Dredging, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation

Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912WJ24B0011
Agency
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

Place of performance
Sandwich, Massachusetts, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, New England District is seeking bids for a dredging project at the Cape Cod Canal and Sandwich Beaches in Sandwich, Massachusetts. The project will involve hydraulically dredging approximately 320,300 CY of sand from the Scussett Beach Borrow Area and pumping it directly onto Town Neck Beach. The successful contractor will be required to provide all necessary equipment and materials for the dredging and beach placement work. The estimated construction cost is $5,000,000 to $10,000,000, and the project is expected to be completed within 5 months. The anticipated dredging window is from October 1, 2024 to March 15, 2025, and a production rate of 110,000 CY per month will be required.

This is an unrestricted solicitation, and any responsible source meeting the $37M size standard for NAICS code 237990 (Other Heavy and Civil Engineering Construction) may submit a bid. The solicitation requirements and contract documents will be available on or about June 10, 2024, and will only be accessible through the Procurement Integrated Enterprise Environment (PIEE) website. There is no set-aside designation for this procurement, and no information is provided about any potential incumbents or current contractors.

Notice text

2 versions

Update #2 · Latest ·

The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Dredging at Cape Cod Canal and Sandwich Beaches for the Shore Damage Mitigation Project, located in Sandwich, Massachusetts. This procurement is an Unrestricted Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take approximately 5 months to complete. The estimated construction cost is $5,000,000 to $10,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District.

This project will require hydraulically dredging about 320,300 CY of sand within the established footprint of the nearshore Scussett Beach Borrow Area (SBBA) to a maximum elevation of -18 feet Mean Lower Low Water (MLLW). The material dredged from the SBBA will be pumped directly onto the beach via an estimated length of approximately 9,000 feet of hydraulic pipeline. Crossing the Canal with the hydraulic pipeline will be required between the SBBA and Town Neck Beach. Within the limits of the Canal the top of pipeline must be submerged at all times to depths equal to or greater than -38 feet MLLW and bottom of pipeline continuously resting on the ocean floor. Dredged material that is pumped directly onto Town Neck Beach will be spread, shaped, and graded to meet the beach’s required beach berm and dune profile.

Under this contract the successful offeror will be required to provide the equipment (i.e., hydraulic pipeline dredge plant, booster pump(s), pipeline weights, and heavy equipment) and materials required for the removal of material from the aforementioned SBBA and for the placement of dredged materials onto Town Neck Beach including both publicly and privately owned properties. The anticipated dredging window for the project is from October 1, 2024 – March 15, 2025. It is anticipated that a production rate (i.e. dredging and placement of dredged material) of 110,000 cubic yards per month will need to be achieved to complete the work within the designated dredging window.

This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about June 10, 2024. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to view the solicitation offerors must access the System of Award Management website (www.sam.gov). To download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/), solicitation module.  Amendments, if any, to the solicitation will be made available at the PIEE website.  Registrants are responsible for the accuracy of the information on the SAM.gov Registration List. All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at Ann.M.Adley@usace.army.mil. This notice does not commit the U.S. Government to contract for any supply or service.

Update #1 ·

The U.S. Army Corps of Engineers, New England District will be issuing Invitation for Bids for the Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation Project, located in Sandwich, Massachusetts. This procurement is an Unrestricted Invitation for Bid (IFB). The NAICS code for the work is 237990 with a size standard of $37M. Construction is expected to take approximately 5 months to complete. The estimated construction cost is $5,000,000 to $10,000,000. Any responsible source meeting this standard may submit a bid to be considered by the New England District.

This project will require hydraulically dredging about 320,300 CY of sand within the established footprint of the nearshore Scussett Beach Borrow Area (SBBA) to a maximum elevation of -18 feet Mean Lower Low Water (MLLW). The material dredged from the SBBA will be pumped directly onto the beach via an estimated length of approximately 9,000 feet of hydraulic pipeline. Crossing the Canal with the hydraulic pipeline will be required between the SBBA and Town Neck Beach. Within the limits of the Canal the top of pipeline must be submerged at all times to depths equal to or greater than -38 feet MLLW and bottom of pipeline continuously resting on the ocean floor. Dredged material that is pumped directly onto Town Neck Beach will be spread, shaped, and graded to meet the beach’s required beach berm and dune profile.

Under this contract the successful offeror will be required to provide the equipment (i.e., hydraulic pipeline dredge plant, booster pump(s), pipeline weights, and heavy equipment) and materials required for the removal of material from the aforementioned SBBA and for the placement of dredged materials onto Town Neck Beach including both publicly and privately owned properties. The anticipated dredging window for the project is from October 1, 2024 – March 15, 2025. It is anticipated that a production rate (i.e. dredging and placement of dredged material) of 110,000 cubic yards per month will need to be achieved to complete the work within the designated dredging window.

This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about June 10, 2024. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online; in order to view the solicitation offerors must access the System of Award Management website (www.sam.gov). To download the solicitation, offerors must access the Procurement Integrated Enterprise Environment (https://piee.eb.mil/), solicitation module.  Amendments, if any, to the solicitation will be made available at the PIEE website.  Registrants are responsible for the accuracy of the information on the SAM.gov Registration List. All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at Ann.M.Adley@usace.army.mil. This notice does not commit the U.S. Government to contract for any supply or service.

Notice history

Notice Type Posted
Dredging, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation Award Award Notice
Dredging, Cape Cod Canal and Sandwich Beaches Shore Damage Mitigation Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM25011) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
USACE National Enterprise Dredging Center Scope Dredge to Budget Contract Galveston, Texas 77553, United States · NAICS 237990 ENDIST Wilmington No set-aside
New Orleans Harbor and Various Bar Channels Cutterhead Dredge 3-2025 Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Fort Eustis Dredge Material Management Area (FEDMMA) Fort Eustis, Virginia, United States · NAICS 237990 ENDIST Norfolk Total Small Business
Atchafalaya river BAY, bar, and crewboat cut cutterhead dredge NOS. 3-2026, OM26061 Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity