Bid_Tabs_CO_ER_94.pdf
PDF 494 KB Posted
- Solicitation number
- DTFH6815B00012
About this file
Bid Tabs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Summary-CO_ER_94-81-106(1)_.docx | DOCX document | |
| Q-A _revised_10-14-15.pdf | ||
| A003.pdf | ||
| A002.pdf | ||
| Sign-in_Sheet.pdf | ||
| A001.pdf | ||
| Earthwork_by_Station.xlsx | XLSX spreadsheet | |
| Cross_Sections.pdf | ||
| CO_ER_94-81-106(1)_Lefthand_Canyon_Drive_Pavements_Report-8-25-2015.pdf | ||
| CO_ER_94_81_106(1)-1.Boulder_County.Left_Hand_Canyon.Final.2015._.pdf | ||
| DTFH6815B00012.pdf | ||
| Plans.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total of Bid Items:
Tabulation of Bids Schedule A Project No. : CO ER 94/81/106(1)
Project Name: BOULDER COUNTY LEFTHAND CANYON DRIVE
Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
1 15101-0000 1 Line A0020 ALL LPSM 1,204,376.00$ 1,204,376.00$ 782,000.00$ 782,000.00$ 750,000.00$ 750,000.00$ 2,050,000.00$ 2,050,000.00$ 1,270,000.00$ 1,270,000.00$ 1,600,000.00$ 1,600,000.00$ 2 15206-0000 2 Line A0040 2.940 MILE 50,000.00$ 147,000.00$ 6,000.00$ 17,640.00$ 2,200.00$ 6,468.00$ 15,000.00$ 44,100.00$ 25,000.00$ 73,500.00$ 25,200.00$ 74,088.00$ 3 15214-1000 3 Line A0060 ALL LPSM 10,000.00$ 10,000.00$ 22,000.00$ 22,000.00$ -$ 15,000.00$ 15,000.00$ 29,000.00$ 29,000.00$ 29,600.00$ 29,600.00$ 4 15216-2000 4 Line A0080 5.880 MILE 25,000.00$ 147,000.00$ 24,000.00$ 141,120.00$ 2,200.00$ 12,936.00$ 8,000.00$ 47,040.00$ 15,000.00$ 88,200.00$ 9,400.00$ 55,272.00$ 5 15301-0000 5 Line A0100 ALL LPSM 300,000.00$ 300,000.00$ 215,000.00$ 215,000.00$ 50,000.00$ 50,000.00$ 250,000.00$ 250,000.00$ 100,000.00$ 100,000.00$ 341,900.00$ 341,900.00$ 6 15401-0000 6 Line A0120 ALL LPSM 100,000.00$ 100,000.00$ 16,000.00$ 16,000.00$ 50,000.00$ 50,000.00$ 400,000.00$ 400,000.00$ 175,000.00$ 175,000.00$ 129,500.00$ 129,500.00$ 7 15501-0000 7 Line A0140 ALL LPSM 20,000.00$ 20,000.00$ 7,000.00$ 7,000.00$ 50,000.00$ 50,000.00$ 25,000.00$ 25,000.00$ 65,100.00$ 65,100.00$ 11,100.00$ 11,100.00$ 8 15705-0100 8 Line A0160 2,500 LNFT 5.00$ 12,500.00$ 2.00$ 5,000.00$ 10.00$ 25,000.00$ 4.00$ 10,000.00$ 4.65$ 11,625.00$ 2.20$ 5,500.00$ 9 15705-1400 9 Line A0180 5,000 LNFT 5.00$ 25,000.00$ 5.00$ 25,000.00$ 25.00$ 125,000.00$ 5.00$ 25,000.00$ 4.45$ 22,250.00$ 3.40$ 17,000.00$ 10 15802-0000 10 Line A0200 ALL LPSM 50,000.00$ 50,000.00$ 130,000.00$ 130,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 85,000.00$ 85,000.00$ 210,500.00$ 210,500.00$ 11 20101-0000 11 Line A0220 35.6 ACRE 2,500.00$ 89,000.00$ 5,600.00$ 199,360.00$ 8,000.00$ 284,800.00$ 5,000.00$ 178,000.00$ 2,500.00$ 89,000.00$ 21,000.00$ 747,600.00$ 12 20304-1000 12 Line A0240 ALL LPSM 40,000.00$ 40,000.00$ 77,000.00$ 77,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 35,000.00$ 35,000.00$ 321,500.00$ 321,500.00$ 13 20401-0000 13 Line A0260 126,500 CUYD 30.00$ 3,795,000.00$ 20.80$ 2,631,200.00$ 10.00$ 1,265,000.00$ 50.00$ 6,325,000.00$ 33.67$ 4,259,255.00$ 37.00$ 4,680,500.00$ 14 20435-2500 14 Line A0280 615 CUYD 60.00$ 36,900.00$ 44.00$ 27,060.00$ 65.00$ 39,975.00$ 40.00$ 24,600.00$ 110.00$ 67,650.00$ 240.00$ 147,600.00$ 15 20801-0000 15 Line A0300 1,495 CUYD 100.00$ 149,500.00$ 26.00$ 38,870.00$ 65.00$ 97,175.00$ 15.00$ 22,425.00$ 25.00$ 37,375.00$ 50.00$ 74,750.00$ 16 25110-2800 16 Line A0320 20,000 CUYD 100.00$ 2,000,000.00$ 55.00$ 1,100,000.00$ 85.00$ 1,700,000.00$ 50.00$ 1,000,000.00$ 65.00$ 1,300,000.00$ 160.00$ 3,200,000.00$ 17 25110-2800 17 Line A0340 410 CUYD 125.00$ 51,250.00$ 80.00$ 32,800.00$ 300.00$ 123,000.00$ 70.00$ 28,700.00$ 90.00$ 36,900.00$ 230.00$ 94,300.00$ 18 25210-0000 18 Line A0360 250 SQFT 190.00$ 47,500.00$ 21.00$ 5,250.00$ 100.00$ 25,000.00$ 30.00$ 7,500.00$ 20.00$ 5,000.00$ 68.00$ 17,000.00$ 19 26001-0000 19 Line A0380 500 LNFT 100.00$ 50,000.00$ 40.00$ 20,000.00$ 25.00$ 12,500.00$ 400.00$ 200,000.00$ 35.00$ 17,500.00$ 85.00$ 42,500.00$ 20 30101-0000 20 Line A0400 21,500 TON 30.00$ 645,000.00$ 14.45$ 310,675.00$ 90.00$ 1,935,000.00$ 22.00$ 473,000.00$ 26.00$ 559,000.00$ 27.00$ 580,500.00$ 21 30401-5700 21 Line A0420 3.200 MILE 78,000.00$ 249,600.00$ 16,000.00$ 51,200.00$ 2,200.00$ 7,040.00$ 30,000.00$ 96,000.00$ 104,000.00$ 332,800.00$ 41,800.00$ 133,760.00$ 22 40101-5600 22 Line A0440 13,500 TON 100.00$ 1,350,000.00$ 111.00$ 1,498,500.00$ 90.00$ 1,215,000.00$ 80.00$ 1,080,000.00$ 115.00$ 1,552,500.00$ 98.00$ 1,323,000.00$ 23 40105-3000 23 Line A0460 150 TON 200.00$ 30,000.00$ 19.00$ 2,850.00$ 780.00$ 117,000.00$ 190.00$ 28,500.00$ 20.00$ 3,000.00$ 25.00$ 3,750.00$ 24 41101-1000 24 Line A0480 100 TON 1,100.00$ 110,000.00$ 1,000.00$ 100,000.00$ 900.00$ 90,000.00$ 900.00$ 90,000.00$ 950.00$ 95,000.00$ 330.00$ 33,000.00$ 25 41201-0000 25 Line A0500 30 TON 1,000.00$ 30,000.00$ 370.00$ 11,100.00$ 1,250.00$ 37,500.00$ 700.00$ 21,000.00$ 375.00$ 11,250.00$ 1,000.00$ 30,000.00$ 26 55201-0200
$9,924,516.00 $11,757,734.00$13,248,136.00 $14,841,653.00 $12,777,673.00 $16,325,170.00
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
Kelley Trucking, Inc. Merry Technology, Inc. RBK Construction, Inc. American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
Engineers Estimate
SURVEY AND STAKING, BRIDGE
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
STRUCTURE EXCAVATION
GROUTED RIPRAP, METHOD B, CLASS 8
GROUTED RIPRAP, METHOD B, CLASS 8
ROCKERY
ROCK BOLT
AGGREGATE BASE
SOIL EROSION CONTROL, FIBER ROLL
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
BACKFILL, PERMEABLE
FULL DEPTH RECLAMATION, METHOD 2, 10-INCH DEPTH
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMI
ANTISTRIP ADDITIVE, TYPE 3
PRIME COAT, METHOD 1
TACK COAT
STRUCTURAL CONCRETE, CLASS A (AE)
No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Kelley Trucking, Inc. Merry Technology, Inc. RBK Construction, Inc. American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
Engineers Estimate
26 Line A0520 302 CUYD 900.00$ 271,800.00$ 1,000.00$ 302,000.00$ 1,390.00$ 419,780.00$ 710.00$ 214,420.00$ 850.00$ 256,700.00$ 670.00$ 202,340.00$ 27 55302-3400 27 Line A0540 714 LNFT 500.00$ 357,000.00$ 850.00$ 606,900.00$ 400.00$ 285,600.00$ 675.00$ 481,950.00$ 600.00$ 428,400.00$ 750.00$ 535,500.00$ 28 55401-1000 28 Line A0560 38,800 LB 1.10$ 42,680.00$ 1.30$ 50,440.00$ 2.00$ 77,600.00$ 1.50$ 58,200.00$ 1.10$ 42,680.00$ 1.00$ 38,800.00$ 29 55601-0900 29 Line A0580 251 LNFT 200.00$ 50,200.00$ 265.00$ 66,515.00$ 550.00$ 138,050.00$ 300.00$ 75,300.00$ 343.00$ 86,093.00$ 250.00$ 62,750.00$ 30 55901-0000 30 Line A0600 396 SQYD 30.00$ 11,880.00$ 36.00$ 14,256.00$ 85.00$ 33,660.00$ 23.00$ 9,108.00$ 25.00$ 9,900.00$ 45.00$ 17,820.00$ 31 56401-1000 31 Line A0620 52 EACH 400.00$ 20,800.00$ 180.00$ 9,360.00$ 8,500.00$ 442,000.00$ 195.00$ 10,140.00$ 225.00$ 11,700.00$ 220.00$ 11,440.00$ 32 60101-0000 32 Line A0640 15 CUYD 750.00$ 11,250.00$ 340.00$ 5,100.00$ 1,550.00$ 23,250.00$ 700.00$ 10,500.00$ 375.00$ 5,625.00$ 280.00$ 4,200.00$ 33 60201-0800 33 Line A0660 1,000 LNFT 180.00$ 180,000.00$ 82.00$ 82,000.00$ 150.00$ 150,000.00$ 115.00$ 115,000.00$ 150.00$ 150,000.00$ 160.00$ 160,000.00$ 34 60201-1000 34 Line A0680 400 LNFT 210.00$ 84,000.00$ 125.00$ 50,000.00$ 220.00$ 88,000.00$ 150.00$ 60,000.00$ 225.00$ 90,000.00$ 170.00$ 68,000.00$ 35 60210-0800 35 Line A0700 10 EACH 1,000.00$ 10,000.00$ 1,900.00$ 19,000.00$ 550.00$ 5,500.00$ 1,500.00$ 15,000.00$ 750.00$ 7,500.00$ 940.00$ 9,400.00$ 36 60210-1000 36 Line A0720 5 EACH 1,500.00$ 7,500.00$ 2,700.00$ 13,500.00$ 700.00$ 3,500.00$ 1,700.00$ 8,500.00$ 1,300.00$ 6,500.00$ 1,400.00$ 7,000.00$ 37 60220-2950 37 Line A0740 20 LNFT 4,000.00$ 80,000.00$ 5,200.00$ 104,000.00$ 1,650.00$ 33,000.00$ 1,500.00$ 30,000.00$ 3,000.00$ 60,000.00$ 4,000.00$ 80,000.00$ 38 60404-0000 38 Line A0760 5 EACH 3,000.00$ 15,000.00$ 3,400.00$ 17,000.00$ 8,500.00$ 42,500.00$ 6,000.00$ 30,000.00$ 4,500.00$ 22,500.00$ 9,600.00$ 48,000.00$ 39 60409-0000 39 Line A0780 5 EACH 2,000.00$ 10,000.00$ 1,100.00$ 5,500.00$ 250.00$ 1,250.00$ 550.00$ 2,750.00$ 1,500.00$ 7,500.00$ 6,800.00$ 34,000.00$ 40 61701-1200 40 Line A0800 2,200 LNFT 25.00$ 55,000.00$ 25.30$ 55,660.00$ 100.00$ 220,000.00$ 25.00$ 55,000.00$ 27.60$ 60,720.00$ 42.00$ 92,400.00$ 41 61702-0800 41 Line A0820 16 EACH 3,800.00$ 60,800.00$ 2,900.00$ 46,400.00$ 5,000.00$ 80,000.00$ 2,800.00$ 44,800.00$ 3,200.00$ 51,200.00$ 3,000.00$ 48,000.00$ 42 61707-0000 42 Line A0840 200 LNFT 100.00$ 20,000.00$ 100.00$ 20,000.00$ 250.00$ 50,000.00$ 85.00$ 17,000.00$ 95.00$ 19,000.00$ 100.00$ 20,000.00$ 43 62201-0250 43 Line A0860 100 HOUR 100.00$ 10,000.00$ 110.00$ 11,000.00$ 140.00$ 14,000.00$ 110.00$ 11,000.00$ 100.00$ 10,000.00$ 100.00$ 10,000.00$ 44 62201-0550 44 Line A0880 100 HOUR 125.00$ 12,500.00$ 90.00$ 9,000.00$ 150.00$ 15,000.00$ 100.00$ 10,000.00$ 100.00$ 10,000.00$ 90.00$ 9,000.00$ 45 62201-1000 45 Line A0900 100 HOUR 140.00$ 14,000.00$ 175.00$ 17,500.00$ 150.00$ 15,000.00$ 150.00$ 15,000.00$ 140.00$ 14,000.00$ 150.00$ 15,000.00$ 46 62201-1450 46 Line A0920 100 HOUR 150.00$ 15,000.00$ 225.00$ 22,500.00$ 150.00$ 15,000.00$ 275.00$ 27,500.00$ 240.00$ 24,000.00$ 140.00$ 14,000.00$ 47 62201-2850 47 Line A0940 100 HOUR 150.00$ 15,000.00$ 130.00$ 13,000.00$ 200.00$ 20,000.00$ 150.00$ 15,000.00$ 160.00$ 16,000.00$ 150.00$ 15,000.00$ 48 62201-3000 48 Line A0960 500 HOUR 180.00$ 90,000.00$ 210.00$ 105,000.00$ 125.00$ 62,500.00$ 200.00$ 100,000.00$ 200.00$ 100,000.00$ 170.00$ 85,000.00$ 49 62301-0000 49 Line A0980 100 HOUR 50.00$ 5,000.00$ 30.00$ 3,000.00$ 85.00$ 8,500.00$ 50.00$ 5,000.00$ 40.00$ 4,000.00$ 35.00$ 3,500.00$ 50 62302-0100 50 Line A1000 80 HOUR 300.00$ 24,000.00$ 200.00$ 16,000.00$ 250.00$ 20,000.00$ 300.00$ 24,000.00$ 500.00$ 40,000.00$ 425.00$ 34,000.00$ 51 62302-1000 51 Line A1020 40 HOUR 150.00$ 6,000.00$ 145.00$ 5,800.00$ 250.00$ 10,000.00$ 165.00$ 6,600.00$ 110.00$ 4,400.00$ 150.00$ 6,000.00$ 52 62302-1100
PRECAST, PRESTRESSED CONCRETE BOX BEAM
REINFORCING STEEL
BRIDGE RAILING, STEEL
MEMBRANE WATERPROOFING
BEARING DEVICE, ELASTOMERIC
CONCRETE
INLET TOP, METAL FRAME AND GRATE
GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
TERMINAL SECTION TYPE TANGENT
STRUCTURE TRANSITION RAILING
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
24-INCH PIPE CULVERT
36-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
END SECTION FOR 36-INCH PIPE CULVERT
10 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
CATCH BASIN
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
BULLDOZER, 350HP MINIMUM FLYWHEEL POWER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR
GENERAL LABOR
SPECIAL LABOR, SLOPE SCALING
No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Kelley Trucking, Inc. Merry Technology, Inc. RBK Construction, Inc. American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
Engineers Estimate
52 Line A1040 100 HOUR 125.00$ 12,500.00$ 160.00$ 16,000.00$ 250.00$ 25,000.00$ 165.00$ 16,500.00$ 180.00$ 18,000.00$ 120.00$ 12,000.00$ 53 62510-2000 53 Line A1060 7.1 ACRE 3,000.00$ 21,300.00$ 500.00$ 3,550.00$ 7,000.00$ 49,700.00$ 700.00$ 4,970.00$ 1,000.00$ 7,100.00$ 500.00$ 3,550.00$ 54 62515-2000 54 Line A1080 7.1 ACRE 3,000.00$ 21,300.00$ 1,600.00$ 11,360.00$ 7,000.00$ 49,700.00$ 1,500.00$ 10,650.00$ 2,000.00$ 14,200.00$ 1,000.00$ 7,100.00$ 55 63301-0000 55 Line A1100 50 EACH 650.00$ 32,500.00$ 575.00$ 28,750.00$ 80.00$ 4,000.00$ 550.00$ 27,500.00$ 600.00$ 30,000.00$ 510.00$ 25,500.00$ 56 63309-0000 56 Line A1120 1,500 EACH 50.00$ 75,000.00$ 22.00$ 33,000.00$ 95.00$ 142,500.00$ 25.00$ 37,500.00$ 20.00$ 30,000.00$ 19.00$ 28,500.00$ 57 63401-0700 57 Line A1140 65,000 LNFT 0.50$ 32,500.00$ 0.50$ 32,500.00$ 0.45$ 29,250.00$ 0.50$ 32,500.00$ 0.60$ 39,000.00$ 0.45$ 29,250.00$ 58 63501-1000 58 Line A1160 ALL LPSM 200,000.00$ 200,000.00$ 100,000.00$ 100,000.00$ 50,000.00$ 50,000.00$ 115,000.00$ 115,000.00$ 250,000.00$ 250,000.00$ 91,100.00$ 91,100.00$ 59 63502-0700 59 Line A1180 500 EACH 25.00$ 12,500.00$ 8.00$ 4,000.00$ 25.00$ 12,500.00$ 10.00$ 5,000.00$ 30.00$ 15,000.00$ 10.00$ 5,000.00$ 60 63502-1300 60 Line A1200 250 EACH 70.00$ 17,500.00$ 30.00$ 7,500.00$ 70.00$ 17,500.00$ 30.00$ 7,500.00$ 65.00$ 16,250.00$ 28.00$ 7,000.00$ 61 63502-2000 61 Line A1220 12 EACH 8,000.00$ 96,000.00$ 7,500.00$ 90,000.00$ 8,500.00$ 102,000.00$ 7,200.00$ 86,400.00$ 2,400.00$ 28,800.00$ 7,300.00$ 87,600.00$ 62 63502-3100 62 Line A1240 2 EACH 30,000.00$ 60,000.00$ 21,000.00$ 42,000.00$ 45,000.00$ 90,000.00$ 20,000.00$ 40,000.00$ 30,000.00$ 60,000.00$ 20,800.00$ 41,600.00$ 63 63503-0300 63 Line A1260 200 LNFT 30.00$ 6,000.00$ 29.00$ 5,800.00$ 30.00$ 6,000.00$ 30.00$ 6,000.00$ 30.00$ 6,000.00$ 28.00$ 5,600.00$ 64 63503-0400 64 Line A1280 2,000 LNFT 30.00$ 60,000.00$ 19.00$ 38,000.00$ 30.00$ 60,000.00$ 45.00$ 90,000.00$ 18.00$ 36,000.00$ 45.00$ 90,000.00$ 65 63503-0500 65 Line A1300 4,000 LNFT 8.00$ 32,000.00$ 10.00$ 40,000.00$ 35.00$ 140,000.00$ 12.00$ 48,000.00$ 5.00$ 20,000.00$ 8.00$ 32,000.00$ 66 63504-1000 66 Line A1320 1,000 SQFT 25.00$ 25,000.00$ 10.00$ 10,000.00$ 25.00$ 25,000.00$ 9.00$ 9,000.00$ 23.00$ 23,000.00$ 9.00$ 9,000.00$ 67 63506-0500 67 Line A1340 7,500 HOUR 35.00$ 262,500.00$ 26.00$ 195,000.00$ 55.00$ 412,500.00$ 25.00$ 187,500.00$ 30.00$ 225,000.00$ 25.00$ 187,500.00$ 68 63506-0600 68 Line A1360 2,500 HOUR 45.00$ 112,500.00$ 52.00$ 130,000.00$ 60.00$ 150,000.00$ 50.00$ 125,000.00$ 40.00$ 100,000.00$ 51.00$ 127,500.00$
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
DELINEATOR
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
PAVEMENT MARKINGS, TYPE D, SOLID
TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
Option X
Project Name : BOULDER COUNTY LEFTHAND CANYON DRIVE
No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
1 15101-0000 1 Line X0020 ALL LPSM 384,422.00$ 384,422.00$ 240,000.00$ 240,000.00$ 150,000.00$ 150,000.00$ 20,000.00$ 20,000.00$ 420,000.00$ 420,000.00$ 200,000.00$ 200,000.00$ 2 15206-0000 2 Line X0040 1.400 MILE 35,000.00$ 49,000.00$ 5,000.00$ 7,000.00$ 2,200.00$ 3,080.00$ 15,000.00$ 21,000.00$ 25,000.00$ 35,000.00$ 21,200.00$ 29,680.00$ 3 15214-1000 3 Line X0060 ALL LPSM 5,000.00$ 5,000.00$ 9,000.00$ 9,000.00$ 50,000.00$ 50,000.00$ 7,500.00$ 7,500.00$ 15,400.00$ 15,400.00$ 14,800.00$ 14,800.00$ 4 15216-2000 4 Line X0080 2.800 MILE 25,000.00$ 70,000.00$ 14,000.00$ 39,200.00$ 2,200.00$ 6,160.00$ 8,000.00$ 22,400.00$ 15,000.00$ 42,000.00$ 7,900.00$ 22,120.00$ 5 15301-0000 5 Line X0100 ALL LPSM 105,000.00$ 105,000.00$ 33,000.00$ 33,000.00$ 50,000.00$ 50,000.00$ 12,000.00$ 12,000.00$ 70,000.00$ 70,000.00$ 48,700.00$ 48,700.00$ 6 15401-0000 6 Line X0120 ALL LPSM 35,000.00$ 35,000.00$ 2,000.00$ 2,000.00$ 50,000.00$ 50,000.00$ 15,000.00$ 15,000.00$ 123,000.00$ 123,000.00$ 24,800.00$ 24,800.00$ 7 15501-0000 7 Line X0140 ALL LPSM 10,000.00$ 10,000.00$ 700.00$ 700.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 45,000.00$ 45,000.00$ 2,000.00$ 2,000.00$ 8 15705-0100 8 Line X0160 1,000 LNFT 5.00$ 5,000.00$ 2.00$ 2,000.00$ 3.50$ 3,500.00$ 4.00$ 4,000.00$ 4.65$ 4,650.00$ 5.00$ 5,000.00$ 9 15705-1400 9 Line X0180 2,500 LNFT 5.00$ 12,500.00$ 5.00$ 12,500.00$ 4.00$ 10,000.00$ 5.00$ 12,500.00$ 4.45$ 11,125.00$ 3.40$ 8,500.00$ 10 15802-0000 10 Line X0200 ALL LPSM 25,000.00$ 25,000.00$ 35,000.00$ 35,000.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 65,000.00$ 65,000.00$ 105,100.00$ 105,100.00$ 11 20101-0000 11 Line X0220 17.0 ACRE 2,500.00$ 42,500.00$ 6,000.00$ 102,000.00$ 7,000.00$ 119,000.00$ 5,000.00$ 85,000.00$ 2,500.00$ 42,500.00$ 21,300.00$ 362,100.00$ 12 20304-1000 12 Line X0240 ALL LPSM 25,000.00$ 25,000.00$ 28,000.00$ 28,000.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 30,000.00$ 30,000.00$ 69,800.00$ 69,800.00$ 13 20401-0000 13 Line X0260 12,500 CUYD 20.00$ 250,000.00$ 38.00$ 475,000.00$ 8.00$ 100,000.00$ 40.00$ 500,000.00$ 34.00$ 425,000.00$ 18.00$ 225,000.00$ 14 20435-2500 14 Line X0280 330 CUYD 60.00$ 19,800.00$ 35.00$ 11,550.00$ 45.00$ 14,850.00$ 40.00$ 13,200.00$ 110.00$ 36,300.00$ 230.00$ 75,900.00$ 15 20801-0000 15 Line X0300 550 CUYD 100.00$ 55,000.00$ 26.00$ 14,300.00$ 45.00$ 24,750.00$ 15.00$ 8,250.00$ 30.00$ 16,500.00$ 65.00$ 35,750.00$ 16 25110-2800 16 Line X0320 5,100 CUYD 100.00$ 510,000.00$ 55.00$ 280,500.00$ 45.00$ 229,500.00$ 50.00$ 255,000.00$ 65.00$ 331,500.00$ 155.00$ 790,500.00$ 17 30101-0000 17 Line X0340 10,500 TON 30.00$ 315,000.00$ 13.00$ 136,500.00$ 10.00$ 105,000.00$ 22.00$ 231,000.00$ 26.00$ 273,000.00$ 27.00$ 283,500.00$ 18 30401-5700 18 Line X0360 1.600 MILE 78,000.00$ 124,800.00$ 16,000.00$ 25,600.00$ 3,500.00$ 5,600.00$ 30,000.00$ 48,000.00$ 104,000.00$ 166,400.00$ 49,800.00$ 79,680.00$ 19 40101-5600 19 Line X0380 6,500 TON 100.00$ 650,000.00$ 111.00$ 721,500.00$ 45.00$ 292,500.00$ 80.00$ 520,000.00$ 115.00$ 747,500.00$ 98.00$ 637,000.00$ 20 40105-3000 20 Line X0400 100 TON 200.00$ 20,000.00$ 18.00$ 1,800.00$ 780.00$ 78,000.00$ 190.00$ 19,000.00$ 20.00$ 2,000.00$ 25.00$ 2,500.00$ 21 41101-1000 21 Line X0420 50 TON 1,100.00$ 55,000.00$ 1,000.00$ 50,000.00$ 800.00$ 40,000.00$ 900.00$ 45,000.00$ 950.00$ 47,500.00$ 330.00$ 16,500.00$ 22 41201-0000 22 Line X0440 15 TON 1,000.00$ 15,000.00$ 40.00$ 600.00$ 800.00$ 12,000.00$ 700.00$ 10,500.00$ 375.00$ 5,625.00$ 1,000.00$ 15,000.00$ 23 55201-0200 23 Line X0460 164 CUYD 900.00$ 147,600.00$ 900.00$ 147,600.00$ 1,250.00$ 205,000.00$ 780.00$ 127,920.00$ 850.00$ 139,400.00$ 450.00$ 73,800.00$ 24 55302-3400 24 Line X0480 512 LNFT 500.00$ 256,000.00$ 675.00$ 345,600.00$ 400.00$ 204,800.00$ 610.00$ 312,320.00$ 600.00$ 307,200.00$ 590.00$ 302,080.00$ 25 55401-1000 25 Line X0500 21,500 LB 1.10$ 23,650.00$ 1.25$ 26,875.00$ 2.00$ 43,000.00$ 1.50$ 32,250.00$ 1.10$ 23,650.00$ 1.00$ 21,500.00$
American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
SOIL EROSION CONTROL, SILT FENCE
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
Kelley Trucking, Inc. Merry Technology, Inc.
SURVEY AND STAKING, BRIDGE
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
ANTISTRIP ADDITIVE, TYPE 3
SOIL EROSION CONTROL, FIBER ROLL
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
BACKFILL, PERMEABLE
STRUCTURE EXCAVATION
GROUTED RIPRAP, METHOD B, CLASS 8
AGGREGATE BASE
FULL DEPTH RECLAMATION, METHOD 2, 10-INCH DEPTH
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL M
PRIME COAT, METHOD 1
TACK COAT
STRUCTURAL CONCRETE, CLASS A (AE)
PRECAST, PRESTRESSED CONCRETE BOX BEAM
REINFORCING STEEL
$4,290,775.00 $4,135,316.00$4,228,642.00
Engineers Estimate
$3,407,609.00 $3,264,660.00 $2,978,962.00
RBK Construction, Inc.
No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
Kelley Trucking, Inc. Merry Technology, Inc.Engineers Estimate RBK Construction, Inc.
26 55601-0900 26 Line X0520 163 LNFT 200.00$ 32,600.00$ 265.00$ 43,195.00$ 550.00$ 89,650.00$ 300.00$ 48,900.00$ 300.00$ 48,900.00$ 250.00$ 40,750.00$ 27 55901-0000 27 Line X0540 284 SQYD 30.00$ 8,520.00$ 36.00$ 10,224.00$ 85.00$ 24,140.00$ 23.00$ 6,532.00$ 25.00$ 7,100.00$ 44.00$ 12,496.00$ 28 56401-1000 28 Line X0560 28 EACH 400.00$ 11,200.00$ 180.00$ 5,040.00$ 9,000.00$ 252,000.00$ 195.00$ 5,460.00$ 225.00$ 6,300.00$ 230.00$ 6,440.00$ 29 60101-0000 29 Line X0580 51 CUYD 750.00$ 38,250.00$ 335.00$ 17,085.00$ 550.00$ 28,050.00$ 600.00$ 30,600.00$ 375.00$ 19,125.00$ 250.00$ 12,750.00$ 30 60201-0800 30 Line X0600 500 LNFT 180.00$ 90,000.00$ 85.00$ 42,500.00$ 85.00$ 42,500.00$ 115.00$ 57,500.00$ 150.00$ 75,000.00$ 120.00$ 60,000.00$ 31 60210-0800 31 Line X0620 8 EACH 1,000.00$ 8,000.00$ 1,900.00$ 15,200.00$ 450.00$ 3,600.00$ 1,500.00$ 12,000.00$ 750.00$ 6,000.00$ 940.00$ 7,520.00$ 32 60220-3000 32 Line X0640 65 LNFT 5,000.00$ 325,000.00$ 2,400.00$ 156,000.00$ 1,800.00$ 117,000.00$ 1,500.00$ 97,500.00$ 3,000.00$ 195,000.00$ 2,700.00$ 175,500.00$ 33 61701-1200 33 Line X0660 400 LNFT 25.00$ 10,000.00$ 26.00$ 10,400.00$ 150.00$ 60,000.00$ 25.00$ 10,000.00$ 35.00$ 14,000.00$ 42.00$ 16,800.00$ 34 61702-0800 34 Line X0680 6 EACH 3,800.00$ 22,800.00$ 3,000.00$ 18,000.00$ 7,000.00$ 42,000.00$ 2,800.00$ 16,800.00$ 2,600.00$ 15,600.00$ 3,000.00$ 18,000.00$ 35 61707-0000 35 Line X0700 100 LNFT 100.00$ 10,000.00$ 85.00$ 8,500.00$ 250.00$ 25,000.00$ 85.00$ 8,500.00$ 90.00$ 9,000.00$ 100.00$ 10,000.00$ 36 62201-0250 36 Line X0720 40 HOUR 100.00$ 4,000.00$ 110.00$ 4,400.00$ 150.00$ 6,000.00$ 110.00$ 4,400.00$ 100.00$ 4,000.00$ 100.00$ 4,000.00$ 37 62201-0550 37 Line X0740 40 HOUR 125.00$ 5,000.00$ 90.00$ 3,600.00$ 180.00$ 7,200.00$ 100.00$ 4,000.00$ 100.00$ 4,000.00$ 90.00$ 3,600.00$ 38 62201-1000 38 Line X0760 40 HOUR 140.00$ 5,600.00$ 175.00$ 7,000.00$ 125.00$ 5,000.00$ 150.00$ 6,000.00$ 140.00$ 5,600.00$ 150.00$ 6,000.00$ 39 62201-1450 39 Line X0780 40 HOUR 150.00$ 6,000.00$ 225.00$ 9,000.00$ 135.00$ 5,400.00$ 275.00$ 11,000.00$ 240.00$ 9,600.00$ 140.00$ 5,600.00$ 40 62201-2850 40 Line X0800 40 HOUR 150.00$ 6,000.00$ 130.00$ 5,200.00$ 200.00$ 8,000.00$ 150.00$ 6,000.00$ 160.00$ 6,400.00$ 150.00$ 6,000.00$ 41 62201-3000 41 Line X0820 200 HOUR 180.00$ 36,000.00$ 210.00$ 42,000.00$ 135.00$ 27,000.00$ 200.00$ 40,000.00$ 200.00$ 40,000.00$ 170.00$ 34,000.00$ 42 62301-0000 42 Line X0840 40 HOUR 50.00$ 2,000.00$ 30.00$ 1,200.00$ 85.00$ 3,400.00$ 50.00$ 2,000.00$ 40.00$ 1,600.00$ 35.00$ 1,400.00$ 43 62302-1000 43 Line X0860 40 HOUR 150.00$ 6,000.00$ 145.00$ 5,800.00$ 125.00$ 5,000.00$ 165.00$ 6,600.00$ 110.00$ 4,400.00$ 150.00$ 6,000.00$ 44 62302-1100 44 Line X0880 40 HOUR 125.00$ 5,000.00$ 160.00$ 6,400.00$ 175.00$ 7,000.00$ 165.00$ 6,600.00$ 180.00$ 7,200.00$ 120.00$ 4,800.00$ 45 62510-2000 45 Line X0900 3.4 ACRE 3,000.00$ 10,200.00$ 500.00$ 1,700.00$ 7,350.00$ 24,990.00$ 700.00$ 2,380.00$ 1,000.00$ 3,400.00$ 500.00$ 1,700.00$ 46 62515-2000 46 Line X0920 3.4 ACRE 3,000.00$ 10,200.00$ 1,600.00$ 5,440.00$ 7,350.00$ 24,990.00$ 1,500.00$ 5,100.00$ 2,000.00$ 6,800.00$ 1,000.00$ 3,400.00$ 47 63301-0000 47 Line X0940 20 EACH 650.00$ 13,000.00$ 600.00$ 12,000.00$ 200.00$ 4,000.00$ 550.00$ 11,000.00$ 600.00$ 12,000.00$ 510.00$ 10,200.00$ 48 63401-0700 48 Line X0960 30,000 LNFT 0.50$ 15,000.00$ 0.50$ 15,000.00$ 2.00$ 60,000.00$ 0.50$ 15,000.00$ 0.60$ 18,000.00$ 0.45$ 13,500.00$ 49 63501-1000 49 Line X0980 ALL LPSM 100,000.00$ 100,000.00$ 23,000.00$ 23,000.00$ 50,000.00$ 50,000.00$ 12,000.00$ 12,000.00$ 120,000.00$ 120,000.00$ 22,800.00$ 22,800.00$ 50 63502-0700 50 Line X1000 300 EACH 25.00$ 7,500.00$ 10.00$ 3,000.00$ 25.00$ 7,500.00$ 10.00$ 3,000.00$ 30.00$ 9,000.00$ 10.00$ 3,000.00$ 51 63502-1300 51 Line X1020 100 EACH 70.00$ 7,000.00$ 30.00$ 3,000.00$ 55.00$ 5,500.00$ 30.00$ 3,000.00$ 65.00$ 6,500.00$ 30.00$ 3,000.00$
10 FEET SPAN, 5 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
BRIDGE RAILING, STEEL
MEMBRANE WATERPROOFING
BEARING DEVICE, ELASTOMERIC
CONCRETE
24-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
SPECIAL LABOR, HIRED SURVEY SERVICES
GUARDRAIL SYSTEM G4, TYPE 2, CLASS A STEEL POSTS
TERMINAL SECTION TYPE TANGENT
STRUCTURE TRANSITION RAILING
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
BULLDOZER, 350HP MINIMUM FLYWHEEL POWER
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
TEMPORARY TRAFFIC CONTROL, DRUM
SEEDING, HYDRAULIC METHOD
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE D, SOLID
TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
Kelley Trucking, Inc. Merry Technology, Inc.Engineers Estimate RBK Construction, Inc.
52 63502-3100 52 Line X1040 1 EACH 30,000.00$ 30,000.00$ 18,000.00$ 18,000.00$ 45,000.00$ 45,000.00$ 18,000.00$ 18,000.00$ 30,000.00$ 30,000.00$ 18,000.00$ 18,000.00$ 53 63503-0300 53 Line X1060 100 LNFT 30.00$ 3,000.00$ 29.00$ 2,900.00$ 30.00$ 3,000.00$ 30.00$ 3,000.00$ 30.00$ 3,000.00$ 30.00$ 3,000.00$ 54 63503-0400 54 Line X1080 500 LNFT 30.00$ 15,000.00$ 19.00$ 9,500.00$ 35.00$ 17,500.00$ 45.00$ 22,500.00$ 18.00$ 9,000.00$ 45.00$ 22,500.00$ 55 63503-0500 55 Line X1100 1,000 LNFT 8.00$ 8,000.00$ 10.00$ 10,000.00$ 35.00$ 35,000.00$ 12.00$ 12,000.00$ 5.00$ 5,000.00$ 10.00$ 10,000.00$ 56 63504-1000 56 Line X1120 250 SQFT 25.00$ 6,250.00$ 10.00$ 2,500.00$ 25.00$ 6,250.00$ 9.00$ 2,250.00$ 23.00$ 5,750.00$ 10.00$ 2,500.00$ 57 63506-0500 57 Line X1140 3,000 HOUR 35.00$ 105,000.00$ 26.00$ 78,000.00$ 65.00$ 195,000.00$ 25.00$ 75,000.00$ 34.00$ 102,000.00$ 25.00$ 75,000.00$ 58 63506-0600 58 Line X1160 1,250 HOUR 45.00$ 56,250.00$ 52.00$ 65,000.00$ 65.00$ 81,250.00$ 50.00$ 62,500.00$ 45.00$ 56,250.00$ 51.00$ 63,750.00$
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Option Y
No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
1 15101-0000 1 Line Y0020 ALL LPSM 475,963.00$ 475,963.00$ 220,000.00$ 220,000.00$ 300,000.00$ 300,000.00$ 20,000.00$ 20,000.00$ 465,000.00$ 465,000.00$ 215,000.00$ 215,000.00$ 2 15206-0000 2 Line Y0040 1.970 MILE 35,000.00$ 68,950.00$ 5,000.00$ 9,850.00$ 2,200.00$ 4,334.00$ 15,000.00$ 29,550.00$ 25,000.00$ 49,250.00$ 15,000.00$ 29,550.00$ 3 15214-1000 3 Line Y0060 ALL LPSM 5,000.00$ 5,000.00$ 9,000.00$ 9,000.00$ 50,000.00$ 50,000.00$ 7,500.00$ 7,500.00$ 15,400.00$ 15,400.00$ 14,800.00$ 14,800.00$ 4 15216-2000 4 Line Y0080 3.940 MILE 25,000.00$ 98,500.00$ 7,800.00$ 30,732.00$ 2,200.00$ 8,668.00$ 8,000.00$ 31,520.00$ 15,000.00$ 59,100.00$ 5,600.00$ 22,064.00$ 5 15301-0000 5 Line Y0100 ALL LPSM 170,000.00$ 170,000.00$ 33,000.00$ 33,000.00$ 50,000.00$ 50,000.00$ 11,000.00$ 11,000.00$ 25,000.00$ 25,000.00$ 48,700.00$ 48,700.00$ 6 15401-0000 6 Line Y0120 ALL LPSM 55,000.00$ 55,000.00$ 2,000.00$ 2,000.00$ 50,000.00$ 50,000.00$ 15,000.00$ 15,000.00$ 100,000.00$ 100,000.00$ 35,900.00$ 35,900.00$ 7 15501-0000 7 Line Y0140 ALL LPSM 10,000.00$ 10,000.00$ 700.00$ 700.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 2,000.00$ 2,000.00$ 8 15705-0100 8 Line Y0160 1,000 LNFT 5.00$ 5,000.00$ 2.00$ 2,000.00$ 10.00$ 10,000.00$ 4.00$ 4,000.00$ 4.65$ 4,650.00$ 5.00$ 5,000.00$ 9 15705-1400 9 Line Y0180 2,500 LNFT 5.00$ 12,500.00$ 5.00$ 12,500.00$ 25.00$ 62,500.00$ 5.00$ 12,500.00$ 4.45$ 11,125.00$ 3.40$ 8,500.00$ 10 15802-0000 10 Line Y0200 ALL LPSM 25,000.00$ 25,000.00$ 35,000.00$ 35,000.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 65,000.00$ 65,000.00$ 105,100.00$ 105,100.00$ 11 20101-0000 11 Line Y0220 24.6 ACRE 2,500.00$ 61,500.00$ 6,000.00$ 147,600.00$ 8,000.00$ 196,800.00$ 5,000.00$ 123,000.00$ 2,500.00$ 61,500.00$ 19,600.00$ 482,160.00$ 12 20304-1000 12 Line Y0240 ALL LPSM 25,000.00$ 25,000.00$ 36,000.00$ 36,000.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 30,000.00$ 30,000.00$ 93,700.00$ 93,700.00$ 13 20401-0000 13 Line Y0260 8,500 CUYD 20.00$ 170,000.00$ 50.00$ 425,000.00$ 10.00$ 85,000.00$ 40.00$ 340,000.00$ 53.00$ 450,500.00$ 39.00$ 331,500.00$ 14 20435-2500 14 Line Y0280 270 CUYD 60.00$ 16,200.00$ 55.00$ 14,850.00$ 65.00$ 17,550.00$ 40.00$ 10,800.00$ 110.00$ 29,700.00$ 240.00$ 64,800.00$ 15 20801-0000 15 Line Y0300 560 CUYD 100.00$ 56,000.00$ 26.00$ 14,560.00$ 65.00$ 36,400.00$ 15.00$ 8,400.00$ 30.00$ 16,800.00$ 130.00$ 72,800.00$ 16 25110-2800 16 Line Y0320 14,000 CUYD 100.00$ 1,400,000.00$ 55.00$ 770,000.00$ 40.00$ 560,000.00$ 50.00$ 700,000.00$ 65.00$ 910,000.00$ 170.00$ 2,380,000.00$ 17 30101-0000 17 Line Y0340 11,500 TON 30.00$ 345,000.00$ 15.00$ 172,500.00$ 25.00$ 287,500.00$ 22.00$ 253,000.00$ 26.00$ 299,000.00$ 27.00$ 310,500.00$ 18 30401-5700 18 Line Y0360 2.200 MILE 78,000.00$ 171,600.00$ 18,000.00$ 39,600.00$ 2,200.00$ 4,840.00$ 30,000.00$ 66,000.00$ 101,200.00$ 222,640.00$ 40,700.00$ 89,540.00$ 19 40101-5600 19 Line Y0380 7,000 TON 100.00$ 700,000.00$ 111.00$ 777,000.00$ 90.00$ 630,000.00$ 80.00$ 560,000.00$ 115.00$ 805,000.00$ 98.00$ 686,000.00$ 20 40105-3000 20 Line Y0400 100 TON 200.00$ 20,000.00$ 20.00$ 2,000.00$ 800.00$ 80,000.00$ 190.00$ 19,000.00$ 20.00$ 2,000.00$ 25.00$ 2,500.00$ 21 41101-1000 21 Line Y0420 50 TON 1,100.00$ 55,000.00$ 1,000.00$ 50,000.00$ 1,200.00$ 60,000.00$ 900.00$ 45,000.00$ 950.00$ 47,500.00$ 330.00$ 16,500.00$ 22 41201-0000 22 Line Y0440 15 TON 1,000.00$ 15,000.00$ 400.00$ 6,000.00$ 1,250.00$ 18,750.00$ 700.00$ 10,500.00$ 375.00$ 5,625.00$ 1,000.00$ 15,000.00$ 23 55201-0200 23 Line Y0460 133 CUYD 900.00$ 119,700.00$ 925.00$ 123,025.00$ 1,350.00$ 179,550.00$ 775.00$ 103,075.00$ 850.00$ 113,050.00$ 470.00$ 62,510.00$
$5,235,593.00 $3,889,536.00 $4,184,052.00 $3,250,482.00 $4,867,825.00 $6,019,200.00
Engineers Estimate
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
Kelley Trucking, Inc. Merry Technology, Inc. RBK Construction, Inc. American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
SURVEY AND STAKING, BRIDGE
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, SILT FENCE
STRUCTURE EXCAVATION
GROUTED RIPRAP, METHOD B, CLASS 8
AGGREGATE BASE
FULL DEPTH RECLAMATION, METHOD 2, 10-INCH DEPTH
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MA
ANTISTRIP ADDITIVE, TYPE 3
SOIL EROSION CONTROL, FIBER ROLL
WATERING FOR DUST CONTROL
CLEARING AND GRUBBING
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
ROADWAY EXCAVATION
BACKFILL, PERMEABLE
PRIME COAT, METHOD 1
TACK COAT
STRUCTURAL CONCRETE, CLASS A (AE)
No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineers Estimate Kelley Trucking, Inc. Merry Technology, Inc. RBK Construction, Inc. American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
24 55302-3400 24 Line Y0480 358 LNFT 500.00$ 179,000.00$ 780.00$ 279,240.00$ 400.00$ 143,200.00$ 675.00$ 241,650.00$ 600.00$ 214,800.00$ 630.00$ 225,540.00$ 25 55401-1000 25 Line Y0500 17,100 LB 1.10$ 18,810.00$ 1.25$ 21,375.00$ 2.00$ 34,200.00$ 1.50$ 25,650.00$ 1.10$ 18,810.00$ 1.10$ 18,810.00$ 26 55601-0900 26 Line Y0520 138 LNFT 200.00$ 27,600.00$ 265.00$ 36,570.00$ 500.00$ 69,000.00$ 300.00$ 41,400.00$ 300.00$ 41,400.00$ 250.00$ 34,500.00$ 27 55901-0000 27 Line Y0540 199 SQYD 30.00$ 5,970.00$ 36.00$ 7,164.00$ 90.00$ 17,910.00$ 23.00$ 4,577.00$ 25.00$ 4,975.00$ 44.00$ 8,756.00$ 28 56401-1000 28 Line Y0560 24 EACH 400.00$ 9,600.00$ 180.00$ 4,320.00$ 9,000.00$ 216,000.00$ 195.00$ 4,680.00$ 225.00$ 5,400.00$ 210.00$ 5,040.00$ 29 60101-0000 29 Line Y0580 16 CUYD 750.00$ 12,000.00$ 335.00$ 5,360.00$ 600.00$ 9,600.00$ 850.00$ 13,600.00$ 375.00$ 6,000.00$ 260.00$ 4,160.00$ 30 60201-0800 30 Line Y0600 500 LNFT 180.00$ 90,000.00$ 85.00$ 42,500.00$ 250.00$ 125,000.00$ 115.00$ 57,500.00$ 150.00$ 75,000.00$ 130.00$ 65,000.00$ 31 60210-0800 31 Line Y0620 8 EACH 1,000.00$ 8,000.00$ 1,900.00$ 15,200.00$ 600.00$ 4,800.00$ 1,500.00$ 12,000.00$ 750.00$ 6,000.00$ 940.00$ 7,520.00$ 32 60220-4050 32 Line Y0640 50 LNFT 6,000.00$ 300,000.00$ 3,700.00$ 185,000.00$ 1,250.00$ 62,500.00$ 1,800.00$ 90,000.00$ 4,000.00$ 200,000.00$ 4,100.00$ 205,000.00$ 33 61702-0800 33 Line Y0660 4 EACH 3,800.00$ 15,200.00$ 3,000.00$ 12,000.00$ 5,000.00$ 20,000.00$ 2,800.00$ 11,200.00$ 2,600.00$ 10,400.00$ 3,000.00$ 12,000.00$ 34 61707-0000 34 Line Y0680 100 LNFT 100.00$ 10,000.00$ 90.00$ 9,000.00$ 250.00$ 25,000.00$ 85.00$ 8,500.00$ 90.00$ 9,000.00$ 100.00$ 10,000.00$ 35 62201-0250 35 Line Y0700 40 HOUR 100.00$ 4,000.00$ 110.00$ 4,400.00$ 140.00$ 5,600.00$ 110.00$ 4,400.00$ 100.00$ 4,000.00$ 100.00$ 4,000.00$ 36 62201-0550 36 Line Y0720 40 HOUR 125.00$ 5,000.00$ 90.00$ 3,600.00$ 150.00$ 6,000.00$ 100.00$ 4,000.00$ 100.00$ 4,000.00$ 90.00$ 3,600.00$ 37 62201-1000 37 Line Y0740 40 HOUR 140.00$ 5,600.00$ 175.00$ 7,000.00$ 150.00$ 6,000.00$ 150.00$ 6,000.00$ 140.00$ 5,600.00$ 150.00$ 6,000.00$ 38 62201-1450 38 Line Y0760 40 HOUR 150.00$ 6,000.00$ 225.00$ 9,000.00$ 150.00$ 6,000.00$ 275.00$ 11,000.00$ 240.00$ 9,600.00$ 140.00$ 5,600.00$ 39 62201-2850 39 Line Y0780 40 HOUR 150.00$ 6,000.00$ 130.00$ 5,200.00$ 200.00$ 8,000.00$ 150.00$ 6,000.00$ 160.00$ 6,400.00$ 150.00$ 6,000.00$ 40 62201-3000 40 Line Y0800 200 HOUR 180.00$ 36,000.00$ 210.00$ 42,000.00$ 150.00$ 30,000.00$ 200.00$ 40,000.00$ 200.00$ 40,000.00$ 170.00$ 34,000.00$ 41 62301-0000 41 Line Y0820 40 HOUR 50.00$ 2,000.00$ 30.00$ 1,200.00$ 85.00$ 3,400.00$ 50.00$ 2,000.00$ 40.00$ 1,600.00$ 35.00$ 1,400.00$ 42 62302-1000 42 Line Y0840 40 HOUR 150.00$ 6,000.00$ 145.00$ 5,800.00$ 250.00$ 10,000.00$ 165.00$ 6,600.00$ 110.00$ 4,400.00$ 150.00$ 6,000.00$ 43 62302-1100 43 Line Y0860 40 HOUR 125.00$ 5,000.00$ 160.00$ 6,400.00$ 250.00$ 10,000.00$ 165.00$ 6,600.00$ 180.00$ 7,200.00$ 120.00$ 4,800.00$ 44 62510-2000 44 Line Y0880 4.9 ACRE 3,000.00$ 14,700.00$ 500.00$ 2,450.00$ 7,000.00$ 34,300.00$ 700.00$ 3,430.00$ 1,000.00$ 4,900.00$ 500.00$ 2,450.00$ 45 62515-2000 45 Line Y0900 4.9 ACRE 3,000.00$ 14,700.00$ 1,600.00$ 7,840.00$ 7,000.00$ 34,300.00$ 1,500.00$ 7,350.00$ 2,000.00$ 9,800.00$ 1,000.00$ 4,900.00$ 46 63301-0000 46 Line Y0920 20 EACH 650.00$ 13,000.00$ 575.00$ 11,500.00$ 80.00$ 1,600.00$ 550.00$ 11,000.00$ 600.00$ 12,000.00$ 510.00$ 10,200.00$ 47 63401-0700 47 Line Y0940 45,000 LNFT 0.50$ 22,500.00$ 0.50$ 22,500.00$ 0.80$ 36,000.00$ 0.50$ 22,500.00$ 0.60$ 27,000.00$ 0.45$ 20,250.00$
MEMBRANE WATERPROOFING
BEARING DEVICE, ELASTOMERIC
CONCRETE
24-INCH PIPE CULVERT
END SECTION FOR 24-INCH PIPE CULVERT
12 FEET SPAN, 8 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
PRECAST, PRESTRESSED CONCRETE BOX BEAM
REINFORCING STEEL
BRIDGE RAILING, STEEL
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR
GENERAL LABOR
SPECIAL LABOR, HIRED TECHNICAL SERVICES
SPECIAL LABOR, HIRED SURVEY SERVICES
SEEDING, HYDRAULIC METHOD
TERMINAL SECTION TYPE TANGENT
STRUCTURE TRANSITION RAILING
DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
BULLDOZER, 350HP MINIMUM FLYWHEEL POWER
MULCHING, HYDRAULIC METHOD
SIGN SYSTEM
PAVEMENT MARKINGS, TYPE D, SOLID
No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
Engineers Estimate Kelley Trucking, Inc. Merry Technology, Inc. RBK Construction, Inc. American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
48 63501-1000 48 Line Y0960 ALL LPSM 100,000.00$ 100,000.00$ 22,000.00$ 22,000.00$ 50,000.00$ 50,000.00$ 12,000.00$ 12,000.00$ 115,000.00$ 115,000.00$ 22,800.00$ 22,800.00$ 49 63502-0700 49 Line Y0980 300 EACH 25.00$ 7,500.00$ 10.00$ 3,000.00$ 25.00$ 7,500.00$ 10.00$ 3,000.00$ 30.00$ 9,000.00$ 10.00$ 3,000.00$ 50 63502-1300 50 Line Y1000 100 EACH 70.00$ 7,000.00$ 30.00$ 3,000.00$ 70.00$ 7,000.00$ 30.00$ 3,000.00$ 65.00$ 6,500.00$ 30.00$ 3,000.00$ 51 63502-3100 51 Line Y1020 1 EACH 30,000.00$ 30,000.00$ 14,000.00$ 14,000.00$ 75,000.00$ 75,000.00$ 13,750.00$ 13,750.00$ 30,200.00$ 30,200.00$ 14,000.00$ 14,000.00$ 52 63503-0300 52 Line Y1040 100 LNFT 30.00$ 3,000.00$ 30.00$ 3,000.00$ 30.00$ 3,000.00$ 30.00$ 3,000.00$ 30.00$ 3,000.00$ 30.00$ 3,000.00$ 53 63503-0400 53 Line Y1060 500 LNFT 30.00$ 15,000.00$ 19.00$ 9,500.00$ 30.00$ 15,000.00$ 45.00$ 22,500.00$ 18.00$ 9,000.00$ 45.00$ 22,500.00$ 54 63503-0500 54 Line Y1080 1,000 LNFT 8.00$ 8,000.00$ 10.00$ 10,000.00$ 35.00$ 35,000.00$ 12.00$ 12,000.00$ 5.00$ 5,000.00$ 10.00$ 10,000.00$ 55 63504-1000 55 Line Y1100 250 SQFT 25.00$ 6,250.00$ 10.00$ 2,500.00$ 25.00$ 6,250.00$ 9.00$ 2,250.00$ 23.00$ 5,750.00$ 10.00$ 2,500.00$ 56 63506-0500 56 Line Y1120 3,000 HOUR 35.00$ 105,000.00$ 26.00$ 78,000.00$ 50.00$ 150,000.00$ 25.00$ 75,000.00$ 34.00$ 102,000.00$ 25.00$ 75,000.00$ 57 63506-0600 57 Line Y1140 1,250 HOUR 45.00$ 56,250.00$ 52.00$ 65,000.00$ 60.00$ 75,000.00$ 50.00$ 62,500.00$ 45.00$ 56,250.00$ 51.00$ 63,750.00$
TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, MOVING CONCRETE BARRIER
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, PILOT CAR
Option Z
No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
1 15101-0000 1 Line Z0020 ALL LPSM 116,235.00$ 116,235.00$ 84,000.00$ 84,000.00$ 150,000.00$ 150,000.00$ 5,000.00$ 5,000.00$ 135,000.00$ 135,000.00$ 80,000.00$ 80,000.00$ 2 15210-3000 2 Line Z0040 4.130 MILE 5,000.00$ 20,650.00$ 5,400.00$ 22,302.00$ 2,200.00$ 9,086.00$ 2,000.00$ 8,260.00$ 10,000.00$ 41,300.00$ 2,700.00$ 11,151.00$ 3 15301-0000 3 Line Z0060 ALL LPSM 32,000.00$ 32,000.00$ 30,000.00$ 30,000.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 15,000.00$ 15,000.00$ 48,700.00$ 48,700.00$ 4 15401-0000 4 Line Z0080 ALL LPSM 11,000.00$ 11,000.00$ 2,000.00$ 2,000.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 25,000.00$ 25,000.00$ 24,800.00$ 24,800.00$ 5 15501-0000 5 Line Z0100 ALL LPSM 5,000.00$ 5,000.00$ 700.00$ 700.00$ 50,000.00$ 50,000.00$ 10,000.00$ 10,000.00$ 1,000.00$ 1,000.00$ 2,000.00$ 2,000.00$ 6 40101-5600 6 Line Z0120 8,000 TON 100.00$ 800,000.00$ 111.00$ 888,000.00$ 90.00$ 720,000.00$ 80.00$ 640,000.00$ 115.00$ 920,000.00$ 98.00$ 784,000.00$ 7 40105-3000 7 Line Z0140 75 TON 200.00$ 15,000.00$ 20.00$ 1,500.00$ -$ 190.00$ 14,250.00$ 20.00$ 1,500.00$ 50.00$ 3,750.00$ 8 41201-0000 8 Line Z0160 30 TON 1,000.00$ 30,000.00$ 400.00$ 12,000.00$ -$ 700.00$ 21,000.00$ 350.00$ 10,500.00$ 330.00$ 9,900.00$ 9 41301-0600 9 Line Z0180 67,000 SQYD 3.00$ 201,000.00$ 2.80$ 187,600.00$ 1.50$ 100,500.00$ 1.50$ 100,500.00$ 1.75$ 117,250.00$ 1.60$ 107,200.00$ 10 63401-0700 10 Line Z0200 88,000 LNFT 0.50$ 44,000.00$ 0.50$ 44,000.00$ 1.35$ 118,800.00$ 0.50$ 44,000.00$ 0.60$ 52,800.00$ 0.45$ 39,600.00$ 11 63502-0700 11 Line Z0220 200 EACH 25.00$ 5,000.00$ 10.00$ 2,000.00$ 50.00$ 10,000.00$ 10.00$ 2,000.00$ 29.00$ 5,800.00$ 10.00$ 2,000.00$ 12 63502-1300 12 Line Z0240 200 EACH 70.00$ 14,000.00$ 30.00$ 6,000.00$ 50.00$ 10,000.00$ 30.00$ 6,000.00$ 64.00$ 12,800.00$ 28.00$ 5,600.00$ 13 63504-1000 13 Line Z0260 200 SQFT 25.00$ 5,000.00$ 10.00$ 2,000.00$ 25.00$ 5,000.00$ 9.00$ 1,800.00$ 22.00$ 4,400.00$ 20.00$ 4,000.00$ 14 63506-0500 14 Line Z0280 500 HOUR 35.00$ 17,500.00$ 26.00$ 13,000.00$ 50.00$ 25,000.00$ 25.00$ 12,500.00$ 34.00$ 17,000.00$ 25.00$ 12,500.00$ 15 63506-0600 15 Line Z0300 160 HOUR 45.00$ 7,200.00$ 52.00$ 8,320.00$ 60.00$ 9,600.00$ 50.00$ 8,000.00$ 45.00$ 7,200.00$ 51.00$ 8,160.00$
$1,323,585.00 $1,303,422.00 $1,307,986.00 $893,310.00 $1,366,550.00 $1,143,361.00
Engineers Estimate
TEMPORARY TRAFFIC CONTROL, PILOT CAR
ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
PAVEMENT MARKINGS, TYPE D, SOLID
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINA
ANTISTRIP ADDITIVE, TYPE 3
TACK COAT
MOBILIZATION
CENTERLINE, VERIFICATION AND STAKING
Kelley Trucking, Inc. Merry Technology, Inc. RBK Construction American Civil Constructors, Inc. SEMA Construction, Inc.
NON-RESPONSIVE
| Bid Tabs |
| Bid Tabs Opt X.pdf |
| Bid Tabs |
| Bid Tabs Opt Y.pdf |
| Bid Tabs |
| Bid Tabs Opt Z.pdf |
| Bid Tabs |
File details come from the government source that posted it. Updated .