Amendment A001. This minor amendment was made late but there is no plan to extend the bid opening. Companies ARE ALLOWED to email or fax both the Amendment and revised/final bid numbers (since the amendment does change the bid schedule).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_tabs_1.pdf | ||
| 00_CA_FTNP_YOSE_500(2)_ _16(7)_EE_ _SOQ.pdf | ||
| CA_FTNPNPS_YOSE_500(2)_Bid_Opening_Summary.pdf | ||
| Bidders_Questions_7-8-16.pdf | ||
| CA_YOSE_500(2)_16(7)_100__Final_Hydraulics_Tech_Memo.pdf | ||
| Bidders_Questions_6-24-16.pdf | ||
| Bidders_Questions_6-22-16.pdf | ||
| DTFH6816B00014_CA_FTNP-NPS_YOSE_500(2)_ _16(7).pdf | ||
| PLANS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B I D S C H E D U L E Schedule A Account: ALL
Project No: CA FTNP/NPS YOSE 500(2) & 16(7)
Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"
PMIS: Quantity Unit Unit Price Amount
15101-0000 Line A0020 ALL LPSM $
15206-0000 Line A0040 31.233 STA $ $
15210-3000 Line A0060 228.321 STA $ $
15214-3000 Line A0080 ALL LPSM $
15215-3000
Line A0100 45 EACH $ $ 15215-5000
Line A0120 5 EACH $ $ 15216-2000
Line A0140 456.641 STA $ $ 15301-0000
Line A0160 ALL LPSM $ 15401-0000
Line A0180 ALL LPSM $
15501-0000 Line A0200 ALL LPSM $
15703-2500 Line A0220 3.7 ACRE $ $
15705-0100 Line A0240 7,000 LNFT $ $
15705-1400 Line A0260 4,050 LNFT $ $
15706-0200 Line A0280 20 EACH $ $
15706-1100 Line A0300 60 EACH $ $
15706-1200 Line A0320 10 EACH $ $
15706-1600 Line A0340 5 EACH $ $
15802-0000 Line A0360 ALL LPSM $
20101-0000 Line A0380 12.3 ACRE $ $
20201-0000
MOBILIZATION
SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
CENTERLINE, VERIFICATION AND STAKING
SURVEY AND STAKING, PARKING AREA
SURVEY AND STAKING, DRAINAGE STRUCTURE
SURVEY AND STAKING, BOX CULVERT
CLEARING AND GRUBBING
SELECTIVE CLEARING (FLUSH CUT AND PRUNING)
SOIL EROSION CONTROL, SEDIMENT LOG
SOIL EROSION CONTROL, CHECK DAM
SOIL EROSION CONTROL, INLET PROTECTION TYPE A
SURVEY AND STAKING, GRADE FINISHING STAKES
CONTRACTOR QUALITY CONTROL
CONTRACTOR TESTING
CONSTRUCTION SCHEDULE
SOIL EROSION CONTROL, MULCHING, HYDRAULIC METHOD
SOIL EROSION CONTROL, SILT FENCE
SOIL EROSION CONTROL, INLET PROTECTION TYPE B
SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE
WATERING FOR DUST CONTROL
Schedule Total: ___________________________
Submitted by: ____________________________
Amendment A001 7/11/16
Jeremiah.Rogers Typewritten Text A-6
Project No: CA FTNP/NPS YOSE 500(2) & 16(7)
Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"
PMIS: Quantity Unit Unit Price Amount
Schedule Total: ___________________________
Submitted by: ____________________________
Line A0400 3.0 ACRE $ $ 20220-1000
Line A0420 10 EACH $ $ 20301-0200
Line A0440 1,100 EACH $ $ 20301-0700
Line A0460 325 EACH $ $ 20301-0900
Line A0480 3 EACH $ $ 20301-2300
Line A0500 6 EACH $ $ 20301-2400
Line A0520 100 EACH $ $ 20301-3400
Line A0540 60 EACH $ $ 20302-0400
Line A0560 1,150 LNFT $ $ 20302-0500
Line A0580 2,830 LNFT $ $ 20303-1600
Line A0600 13,875 SQYD $ $ 20303-1600
Line A0620 300 SQYD $ $ 20303-2300
Line A0640 120 SQYD $ $ 20303-3000
Line A0660 2,600 SQYD $ $ 20303-3200
Line A0680 130 SQYD $ $ 20401-0000
Line A0700 9,150 CUYD $ $ 20401-0000
Line A0720 8,700 CUYD $ $ 20402-0000
Line A0740 6,600 CUYD $ $ 20425-1000
Line A0760 825 LNFT $ $ 20435-2500
Line A0780 1,800 CUYD $ $
REMOVAL OF PAVEMENT, ASPHALT (CURB INSTALLATION)
REMOVAL OF PAVEMENT, CONCRETE
REMOVAL OF SIDEWALK, ASPHALT
REMOVAL, INDIVIDUAL TREE
REMOVAL OF SIGN/MARKER (SIGN PANEL ONLY)
REMOVAL OF SIGN
REMOVAL OF WHEELSTOP
REMOVAL OF CURB, ASPHALT
REMOVAL OF CURB, CONCRETE
REMOVAL OF PAVEMENT, ASPHALT
REMOVAL OF BOULDER
REMOVAL OF DELINEATOR (OR SNOW POLE)
REMOVAL OF FIRE HYDRANT
SUBEXCAVATION
DITCH, EXCAVATION
BACKFILL, PERMEABLE
REMOVAL OF SIDEWALK, CONCRETE
ROADWAY EXCAVATION
ROADWAY EXCAVATION (SPECIAL)
Amendment A001 7/11/16
Jeremiah.Rogers Typewritten Text A-7
Jeremiah.Rogers
Project No: CA FTNP/NPS YOSE 500(2) & 16(7)
Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"
PMIS: Quantity Unit Unit Price Amount
Schedule Total: ___________________________
Submitted by: ____________________________
20435-3000 Line A0800 1,600 CUYD $ $
20443-0000 Line A0820 950 LNFT $ $
21101-1000 Line A0840 5,050 SQYD $ $
25101-2000 Line A0860 140.0 CUYD $ $
25101-3000 Line A0880 80.0 CUYD $ $
25125-0000 Line A0900 50 EACH $ $
25126-0000 Line A0920 15 EACH $ $
30101-0000 Line A0940 16,720.0 TON $ $
30110-0000 Line A0960 3,500.0 TON $ $
30110-0000 Line A0980 520.0 TON $ $
30301-3000 Line A1000 178.450 STA $ $
30305-3000 Line A1020 210.000 STA $ $
30802-2000 Line A1040 6,160.0 TON $ $
40101-0600 Line A1060 20,120.0 TON $ $
40105-3000 Line A1080 200.0 TON $ $
40920-1000 Line A1100 41.0 TON $ $
41103-0000 Line A1120 86,800 SQYD $ $
41105-0000 Line A1140 525.0 TON $ $
41201-1000 Line A1160 37.0 TON $ $
41410-1000
BACKFILL, CURB
BERMS
ROADWAY OBLITERATION, METHOD 1
AGGREGATE SURFACE COURSE (TRAILS)
SHOULDER AND DITCH RECONDITIONING
PULVERIZING, 6-INCH DEPTH
ROADWAY AGGREGATE, METHOD 2
SUPERPAVE PAVEMENT, 1/2-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL
ANTISTRIP ADDITIVE, TYPE 3
PLACED RIPRAP, CLASS 2
PLACED RIPRAP, CLASS 3
BOULDER
REMOVE AND RESET BOULDER
AGGREGATE BASE
AGGREGATE SURFACE COURSE
FOG SEAL, EMULSIFIED ASPHALT GRADE CSS-1 OR CSS-1H, SS-1 OR SS-1H
PRIME COAT
BLOTTER
TACK COAT GRADE CSS-1, CSS-1H, SS-1, OR SS-1H (EMULSIFIED ASPHALT)
CRACKS, CLEANING AND SEALING
Amendment A001 7/11/16
Jeremiah.Rogers Typewritten Text A-8
Highlight
Project No: CA FTNP/NPS YOSE 500(2) & 16(7)
Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"
PMIS: Quantity Unit Unit Price Amount
Schedule Total: ___________________________
Submitted by: ____________________________
Line A1180 1,525 LNFT $ $ 50101-0300
Line A1200 690 SQYD $ $ 50101-0900
Line A1220 500 SQYD $ $ 50102-0300
Line A1240 330 SQYD $ $ 60101-0000
Line A1260 120.0 CUYD $ $ 60110-0000
Line A1280 50,000 LB $ $ 60201-0100
Line A1300 1,100 LNFT $ $ 60201-0400
Line A1320 130 LNFT $ $ 60201-0600
Line A1340 220 LNFT $ $ 60201-0800
Line A1360 2,220 LNFT $ $ 60202-0200
Line A1380 110 LNFT $ $ 60210-0800
Line A1400 12 EACH $ $ 60220-0300
Line A1420 220 LNFT $ $ 60220-1150
Line A1440 125 LNFT $ $ 60403-0000
Line A1460 30 EACH $ $ 60405-0000
Line A1480 51 EACH $ $ 60405-0000
Line A1500 18 EACH $ $ 60407-0000
Line A1520 2 EACH $ $ 60526-0000
Line A1540 5 LNFT $ $ 60704-0000
Line A1560 26 EACH $ $
REINFORCED RIGID PAVEMENT, 8-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS
PLAIN RIGID PAVEMENT, 6-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS
CONCRETE (BOX CULVERT HEDWALL/WINGWALL)
CONCRETE COLORING AGENT
4-INCH PIPE CULVERT (SLEEVE)
12-INCH PIPE CULVERT (CMP, POLYMERIC COATED)
REINFORCED RIGID PAVEMENT, 6-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS (EXPOSED AGGREGATE FINISH)
INLET
MANHOLE ADJUSTMENT
MANHOLE ADJUSTMENT (ELECTRICAL VAULT)
CAPPING INLETS AND MANHOLES
DRAINAGE CHASE
CLEANING CULVERT IN PLACE
18-INCH PIPE CULVERT (CMP, POLYMERIC COATED)
24-INCH PIPE CULVERT (CMP, POLYMERIC COATED)
18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (CMP, POLYMERIC COATED)
END SECTION FOR 24-INCH PIPE CULVERT (POLYMERIC COATED) (POLYMERIC COATED)
4 FEET SPAN, 3 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT (BURIED FLOOR)
6 FEET SPAN, 3 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT (BURIED FLOOR)
Amendment A001 7/11/16
Jeremiah.Rogers
A-9
Project No: CA FTNP/NPS YOSE 500(2) & 16(7)
Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"
PMIS: Quantity Unit Unit Price Amount
Schedule Total: ___________________________
Submitted by: ____________________________
60901-0400 Line A1580 275 LNFT $ $
60901-0600 Line A1600 80 LNFT $ $
60901-0800 Line A1620 210 LNFT $ $
60901-1200 Line A1640 29,730 LNFT $ $
60901-1200 Line A1660 610 LNFT $ $
60901-5600 Line A1680 3,750 LNFT $ $
60901-6100 Line A1700 530 LNFT $ $
60902-0600 Line A1720 520 LNFT $ $
60902-1000 Line A1740 485 LNFT $ $
60905-1000 Line A1760 510 LNFT $ $
60908-1000 Line A1780 1,700 SQYD $ $
60920-0000 Line A1800 30 EACH $ $
61101-0000 Line A1820 ALL LPSM $
61102-1600 Line A1840 20 LNFT $ $
61106-0000 Line A1860 4 EACH $ $
61108-4000 Line A1880 17 EACH $ $
61108-4000 Line A1900 3 EACH $ $
61114-1500 Line A1920 9 EACH $ $
61202-0400 Line A1940 770 LNFT $ $
61202-0700
CURB, STONE, TYPE 2, 18-INCH DEPTH
CURB AND GUTTER, CONCRETE, 8-INCH DEPTH (OUTFALL)
CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
GUTTER, CONCRETE (8-INCH DEPTH)
PAVED DITCH, ASPHALT
RESET WHEELSTOP
CURB, CONCRETE, 6-INCH DEPTH (DOWELED)
CURB, CONCRETE, 8-INCH DEPTH
CURB, CONCRETE, 10-INCH DEPTH
CURB, CONCRETE, 14-INCH DEPTH
CURB, CONCRETE, 14-INCH DEPTH (SPECIAL)
CURB, STONE, TYPE 2, 14-INCH DEPTH (GRANITE WHEELSTOP)
6-INCH SEWER LINE, PLASTIC
8-INCH SEWER LINE, PLASTIC (10-INCH)
WATER SYSTEM (IRRIGATION)
2-INCH WATERLINE, COPPER
FIRE HYDRANT
ADJUST VALVE BOX
ADJUST VALVE BOX (CLEANOUT)
WATER SYSTEM ACCESSORY, TIE-IN
Amendment A001 7/11/16
Jeremiah.Rogers Typewritten Text A-10
Jeremiah.Rogers Typewritten Text
Project No: CA FTNP/NPS YOSE 500(2) & 16(7)
Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"
PMIS: Quantity Unit Unit Price Amount
Schedule Total: ___________________________
Submitted by: ____________________________
Line A1960 540 LNFT $ $ 61203-0000
Line A1980 10 EACH $ $ 61501-0100
Line A2000 695 SQYD $ $ 61501-1100
Line A2020 2,090 SQYD $ $ 61501-1100
Line A2040 2,920 SQYD $ $ 61503-5000
Line A2060 225 SQYD $ $ 61504-1000
Line A2080 40.0 SQYD $ $ 61509-0000
Line A2100 5.0 SQYD $ $ 61509-0000
Line A2120 4 SQYD (CQ) $ $ 61901-0000
Line A2140 35 LNFT $ $ 61901-2300
Line A2160 3,900 LNFT $ $ 61902-2000
Line A2180 1 EACH $ $ 62002-0000
Line A2200 10 SQYD $ $ 62002-1000
Line A2220 205.0 SQYD $ $ 62011-0100
Line A2240 4 EACH $ $ 62011-0300
Line A2260 9 EACH $ $ 62011-0500
Line A2280 22 EACH $ $ 62011-1600
Line A2300 6 EACH $ $ 62011-1800
Line A2320 14 EACH $ $ 62014-0000
Line A2340 ALL LPSM $
MANHOLE, SANITARY SEWER
SIDEWALK, CONCRETE (4-INCH DEPTH)
SIDEWALK, ASPHALT (3-INCH DEPTH)
SIDEWALK, ASPHALT (4-INCH DEPTH)
GATE, METAL, 28 FEET WIDTH
STONE MASONRY
CLASS B MASONRY, ROCK FACE FINISH
STONE MASONRY HEADWALL FOR 12-INCH PIPE CULVERT
STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT
STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
MEDIAN, STONE (GRANITE)
ACCESSIBILITY RAMP, CONCRETE
DETECTABLE WARNING PANELS
DETECTABLE WARNING PANELS (ADJUST)
FENCE (REMOVE AND RESET)
FENCE, SPLIT RAIL
STONE MASONRY HEADWALL FOR DOUBLE 18-INCH PIPE CULVERT
STONE MASONRY HEADWALL FOR DOUBLE 24-INCH PIPE CULVERT
SAMPLE WALL
Amendment A001 7/11/16
Jeremiah.Rogers Typewritten Text A-11
Highlight
Project No: CA FTNP/NPS YOSE 500(2) & 16(7)
Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"
PMIS: Quantity Unit Unit Price Amount
Schedule Total: ___________________________
Submitted by: ____________________________
62028-1000 Line A2360 9 EACH $ $
62201-0200 Line A2380 40 HOUR $ $
62201-0450 Line A2400 40 HOUR $ $
62201-0950 Line A2420 40 HOUR $ $
62201-2850 Line A2440 40 HOUR $ $
62201-3400 Line A2460 40 HOUR $ $
62202-1000 Line A2480 ALL LPSM $
62301-0000 Line A2500 40 HOUR $ $
62302-1100 Line A2520 40 HOUR $ $
62303-1000 Line A2540 ALL LPSM $
62407-0000 Line A2560 1,730 CUYD $ $
63301-0000 Line A2580 160 EACH $ $
63301-1000 Line A2600 25 EACH $ $
63304-1200 Line A2620 30.00 SQFT $ $
63306-1700 Line A2640 10 EACH $ $
63308-0000 Line A2660 120 EACH $ $
63309-0000 Line A2680 250 EACH $ $
63309-1000 Line A2700 350 EACH $ $
63313-0000 Line A2720 11,110 LNFT $ $
63316-1000
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
MOTOR GRADER, 12 FOOT MINIMUM BLADE
HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT
MATERIALS TRANSFER VEHICLE
GENERAL LABOR
SPECIAL LABOR, HIRED SURVEY SERVICES
REMOVE AND RESET STONE MASONRY HEADWALL
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH
OBJECT MARKER
DELINEATOR
DELINEATOR, TYPE SNOWPOLE
RUMBLE STRIP (CENTERLINE)
REMOVE AND RESET SIGN
SPECIAL LABOR, HIRED TECHNICAL SERVICES (ELECTRICAL CONSULTANT)
PLACING CONSERVED TOPSOIL
SIGN SYSTEM
SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
SIGNS, ALUMINUM PANELS, TYPE 9 SHEETING
POST, WOOD, 4-INCH X 4-INCH
Amendment A001 7/11/16
Jeremiah.Rogers
A-12
Project No: CA FTNP/NPS YOSE 500(2) & 16(7)
Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"
PMIS: Quantity Unit Unit Price Amount
Schedule Total: ___________________________
Submitted by: ____________________________
Line A2740 18 EACH $ $ 63401-0700
Line A2760 101,000 LNFT $ $ 63401-0800
Line A2780 16,000 LNFT $ $ 63405-0050
Line A2800 10 EACH $ $ 63405-0050
Line A2820 5 EACH $ $ 63405-0050
Line A2840 5 EACH $ $ 63405-0050
Line A2860 4 EACH $ $ 63405-0050
Line A2880 2 EACH $ $ 63405-1300
Line A2900 13 EACH $ $ 63405-1350
Line A2920 8 EACH $ $ 63405-1350
Line A2940 5 EACH $ $ 63405-1400
Line A2960 3 EACH $ $ 63405-1500
Line A2980 25 EACH $ $ 63405-1650
Line A3000 25 EACH $ $ 63406-0000
Line A3020 20 EACH $ $ 63502-0600
Line A3040 11 EACH $ $ 63502-0700
Line A3060 580 EACH $ $ 63502-1050
Line A3080 680 EACH $ $ 63502-1300
Line A3100 370 EACH $ $ 63502-1700
Line A3120 90 EACH $ $
PAVEMENT MARKINGS, TYPE D, SOLID
PAVEMENT MARKINGS, TYPE D, TURN ARROW
PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW
PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW (MERGE)
PAVEMENT MARKINGS, TYPE D, STRAIGHT/TURN ARROW COMBINATION
PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE
PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
PAVEMENT MARKINGS, TYPE D, BROKEN
PAVEMENT MARKINGS, SYMBOLS (TYPE D, PED XING)
PAVEMENT MARKINGS, SYMBOLS (TYPE D, YEILD)
PAVEMENT MARKINGS, SYMBOLS (TYPE D, NO PARKING)
PAVEMENT MARKINGS, SYMBOLS (TYPE D, YEILD LINE)
PAVEMENT MARKINGS, SYMBOLS (TYPE D, BUS ONLY)
RAISED PAVEMENT MARKER (TOP OF CURB APPLICATION)
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
TEMPORARY TRAFFIC CONTROL, CONE
TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
TEMPORARY TRAFFIC CONTROL, DRUM
TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
Amendment A001 7/11/16
Jeremiah.Rogers
A-13
Project No: CA FTNP/NPS YOSE 500(2) & 16(7)
Name: Valley Loop Road and El Portal Road CQ = "Contract Quantity"
PMIS: Quantity Unit Unit Price Amount
Schedule Total: ___________________________
Submitted by: ____________________________
63502-2000 Line A3140 9 EACH $ $
63503-0700 Line A3160 47,600 LNFT $ $
63503-1000 Line A3180 12,000 LNFT $ $
63504-1000 Line A3200 1,100.00 SQFT $ $
63506-0500 Line A3220 12,800 HOUR $ $
63506-0600 Line A3240 3,760 HOUR $ $
63601-3000 Line A3260 ALL LPSM $
63602-5000 Line A3280 4 EACH $ $
63610-1600 Line A3300 130 LNFT $ $
63610-1600 Line A3320 560 LNFT $ $
63610-2800 Line A3340 530 LNFT $ $
63621-1000 Line A3360 6 EACH $ $
63621-1000 Line A3380 2 EACH $ $
63621-1000 Line A3400 10 EACH $ $
64502-0000 Line A3420 50 EACH $ $
TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (BLACK)
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
TEMPORARY TRAFFIC CONTROL, FLAGGER
TEMPORARY TRAFFIC CONTROL, PILOT CAR
UTILITY BOX, PULLBOX (24x24x24)
UTILITY BOX, PULLBOX (24x16x12)
LOCATE UTILITIES
SYSTEM INSTALLATION, ELECTRICAL (TRANSFORMER/SWITCH GEAR RELOCATION)
SYSTEM INSTALLATION, CHANGEABLE MESSAGE SIGN (SOLAR RADAR SPEED SIGN)
CONDUIT, 2-INCH, PVC (SCHED 80)
CONDUIT, 2-INCH, PVC
CONDUIT, 4-INCH, PVC
UTILITY BOX, PULLBOX (ELECTRICAL)
Amendment A001 7/11/16
Jeremiah.Rogers Typewritten Text A-14
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
TOTAL $__________________
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text
Jeremiah.Rogers Typewritten Text Schedule A Alternate Bid Item 15401-0000, Contractor Testing (Government furnished lab trailer)* $_________________ *See Page A-5 of this Solicitation for an explanation of how to bid this item.
E-66 CA FTNP NPS YOSE 500(2) & 16(7)
Valley Loop Road and El Portal Road
PMIS Nos. 138988, 202849, 198218A, and 196917A
Section 203. - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Construction Requirements
203.03 Salvaging Material. Add the following:
Salvage all existing roadway, information, and interpretive signs located within the project limits. Salvage all snow poles. Salvage removed concrete barrier segments on Northside Drive.
Deliver these materials to the NPS Yosemite Village maintenance yard located on Village Drive, ½ mile northeast of the new Village roundabout.
Salvage all boulders measured under the removal of boulder item to Pohono Pit, located ¼ mile west of the Pohono Bridge intersection. Salvaged boulders may be reused for boulder placement under Section 251.
Following removal and prior to delivery of salvaged materials as noted above, coordinate through the CO an opportunity for the Park representative to review the salvaged materials.
Dispose outside of the Park all materials determined by the Park to be unsalvagable.
Salvage all duff and topsoil from all excavation, embankment and borrow areas. Where possible, conserve topsoil in place. Windrow topsoil immediately adjacent to excavation area.
Do not windrow piles exceeding 24 inches in height. Replace topsoil adjacent to the original salvage location upon completion of work as best as possible. Final topsoil depth should be between 4 to 6 inches.
If organic materials from meadow areas are encountered, salvage and haul approximately 1500 cubic yards of this material to the Upper Rivers Campground for future use by the NPS. Limit the stockpile height to be less than three feet tall, and fit within the area described by the NPS staff.
203.04 Removing Material. Add the following:
Remove drop inlets and concrete headwalls buried and partially buried in the roadway prior to milling and/or pulverizing. If resetting drop inlets and headwalls, reset prior to paving.
Remove asphalt paved waterways and paved ditch by one of the following methods:
Excavate by digging and/or ripping Pulverize into small fragments as approved by the CO
(a) Concrete Removal by Mechanical Impact Methods. Saw cut approximately ¾ inch deep along all boundaries of repair areas.
Use power-driven hand tools to remove existing concrete with the following restrictions:
(1) Do not use jack hammers heavier than 30 pounds.
Amendment A001 7/11/16
20402-0000 No Pay
SUBEXCAVATION GEOTEXTILE
CUYD SQYD
Northside Drive
A 2017+50 to 2022+00 Lt. & Rt. 867 2,600
A 2022+00 to 2026+00 Rt. 415 1,245
A 2026+00 to 2028+00 Rt. 208 622
A 2036+73 to 2037+62 Lt. & Rt. 118 356
A 2062+00 to 2065+20 Rt. 331 995
A 2077+67 to 2082+50 Lt. & Rt. 931 2,791
A 2092+17 to 2095+71 Rt. 367 1,101
A 2103+60 to 2104+51 Rt. 94 283
A 2297+00 to 2299+00 Rt. 208 622
A 2302+54 to 2304+00 Rt. 152 454
A 2306+00 to 2308+40 Rt. 249 747
A 2308+40 to 2314+00 Lt. & Rt. 1,079 3,236
A 2315+70 to 2316+64 Lt. & Rt. 181 543
A 2325+49 to 2326+18 Lt. & Rt. 133 399
A 2326+18 to 2327+18 Rt. 104 311
A 2327+18 to 2330+00 Lt. & Rt. 543 1,629
A 2330+00 to 2330+33 Lt. & Rt. 64 191
Sentinel Drive
A 47+00 to 51+20 Rt. 435 1,307
6,479 19,432
Pay Item
SCHEDULE A TOTALS
Schedule
SUBEXCAVATION TABULATION
Station to Station Side
30101-0000 50101-0300 50101-0900 50102-0300
AGGREGATE
BASE
REINFORCED
RIDGID PAVEMENT,
6-INCH DEPTH,
TYPE C
SMOOTHNESS/
ROUGHNESS
(EXPOSED
AGGREGATE
REINFORCED
RIDGID PAVEMENT,
8-INCH DEPTH,
TYPE C
SMOOTHNESS/
ROUGHNESS
PLAIN RIDGID
PAVEMENT, 6-INCH
DEPTH, TYPE C
SMOOTHNESS/
ROUGHNESS
TON SQYD SQYD SQYD
Yosemite Village Day Use Area Shuttle Stop, Sheet D8
A 3001+65 to 3003+13 Rt. 43.0 100
Camp 4 Shuttle Stop, Sheet D9
A 2114+17.50 to 2105+63.00 Rt. 37.0 117
Roundabout Truck Apron, Sheet C12
A 3000+00.00 -- 139.0 268
Yosemite Village Day Use Area, Sheet D16
A -- -- 10.6 195 95
West of Lodge, Sheet D23
A -- -- 9.2 324 130
Camp 4, Sheet Sheet D30
A -- -- 16.8 147 100
255.6 666 485 325
RIGID PAVEMENT SUMMARY
Schedule
Pay Item
Location Side
SHEET TOTALS
20220-1000 20301-0200 20302-0400 20302-0500 20303-1600 20303-1600 20303-2300 25125-0000 25126-0000
REMOVAL,
INDIVIDUAL
TREE
REMOVAL OF
BOULDER
REMOVAL OF
CURB,
ASPHALT
REMOVAL OF
CURB,
CONCRETE
REMOVAL OF
PAVEMENT,
ASPHALT
REMOVAL OF
PAVEMENT,
ASPHALT (CURB
INSTALLATION)
(1)
REMOVAL OF
PAVEMENT,
CONCRETE
BOULDER
REMOVE AND
RESET
BOULDER
EA EA LF LF SQYD SQYD SQYD EA EA
A 2095+20 Rt. 207
A 2099+60 Rt. 41
A 2099+80 Lt. 5
A 2101+75 to 2102+65 Rt. 14
A 2107+45 Rt. 13
A 2109+75 Rt. 12
A 2314+00 to 2315+70 Lt & Rt. 416
A 41+68 to 45+17 Lt & Rt. 1,251
A Sentinel Bridge Parking Area Lt. 1,820 Sheet D6
A -- Lt. 280 50 Sheet D1
A 2000+00 to 2000+71 Lt. 65 Sheet D2
A 2000+15 to 2000+27 Rt. 30 83 Sheet D2
A 2000+76 to 2001+64 Rt. 160 Sheet D2
A 2001+23 to 2001+64 Lt. 90 Sheet D2
A -- Rt. 232 Sheet D3
A 2278+90 to 2280+97 Lt. 198 Sheet D4
A -- -- 1,820 Sheet D6
A -- -- 22 Sheet D7
A -- -- 1,640 88 Sheet D23
A -- -- 90 Sheet C21
A -- -- 16
262 315 740 7,170 110 41 5
4 1,069 1,096 2,808 13,591 278 110 50 11
NOTES: (1) 9" Width Assumed
SCHEDULE A TOTALS
Sentinel Drive Parking Area
Sentinel Drive 3R
Sentinel Drive Bus Pad
REMOVALS AND BOULDER SUMMARY
Schedule
Pay Item
Remarks
LOCATION SIDE
Northside Drive, 3R (Cont.)
West of Lodge
SCHEDULE A TOTALS
Pohono Bridge Intersection
Curry Village Intersection
Stoneman Bridge
Hanging Valley Pullout
Obilteration Areas
Schedule ITEM NUMBER ITEM Unit Quantity Remarks
A 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 11
A 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 580
A 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER EACH 680
A 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 370
A 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C EACH 90
A 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 9
A 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 170
A 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS LNFT 47,600
A 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE (BLACK) LNFT 5,000
A 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 1,100.00
A 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 12,800
A 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 3,760
TEMPORARY TRAFFIC CONTROL SUMMARY
63504-1000
Panel Size
TEMPORARY
TRAFFIC CONTROL,
CONSTRUCTION
SIGNS
(SQFT) (SQFT)
G20-1 "ROAD WORK NEXT XX MILES" 5 36 x 60 15.00 75.00
G20-2a "END ROAD WORK" 5 36 x 18 4.50 22.50
G20-4 "PILOT CAR FOLLOW ME" 2 36 x 18 4.50 9.00
R11-2 "ROAD CLOSED" 2 48 x 30 10.00 20.00
R3-1 NO RIGHT TURN 4 24 x 24 4.00 16.00
R3-2 NO LEFT TURN 4 24 x 24 4.00 16.00
R4-1 "DO NOT PASS" 8 24 x 30 5.00 40.00
W1-3 REVERSE TURN 2 30 x 30 6.25 12.50
W13-1 XX M.P.H. 8 24 x 24 4.00 32.00
W16-2 "500 FT" 6 24 x 18 3.00 18.00
W20-1 "ROAD WORK AHEAD" 5 48 x 48 16.00 80.00
W20-1 "ROAD WORK 1000 FT" 5 48 x 48 16.00 80.00
W20-1 "ROAD WORK 500 FT" 5 48 x 48 16.00 80.00
W20-4 "ONE LANE ROAD AHEAD" 4 48 x 48 16.00 64.00
W20-7a FLAGGER 4 48 x 48 16.00 64.00
W20-7b "BE PREPARED TO STOP" 4 48 x 48 16.00 64.00
W21-1a WORKER 2 48 x 48 16.00 32.00
W21-5 "SHOULDER WORK" 2 48 x 48 16.00 32.00
W4-2 LANE REDUCTION 2 36 x 36 9.00 18.00
W5-1 "ROAD NARROWS" 2 48 x 48 16.00 32.00
W6-3 TWO WAY TRAFFIC 4 36 x 36 9.00 36.00
W8-1 "BUMP" 2 36 x 36 9.00 18.00
W8-11 "UNEVEN LANES" 2 36 x 36 9.00 18.00
W8-12 "NO CENTER LINE" 4 36 x 36 9.00 36.00
W8-3 "PAVEMENT ENDS" 2 30 x 30 6.25 12.50
W8-7 "LOOSE GRAVEL" 2 30 x 30 6.25 12.50
W8-9a "SHOULDER DROP-OFF" 2 30 x 30 6.25 12.50
-- ADDITIONAL SIGNS AS REQUIRED 147.50
Project Total 1,100.00
CONSTRUCTION SIGNING TABULATION
Pay Item
MUTCD
REFERENCE
"LEGEND"/MESSAGE
NUMBER OF
SIGNS
DIMENSIONS
60201-0100 61101-0000
4-INCH PIPE
CULVERT
(SLEEVE)
WATER SYSTEM
(IRRIGATION)
LNFT LMSP
Yosemite Village Day Use Area, Sheet U14
A -- -- 1,050 All
1,050 AllSCHEDULE A TOTALS
IRRIGATION TABULATION
SideLocation
Pay Item
Schedule
20301-0900 60201-0400 60407-0000 61102-1600 61106-0000 61114-1500 61202-0400 61202-0400 61203-0000 62303-1000 63601-3000 63610-1600 63610-1600 63610-2800 63621-1000 63621-1000 63621-1000
REMOVAL
OF FIRE
HYDRANT
12-INCH
PIPE
CULVERT
CAPPING
INLETS AND
MANHOLES
2-INCH
WATERLINE
, COPPER
FIRE
HYDRANT
WATER
SYSTEM
ACCESSOR
Y, TIE-IN
6-INCH
SEWER
LINE,
PLASTIC
8-INCH
SEWER
LINE,
PLASTIC
(10-INCH)
MANHOLE,
SANITARY
SEWER
SPECIAL
LABOR, HIRED
TECHNICAL
SERVICES
(ELECTRICAL
CONSULTANT)
SYSTEM
INSTALLATIO
N, ELECTRICAL
(TRANSFORME
R/ SWITCH
GEAR
CONDUIT,
2-INCH,
PVC
CONDUIT,
2-INCH,
PVC
(SCHED 80)
CONDUIT,
4-INCH,
PVC
UTILITY BOX,
PULLBOX
(24"x16"x12")
UTILITY BOX,
PULLBOX
(24"x24"x24")
UTILITY BOX,
PULLBOX
(ELECTRICAL)
EACH LNFT EA LNFT EACH EACH LNFT LNFT EACH LPSM LPSM LNFT LNFT LNFT EACH EACH EACH
Northside Drive, 3R, Sheet C10
A 2335+30 Lt. & Rt. 120 2
Yosemite Village Day Use Area, Sheet U1
A -- -- 1 1 17 2 3 125 2 ALL ALL 478 5
Yosemite Village Day Use Area, Sheet D36
A -- -- 545 9
West of Lodge, Sheet U2
A -- -- 1 1 1
Sanitary Sewer Relocation, Sheet U3
A -- -- 532 2
Camp 4, Sheet U4
A -- -- 45 636 3 45
2 45 1 17 3 4 761 532 7 ALL ALL 545 120 523 9 2 5SCHEDULE A TOTAL
Schedule
UTILITY SUMMARY
SideLocation
Pay Item
| Full Appendix B.pdf |
| APPENDIX B.pdf |
| subcontractingplan |
| Plan Pages.pdf |
| B02_Amend_001 |
| B03_Amend_001 |
| B14_Amend_001 |
| B20_Amend_001 |
| U03_UTL(NSDR)YOSE_03_Amend_A001 |
| U05_PRO(WOL)YOSE_05_Amend_A001-Int_ft2D-000 |
File details come from the government source that posted it. Updated .