A003.pdf
PDF 2 MB Posted
- Solicitation number
- DTFH6815B00012
About this file
Amendment A003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Tabs_CO_ER_94.pdf | ||
| Bid_Opening_Summary-CO_ER_94-81-106(1)_.docx | DOCX document | |
| Q-A _revised_10-14-15.pdf | ||
| A002.pdf | ||
| Sign-in_Sheet.pdf | ||
| A001.pdf | ||
| Earthwork_by_Station.xlsx | XLSX spreadsheet | |
| Cross_Sections.pdf | ||
| CO_ER_94-81-106(1)_Lefthand_Canyon_Drive_Pavements_Report-8-25-2015.pdf | ||
| CO_ER_94_81_106(1)-1.Boulder_County.Left_Hand_Canyon.Final.2015._.pdf | ||
| DTFH6815B00012.pdf | ||
| Plans.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
aaron.sanford Typewritten Text
Item No. Quantity Unit Unit Price Amount
15101-0000
Line Z0020 ALL LPSM $ $
15210-3000
Line Z0040 4.130 MILE $ $
15301-0000
Line Z0060 ALL LPSM $ $
15401-0000
Line Z0080 ALL LPSM $ $
15501-0000
Line Z0100 ALL LPSM $ $
40101-5600
Line Z0120 8,000 TON $ $
40105-3000
Line Z0140 75 TON $ $
41201-0000
Line Z0160 30 TON $ $
41301-0600
Line Z0180 67,000 SQYD $ $
63401-0700
Line Z0200 88,000 LNFT $ $
63502-0700
Line Z0220 200 EACH $ $
63502-1300
Line Z0240 200 EACH $ $
63504-1000
Line Z0260 200 SQFT $ $
63506-0500
Line Z0280 500 HOUR $ $
63506-0600
Line Z0300 160 HOUR $ $
Bid Schedule Schedule: Z Schedule Type: Options Project No: CO ER 94/81/106(1) Project Name: Boulder Cty Lefthand Canyon Dr
ANTISTRIP ADDITIVE, TYPE 3
TACK COAT
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
PAVEMENT MARKINGS, TYPE D, SOLID
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
Amendment A003 October 14, 2015
Joe.Wilson Typewritten Text A-21
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson
E-34
CO ER 94/81/106(1)
BOULDER COUNTY LEFTHAND CANYON DRIVE
20401-0000 Roadway Excavation. Actual volume of excess material may vary, depending on the processing, sizing and placement of excess material in the available stockpile areas. The computed excess material volume assumes material is stockpiled at 95-percent density.
If imported materials are used for embankment or riprap, excess excavation volumes will increase.
Increases in excess excavation as a result of the Contractor’s discretion in material handling or utilization of import material will result in no increased cost to the Government.
Payment
204.17 Add the following:
Payment for Item 20401 is limited to ten percent of the plan quantity of excavation in the cut until the slope rounding in that cut is completed.
Section 205. – ROCK BLASTING
Description
205.01 Add the following:
Controlled pre-split blasting will be required for all excavated slopes where rock blasting is expected.
205.07 Add the following:
205.07 A test blast of up to 400 cubic yards (300 cubic meters) may be allowed with CO approval.
205.08 Delete the first sentence in fourth paragraph
205.08 (b) Add the following to the seventh paragraph:
Lifts may be offset 36 inches (900 millimeters) for drill clearance.
205.08 (b)(1) Delete first sentence
Measurement
205.11 Delete the text and substitute the following:
205.11 Measure the Section 205 items listed in the bid schedule according to Subsection 109.02 and the following as applicable:
Do not measure controlled blasting or production blast holes. Controlled and Production blasting is considered subsidiary to pay item 20401-0000 Roadway Excavation.
Payment
205.12 Add the following:
Amendment A003 October 14, 2015
E-35
Controlled blasting and production blasting is considered subsidiary to pay item 20401-0000 Roadway Excavation.
Section 251. — RIPRAP
Delete this section and substitute the following:
Description
251.01 This work consists of furnishing and placing riprap for bank protection, slope protection, drainage structures, and erosion control.
It is intended that rock excavated from the roadway prism will be conserved and used for pay items 25110-2800 Grouted Riprap, Method B, Class 8 and 25110-2800 Grouted Riprap, Method B, Class 8 (Bridge Foundation).
It is assumed that 15% grout by volume will be utilized for 25110-2800 Grouted Riprap, Method B, Class 8.
It is assumed that 25% grout by volume will be utilized for 25110-2800 Grouted Riprap, Method B, Class 8 (Bridge Foundation).
Geotextile filters are designated according to Table 714-1.
Material
251.02 Conform to the following Subsections:
Geotextile 714.01 Minor Concrete 601 Riprap 705.02
Construction Requirements
251.03 General. Perform the work under Section 209. Dress the slope to produce a smooth surface. If geotextile filter is required, place according to Section 207. Provide a concrete mix design for grouting that conforms to Section 601
251.04 Placed Riprap. Placed riprap is rock placed on a prepared surface to form a well-graded mass.
Place riprap to its full thickness in one operation to avoid displacing the underlying material. Do not place riprap material by methods that cause segregation or damage to the prepared surface. Place or rearrange individual rocks by mechanical or hand methods to obtain a dense uniform blanket with a reasonably smooth surface.
251.05 Keyed Riprap. Keyed riprap is rock placed on a prepared surface and set into place by impact pressure.
E-36
Place rock for keyed riprap according to Subsection 251.04. Set the riprap into place by exerting impact pressure with a hydraulic-powered bucket or an approximate 5000-pound (2000-kilogram) flat-faced mass.
Repeated impacts should be made until the rock is firmly seated and forms a reasonably uniform surface without reducing the effective sizes of the rocks. Do not use impact pressure on riprap below the water surface.
251.06 Grouted Riprap. Grouted riprap is rock placed or keyed on a prepared surface with the voids filled or partially filled with concrete grout.
Place rock for grouted riprap according to Subsection 251.04 or 251.05. Do not place concrete grout unless the air temperature is at or above 35 °F (1 °C) within the near-surface voids of the riprap. Place the grout in a manner to prevent segregation. Protect grout from freezing for at least 7 days after grouting.
251.07 Acceptance. See Table 251-1 for sampling, testing, and acceptance requirements.
Rock for riprap will be evaluated under Subsections 106.02 and 106.04. Perform acceptance testing for grading at stockpile at the source.
Concrete grout mix design will be evaluated under Section 601.
Material for concrete grout will be evaluated under Subsections 106.02 and 106.03.
Acceptance Method A riprap construction will be evaluated under Subsection 106.02.
Acceptance Method B riprap construction will be evaluated under Subsections 106.02 and 106.04.
Placing grout will be evaluated under Subsection 106.02.
Geotextile filters will be evaluated under Section 207.
Structure excavation and backfill will be evaluated under Section 209.
Measurement
251.08 Measure the Section 251 pay items listed in the bid schedule according to Subsection 109.02 and the following as applicable:
When measuring riprap by the cubic yard (cubic meter), measure in place.
Concrete grout will not be measured for payment and is considered subsidiary to 25110-2800 Grouted Riprap, Method B, Class 8 and 25110-2800 Grouted Riprap, Method B, Class 8 (Bridge Foundation).
Payment
251.09 The accepted quantities will be paid at the contract price per unit of measurement for the Section 251 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Sheet and Description
B11 B12
Grading Summary
Miscellaneo us
Summaries ALLOWANCE Bid
Schedule
Z0020 15101-0000 MOBILIZATION LPSM ALL
Z0040 15210-3000 CENTERLINE, VERIFICATION AND
STAKING MILE 4.130
Z0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Z0080 15401-0000 CONTRACTOR TESTING LPSM ALL
Z0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Z0120 40101-5600 ASPHALT CONCRETE PAVEMENT,
GYRATORY MIX, 1/2-INCH OR
3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION
ESAL TON 8,000
003 Z0140 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 71 4 75
003 Z0160 41201-0000 TACK COAT TON 28 2 30
Z0180 41301-0600 ASPHALT PAVEMENT MILLING,
2-INCH DEPTH SQYD 65,007 1,993 67,000
Z0200 63401-0700 PAVEMENT MARKINGS, TYPE D,
SOLID LNFT 88,000
Z0220 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 200
Z0240 63502-1300 TEMPORARY TRAFFIC CONTROL,
DRUM EACH 200
Z0260 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 200
Z0280 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 500
Z0300 63506-0600 TEMPORARY TRAFFIC CONTROL,
PILOT CAR HOUR 160
-O ct -2
8:
A M
N
C O
\c o9
4( 1)
\R oa dw ay
\A m en dm en t
3\
[A
3_ O pt io nZ _E
E_ Es tim at e-
.x ls x] Sh ee t
SUMMARY OF QUANTITIES - Option Z
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B10 ER 94/81/106(1) CO
SHEET
NUMBER
Amendment A003 October 14, 2015
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Joe.Wilson Typewritten Text
Amendment A003 October 14, 2015
Joe.Wilson Typewritten Text
| Untitled |
| A003_SummaryofQuantities_B10.pdf |
| Sheet |
| Text1: |
| Text2: |
| 0: 1 |
| 1: 7 |
| Text3: |
| 0: A003 |
| 1: 10/14/2015 |
| 2: |
| 0: |
| 1: CO ER 94/81/106(1) |
| Text4: |
| 0: |
| 0: FEDERAL HIGHWAY ADMINISTRATION |
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: Joe Wilson 1:
| 1: |
| 0: |
| Text6: |
| 0: DTFH6815B00012 |
| 1: September 22, 2015 |
| 2: |
| 3: |
| Check Box7: |
| 0: Yes |
| 2: Yes |
| 1: |
| 0: |
| 0: Off |
| 1: Off |
| 2: Off |
| Check Box9: |
| 1: Off |
| 2: Off |
| 0: |
| 0: Off |
| 1: Off |
| Text10: 0 * |
| Text11: |
| 0: |
| 1: |
| Text12: See Below * |
| Text13: Invitation for Bid |
Remove Page A-21 and replace with attached Page A-21 dated October 14, 2015.
Remove Pages E-34 thru E-36 and replace with the attached Pages E-34 thru E-36 dated October 14, 2015.
Plan Sheets Remove Plan Sheet B10 and replace with attached Plan Sheet B10 dated October 14, 2015.
Remove Plan Sheet B12 and replace with attached Plan Sheet B12 dated October 14, 2015.
NOTE: When printing revised sheets, turn on 'Document and Markups' in the Print Properties menu to illustrate changes on hard copy print.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN ITEM 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)
| Text14: |
| 0: |
| 1: |
| Text15: |
| 1: |
| 0: |
| 1: |
| 0: |
| 0: |
| 1: |
| Text16: |
| 0: |
| 1: |
| Text17: |
| Text5: |
| 0: 6905001 |
| 1: |
| Check Box1: |
| 0: Yes |
| 1: Off |
File details come from the government source that posted it. Updated .