CA FS 1038(1), Salt Gulch Bridge

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF20B000006
Agency
Federal Highway Administration Department of Transportation
Responses due
Set-aside
HUBZone

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
CA 96097 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks bids to complete bridge repair and culvert replacement work along California Forest Service Route 1038 in Siskiyou County, California. Major work elements include drilled shaft construction, installation of a temporary bridge support structure, placement of approximately 80 cubic yards of structural concrete, and replacement of around 1,000 linear feet of corrugated metal pipe culverts ranging in size from 36 to 96 inches. Bids are due by July 14, 2020 to the United States Department of Transportation Federal Highway Administration, which will evaluate bids and award a firm fixed-price contract based on price. Construction must be completed between August 2020 and late October/early November 2020.

This is a HUBZone set-aside solicitation. The NAICS code is 237990 and PSC code is R499. The engineer's estimate for total project costs is between $1-2 million. Seven contractors submitted bids ranging from $978,712 to $1,830,650. The apparent low bid of $978,712 was from West Coast Contractors, Inc. Work will be performed in Yreka, California and involve 76 linear feet of drilled shafts, a temporary bridge structure, 80 cubic yards of concrete, and 1,000 linear feet of corrugated metal pipes installed between August and late October/early November 2020.

Notice text

2 versions

Update #2 · Latest ·

THIS IS AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE.

THIS SOLICITATION WILL BE SET-ASIDE FOR HUBZONE SMALL BUSINESS CONCERNS.

PROJECT NUMBER: CA FS 1038 (1)

PROJECT NAME:  Salt Gulch Bridge

PROJECT DESCRIPTION:

The CA FS 1038(1) Salt Gulch Bridge project is located in Siskiyou County, CA within the Klamath National Forest, approximately 30 miles northwest of Yreka, CA. This project will provide a bridge abutment repair and replacement of approximately 20 culverts.
The major work elements include drilled sha  construction, temporary bridge support structure, structural concrete, and CMP culverts ranging in size from 36 inches to 96 inches.

SIGNIFICANT QUANTITIES:

Line Item                                                         Unit                                   Est. Quantity

Drilled Shaft Construction                      LNFT                                     76

Temporary Bridge Support Structure  LPSM                                  ALL

Structural Concrete                                    CUYD                                   80

CMP Culverts                                                 LNFT                                   1,000

ENGINEER’S ESTIMATE: 
Estimated total cost is $1 million to $2 million.


CONSTRUCTION DURATION:  Construction is anticipated between August 2020 and Late October/Early November 2020.


ADDITIONAL INFORMATION FOR NOTICE:
Anticipated Award in mid/late July 2020

Update #1 ·

THIS IS AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE CURRENTLY AVAILABLE.

PROJECT NUMBER: CA FS 1038 (1)

PROJECT NAME:  Salt Gulch Bridge

PROJECT DESCRIPTION:

The CA FS 1038(1) Salt Gulch Bridge project is located in Siskiyou County, CA within the Klamath National Forest, approximately 30 miles northwest of Yreka, CA. This project will provide a bridge abutment repair and replacement of approximately 20 culverts.
The major work elements include drilled sha  construction, temporary bridge support structure, structural concrete, and CMP culverts ranging in size from 36 inches to 96 inches.

SIGNIFICANT QUANTITIES:

Line Item                                                         Unit                                   Est. Quantity

Drilled Shaft Construction                      LNFT                                     76

Temporary Bridge Support Structure  LPSM                                  ALL

Structural Concrete                                    CUYD                                   80

CMP Culverts                                                 LNFT                                   1,000

ENGINEER’S ESTIMATE: 
Estimated total cost is $1 million to $2 million.


CONSTRUCTION DURATION:  Construction is anticipated between August 2020 and Late October/Early November 2020.


ADDITIONAL INFORMATION FOR NOTICE:
Anticipated Award in mid/late July 2020

Attachments

Show all 14

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
CA FS 1038(1), Salt Gulch Bridge Award Award Notice
CA FS 1038(1), Salt Gulch Bridge This notice · Latest solicitation Solicitation
CA FS 1038(1), Salt Gulch Bridge Pre-Solicitation
CA FS 1038(1), Salt Gulch Bridge Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity