Crow Creek Reservation Water Main Replacement
Awarded Award Notice Posted
- Solicitation number
- 19-102-SOL-00014
- Agency
- Indian Health Service Department of Health and Human Services
- Awarded
- to Northern Plains, LLC
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 75H70119C00011 Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
- Place of performance
- Fort Thompson and Crow Creek Communities Buffalo County, South Dakota on the Crow Creek Reservation, United States
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
Awarded Vendors: Northern Plains LLC. Contract Award Dollar Amount: 4867194.00. Contract Award Date: 2019-07-22.
Update #2 ·
The solicitation has been issued. Please see the attachments to this notice for the RFP and associated documents.
Please make sure to read the instructions in the RFP very carefully to ensure that offerors submit all of the required information.
Project Description/Synopsis:
The contractor shall furnish all labor, personnel, materials, equipment, tools, appliances, supplies, services, manufactured articles, permits, insurance, supervision, transportation and facilities to remove and replace the water main and associated lines. This project includes the construction of approximately 87,638 feet of 6-inch water main, 885 feet of 10-inch casing and appurtenances, 9,216 feet of 2-inch water service line, 3,879 feet of 1-1/2-inch water service line, a new bolted stainless steel water standpipe with control vault at Lee's Corner, rehabilitation of the Crow Creek Community water standpipe and installation of a control vault, SCADA controls and integration at the Crow Creek Community water storage standpipe and vault, the Lee Corner water storage standpipe and vault, the Bad Nation booster station, the Fort Thompson elevated water storage tank, and the water treatment plant, abandonment of the existing well building, wells, and well site at the Crow Creek Community, and abandonment of the Bad Nation water storage tank.
This solicitation will be procured as a Request for Proposal in accordance with FAR Part 15 procedures.
Estimated Cost Range: Construction estimated between $1,000,000 and $5,000,000
Project Performance Period: Project completion time is currently defined to be 240 calendar days after the effective date of the notice to proceed.
Government Furnished Material: There is no Government Furnished material.
Pre-Bid Site Visit: A pre-proposal site visit will be determined at a later point in the solicitation.
Set Aside: This is a 100% small business set-aside.
.
Update #1 ·
Project Description/Synopsis:
The contractor shall furnish all labor, personnel, materials, equipment, tools, appliances, supplies, services, manufactured articles, permits, insurance, supervision, transportation and facilities to remove and replace the water main and associated lines. This project includes the construction of approximately 87,638 feet of 6-inch water main, 885 feet of 10-inch casing and appurtenances, 9,216 feet of 2-inch water service line, 3,879 feet of 1-1/2-inch water service line, a new bolted stainless steel water standpipe with control vault at Lee's Corner, rehabilitation of the Crow Creek Community water standpipe and installation of a control vault, SCADA controls and integration at the Crow Creek Community water storage standpipe and vault, the Lee Corner water storage standpipe and vault, the Bad Nation booster station, the Fort Thompson elevated water storage tank, and the water treatment plant, abandonment of the existing well building, wells, and well site at the Crow Creek Community, and abandonment of the Bad Nation water storage tank.
This is NOT a request for proposal and there is no solicitation nor are there construction documents available at this time. No responses are requested at this time. Award is subject to the availability of funds.
This solicitation will be procured as a Request for Proposal in accordance with FAR Part 15 procedures. This solicitation will be available for download in April 2019 with proposals due approximately 30 days after solicitation issuance.
Estimated Cost Range: Construction estimated between $1,000,000 and $5,000,000
Project Performance Period: Project completion time is currently defined to be 240 calendar days after the effective date of the notice to proceed.
Government Furnished Material: There is no Government Furnished material.
Pre-Bid Site Visit: A pre-proposal site visit will be determined at a later point in the solicitation.
Set Aside: This is a 100% small business set-aside.
.
Attachments
| File | Type | Posted |
|---|---|---|
| B01_Amendment_3.pdf | ||
| B01_RFP_Attachment_J07_Price_Schedule_Breakdown_Rev_2.xlsx | XLSX spreadsheet | |
| B01_RFP_Attachment_J07_Price_Schedule_Breakdown_Rev_1.xlsx | XLSX spreadsheet | |
| B01_RFP_Attachment_J01_-_Wage_Determination_V2.pdf | ||
| B01_Amendment_2.pdf | ||
| B01_Amendment_1.pdf | ||
| B01_RFP_Attachment_J03_-_Self_Performed_Calculation_Sheet_(Construction).docx | DOCX document | |
| B01_RFP_Attachment_J01_-_Wage_Determination.pdf | ||
| B01_RFP_Attachment_J02.3_Crow_Creek_WM_Geotechnical_Reports.pdf | ||
| B01_RFP_Final.pdf | ||
| B01_RFP_Attachment_J06_-_Key_Personnel_Resume_Form.docx | DOCX document | |
| B01_RFP_Attachment_J04_-_Specialized_Experience_Form_Construction.docx | DOCX document | |
| B01_RFP_Attachment_J02.1_F56_Crow_Creek_WM_Specs_Final.pdf | ||
| B01_RFP_Attachment_J05_-_PPQ.docx | DOCX document | |
| B01_RFP_Attachment_J07_Price_Schedule_Breakdown.xlsx | XLSX spreadsheet | |
| B01_RFP_Attachment_J02.2_Crow_Creek_WM_Plans_Final.pdf |
Show all 16