Support PWS_27Apr2021.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Entry Control Point Support | Award Notice | |
| Entry Control Point Support | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity