B01_RFP_Attachment_J07_Price_Schedule_Breakdown.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Crow Creek Reservation Water Main Replacement Federal contract opportunity
Solicitation number
19-102-SOL-00014
Issued by
Department of Health and Human Services Indian Health Service

About this file

RFP Attachment J07 Price Schedule Breakdown

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total of All Schedules

ScheduleTotals
Line Item 1 - Schedule AERROR:#VALUE!
Line Item 2 - Schedule BERROR:#VALUE!
Line Item 3 - Schedule CERROR:#VALUE!
Line Item 4 - Schedule DERROR:#VALUE!
Line Item 5 - Schedule EERROR:#VALUE!
Line Item 6 - Schedule FERROR:#VALUE!
Line Item 7 - Schedule GERROR:#VALUE!
Line Item 8 - Schedule HERROR:#VALUE!
Line Item 9 - TERO, state and local taxes
Total Price for All SchedulesERROR:#VALUE!

Abbreviations CY = Cubic Yards EA = Each FT = Foot JB = Job SQ FT = Square Feet HR = Hours

&"-,Bold"&URFP 19-102-SOL-00001 Attachment J07- Price Schedule Breakdown IHS Project AB-14-F56

Line Item 1 Schedule A

Schedule AWater Main Construction - Alignment A
ItemDescriptionQuantityUnitUnit CostTotal Cost
1.1Mobilization1JB$________________$________________
1.2STA. 0+00A Connection1JB$________________$________________
1.36-inch Gate Valve w/Box7EA$________________$________________
1.46-inch SDR-26 PVC Water Main7,492FT$________________$________________
1.56-inch SDR-21 PVC Water Main6,100FT$________________$________________
1.66-inch SRD-17 PVC Water Main2,700FT$________________$________________
1.76-inch Directionally Drilled DR-9 (250 psi) IPS HDPE Water Main500FT$________________$________________
1.810-inch Directionally Drilled SDR-21 Yelomine Casing100FT$________________$________________
1.96-inch SDR-26 Yelomine Water Main100FT$________________$________________
1.10Fire Hydrant w/Gate Valve & Box1EA$________________$________________
1.11Air Release Pit6EA$________________$________________
1.12Erosion Control Blanket16,168SQ FT$________________$________________

Total for Schedule A ERROR:#VALUE!

&"-,Bold"&URFP 19-102-SOL-00001 Attachment J07 - Price Schedule Breakdown IHS Project AB-14-F56

Line Item 2 Schedule B

Schedule BLee Corner Tank Site
ItemDescriptionQuantityUnitUnit CostTotal Cost
2.1Mobilization1JB$________________$________________
2.2Lee Corner Bolted SS Water Standpipe1JB$________________$________________
2.3Lee Corner Standpipe Control Vault1JB$________________$________________
2.4SCADA1JB$________________$________________
2.56-inch Gate Valve w/Box2EA$________________$________________
2.66-inch SDR-21 PVC Water Main83FT$________________$________________
2.7Fire Hydrant w/Gate Valve & Box1EA$________________$________________
2.8Lee Corner Standpipe Access Road1JB$________________$________________
2.9Erosion Control Blanket2,580SQ FT$________________$________________
2.10Power Service to Lee Corner Tank Site1JB$________________$________________

Total for Schedule B ERROR:#VALUE!

IHS Project AB-14-F56

Line Item 3 Schedule C

Schedule CWater Main Construction - Alignment B
ItemDescriptionQuantityUnitUnit CostTotal Cost
3.16-inch SRD-26 PVC Water Main4,196FT$________________$________________
3.26-inch SDR-21 PVC Water Main17,804FT$________________$________________
3.36-inch SDR-17 PVC Water Main12,517FT$________________$________________
3.46-inch Directionally Drilled DR-9 (250 psi) IPS HDPE Water Main500FT$________________$________________
3.56-inch Gate Valve w/Box10EA$________________$________________
3.610-inch Directionally Drilled SDR-21 Yelomine Casing200FT$________________$________________
3.76-inch SDR-26 Yelomine Water Main200FT$________________$________________
3.8Fire Hydrant w/Gate Valve & Box1EA$________________$________________
3.9Air Release Pit4EA$________________$________________
3.10Erosion Control Blanket2,576Sq FT$________________$________________

Total for Schedule C ERROR:#VALUE!

IHS Project AB-14-F56

Line Item 4 Schedule D

Schedule DWater Main Construction - Alignment C
ItemDescriptionQuantityUnitUnit CostTotal Cost
4.16-inch SDR-21 PVC Water Main16,500FT$________________$________________
4.26-inch SDR-17 PVC Water Main18,611FT$________________$________________
4.36-inch Directionally Drilled DR-9 (250 psi) IPS HDPE Water Main250FT$________________$________________
4.46-inch Gate Valve w/Box16EA$________________$________________
4.54-inch Directionally Drilled SDR-21 Yelomine Casing90FT$________________$________________
4.610-inch Directionally Drilled SDR-21 Yelomine Casing585FT$________________$________________
4.76-inch SDR-17 Yelomine Water Main585FT$________________$________________
4.8Air Release Pit5EA$________________$________________
4.9Gravel Road Restoration149FT$________________$________________
4.10Erosion Control Blanket6096SQ FT$________________$________________
Total for Schedule DERROR:#VALUE!

IHS Project AB-14-F56

Line Item 5 Schedule E

Schedule ECrow Creek Tank Site
ItemDescriptionQuantityUnitUnit CostTotal Cost
5.1Mobilization1JB$________________$________________
5.2Crow Creek Standpipe Renovation1JB$________________$________________
5.3Crow Creek Standpipe Control Vault1JB$________________$________________
5.4Abandonment of Existing Pump House, Wells, and Well Site1JB$________________$________________
5.54-inch SDR-21 PVC Water Main40FT$________________$________________
5.6Fire Hydrant w/Gate Valve & Box1EA$________________$________________
5.74-inch Gate Valve w/Box2EA$________________$________________
5.8Power Service to Crow Creek Tank Site1JB$________________$________________
Total for Schedule EERROR:#VALUE!

IHS Project AB-14-F56

Line Item 6 Schedule F

Schedule FCrow Creek Community Valves & Hydrants
ItemDescriptionQuantityUnitUnit CostTotal Cost
6.14-inch Gate Valve w/Box8EA$________________$________________
6.2Fire Hydrant w/Gate Valve & Box7EA$________________$________________
6.3Bituminous Road Restoration30SY$________________$________________
6.4Concrete Sidewalk Restoration10SY$________________$________________
6.5Gravel Road Restoration50FT$________________$________________
Total for Schedule FERROR:#VALUE!

IHS Project AB-14-F56

Line Item 7 Schedule G

Schedule GWater Service Line Construction
ItemDescriptionQuantityUnitUnit CostTotal Cost
7.11-inch Curb Stop14EA$________________$________________
7.21-1/2-inch Corporation Stop17EA$________________$________________
7.31-1/2-inch Curb Stop22EA$________________$________________
7.41-1/2-inch SDR-26 PVC Water Service Line160FT$________________$________________
7.51-1/2-inch SDR-21 PVC Water Service Line540FT$________________$________________
7.61-1/2-inch SDR-17 PVC Water Service Line3,179FT$________________$________________
7.72-inch Corporation Stop8EA$________________$________________
7.82-inch Curb Stop14EA$________________$________________
7.92-inch SDR-26 PVC Water Service Line3,791FT$________________$________________
7.102-inch SDR-21 PVC Water Service Line1,303FT$________________$________________
7.112-inch SDR-17 PVC Water Service Line4,122FT$________________$________________
7.122-inch Gate Valve W/Box1JB$________________$________________
7.132-inch Post Flush Hydrant2EA$________________$________________
7.14Meter Pit49EA$________________$________________
7.15Gravel Road Restoration45FT$________________$________________
7.16Exploratory Digging35HR$________________$________________
Total for Schedule GERROR:#VALUE!

IHS Project AB-14-F56

Line Item 8 Schedule H

Schedule HBad Nation Water Storage Tank Abandonment
ItemDescriptionQuantityUnitUnit CostTotal Cost
8.1Abandonment of Bad Nation Water Storage Tank & Site1JB$________________$________________
8.2Fire Hydrant w/Gate Valve & Box1EA$________________$________________

Total for Schedule H ERROR:#VALUE!