CO ER 94/81/106(1), Boulder County Lefthand Canyon Drive
Award Notice Posted
- Solicitation number
- DTFH6815B00012
- Agency
-
Federal Highway Administration
Department of Transportation
- Awarded
- to Kelley Trucking Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH6816C00004 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Boulder County Altona, Colorado 80302, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS.
AN ORGANIZED SITE VISIT IS SCHEDULED ON OCTOBER 6, 2015. MEET AT LARGE PULLOUT AT MP 1.3 (STA 480+00 ON PLANS) AT 9:00 AM.
PROJECT DETAILS
This is a 4R (reconstruction) project in Boulder County Colorado. Foothills Highway (US 36) and Lefthand Canyon Drive, and proceeds west for 10.3 miles towards Ward, CO. The project has a base schedule and three options.
Schedule A = 2.94 Miles
Option X = 1.40 Miles
Option Y = 1.97 Miles
Option Z = 4.13 Miles
The contractor should have experience in the following areas:
• Rock excavation
• Riprap armament placement
• Bridge construction
• Asphalt paving
Significant quantities include approximately 150,000 CUYD of excavation; 40,000 CUYD of embankment; 40,000 CUYD of riprap installation; 95,000 SQYD; 45,000 TONS of Roadway Aggregate; 35,000 TONS of Hot Asphalt Concrete Paving; 3,000 LNFT of culvert installation; 150 LNFT of Concrete Box Culvert installation; and 4 Concrete Abutment Bridge Structures.
The contracting range for this project is between $20 million and $25 million.
Update #1 ·
THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENTATIVE ADVERTISEMENT DATE IS SEPTEMBER 21, 2015. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.
AN ORGANIZED SITE VISIT IS TENTATIVELY PLANNED DURING ADVERTISEMENT ON OCTOBER 6, 2015. DETAILS REGARDING THE SITE VISIT WE BE INCLUDED IN THE INVITATION FOR BID.
PROJECT DETAILS
This is a 4R (reconstruction) project in Boulder County Colorado. Foothills Highway (US 36) and Lefthand Canyon Drive, and proceeds west for 10.3 miles towards Ward, CO. The project has a base schedule and three options.
Schedule A = 2.94 Miles
Option X = 1.40 Miles
Option Y = 1.97 Miles
Option Z = 4.13 Miles
The contractor should have experience in the following areas:
• Rock excavation
• Riprap armament placement
• Bridge construction
• Asphalt paving
Significant quantities include approximately 150,000 CUYD of excavation; 40,000 CUYD of embankment; 40,000 CUYD of riprap installation; 95,000 SQYD; 45,000 TONS of Roadway Aggregate; 35,000 TONS of Hot Asphalt Concrete Paving; 3,000 LNFT of culvert installation; 150 LNFT of Concrete Box Culvert installation; and 4 Concrete Abutment Bridge Structures.
The contracting range for this project is between $20 million and $25 million.
Files
| File | Type | Posted |
|---|---|---|
| Bid_Tabs_CO_ER_94.pdf | ||
| Bid_Opening_Summary-CO_ER_94-81-106(1)_.docx | DOCX document | |
| A003.pdf | ||
| Q-A _revised_10-14-15.pdf | ||
| Sign-in_Sheet.pdf | ||
| A002.pdf | ||
| Earthwork_by_Station.xlsx | XLSX spreadsheet | |
| A001.pdf | ||
| DTFH6815B00012.pdf | ||
| CO_ER_94_81_106(1)-1.Boulder_County.Left_Hand_Canyon.Final.2015._.pdf | ||
| Plans.pdf | ||
| CO_ER_94-81-106(1)_Lefthand_Canyon_Drive_Pavements_Report-8-25-2015.pdf | ||
| Cross_Sections.pdf |
Show all 13
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity