CA ftnp/NPS yose 500(1) & 16(7)

Awarded Award Notice Posted

Solicitation number
DTFH6816B00014
Agency
Federal Highway Administration Department of Transportation
Awarded
to George Reed Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6816C00030 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Yosemite National Park El Portal, California 95389, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: May 23, 2016 4:45 pm

This project will consist of roadway resurfacing, restoration, rehabilitation, and reconstruction of approximately 4.9 miles of roadway on the CA FTNP/NPS YOSE 500(2) & 16(7) project in Yosemite National Park, Mariposa County, California.  Work is included on El Portal Road and Valley Loop Road (Northside and Southside Drives), and Sentinel Drive within Yosemite Valley. 


Principle work items include 22,000 tons of superpave hot asphalt concrete pavement, 24,000 tons of aggregate base, 18,000 cubic yards of roadway excavation, 7,000 cubic yards of subexcavation, 8,000 tons of surface course aggregate, and 3.8 miles of pulverizing.  Work also includes realignment of 2,000 feet of Northside Drive, roundabout construction at the Village Drive intersection, reconstruction of the Camp 6 and Camp 4 parking lots, drainage improvements, asphalt and aggregate trail construction, and utility work including waterline, sewerline, and electrical system installation.  Additional work items include 1,200 square yards of reinforced concrete pavement, 30,000 linear feet of concrete curb, 5,000 feet of granite curb, 2,800 linear feet of pipe culverts (CMP), and 50 stone masonry headwalls.


All of the work is occurring in cultural and natural resource sensitive areas.  Construction phasing and temporary traffic will be very important to minimize disruptions to park visitors throughout construction.  Temporary traffic control will need to accommodate vehicles, bicycles, and pedestrians.


It is anticipated this project will be advertised in June, 2016 with construction beginning in October2016 and extending through November 2017.


The estimated price range is between $12,000,000 and $16,000,000.

Attachments

Files attached to this notice, newest first
File Type Posted
Bid_tabs_1.pdf PDF
00_CA_FTNP_YOSE_500(2)_ _16(7)_EE_ _SOQ.pdf PDF
CA_FTNPNPS_YOSE_500(2)_Bid_Opening_Summary.pdf PDF
Amendment_A001.pdf PDF
Bidders_Questions_7-8-16.pdf PDF
CA_YOSE_500(2)_16(7)_100__Final_Hydraulics_Tech_Memo.pdf PDF
Bidders_Questions_6-24-16.pdf PDF
Bidders_Questions_6-22-16.pdf PDF
DTFH6816B00014_CA_FTNP-NPS_YOSE_500(2)_ _16(7).pdf PDF
PLANS.pdf PDF