Bid_tabs_1.pdf

PDF 34 KB Posted

Attached to
CA FTNP/NPS YOSE 500(1) & 16(7) Federal contract opportunity
Solicitation number
DTFH6816B00014
Issued by
Department of Transportation Federal Highway Administration

About this file

Replace Bid Tabulations dated July 14 2016 with Bid Tabulations dated August 2 2016.

View the file

Other files for this federal contract opportunity

Other files attached to CA FTNP/NPS YOSE 500(1) & 16(7), newest first.
File Type Posted
00_CA_FTNP_YOSE_500(2)_ _16(7)_EE_ _SOQ.pdf PDF
CA_FTNPNPS_YOSE_500(2)_Bid_Opening_Summary.pdf PDF
Amendment_A001.pdf PDF
Bidders_Questions_7-8-16.pdf PDF
CA_YOSE_500(2)_16(7)_100__Final_Hydraulics_Tech_Memo.pdf PDF
Bidders_Questions_6-24-16.pdf PDF
Bidders_Questions_6-22-16.pdf PDF
DTFH6816B00014_CA_FTNP-NPS_YOSE_500(2)_ _16(7).pdf PDF
PLANS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T A B U L A T I O N O F B I D S

Schedule A Total of Bid Items: 13,339,081.00$ 58.6% 21,155,555.00$ 32.8% 17,711,898.70$ 61.3% 21,512,160.20$ 124.5% 29,949,949.00$ Project No: CA FTNP/NPS YOSE 500(2) & 16(7)

Project Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

15101-0000 Line A0020 ALL LPSM 1,262,973.90$ 1,262,973.90$ 2,199,992.64$ 1,520,000.00$ 2,000,000.00$ 6,015,724.40$

15206-0000 Line A0040 31.233 STA 300.00$ 9,369.90$ 17,178.15$ 17,490.48$ 14,054.85$ 93,699.00$

15210-3000 Line A0060 228.321 STA 100.00$ 22,832.10$ 37,672.97$ 38,814.57$ 25,115.31$ 342,481.50$

15214-3000 Line A0080 ALL LPSM 25,000.00$ 25,000.00$ 58,000.00$ 100,000.00$ 50,000.00$ 200,000.00$

15215-3000 Line A0100 45 EACH 2,100.00$ 94,500.00$ 67,500.00$ 69,750.00$ 33,750.00$ 22,500.00$

15215-5000 Line A0120 5 EACH 8,000.00$ 40,000.00$ 8,750.00$ 9,000.00$ 5,500.00$ 5,000.00$

15216-2000 Line A0140 456.641 STA 100.00$ 45,664.10$ 63,929.74$ 68,496.15$ 61,646.54$ 45,664.10$

15301-0000 Line A0160 ALL LPSM 175,500.00$ 175,500.00$ 250,000.00$ 1,100,000.00$ 400,000.00$ 2,900,000.00$

15401-0000 Line A0180 ALL LPSM 235,000.00$ 235,000.00$ 650,000.00$ 150,000.00$ 600,000.00$ 1,500,000.00$

15501-0000 Line A0200 ALL LPSM 20,000.00$ 20,000.00$ 2,000.00$ 25,000.00$ 15,000.00$ 250,000.00$

15703-2500 Line A0220 3.7 ACRE 4,000.00$ 14,800.00$ 17,760.00$ 12,210.00$ 31,450.00$ 44,400.00$

15705-0100 Line A0240 7,000 LNFT 5.00$ 35,000.00$ 63,000.00$ 63,000.00$ 70,000.00$ 56,000.00$

15705-1400 Line A0260 4,050 LNFT 8.00$ 32,400.00$ 40,500.00$ 42,525.00$ 60,750.00$ 28,350.00$

15706-0200 Line A0280 20 EACH 500.00$ 10,000.00$ 15,000.00$ 12,000.00$ 9,000.00$ 24,000.00$

15706-1100 Line A0300 60 EACH 800.00$ 48,000.00$ 42,000.00$ 12,000.00$ 21,000.00$ 6,000.00$

15706-1200 Line A0320 10 EACH 800.00$ 8,000.00$ 8,000.00$ 2,750.00$ 5,000.00$ 2,500.00$

15706-1600 Line A0340 5 EACH 3,000.00$ 15,000.00$ 32,500.00$ 47,500.00$ 16,000.00$ 25,000.00$

15802-0000 Line A0360 ALL LPSM 80,000.00$ 80,000.00$ 300,000.00$ 65,000.00$ 150,000.00$ 150,000.00$

20101-0000 Line A0380 12.3 ACRE 5,000.00$ 61,500.00$ 615,000.00$ 135,300.00$ 49,200.00$ 184,500.00$

20201-0000 Line A0400 3.0 ACRE 6,000.00$ 18,000.00$ 60,000.00$ 33,000.00$ 13,500.00$ 120,000.00$

20220-1000 Line A0420 10 EACH 1,000.00$ 10,000.00$ 40,000.00$ 35,750.00$ 32,000.00$ 20,000.00$

20301-0200 Line A0440 1,100 EACH 80.00$ 88,000.00$ 110,000.00$ 19,800.00$ 220,000.00$ 11,000.00$

20301-0700 Line A0460 325 EACH 20.00$ 6,500.00$ 13,000.00$ 8,450.00$ 6,500.00$ 16,250.00$

20301-0900 Line A0480 3 EACH 2,500.00$ 7,500.00$ 3,900.00$ 7,800.00$ 12,000.00$ 4,500.00$

20301-2300 Line A0500 6 EACH 150.00$ 900.00$ 1,200.00$ 252.00$ 600.00$ 9,000.00$

20301-2400 Line A0520 100 EACH 100.00$ 10,000.00$ 25,000.00$ 4,500.00$ 12,000.00$ 10,000.00$

20301-3400 Line A0540 60 EACH 50.00$ 3,000.00$ 18,000.00$ 2,760.00$ 6,000.00$ 6,000.00$

20302-0400 Line A0560 1,150 LNFT 5.00$ 5,750.00$ 3,450.00$ 7,187.50$ 6,900.00$ 23,000.00$

SURVEY AND STAKING, PARKING AREA

58,000.00$ 100,000.00$ 50,000.00$ 200,000.00$

MOBILIZATION

SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

CENTERLINE, VERIFICATION AND STAKING

SOIL EROSION CONTROL, INLET PROTECTION TYPE B

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE

WATERING FOR DUST CONTROL

SURVEY AND STAKING, GRADE FINISHING STAKES

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, MULCHING, HYDRAULIC METHOD

SOIL EROSION CONTROL, SILT FENCE

REMOVAL OF SIGN/MARKER (SIGN PANEL ONLY)

REMOVAL OF SIGN

REMOVAL OF WHEELSTOP

REMOVAL OF CURB, ASPHALT

CLEARING AND GRUBBING

SELECTIVE CLEARING (FLUSH CUT AND PRUNING)

REMOVAL, INDIVIDUAL TREE

REMOVAL OF BOULDER

REMOVAL OF DELINEATOR (OR SNOW POLE)

REMOVAL OF FIRE HYDRANT

SURVEY AND STAKING, DRAINAGE STRUCTURE

SURVEY AND STAKING, BOX CULVERT

SOIL EROSION CONTROL, SEDIMENT LOG

SOIL EROSION CONTROL, CHECK DAM

SOIL EROSION CONTROL, INLET PROTECTION TYPE A

1,520,000.00$ 2,000,000.00$ 6,015,724.40$

Granite Construction Company George Reed, Inc. McCullough Construction, Inc. Road and Highway Builders, LLC

550.00$

2,199,992.64$

1,500.00$ 1,550.00$ 750.00$ 500.00$

560.00$ 450.00$ 3,000.00$

165.00$ 170.00$ 110.00$ 1,500.00$

250,000.00$ 1,100,000.00$ 400,000.00$ 2,900,000.00$

140.00$ 150.00$ 135.00$ 100.00$

1,750.00$ 1,800.00$ 1,100.00$ 1,000.00$

2,000.00$ 25,000.00$ 15,000.00$ 250,000.00$

650,000.00$ 150,000.00$ 600,000.00$ 1,500,000.00$

9.00$ 9.00$ 10.00$ 8.00$

4,800.00$ 3,300.00$ 8,500.00$ 12,000.00$

750.00$ 600.00$ 450.00$ 1,200.00$

10.00$ 10.50$ 15.00$ 7.00$

800.00$ 275.00$ 500.00$ 250.00$

700.00$ 200.00$ 350.00$ 100.00$

300,000.00$ 65,000.00$ 150,000.00$ 150,000.00$

6,500.00$ 9,500.00$ 3,200.00$ 5,000.00$

20,000.00$ 11,000.00$ 4,500.00$ 40,000.00$

50,000.00$ 11,000.00$ 4,000.00$ 15,000.00$

100.00$ 18.00$ 200.00$ 10.00$

4,000.00$ 3,575.00$ 3,200.00$ 2,000.00$

1,300.00$ 2,600.00$ 4,000.00$ 1,500.00$

40.00$ 26.00$ 20.00$ 50.00$

250.00$ 45.00$ 120.00$ 100.00$

200.00$ 42.00$ 100.00$ 1,500.00$

3.00$ 6.25$ 6.00$ 20.00$

300.00$ 46.00$ 100.00$ 100.00$

Engineer's Estimate

8/2/2016 Page 1 of 7

Schedule A Total of Bid Items: 13,339,081.00$ 58.6% 21,155,555.00$ 32.8% 17,711,898.70$ 61.3% 21,512,160.20$ 124.5% 29,949,949.00$ Project No: CA FTNP/NPS YOSE 500(2) & 16(7)

Project Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Granite Construction Company George Reed, Inc. McCullough Construction, Inc. Road and Highway Builders, LLCEngineer's Estimate

20302-0500 Line A0580 2,830 LNFT 6.00$ 16,980.00$ 14,150.00$ 12,027.50$ 22,640.00$ 56,600.00$

20303-1600 Line A0600 13,875 SQYD 8.00$ 111,000.00$ 124,875.00$ 159,562.50$ 90,187.50$ 194,250.00$

20303-1600 Line A0620 300 SQYD 12.00$ 3,600.00$ 24,000.00$ 975.00$ 1,800.00$ 6,000.00$

20303-2300 Line A0640 120 SQYD 35.00$ 4,200.00$ 5,400.00$ 780.00$ 1,800.00$ 2,400.00$

20303-3000 Line A0660 2,600 SQYD 10.00$ 26,000.00$ 36,400.00$ 5,850.00$ 2,600.00$ 26,000.00$

20303-3200 Line A0680 130 SQYD 25.00$ 3,250.00$ 5,850.00$ 812.50$ 1,560.00$ 3,900.00$

20401-0000 Line A0700 9,150 CUYD 20.00$ 183,000.00$ 366,000.00$ 411,750.00$ 576,450.00$ 366,000.00$

20401-0000 Line A0720 8,700 CUYD 35.00$ 304,500.00$ 348,000.00$ 130,500.00$ 626,400.00$ 348,000.00$

20402-0000 Line A0740 6,600 CUYD 60.00$ 396,000.00$ 1,023,000.00$ 198,000.00$ 363,000.00$ 363,000.00$

20425-1000 Line A0760 825 LNFT 18.00$ 14,850.00$ 14,850.00$ 5,775.00$ 41,250.00$ 24,750.00$

20435-2500 Line A0780 1,800 CUYD 50.00$ 90,000.00$ 405,000.00$ 239,400.00$ 207,000.00$ 180,000.00$

20435-3000 Line A0800 1,600 CUYD 10.00$ 16,000.00$ 136,000.00$ 83,200.00$ 96,000.00$ 240,000.00$

20443-0000 Line A0820 950 LNFT 12.00$ 11,400.00$ 33,250.00$ 9,025.00$ 30,400.00$ 38,000.00$

21101-1000 Line A0840 5,050 SQYD 8.00$ 40,400.00$ 35,350.00$ 35,350.00$ 15,150.00$ 35,350.00$

25101-2000 Line A0860 140.0 CUYD 150.00$ 21,000.00$ 56,000.00$ 56,000.00$ 31,500.00$ 98,000.00$

25101-3000 Line A0880 80.0 CUYD 200.00$ 16,000.00$ 24,000.00$ 28,000.00$ 20,000.00$ 56,000.00$

25125-0000 Line A0900 50 EACH 175.00$ 8,750.00$ 25,000.00$ 8,250.00$ 35,000.00$ 50,000.00$

25126-0000 Line A0920 15 EACH 100.00$ 1,500.00$ 7,500.00$ 3,150.00$ 9,750.00$ 22,500.00$

30101-0000 Line A0940 16,720.0 TON 45.00$ 752,400.00$ 919,600.00$ 802,560.00$ 1,187,120.00$ 836,000.00$

30110-0000 Line A0960 3,500.0 TON 48.00$ 168,000.00$ 297,500.00$ 280,000.00$ 280,000.00$ 175,000.00$

30110-0000 Line A0980 520.0 TON 350.00$ 182,000.00$ 70,200.00$ 57,720.00$ 57,200.00$ 93,600.00$

30301-3000 Line A1000 178.450 STA 200.00$ 35,690.00$ 12,491.50$ 17,845.00$ 17,845.00$ 356,900.00$

30305-3000 Line A1020 210.000 STA 500.00$ 105,000.00$ 357,000.00$ 194,250.00$ 199,500.00$ 1,680,000.00$

30802-2000 Line A1040 6,160.0 TON 45.00$ 277,200.00$ 492,800.00$ 320,320.00$ 523,600.00$ 246,400.00$

40101-0600 Line A1060 20,120.0 TON 105.00$ 2,112,600.00$ 2,012,000.00$ 2,172,960.00$ 2,816,800.00$ 6,036,000.00$

40105-3000 Line A1080 200.0 TON 280.00$ 56,000.00$ 200.00$ 68,000.00$ 80,000.00$ 40,000.00$

40920-1000 Line A1100 41.0 TON 500.00$ 20,500.00$ 53,300.00$ 28,700.00$ 20,500.00$ 8,200.00$

41103-0000 Line A1120 86,800 SQYD 0.50$ 43,400.00$ 108,500.00$ 151,900.00$ 86,800.00$ 86,800.00$

REMOVAL OF PAVEMENT, ASPHALT

SUBEXCAVATION

DITCH, EXCAVATION

BACKFILL, PERMEABLE

BACKFILL, CURB

BERMS

ROADWAY OBLITERATION, METHOD 1

REMOVAL OF PAVEMENT, ASPHALT (CURB INSTALLATION)

REMOVAL OF PAVEMENT, CONCRETE

REMOVAL OF SIDEWALK, ASPHALT

REMOVAL OF SIDEWALK, CONCRETE

ROADWAY EXCAVATION

ROADWAY EXCAVATION (SPECIAL)

REMOVAL OF CURB, CONCRETE

AGGREGATE SURFACE COURSE (TRAILS)

SHOULDER AND DITCH RECONDITIONING

PULVERIZING, 6-INCH DEPTH

ROADWAY AGGREGATE, METHOD 2

SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL

ANTISTRIP ADDITIVE, TYPE 3

PLACED RIPRAP, CLASS 2

PLACED RIPRAP, CLASS 3

BOULDER

REMOVE AND RESET BOULDER

AGGREGATE BASE

AGGREGATE SURFACE COURSE

FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H

PRIME COAT

9.00$ 11.50$ 6.50$ 14.00$

5.00$ 4.25$ 8.00$ 20.00$

45.00$ 6.50$ 15.00$ 20.00$

80.00$ 3.25$ 6.00$ 20.00$

45.00$ 6.25$ 12.00$ 30.00$

14.00$ 2.25$ 1.00$ 10.00$

40.00$ 15.00$ 72.00$ 40.00$

40.00$ 45.00$ 63.00$ 40.00$

18.00$ 7.00$ 50.00$ 30.00$

155.00$ 30.00$ 55.00$ 55.00$

85.00$ 52.00$ 60.00$ 150.00$

225.00$ 133.00$ 115.00$ 100.00$

7.00$ 7.00$ 3.00$ 7.00$

35.00$ 9.50$ 32.00$ 40.00$

300.00$ 350.00$ 250.00$ 700.00$

400.00$ 400.00$ 225.00$ 700.00$

500.00$ 210.00$ 650.00$ 1,500.00$

500.00$ 165.00$ 700.00$ 1,000.00$

85.00$ 80.00$ 80.00$ 50.00$

55.00$ 48.00$ 71.00$ 50.00$

70.00$ 100.00$ 100.00$ 2,000.00$

135.00$ 111.00$ 110.00$ 180.00$

80.00$ 52.00$ 85.00$ 40.00$

1,700.00$ 925.00$ 950.00$ 8,000.00$

1.00$ 340.00$ 400.00$ 200.00$

100.00$ 108.00$ 140.00$ 300.00$

1.25$ 1.75$ 1.00$ 1.00$

1,300.00$ 700.00$ 500.00$ 200.00$

8/2/2016 Page 2 of 7

Schedule A Total of Bid Items: 13,339,081.00$ 58.6% 21,155,555.00$ 32.8% 17,711,898.70$ 61.3% 21,512,160.20$ 124.5% 29,949,949.00$ Project No: CA FTNP/NPS YOSE 500(2) & 16(7)

Project Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Granite Construction Company George Reed, Inc. McCullough Construction, Inc. Road and Highway Builders, LLCEngineer's Estimate

41105-0000 Line A1140 525.0 TON 50.00$ 26,250.00$ 21,000.00$ 36,487.50$ 52,500.00$ 10,500.00$

41201-1000 Line A1160 37.0 TON 600.00$ 22,200.00$ 44,400.00$ 10,175.00$ 44,400.00$ 22,200.00$

41410-1000 Line A1180 1,525 LNFT 14.00$ 21,350.00$ 18,300.00$ 12,200.00$ 99,125.00$ 13,725.00$

50101-0300 Line A1200 690 SQYD 300.00$ 207,000.00$ 172,500.00$ 79,350.00$ 69,000.00$ 138,000.00$

50101-0900 Line A1220 500 SQYD 150.00$ 75,000.00$ 162,500.00$ 80,000.00$ 40,000.00$ 120,000.00$

50102-0300 Line A1240 330 SQYD 120.00$ 39,600.00$ 66,000.00$ 39,600.00$ 23,100.00$ 33,000.00$

60101-0000 Line A1260 120.0 CUYD 500.00$ 60,000.00$ 216,000.00$ 216,000.00$ 102,000.00$ 240,000.00$

60110-0000 Line A1280 50,000 LB 4.00$ 200,000.00$ 230,000.00$ 175,000.00$ 250,000.00$ 50,000.00$

60201-0100 Line A1300 1,100 LNFT 35.00$ 38,500.00$ 38,500.00$ 66,000.00$ 121,000.00$ 33,000.00$

60201-0400 Line A1320 130 LNFT 150.00$ 19,500.00$ 16,250.00$ 15,860.00$ 39,000.00$ 19,500.00$

60201-0600 Line A1340 220 LNFT 150.00$ 33,000.00$ 27,500.00$ 41,360.00$ 68,200.00$ 35,200.00$

60201-0800 Line A1360 2,220 LNFT 180.00$ 399,600.00$ 321,900.00$ 535,020.00$ 765,900.00$ 399,600.00$

60202-0200 Line A1380 110 LNFT 200.00$ 22,000.00$ 22,000.00$ 20,790.00$ 42,350.00$ 33,000.00$

60210-0800 Line A1400 12 EACH 500.00$ 6,000.00$ 14,400.00$ 36,552.00$ 10,200.00$ 31,200.00$

60220-0300 Line A1420 220 LNFT 300.00$ 66,000.00$ 231,000.00$ 111,760.00$ 159,500.00$ 176,000.00$

60220-1150 Line A1440 125 LNFT 450.00$ 56,250.00$ 162,500.00$ 93,500.00$ 110,625.00$ 125,000.00$

60403-0000 Line A1460 30 EACH 3,500.00$ 105,000.00$ 150,000.00$ 150,000.00$ 202,500.00$ 60,000.00$

60405-0000 Line A1480 51 EACH 900.00$ 45,900.00$ 102,000.00$ 81,600.00$ 43,350.00$ 51,000.00$

60405-0000 Line A1500 18 EACH 5,500.00$ 99,000.00$ 43,200.00$ 16,200.00$ 11,700.00$ 18,000.00$

60407-0000 Line A1520 2 EACH 500.00$ 1,000.00$ 1,500.00$ 4,062.00$ 1,100.00$ 2,000.00$

60526-0000 Line A1540 5 LNFT 400.00$ 2,000.00$ 1,750.00$ 1,000.00$ 1,250.00$ 5,000.00$

60704-0000 Line A1560 26 EACH 1,250.00$ 32,500.00$ 65,000.00$ 15,600.00$ 91,000.00$ 26,000.00$

60901-0400 Line A1580 275 LNFT 35.00$ 9,625.00$ 20,625.00$ 1,650.00$ 5,775.00$ 6,875.00$

60901-0600 Line A1600 80 LNFT 20.00$ 1,600.00$ 4,800.00$ 560.00$ 1,760.00$ 4,000.00$

60901-0800 Line A1620 210 LNFT 22.00$ 4,620.00$ 14,700.00$ 4,830.00$ 4,410.00$ 10,500.00$

60901-1200 Line A1640 29,730 LNFT 20.00$ 594,600.00$ 1,189,200.00$ 520,275.00$ 624,330.00$ 237,840.00$

60901-1200 Line A1660 610 LNFT 25.00$ 15,250.00$ 42,700.00$ 9,760.00$ 21,350.00$ 15,250.00$

60901-5600 Line A1680 3,750 LNFT 45.00$ 168,750.00$ 562,500.00$ 600,000.00$ 750,000.00$ 300,000.00$ 150.00$ 160.00$ 200.00$ 80.00$

70.00$ 16.00$ 35.00$ 25.00$

40.00$ 17.50$ 21.00$ 8.00$

70.00$ 23.00$ 21.00$ 50.00$

60.00$ 7.00$ 22.00$ 50.00$

75.00$ 6.00$ 21.00$ 25.00$

2,500.00$ 600.00$ 3,500.00$ 1,000.00$

350.00$ 200.00$ 250.00$ 1,000.00$

750.00$ 2,031.00$ 550.00$ 1,000.00$

2,400.00$ 900.00$ 650.00$ 1,000.00$

2,000.00$ 1,600.00$ 850.00$ 1,000.00$

5,000.00$ 5,000.00$ 6,750.00$ 2,000.00$

1,300.00$ 748.00$ 885.00$ 1,000.00$

1,050.00$ 508.00$ 725.00$ 800.00$

1,200.00$ 3,046.00$ 850.00$ 2,600.00$

200.00$ 189.00$ 385.00$ 300.00$

145.00$ 241.00$ 345.00$ 180.00$

125.00$ 188.00$ 310.00$ 160.00$

125.00$ 122.00$ 300.00$ 150.00$

35.00$ 60.00$ 110.00$ 30.00$

4.60$ 3.50$ 5.00$ 1.00$

1,800.00$ 1,800.00$ 850.00$ 2,000.00$

200.00$ 120.00$ 70.00$ 100.00$

REINFORCED RIGID PAVEMENT, 8-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS

PLAIN RIGID PAVEMENT, 6-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS

CONCRETE (BOX CULVERT HEADWALL/WINGWALL)

CONCRETE COLORING AGENT

4-INCH PIPE CULVERT (SLEEVE)

12-INCH PIPE CULVERT (CMP, POLYMERIC COATED)

BLOTTER

TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H (EMULSIFIED ASPHALT)

CRACKS, CLEANING AND SEALING

REINFORCED RIGID PAVEMENT, 6-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS (EXPOSED AGGREGATE FINISH)

INLET

MANHOLE ADJUSTMENT

MANHOLE ADJUSTMENT (ELECTRICAL VAULT)

CAPPING INLETS AND MANHOLES

DRAINAGE CHASE

CLEANING CULVERT IN PLACE

18-INCH PIPE CULVERT (CMP, POLYMERIC COATED)

24-INCH PIPE CULVERT (CMP, POLYMERIC COATED)

18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (CMP, POLYMERIC COATED)

END SECTION FOR 24-INCH PIPE CULVERT (POLYMERIC COATED) (POLYMERIC COATED)

4 FEET SPAN, 3 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT (BURIED FLOOR)

6 FEET SPAN, 3 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT (BURIED FLOOR)

CURB, CONCRETE, 6-INCH DEPTH (DOWELED)

CURB, CONCRETE, 8-INCH DEPTH

CURB, CONCRETE, 10-INCH DEPTH

CURB, CONCRETE, 14-INCH DEPTH

CURB, CONCRETE, 14-INCH DEPTH (SPECIAL)

CURB, STONE, TYPE 2, 14-INCH DEPTH (GRANITE WHEELSTOP)

1,200.00$ 275.00$ 1,200.00$ 600.00$

40.00$ 69.50$ 100.00$ 20.00$

325.00$ 160.00$ 80.00$ 240.00$

250.00$ 115.00$ 100.00$ 200.00$

12.00$ 8.00$ 65.00$ 9.00$

8/2/2016 Page 3 of 7

Schedule A Total of Bid Items: 13,339,081.00$ 58.6% 21,155,555.00$ 32.8% 17,711,898.70$ 61.3% 21,512,160.20$ 124.5% 29,949,949.00$ Project No: CA FTNP/NPS YOSE 500(2) & 16(7)

Project Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Granite Construction Company George Reed, Inc. McCullough Construction, Inc. Road and Highway Builders, LLCEngineer's Estimate

60901-6100 Line A1700 530 LNFT 180.00$ 95,400.00$ 132,500.00$ 148,400.00$ 159,000.00$ 53,000.00$

60902-0600 Line A1720 520 LNFT 30.00$ 15,600.00$ 59,800.00$ 21,840.00$ 23,400.00$ 20,800.00$

60902-1000 Line A1740 485 LNFT 25.00$ 12,125.00$ 60,625.00$ 16,490.00$ 36,375.00$ 19,400.00$

60905-1000 Line A1760 510 LNFT 40.00$ 20,400.00$ 58,650.00$ 30,090.00$ 38,250.00$ 20,400.00$

60908-1000 Line A1780 1,700 SQYD 45.00$ 76,500.00$ 71,400.00$ 37,400.00$ 17,000.00$ 68,000.00$

60920-0000 Line A1800 30 EACH 100.00$ 3,000.00$ 15,000.00$ 18,390.00$ 9,000.00$ 6,000.00$

61101-0000 Line A1820 ALL LPSM 100,000.00$ 100,000.00$ 75,000.00$ 160,000.00$ 185,000.00$ 200,000.00$

61102-1600 Line A1840 20 LNFT 50.00$ 1,000.00$ 7,000.00$ 8,200.00$ 4,000.00$ 3,000.00$

61106-0000 Line A1860 4 EACH 5,000.00$ 20,000.00$ 32,000.00$ 50,000.00$ 15,400.00$ 20,000.00$

61108-4000 Line A1880 17 EACH 400.00$ 6,800.00$ 18,700.00$ 19,550.00$ 6,800.00$ 3,400.00$

61108-4000 Line A1900 3 EACH 1,000.00$ 3,000.00$ 3,000.00$ 3,450.00$ 2,400.00$ 600.00$

61114-1500 Line A1920 9 EACH 3,000.00$ 27,000.00$ 13,500.00$ 37,350.00$ 36,900.00$ 2,700.00$

61202-0400 Line A1940 770 LNFT 50.00$ 38,500.00$ 77,000.00$ 55,440.00$ 211,750.00$ 308,000.00$

61202-0700 Line A1960 540 LNFT 90.00$ 48,600.00$ 67,500.00$ 44,280.00$ 167,400.00$ 243,000.00$

61203-0000 Line A1980 10 LNFT 5,000.00$ 50,000.00$ 46,000.00$ 70,000.00$ 155,000.00$ 12,000.00$

61501-0100 Line A2000 695 SQYD 90.00$ 62,550.00$ 69,500.00$ 62,550.00$ 34,750.00$ 48,650.00$

61501-1100 Line A2020 2,090 SQYD 30.00$ 62,700.00$ 73,150.00$ 68,970.00$ 73,150.00$ 146,300.00$

61501-1100 Line A2040 2,920 SQYD 35.00$ 102,200.00$ 110,960.00$ 131,400.00$ 151,840.00$ 233,600.00$

61503-5000 Line A2060 225 SQYD 100.00$ 22,500.00$ 163,125.00$ 111,375.00$ 303,750.00$ 90,000.00$

61504-1000 Line A2080 40.0 SQYD 200.00$ 8,000.00$ 14,000.00$ 6,800.00$ 10,000.00$ 8,000.00$

61509-0000 Line A2100 5.0 SQYD 250.00$ 1,250.00$ 750.00$ 4,350.00$ 1,125.00$ 5,000.00$

61509-0000 Line A2120 4 SQYD (CQ) 500.00$ 2,000.00$ 3,200.00$ 5,200.00$ 1,200.00$ 400.00$

61901-0000 Line A2140 35 LNFT 25.00$ 875.00$ 1,750.00$ 1,960.00$ 1,750.00$ 2,450.00$

61901-2300 Line A2160 3,900 LNFT 50.00$ 195,000.00$ 89,700.00$ 101,400.00$ 89,700.00$ 78,000.00$

61902-2000 Line A2180 1 EACH 8,000.00$ 8,000.00$ 8,500.00$ 9,500.00$ 9,000.00$ 5,000.00$

62002-0000 Line A2200 10 SQYD 1,000.00$ 10,000.00$ 11,000.00$ 11,500.00$ 16,500.00$ 5,000.00$

62002-1000 Line A2220 205.0 SQYD 300.00$ 61,500.00$ 246,000.00$ 246,000.00$ 283,925.00$ 41,000.00$

62011-0100 Line A2240 4 EACH 5,000.00$ 20,000.00$ 56,000.00$ 46,000.00$ 64,000.00$ 16,000.00$ 14,000.00$ 11,500.00$ 16,000.00$ 4,000.00$

1,200.00$ 1,200.00$ 1,385.00$ 200.00$

1,100.00$ 1,150.00$ 1,650.00$ 500.00$

8,500.00$ 9,500.00$ 9,000.00$ 5,000.00$

23.00$ 26.00$ 23.00$ 20.00$

50.00$ 56.00$ 50.00$ 70.00$

800.00$ 1,300.00$ 300.00$ 100.00$

150.00$ 870.00$ 225.00$ 1,000.00$

350.00$ 170.00$ 250.00$ 200.00$

725.00$ 495.00$ 1,350.00$ 400.00$

38.00$ 45.00$ 52.00$ 80.00$

35.00$ 33.00$ 35.00$ 70.00$

100.00$ 90.00$ 50.00$ 70.00$

4,600.00$ 7,000.00$ 15,500.00$ 1,200.00$

125.00$ 82.00$ 310.00$ 450.00$

100.00$ 72.00$ 275.00$ 400.00$

1,500.00$ 4,150.00$ 4,100.00$ 300.00$

1,000.00$ 1,150.00$ 800.00$ 200.00$

1,100.00$ 1,150.00$ 400.00$ 200.00$

8,000.00$ 12,500.00$ 3,850.00$ 5,000.00$

350.00$ 410.00$ 200.00$ 150.00$

75,000.00$ 160,000.00$ 185,000.00$ 200,000.00$

500.00$ 613.00$ 300.00$ 200.00$

42.00$ 22.00$ 10.00$ 40.00$

115.00$ 59.00$ 75.00$ 40.00$

125.00$ 34.00$ 75.00$ 40.00$

115.00$ 42.00$ 45.00$ 40.00$

250.00$ 280.00$ 300.00$ 100.00$

CURB, STONE, TYPE 2, 18-INCH DEPTH

CURB AND GUTTER, CONCRETE, 8-INCH DEPTH (OUTFALL)

CURB AND GUTTER, CONCRETE, 12-INCH DEPTH

GUTTER, CONCRETE (8-INCH DEPTH)

PAVED DITCH, ASPHALT

RESET WHEELSTOP

6-INCH SEWER LINE, PLASTIC

8-INCH SEWER LINE, PLASTIC (10-INCH)

MANHOLE, SANITARY SEWER

SIDEWALK, CONCRETE (4-INCH DEPTH)

SIDEWALK, ASPHALT (3-INCH DEPTH)

SIDEWALK, ASPHALT (4-INCH DEPTH)

WATER SYSTEM (IRRIGATION)

2-INCH WATERLINE, COPPER

FIRE HYDRANT

ADJUST VALVE BOX

ADJUST VALVE BOX (CLEANOUT)

WATER SYSTEM ACCESSORY, TIE-IN

GATE, METAL, 28 FEET WIDTH

STONE MASONRY

CLASS B MASONRY, ROCK FACE FINISH

STONE MASONRY HEADWALL FOR 12-INCH PIPE CULVERT

MEDIAN, STONE (GRANITE)

ACCESSIBILITY RAMP, CONCRETE

DETECTABLE WARNING PANELS

DETECTABLE WARNING PANELS (ADJUST)

FENCE (REMOVE AND RESET)

FENCE, SPLIT RAIL

8/2/2016 Page 4 of 7

Schedule A Total of Bid Items: 13,339,081.00$ 58.6% 21,155,555.00$ 32.8% 17,711,898.70$ 61.3% 21,512,160.20$ 124.5% 29,949,949.00$ Project No: CA FTNP/NPS YOSE 500(2) & 16(7)

Project Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Granite Construction Company George Reed, Inc. McCullough Construction, Inc. Road and Highway Builders, LLCEngineer's Estimate

62011-0300 Line A2260 9 EACH 5,000.00$ 45,000.00$ 135,000.00$ 112,500.00$ 140,850.00$ 45,000.00$

62011-0500 Line A2280 22 EACH 5,000.00$ 110,000.00$ 330,000.00$ 297,000.00$ 352,000.00$ 132,000.00$

62011-1600 Line A2300 6 EACH 8,000.00$ 48,000.00$ 135,000.00$ 120,000.00$ 135,900.00$ 42,000.00$

62011-1800 Line A2320 14 EACH 8,000.00$ 112,000.00$ 315,000.00$ 294,000.00$ 329,700.00$ 112,000.00$

62014-0000 Line A2340 ALL LPSM 20,000.00$ 20,000.00$ 5,000.00$ 1,000.00$ 46,500.00$ 2,000.00$

62028-1000 Line A2360 9 EACH 5,000.00$ 45,000.00$ 121,500.00$ 103,500.00$ 153,000.00$ 45,000.00$

62201-0200 Line A2380 40 HOUR 110.00$ 4,400.00$ 4,800.00$ 4,800.00$ 6,000.00$ 4,800.00$

62201-0450 Line A2400 40 HOUR 130.00$ 5,200.00$ 5,600.00$ 6,000.00$ 6,000.00$ 5,000.00$

62201-0950 Line A2420 40 HOUR 150.00$ 6,000.00$ 6,200.00$ 6,800.00$ 6,400.00$ 6,000.00$

62201-2850 Line A2440 40 HOUR 160.00$ 6,400.00$ 6,400.00$ 7,400.00$ 7,000.00$ 6,800.00$

62201-3400 Line A2460 40 HOUR 200.00$ 8,000.00$ 6,600.00$ 9,000.00$ 7,400.00$ 6,800.00$

62202-1000 Line A2480 ALL LPSM 80,000.00$ 80,000.00$ 275,000.00$ 200,000.00$ 120,000.00$ 100,000.00$

62301-0000 Line A2500 40 HOUR 65.00$ 2,600.00$ 2,520.00$ 3,400.00$ 3,600.00$ 2,400.00$

62302-1100 Line A2520 40 HOUR 250.00$ 10,000.00$ 8,200.00$ 8,400.00$ 5,440.00$ 8,000.00$

62303-1000 Line A2540 ALL LPSM 25,000.00$ 25,000.00$ 10,000.00$ 50,000.00$ 200.00$ 1,400.00$

62407-0000 Line A2560 1,730 CUYD -$ -$ 86,500.00$ 38,060.00$ 129,750.00$ 207,600.00$

63301-0000 Line A2580 160 EACH 500.00$ 80,000.00$ 32,000.00$ 112,000.00$ 16,000.00$ 160,000.00$

63301-1000 Line A2600 25 EACH 300.00$ 7,500.00$ 4,500.00$ 13,750.00$ 6,250.00$ 22,500.00$

63304-1200 Line A2620 30.00 SQFT 35.00$ 1,050.00$ 660.00$ 1,140.00$ 1,050.00$ 2,700.00$

63306-1700 Line A2640 10 EACH 100.00$ 1,000.00$ 500.00$ 325.00$ 2,000.00$ 2,000.00$

63308-0000 Line A2660 120 EACH 70.00$ 8,400.00$ 7,920.00$ 7,800.00$ 9,000.00$ 12,000.00$

63309-0000 Line A2680 250 EACH 60.00$ 15,000.00$ 16,500.00$ 16,250.00$ 18,750.00$ 10,000.00$

63309-1000 Line A2700 350 EACH 70.00$ 24,500.00$ 27,300.00$ 22,750.00$ 26,250.00$ 35,000.00$

63313-0000 Line A2720 11,110 LNFT 1.00$ 11,110.00$ 11,110.00$ 22,220.00$ 12,221.00$ 44,440.00$

63316-1000 Line A2740 18 EACH 300.00$ 5,400.00$ 3,600.00$ 6,300.00$ 5,850.00$ 18,000.00$

63401-0700 Line A2760 101,000 LNFT 0.35$ 35,350.00$ 388,850.00$ 429,250.00$ 429,250.00$ 101,000.00$

63401-0800 Line A2780 16,000 LNFT 0.35$ 5,600.00$ 12,800.00$ 16,800.00$ 16,000.00$ 16,000.00$

63405-0050 Line A2800 10 EACH 800.00$ 8,000.00$ 16,000.00$ 6,600.00$ 21,000.00$ 15,000.00$ 1,600.00$ 660.00$ 2,100.00$ 1,500.00$

0.80$ 1.05$ 1.00$ 1.00$

3.85$ 4.25$ 4.25$ 1.00$

200.00$ 350.00$ 325.00$ 1,000.00$

1.00$ 2.00$ 1.10$ 4.00$

78.00$ 65.00$ 75.00$ 100.00$

66.00$ 65.00$ 75.00$ 40.00$

66.00$ 65.00$ 75.00$ 100.00$

50.00$ 32.50$ 200.00$ 200.00$

22.00$ 38.00$ 35.00$ 90.00$

180.00$ 550.00$ 250.00$ 900.00$

200.00$ 700.00$ 100.00$ 1,000.00$

50.00$ 22.00$ 75.00$ 120.00$

10,000.00$ 50,000.00$ 200.00$ 1,400.00$

205.00$ 210.00$ 136.00$ 200.00$

63.00$ 85.00$ 90.00$ 60.00$

275,000.00$ 200,000.00$ 120,000.00$ 100,000.00$

165.00$ 225.00$ 185.00$ 170.00$

160.00$ 185.00$ 175.00$ 170.00$

155.00$ 170.00$ 160.00$ 150.00$

140.00$ 150.00$ 150.00$ 125.00$

120.00$ 120.00$ 150.00$ 120.00$

13,500.00$ 11,500.00$ 17,000.00$ 5,000.00$

5,000.00$ 1,000.00$ 46,500.00$ 2,000.00$

22,500.00$ 21,000.00$ 23,550.00$ 8,000.00$

22,500.00$ 20,000.00$ 22,650.00$ 7,000.00$

15,000.00$ 13,500.00$ 16,000.00$ 6,000.00$

15,000.00$ 12,500.00$ 15,650.00$ 5,000.00$

STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT

STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT

WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

MOTOR GRADER, 12 FOOT MINIMUM BLADE

HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT

MATERIALS TRANSFER VEHICLE

GENERAL LABOR

SPECIAL LABOR, HIRED SURVEY SERVICES

STONE MASONRY HEADWALL FOR DOUBLE 18-INCH PIPE CULVERT

STONE MASONRY HEADWALL FOR DOUBLE 24-INCH PIPE CULVERT

SAMPLE WALL

REMOVE AND RESET STONE MASONRY HEADWALL

DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

OBJECT MARKER

DELINEATOR

DELINEATOR, TYPE SNOWPOLE

RUMBLE STRIP (CENTERLINE)

REMOVE AND RESET SIGN

PAVEMENT MARKINGS, TYPE D, SOLID

SPECIAL LABOR, HIRED TECHNICAL SERVICES (ELECTRICAL CONSULTANT)

PLACING CONSERVED TOPSOIL

SIGN SYSTEM

SIGN SYSTEM, GOVERNMENT FURNISHED SIGN

SIGNS, ALUMINUM PANELS, TYPE 9 SHEETING

POST, WOOD, 4-INCH X 4-INCH

PAVEMENT MARKINGS, TYPE D, BROKEN

PAVEMENT MARKINGS, SYMBOLS (TYPE D, PED XING)

8/2/2016 Page 5 of 7

Schedule A Total of Bid Items: 13,339,081.00$ 58.6% 21,155,555.00$ 32.8% 17,711,898.70$ 61.3% 21,512,160.20$ 124.5% 29,949,949.00$ Project No: CA FTNP/NPS YOSE 500(2) & 16(7)

Project Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Granite Construction Company George Reed, Inc. McCullough Construction, Inc. Road and Highway Builders, LLCEngineer's Estimate

63405-0050 Line A2820 5 EACH 400.00$ 2,000.00$ 4,000.00$ 2,795.00$ 5,500.00$ 7,500.00$

63405-0050 Line A2840 5 EACH 400.00$ 2,000.00$ 8,000.00$ 2,925.00$ 10,000.00$ 5,000.00$

63405-0050 Line A2860 4 EACH 400.00$ 1,600.00$ 1,200.00$ 2,240.00$ 2,200.00$ 4,000.00$

63405-0050 Line A2880 2 EACH 19,668.00$ 39,336.00$ 3,200.00$ 1,320.00$ 4,200.00$ 4,000.00$

63405-1300 Line A2900 13 EACH 300.00$ 3,900.00$ 5,200.00$ 4,628.00$ 7,150.00$ 26,000.00$

63405-1350 Line A2920 8 EACH 300.00$ 2,400.00$ 3,200.00$ 2,848.00$ 4,400.00$ 16,000.00$

63405-1350 Line A2940 5 EACH 300.00$ 1,500.00$ 3,000.00$ 2,540.00$ 3,750.00$ 7,500.00$

63405-1400 Line A2960 3 EACH 300.00$ 900.00$ 1,800.00$ 1,068.00$ 2,250.00$ 4,500.00$

63405-1500 Line A2980 25 EACH 400.00$ 10,000.00$ 20,000.00$ 14,000.00$ 25,000.00$ 25,000.00$

63405-1650 Line A3000 25 EACH 500.00$ 12,500.00$ 7,500.00$ 14,000.00$ 15,000.00$ 25,000.00$

63406-0000 Line A3020 20 EACH 20.00$ 400.00$ 600.00$ 510.00$ 1,000.00$ 1,000.00$

63502-0600 Line A3040 11 EACH 200.00$ 2,200.00$ 1,320.00$ 1,320.00$ 1,100.00$ 5,500.00$

63502-0700 Line A3060 580 EACH 25.00$ 14,500.00$ 9,280.00$ 9,280.00$ 17,400.00$ 11,600.00$

63502-1050 Line A3080 680 EACH 28.00$ 19,040.00$ 6,800.00$ 6,800.00$ 20,400.00$ 13,600.00$

63502-1300 Line A3100 370 EACH 50.00$ 18,500.00$ 14,800.00$ 14,800.00$ 37,000.00$ 7,400.00$

63502-1700 Line A3120 90 EACH 50.00$ 4,500.00$ 3,600.00$ 2,880.00$ 22,500.00$ 2,700.00$

63502-2000 Line A3140 9 EACH 15,000.00$ 135,000.00$ 90,000.00$ 80,505.00$ 81,000.00$ 63,000.00$

63503-0700 Line A3160 47,600 LNFT 0.30$ 14,280.00$ 42,840.00$ 26,180.00$ 19,040.00$ 47,600.00$

63503-1000 Line A3180 12,000 LNFT 4.00$ 48,000.00$ 120,000.00$ 120,000.00$ 96,000.00$ 24,000.00$

63504-1000 Line A3200 1,100.00 SQFT 35.00$ 38,500.00$ 24,200.00$ 24,200.00$ 44,000.00$ 22,000.00$

63506-0500 Line A3220 12,800 HOUR 65.00$ 832,000.00$ 908,800.00$ 1,011,200.00$ 1,254,400.00$ 384,000.00$

63506-0600 Line A3240 3,760 HOUR 75.00$ 282,000.00$ 327,120.00$ 413,600.00$ 413,600.00$ 225,600.00$

63601-3000 Line A3260 ALL LPSM 125,000.00$ 125,000.00$ 65,000.00$ 150,000.00$ 70,000.00$ 15,000.00$

63602-5000 Line A3280 4 EACH 20,000.00$ 80,000.00$ 60,000.00$ 93,600.00$ 24,000.00$ 40,000.00$

63610-1600 Line A3300 130 LNFT 5.00$ 650.00$ 7,800.00$ 10,530.00$ 3,900.00$ 6,500.00$

63610-1600 Line A3320 560 LNFT 3.00$ 1,680.00$ 11,200.00$ 22,680.00$ 14,000.00$ 22,400.00$

63610-2800 Line A3340 530 LNFT 6.00$ 3,180.00$ 18,550.00$ 27,030.00$ 23,850.00$ 31,800.00$

63621-1000 Line A3360 6 EACH 5,000.00$ 30,000.00$ 18,000.00$ 37,800.00$ 1,350.00$ 12,000.00$ 3,000.00$ 6,300.00$ 225.00$ 2,000.00$

35.00$ 51.00$ 45.00$ 60.00$

20.00$ 40.50$ 25.00$ 40.00$

60.00$ 81.00$ 30.00$ 50.00$

15,000.00$ 23,400.00$ 6,000.00$ 10,000.00$

65,000.00$ 150,000.00$ 70,000.00$ 15,000.00$

87.00$ 110.00$ 110.00$ 60.00$

71.00$ 79.00$ 98.00$ 30.00$

22.00$ 22.00$ 40.00$ 20.00$

10.00$ 10.00$ 8.00$ 2.00$

0.90$ 0.55$ 0.40$ 1.00$

10,000.00$ 8,945.00$ 9,000.00$ 7,000.00$

40.00$ 32.00$ 250.00$ 30.00$

40.00$ 40.00$ 100.00$ 20.00$

10.00$ 10.00$ 30.00$ 20.00$

16.00$ 16.00$ 30.00$ 20.00$

120.00$ 120.00$ 100.00$ 500.00$

30.00$ 25.50$ 50.00$ 50.00$

300.00$ 560.00$ 600.00$ 1,000.00$

800.00$ 560.00$ 1,000.00$ 1,000.00$

600.00$ 356.00$ 750.00$ 1,500.00$

600.00$ 508.00$ 750.00$ 1,500.00$

400.00$ 356.00$ 550.00$ 2,000.00$

400.00$ 356.00$ 550.00$ 2,000.00$

1,600.00$ 660.00$ 2,100.00$ 2,000.00$

300.00$ 560.00$ 550.00$ 1,000.00$

1,600.00$ 585.00$ 2,000.00$ 1,000.00$

800.00$ 559.00$ 1,100.00$ 1,500.00$

RAISED PAVEMENT MARKER (TOP OF CURB APPLICATION)

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

PAVEMENT MARKINGS, TYPE D, TURN ARROW

PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW

PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW (MERGE)

PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN ARROW COMBINATION

PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE

PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL

PAVEMENT MARKINGS, SYMBOLS (TYPE D, YEILD)

PAVEMENT MARKINGS, SYMBOLS (TYPE D, NO PARKING)

PAVEMENT MARKINGS, SYMBOLS (TYPE D, YEILD LINE)

PAVEMENT MARKINGS, SYMBOLS (TYPE D, BUS ONLY)

CONDUIT, 2-INCH, PVC (SCHED 80)

CONDUIT, 2-INCH, PVC

CONDUIT, 4-INCH, PVC

UTILITY BOX, PULLBOX (ELECTRICAL)

TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (BLACK)

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, PILOT CAR

SYSTEM INSTALLATION, ELECTRICAL (TRANSFORMER/SWITCH GEAR RELOCATION)

SYSTEM INSTALLATION, CHANGEABLE MESSAGE SIGN (SOLAR RADAR SPEED SIGN)

8/2/2016 Page 6 of 7

Schedule A Total of Bid Items: 13,339,081.00$ 58.6% 21,155,555.00$ 32.8% 17,711,898.70$ 61.3% 21,512,160.20$ 124.5% 29,949,949.00$ Project No: CA FTNP/NPS YOSE 500(2) & 16(7)

Project Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount

Granite Construction Company George Reed, Inc. McCullough Construction, Inc. Road and Highway Builders, LLCEngineer's Estimate

63621-1000 Line A3380 2 EACH 500.00$ 1,000.00$ 4,400.00$ 5,500.00$ 700.00$ 3,000.00$

63621-1000 Line A3400 10 EACH 400.00$ 4,000.00$ 22,000.00$ 27,000.00$ 4,000.00$ 10,000.00$

64502-0000 Line A3420 50 EACH 500.00$ 25,000.00$ 47,500.00$ 65,000.00$ 37,500.00$ 50,000.00$ 950.00$ 1,300.00$ 750.00$ 1,000.00$

2,200.00$ 2,700.00$ 400.00$ 1,000.00$

2,200.00$ 2,750.00$ 350.00$ 1,500.00$

UTILITY BOX, PULLBOX (24x24x24)

UTILITY BOX, PULLBOX (24x16x12)

LOCATE UTILITIES

8/2/2016 Page 7 of 7

File details come from the government source that posted it. Updated .