CO ER 94/81/106(1), Boulder County Lefthand Canyon Drive

Award Notice Posted

Solicitation number
DTFH6815B00012
Agency
Awarded
to Kelley Trucking Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6816C00004 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Boulder County Altona, Colorado 80302, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS.

AN ORGANIZED SITE VISIT IS SCHEDULED ON OCTOBER 6, 2015.  MEET AT LARGE PULLOUT AT MP 1.3 (STA 480+00 ON PLANS) AT 9:00 AM.

PROJECT DETAILS
This is a 4R (reconstruction) project in Boulder County Colorado.  Foothills Highway (US 36) and Lefthand Canyon Drive, and proceeds west for 10.3 miles towards Ward, CO.  The project has a base schedule and three options.

Schedule A = 2.94 Miles
Option X = 1.40 Miles
Option Y = 1.97 Miles
Option Z = 4.13 Miles

The contractor should have experience in the following areas:


• Rock excavation


• Riprap armament placement


• Bridge construction


• Asphalt paving


Significant quantities include approximately 150,000 CUYD of excavation; 40,000 CUYD of embankment; 40,000 CUYD of riprap installation; 95,000 SQYD; 45,000 TONS of Roadway Aggregate; 35,000 TONS of Hot Asphalt Concrete Paving; 3,000 LNFT of culvert installation; 150 LNFT of Concrete Box Culvert installation; and 4 Concrete Abutment Bridge Structures.


The contracting range for this project is between $20 million and $25 million.

Update #1 ·

THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE.  THE TENTATIVE ADVERTISEMENT DATE IS SEPTEMBER 21, 2015.  THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.

AN ORGANIZED SITE VISIT IS TENTATIVELY PLANNED DURING ADVERTISEMENT ON OCTOBER 6, 2015.  DETAILS REGARDING THE SITE VISIT WE BE INCLUDED IN THE INVITATION FOR BID.


PROJECT DETAILS
This is a 4R (reconstruction) project in Boulder County Colorado.  Foothills Highway (US 36) and Lefthand Canyon Drive, and proceeds west for 10.3 miles towards Ward, CO.  The project has a base schedule and three options.

Schedule A = 2.94 Miles
Option X = 1.40 Miles
Option Y = 1.97 Miles
Option Z = 4.13 Miles

The contractor should have experience in the following areas:


• Rock excavation


• Riprap armament placement


• Bridge construction


• Asphalt paving


Significant quantities include approximately 150,000 CUYD of excavation; 40,000 CUYD of embankment; 40,000 CUYD of riprap installation; 95,000 SQYD; 45,000 TONS of Roadway Aggregate; 35,000 TONS of Hot Asphalt Concrete Paving; 3,000 LNFT of culvert installation; 150 LNFT of Concrete Box Culvert installation; and 4 Concrete Abutment Bridge Structures.


The contracting range for this project is between $20 million and $25 million.

Files

File Type Posted
Bid_Tabs_CO_ER_94.pdf PDF
Bid_Opening_Summary-CO_ER_94-81-106(1)_.docx DOCX document
A003.pdf PDF
Q-A _revised_10-14-15.pdf PDF
Sign-in_Sheet.pdf PDF
A002.pdf PDF
Earthwork_by_Station.xlsx XLSX spreadsheet
A001.pdf PDF
DTFH6815B00012.pdf PDF
CO_ER_94_81_106(1)-1.Boulder_County.Left_Hand_Canyon.Final.2015._.pdf PDF
Plans.pdf PDF
CO_ER_94-81-106(1)_Lefthand_Canyon_Drive_Pavements_Report-8-25-2015.pdf PDF
Cross_Sections.pdf PDF
Show all 13