FA460021R0011 Solicitation Additional Questions and Answers.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Entry Control Point Support
Solicitation number
FA460021R0011
Issued by

About this file

This document includes a solicitation for Entry Control Point support services and additional questions and answers pertaining to the solicitation. The requirement consists of providing monitoring of the Entry Control Points for the construction zone located at Offutt Air Force Base during the demolition phase of rebuilding damaged facilities. The period of performance is a 12-month base period plus four 3-month option periods. The contract is contemplated as firm-fixed price. The contractor must provide their own power and hardened shelter within 14 working days of the start of construction. The shelter must have space for two employees, furnishings, and lighting, be approximately 15x15 feet, and require a concrete pad for placement and anchoring. The solicitation number is FA460021R0011 and is issued by the Department of the Air Force Air Combat Command. The contractor is responsible for safety and placement of the shelter pad.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

QUESTIONANSWER
Where existing power is located?There is no existing power, the contractor must provide their own power. Please refer to the PWS, which states: 1.4.1.12 The contractor shall provide the following equipment and associated cleaning or maintenance services and supplies within 14 working days prior to the first day of construction: . . . 1.4.1.12.4 Temporary power (ex. generator and fuel sufficient to power facility and equipment
If located in a nearby building, what Blast rating, or other special requirements are necessary for adding additional electrical that leaves that building?There is no existing power, the contractor must provide their own power. Please refer to the PWS, which states: 1.4.1.12 The contractor shall provide the following equipment and associated cleaning or maintenance services and supplies within 14 working days prior to the first day of construction: . . . 1.4.1.12.4 Temporary power (ex. generator and fuel sufficient to power facility and equipment).
Requirements for trenching?There is no existing power, the contractor must provide their own power. Please refer to the PWS, which states: 1.4.1.12 The contractor shall provide the following equipment and associated cleaning or maintenance services and supplies within 14 working days prior to the first day of construction: . . . 1.4.1.12.4 Temporary power (ex. generator and fuel sufficient to power facility and equipment).
Specific concrete specifications (thickness, curbing, protection bollards)?Contractor is responsible for placement of a safe suitable pad for their shelter. Please refer to the PWS, which states: 1.4.1.12 The contractor shall provide the following equipment and associated cleaning or maintenance services and supplies within 14 working days prior to the first day of construction: 1.4.1.12.1 Hardened shelter/guard shack with overhead protection and interior and exterior lighting. Shelter shall have ample space to support 2 ECMs occupying at once with furnishings such as a desk, landline, microwave, mini-fridge, heating/air conditioning, and file cabinet. Shelter should be approximately 15’ x 15’ (estimated, not limit or requirement), and does not require ballistic protection. Shelter will require concrete pad for placement and anchoring or independent anchoring system (some trailers).