Plans Final-CA FS 1038(1) .pdf

PDF 17 MB Posted

Attached to
CA FS 1038(1), Salt Gulch Bridge Federal contract opportunity
Solicitation number
6982AF20B000006
Issued by
Department of Transportation Federal Highway Administration

About this file

This document provides the plans and specifications for the CA FS 1038(1) Salt Gulch Bridge project. The project is located in Siskiyou County, California within the Klamath National Forest and will include bridge abutment repair, replacement of approximately 20 culverts ranging in size from 36 to 96 inches, and other work elements such as drilled shaft construction, temporary bridge support structure, and structural concrete. The engineer's estimate for the total project cost is between $1 million to $2 million. Construction is anticipated to take place between August 2020 and late October/early November 2020, with anticipated award of the contract in mid-to-late July 2020. The solicitation was issued by the United States Department of Transportation Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts A G e n s h t\

A

T T

L

C A F S S a lt

G u lc h .d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

D E P

A R T

M

E

NT

OF TRANSPO

R T

A T I O

N

U N

IT

E

D STATES OF

AME

R I C

A

PLANS FOR PROPOSED

PROJECT MANAGER LEAD DESIGNER

PLANS PREPARED BY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

DENVER, COLORADO

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

APPROVED:

DATE:

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

Slopes are expressed as RISE:RUN

U.S. CUSTOMARY DIMENSIONS:

AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"

"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS

SPECIFICATIONS:

Eureka

SAN

FRANCISCO

LOS

ANGELES

San

Diego

Sacramento

OREGON

N

EV

A D

A

ARIZONA

MEXICO

Redding

KEY MAP OF CALIFORNIA

INTERSTATE

INTERSTATE

INTERSTATE

INTERSTATE

INTERSTATE

INTERSTATE

INTERSTATE

LOCKHARTHENWOOD

25 mph

50%

<400

<400

V --------------------

D --------------------

DHV ------------------

ADT (2039) -----------

ADT (2019) -----------

DESIGN DESIGNATIONS:

A1

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

CHIEF OF ENGINEERING

Know what'sbelow.

before you dig.Call

R www.call811.com

SALT GULCH BRIDGE

CA FS 1038(1)

H o rs e C re e k

Horse Creek

Klamath National Forest

FR 46N50

F R

N

F R

N

F R

N

B a r R o a d

I-5 interchange Williams Creek 30 miles

Happy Camp 19 miles

Se ia d

Cr ee k Ro ad

FR

46N

FR

6N

PROJECT LOCATION

SALT GULCH BRIDGE

CA FS 1038(1)

Seiad Valley, CA

Creek, CA Horse

No Scale

SCHEDULE A

SALT GULCH BRIDGE

CA FS 1038(1)

OPTION Y

OPTION X

CULVERT REPAIR

CA FS 1038(1)

Bridge repair and culvert replacement

TYPE OF CONSTRUCTION:

ROUTES 46N50, 47N70 AND 47N72

OPTION Y - 3 CULVERT REPLACEMENT SITES,

OPTION X - 9 CULVERT REPLACEMENT SITES, ROUTE 46N50

SCHEDULE A - SALT GULCH BRIDGE OVER HORSE CREEK REPAIR

LENGTH 0.1 miles

SISKIYOU COUNTY

KLAMATH NATIONAL FOREST

Sheet 1 of 2

SYMBOLS AND ABBREVIATIONS

CONVENTIONAL PLAN

A2

ABBREVIATIONS DRAINAGE SYMBOLS

GEOLOGIC SYMBOLS

DI

FENCE & CATTLEGUARD SYMBOLS

Cattleguard (Existing, Proposed)

Fence w/ Gate (Existing, Proposed)

Fence (Existing, Proposed)

Material Source

Boring Location (Existing, Proposed)

Riprap Apron (Proposed)

Underdrain (Existing, Proposed)

With Drop Inlet (Existing, Proposed)

With Headwalls (Existing, Proposed)

With End Sections (Existing, Proposed)

Pipe Culvert (Existing, Proposed)

Box Culvert (Existing, Proposed)

Bridge (Existing, Proposed)

Spring

River

Wetland

Large Creek

Lake, Pond or Reservoir

Drainage or Small Creek

Flow Arrow

Ditch (Existing, Proposed)

SPRING

D jt.J int.

incr.

incl.

IDI

hwy.

HW

horiz.

hex.

HES

hdwl.H gdr.

galv.

ga.G ftg.

fin.

FES

Fed.

f.f.F ext.

exp. jt.

exc.

EW

et ux et al

ER

EQ or eq.

EOP

engr(s).

emb.

elev.

El. 94.066 e

EE

dwg(s).

DLC

Dist.

dist.

diaph.

diag.

dia. or D

DI

DHV

decr.D culv.

CTSM

ctrs.

CS

cr.

corr.

cont.

constr. jt.

constr.

conc.

col.

Co.

CMP

clr.

c-c

CBCC

brg.

br.

BP

BM

BK

beg.

b.f.B asph.

appr.

alt.

AH

aggr.

ADT

abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall

Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve

WW

VPI

vph vert.

VV

typ.

TS

transv.

TCE

TBM

tan.

T.

TT

sym.

struc.

str.

stiff.

std.

sta.

ST

st.

spec.

spa.

shldr.

sec.

SC

SADT

SS

rte.

Rt. or RT

RH

ret. wall

Res.

res.

reqd.

reinf.

reconst.

rdwy.

rd.

R/W

R.

RR

quant., QtyQ pvmt.

PT

psi proj.

POT

POS

POC

pl.

PI

perf.

PCC

PCP

OD

o.f.

o.c.O

no. or # neg.

NC

NN

mtn(s).

mon.

min.

max.

matl.

maint.

mag.M

LW

Lt. or LT

LPSM

long.

lat.

lam.

LL

EROSION & SEDIMENT CONTROL SYMBOLS

joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement

Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline

Ø

Riprap

Rolled Erosion Control Product

Diversion Berm

Check Dam

Bonded Fiber Matrix Mulching

Fiber Roll (Slope Protection)

Temporary Inlet Protection

Silt Fence

Fiber Roll (Ditch and/or Cut Slope)

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts A G e n s h t\

A A S

Y M

C

A F S .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a r t_ CA

SYMBOLS AND ABBREVIATIONS

CONVENTIONAL PLAN

Sheet 2 of 2

A3

36 31

36 31

6 1

ˆ

Treeline

Tree

MAPPING SYMBOLS

LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS

RIGHT-OF-WAY SYMBOLS

ROADWAY SYMBOLS

SIGN SYMBOLS

UTILITY SYMBOLS

Retaining Wall (Existing, Proposed)

Median & Side Barrier (Existing, Proposed)

Guardwall (Existing, Proposed)

Guardrail (Existing, Proposed)

GUARDRAIL, BARRIER & WALL SYMBOLS

Post Mounted (Existing, Proposed)

Portable (Proposed)

Delineator (Existing, Proposed)

Commercial (Existing, Proposed)

Signs

Telephone

Power

Fiber Optic

CATV

Overhead Utility Line (Existing, Proposed)

Water

Telephone

Sanitary Sewer

Power

Oil

Gas

Fiber Optic

CATV

Underground Utility (Existing, Proposed)

Telephone Pedestal (Existing, Proposed)

Telephone Booth (Existing, Proposed)

Street Light (Existing, Proposed)

Support Pole Anchor (Existing, Proposed)

Support Pole (Existing, Proposed)

Surface (Existing, Proposed)

Underground (Existing, Proposed)

Irrigation Ditch

999.9

Roadway Obliteration

Roadway Centerline (With Station ticks)

Proposed

Existing

Edge of Roadway

Toe of Fill

Transition

Top of Cut

Slope Stake Limits

Clearing/Construction Limits

Survey Control Point

Trail

Spot Elevation

Double Track

Single Track

Railroad

North Arrow

Coordinate Grid Tick

Building (Existing, Proposed)

Section Corner (Found)

Section Corner (Found, Projected)

Section Corner (Found, Projected)

Right-of-Way Line (Proposed)

Right-of-Way Line (Existing)

Property Line

Parcel Number

Monument (As described)

Temporary (Proposed)

Permanent (Proposed)

Permanent (Existing)

Easements

National Wildlife Refuge

National Park

National Forest

Bureau of Land Management

Bureau of Indian Affairs

Section

Section

Section

Township or Range Line

City

County

State

National

Boundaries

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts A G e n s h t\

A A S

Y M

C

A F S .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a r t_ CA

5.02.50

Scale in Miles

BRIDGE APPROACH REPAIR

SALT GULCH BRIDGE

CA FS 1038(1)

CULVERT REPLACEMENTS

SALT GULCH BRIDGE

CA FS 1038(1)

Seiad Valley

Horse Creek

Hamburg

I-5

A4

VICINITY MAP

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts A G e n s h t\

A S it e M a p

C A F S .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

30 IN PINE

102 IN CMP948.3

30 INCH CMP948.5

TOP OF PIPE MP 2.37

32 IN PINE954.1954.4

36 IN PINE

22 IN PINE

48 IN PINE

48 IN PINE

963.218 IN CMP

22 IN PINE

30 IN PINE

26 IN PINE

966.1LARGE CMP

967.1

26 IN PINE

34 IN PINE

40 IN PINE

969.0

969.1

36 IN CMP 969.6

18 IN PINE

971.4

40 IN PINE

973.836 IN CMP

40 IN PINE

20 IN ELM

36 IN PINE

30 IN PINE

40 IN PINE

18 IN PINE20 IN OAK

978.6

18 IN ELM

979.6

84 IN VERT CMP980.1

24 IN CMP 980.7

52 IN PINE

30 IN PINE

20 IN PINE

36 IN PINE

26 IN PINE

20 IN PINE

40 IN PINE

982.018 IN CMP 40 IN PINE

18 IN ELM

18 IN OAK

40 IN PINE

18 IN PINE

18 IN CEDAR

450160D NAIL

18 IN PINE

18 IN CMP983.9

36 IN PINE

18 IN PINE

18 IN PINE

18 IN PINE30 IN PINE

STREAM BOTTOM

18 IN TRI ELM

28 IN PINE

18 IN PINE

20 IN PINE

24 IN CPP986.5

40D NAIL

66 IN CMP986.6

48 IN PINE

30 INCH ASH

46N50 MP 7.68

DRY BTM

987.2

24 IN PINE

18 IN PINE 24 IN PINE

18 INCH PINE

18 IN PINE

988.0

18 INCH PINE

30 IN PINE

24 IN PINE

33 IN PINE

20 IN PINE

988.9

24 IN PINE

18 IN PINE

24 IN PINE

36 IN CMP989.4

24 IN CMP

40 IN PINE 24 IN PINE

36 IN PINE

18 IN CMP

28 IN PINE

18 IN ELM

18 IN ELM

20 IN PINE

36 TO 24 IN

36 TO 24 IN

18 IN PINE

36 IN PINE

24 IN CMP

RESECT

991.3

20 IN PINE

18 IN TRI OAK

24 IN OAK

18 IN PINE

6 IN CMP 992.1

40D NAIL

48N20 MP 6.66

36 IN CMP992.3

20 IN PINE

MP 2.7992.5

24 IN DBL OAK

20 INCH PINE

993.0

40D NAIL

993.136 IN CMP

26 IN PINE

40D NAIL

20 IN PINE

993.5

993.5

RESECT

40 INCH PINE

48 IN CMP993.8

36 IN CMP993.9

18 IN PINE

38 IN SNAG

18 IN PINE 40D NAIL

994.918 IN CMP

46N50 MP2.58

40D NAIL

36 INCH CMP995.4

36 IN CMP995.5

995.524 IN CMP

995.6

40D NAIL

48 IN CMP

995.718 IN CMP

CLIFF BOTTOM

36 IN PINE

30 INCH CMP

18 IN CMP 995.9

40D NAIL

48N20 MP 3.09

36 IN PINE

36 IN PINE

24 IN PINE

20 IN PINE

35 IN PINE

18 IN PINE

18 IN CMP

20 IN PINE

996.3

40D NAIL

40D NAIL

20 IN PINE

18 IN CMP

48N20 MP 4.5

18 IN PINE

BURIED

48N20 MP 6.37

24 IN PINE

26 IN PINE

40D NAIL

40D NAIL

40D NAIL

997.130 IN CMP

18 INCH CMP997.1

RESECT

18 INCH CMP

34 IN PINE

40D NAIL

GRATE

40D NAIL

STONE

ROCK BEDDED

60D NAIL

18 IN CMP

18 IN CEDAR

RESECT

40D NAIL

18 IN OAK

22 IN PINE

22 IN PINE

20 IN PINE

998.8

47N72 MP1.73

24 IN CMP

40D NAIL

40D NAIL

60 INCH PINE

46N50 MP

9.73

18 IN ELM

RESECT

60D NAIL

48 IN PINE

46N50 MP1.93

46N50 MP9.62

40D NAIL

18 INCH CMP

999.8

18 INCH PINE

46N50 MP 7.48

40D NAIL

40D NAIL

22 IN ELM

60D NAIL

40D NAIL

40D NAIL

40D NAIL

40D NAIL

60D NAIL

60D NAIL

40D NAIL

40D NAIL

40D NAIL

40D NAIL

40D NAIL

46N50 MP 7.38

40D NAIL

40D NAIL

40D NAIL

40D NAIL

4502NAIL

MP 2.46

40D NAIL

ROCK BEDDED

46N50 MP 8.28

46N50 MP 8.40

40D NAIL

40 IN PINE

RESECT

46N50 MP 7.33

DIR ONLY

RESECT

26 IN PINE

20 IN PINE

18 IN OAK

47N70 MP 1

.12

18 IN

18 IN PINE

40D NAIL

MP 1.04

40 IN PINE

18 IN PINE

40D NAIL

MP 3.75

40D NAIL

20 IN

46N50 MP 7.63

20 IN

36 IN PINE

18 IN MADRONE

20 INCH PINE

40D NAIL

40D NAIL

MP 1.12

24 IN

20 INCH PINE

18 IN PINE

40D NAIL

MP 2.10

36 IN TRI OAK

40D NAIL

18 IN PINE

18 IN PINE

40D NAIL

20 INCH PINE

18 IN PINE

46N50 MP2.36

18 IN PINE

46N50 MP2.76

60D NAIL

MP 2.23

1003.4

40D NAIL

40D NAIL

1003.948 IN CMP

40D NAIL

29 IN PINE

24 INCH PINE

24 IN PINE

40D NAIL

40D NAIL

20 IN PINE

18 IN PINE

60D NAIL

40D NAIL

40D NAIL

40D NAIL

MP 7.83

60D NAIL

36 IN PINE

60D NAIL

30 IN PINE

24 INCH PINE

20 IN PINE

STREAM BOTTOM

40D NAIL

18 IN PINE

18 IN PINE

24 IN

18 IN PINE

60D NAIL

18 IN OAK

18 INCH PINE

60D NAIL

24 IN

40D NAIL

24 INCH PINE

1008.118 IN CMP

JJ NOLEN MEMORIAL

30 IN

MP 3.71

18 IN PINE18 IN PINE

20 INCH PINE

18 IN PINE

18 IN PINE

18 IN PINE

18 IN PINE

18 IN PINE2X 20 IN PINES

18 IN ELM

46N50 MP 7.77

30 IN PINE

18 IN PINE

18 IN PINE

40D NAIL

20 IN OAK

24 IN PINE

20 IN PINE

44 IN PINE

20 IN OAK

20 IN PINE

28 IN PINE

26 IN PINE

36 IN PINE

18 IN OAK

24 IN PINE

18 IN PINE

20 IN PINE

24 IN PINE

36 IN PINE

24 IN DBL PINE

24 IN PINE

28 IN PINE

34 IN PINE

36 IN PINE

39 IN PINE

34 IN PINE

20 IN PINE

60D NAIL4503

24 IN PINE

36 IN PINE

T POST

36 IN PINE

WATERFALL

20 INCH PINE

26 IN PINE

36 IN PINE

30 INCH PINE

WATERFALL

30 INCH PINE

20 INCH PINE

30 INCH PINE

5280'2640'0

Scale in Feet

Legend

Culvert replacement locations

A5

N

N

N

N

N

N

N

N

ROUTE 46N50

CA FS 1038(1)

SITE MAP

ROUTE 47N72

CA FS 1038(1)

ROUTE 47N70

CA FS 1038(1)

SCHEDULE A

SALT GULCH BRIDGE

CA FS 1038(1)

46N50 8.40 - OPTION Y

46N50 8.28 - OPTION X

46N50 7.33 - OPTION X

46N50 7.38 - OPTION X

46N50 7.63 - OPTION X

46N50 7.48 - OPTION X

46N50 7.68 - OPTION X

46N50 9.62 - OPTION X

46N50 7.77 - OPTION X

N .7 O

P T

IO

N Y

- OPTION Y

47N70 1.12

O

P T

IO

N X

N .7

ROUTE 48N20

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts A G e n s h t\

A S it e M a p

C A F S .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a r t_ CA

REVISIONS (OR CHANGE NOTICES)

DESCRIPTION

NO.

DATE INIT.

A6

SURVEY CONTROL

Sheet 1 of 2

CA

SALT GULCH BRIDGE

CA FS 1038(1)

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts A G e n s h t\

A A

C A F

S S a lt G u lc h c o n tr o l_ s h e e t.

d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a r t_

SURVEY CONTROL

REVISIONS (OR CHANGE NOTICES)

DESCRIPTION

NO.

DATE INIT.

A7

Sheet 2 of 2

CA

SALT GULCH BRIDGE

CA FS 1038(1)

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts A G e n s h t\

A A

C A F

S S a lt G u lc h c o n tr o l_ s h e e t.

d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a t_

NO SCALE

DETAIL B

EXISTING TYPICAL SECTION

from 14' to 22'

Existing width varies

Existing Ground

Existing Ground

1:3

NOTE:

3.

3. 1.

Method 2

6" Roadway Aggregate, See Detail B

1.

Clearing Limits

(Typ)

3'

(Typ)

3'

Minimize disturbances to existing slope

(top of surfacing)

Profile grade

Existing Ground 3.

2.

1.

to match bridge approach elevation

Grade existing road surface

6" Roadway Aggregate, Method 2

3.

3.

1.

(top of surfacing)

Profile grade

Varies (6' to 20') Varies (6' to 11')

AT BRIDGE APPROACH

ONE LANE TWO WAY ROAD

TYPICAL SECTION

AT CULVERT REPLACEMENT

ONE LANE TWO WAY ROAD

TYPICAL SECTION

Existing Ground6" Roadway Aggregate, Method 2

1V:4H

Clear Zone)

(Typical for

7'

1V:4H

Clear Zone)

(Typical for

7'

Varies Varies

1.

TYPICAL SECTIONS

(Typical 18')

Match Existing Road Width cross slope for drainage.

Match existing road width and cross slope in curves. Typical 3% minimum

Place Roadway Aggregate, Method 2 according to Section 302.

may be adjusted by the CO for adequate drainage and stability.

The foreslope, width of roadway ditches, cut and fill slope ratios

A6

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts A G e n s h t\

A

T Y P

C A F S .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a r t_ CA

B4 B5-B7 S2

Drainage Summary

Miscellaneous Summaries Bridge Summary Allowance Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15214-1000 SURVEY AND STAKING, BRIDGE LPSM All ALL

A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 400 400

A0140 20304-2000 REMOVAL OF BRIDGE (PARTIAL) LPSM All ALL

A0160 20435-2000 BACKFILL, GRANULAR CUYD 75 75

A0180 20720-0300 REINFORCEMENT GEOSYNTHETIC, TYPE 3 SQYD 540 540

A0200 20801-0000 STRUCTURE EXCAVATION CUYD 130 130 Contract Quantity

A0220 30203-2140 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 6-INCH DEPTH SQYD 130 20 150

A0240 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 72 72 Contract Quantity

A0260 55235-0000 EXPANSION JOINTS LNFT 22 22 Contract Quantity

A0280 55401-1000 REINFORCING STEEL LB 7,200 7,200 Contract Quantity

A0300 55401-2000 REINFORCING STEEL, EPOXY COATED LB 2,700 2,700 Contract Quantity

A0320 55601-0900 BRIDGE RAILING, STEEL LNFT 25 25 Contract Quantity

A0340 56202-0000 TEMPORARY SUPPORT STRUCTURE LPSM All ALL

A0360 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 2 2 Contract Quantity

A0380 56501-0400 DRILLED SHAFT, 36-INCH DIAMETER LNFT 76 76

A0400 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY HOUR 20

A0420 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20

A0440 62201-2750 MOTOR GRADER HOUR 20

A0460 62201-3000 HYDRAULIC EXCAVATOR HOUR 20

A0480 62301-0000 GENERAL LABOR HOUR 40

A0500 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 40

A0520 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 40

A0540 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 556 44 600

A0560 62516-2000 MULCHING, HYDRAULIC METHOD SQYD 556 44 600

A0580 63308-0000 OBJECT MARKER EACH 2 2

A0600 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 8 8

A0620 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 14 4 18

MileStone: 100% Estimate Date Completed: In Progress Report Date: 04/23/20

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-A pr

-2

5:

P

M

Remarks and/or Determination of

Estimated Quantity Pay Item Description Unit

Estimated Quantities

C

C A\

FS

S al t

G ul ch \R oa dw ay \C

AD

D

_S he et s\

B -S um m

SO

Q B

1- B su m m ar y_

0.

xl sm ]S he et

STATE PROJECT

B1FS 1038(1)

SALT GULCH BRIDGECA

SHEET

NUMBER

Summary

Miscellaneous Summaries Bridge Summary Allowance Bid Schedule

X0010 15101-0000 MOBILIZATION LPSM ALL

X0030 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 9 9

X0050 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

X0070 15401-0000 CONTRACTOR TESTING LPSM ALL

X0090 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

X0110 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 900 900

X0130 20301-1900 REMOVAL OF PIPE CULVERT EACH 8 8

X0150 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 128 7 135

X0170 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 42 3 45

X0190 30203-2140 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 6-INCH DEPTH SQYD 375 25 400

X0210 60201-1000 36-INCH PIPE CULVERT LNFT 385 15 400

X0230 60201-1100 42-INCH PIPE CULVERT LNFT 47 3 50

X0250 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT EACH 2 2

X0270 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 16 16

X0290 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT EACH 2 2

X0310 60212-1000 ELBOW, 36-INCH EACH 5 1 6

X0330 60230-0000 DEBRIS RACK EACH 8 8

X0350 60602-0900 PIPE ANCHOR ASSEMBLY, 36-INCH EACH 4 4

X0370 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY HOUR 20

X0390 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20

X0410 62201-2750 MOTOR GRADER HOUR 20

X0430 62201-3000 HYDRAULIC EXCAVATOR HOUR 20

X0450 62301-0000 GENERAL LABOR HOUR 40

X0470 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 40

X0490 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 40

X0510 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 3,889 2,500

X0530 62516-2000 MULCHING, HYDRAULIC METHOD SQYD 2,500 2,500

X0550 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 8 8

X0570 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 14 4 18

-A pr -2

5:

P M

MileStone: 100% Estimate Date Completed: In Progress Report Date: 04/23/20

C

C A\

FS

S al t

G ul ch \R oa dw ay \C

AD

D

_S he et s\

B -S um m

SO

Q B

1- B su m m ar y_

0.

xl sm ]S he et

2)

SUMMARY OF QUANTITIES - Option X

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities Remarks and/or Determination of

Estimated Quantity

STATE PROJECT

B2FS 1038(1)

SALT GULCH BRIDGECA

Summary

Miscellaneous Summaries Bridge Summary Allowance Bid Schedule

Y0010 15101-0000 MOBILIZATION LPSM ALL

Y0030 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 3 3

Y0050 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

Y0070 15401-0000 CONTRACTOR TESTING LPSM ALL

Y0090 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

Y0110 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 500 500

Y0130 20301-1900 REMOVAL OF PIPE CULVERT EACH 3 3

Y0150 25101-0600 PLACED RIPRAP, METHOD A, CLASS 6 CUYD 254 254

Y0170 30203-2140 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 6-INCH DEPTH SQYD 212 23 235

Y0190 60201-1200 48-INCH PIPE CULVERT LNFT 310 20 330

Y0210 60202-1500 90-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (103 X 71 ARCH PIPE CULVERT) LNFT 41 5 46

Y0230 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT EACH 6 6

Y0250 60212-1200 ELBOW, 48-INCH EACH 3 3

Y0270 60230-0000 DEBRIS RACK (SPECIAL 96-INCH) EACH 1 1

Y0290 60233-1500 METAL HEADWALL FOR 90-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT EACH 2 2

Y0310 60602-1100 PIPE ANCHOR ASSEMBLY, 48-INCH EACH 3 3

Y0330 60706-0000 CLEANING DRAINAGE STRUCTURE EACH 2 2

Y0350 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY HOUR 10

Y0370 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY HOUR 10

Y0390 62201-2750 MOTOR GRADER HOUR 10

Y0410 62201-3000 HYDRAULIC EXCAVATOR HOUR 10

Y0430 62301-0000 GENERAL LABOR HOUR 40

Y0450 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 20

Y0470 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20

Y0490 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 1,389 1,389

Y0510 62516-2000 MULCHING, HYDRAULIC METHOD SQYD 1,389 1,389

Y0530 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4

Y0550 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 14 4 18

-A pr -2

5:

P M

MileStone: 100% Estimate Date Completed: In Progress Report Date: 04/23/20

C

C A\

FS

S al t

G ul ch \R oa dw ay \C

AD

D

_S he et s\

B -S um m

SO

Q B

1- B su m m ar y_

0.

xl sm ]S he et

3)

SUMMARY OF QUANTITIES - Option Y

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities Remarks and/or Determination of

Estimated Quantity

STATE PROJECT

B3FS 1038(1)

SALT GULCH BRIDGECA

B4

DRAINAGE SUMMARY

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts B S u m m S

U M

.d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a r t_ CA

B5

MISCELLANEOUS SUMMARIES

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts B S u m m S

U M

.d

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a r t_ CA

B6

MISCELLANEOUS SUMMARIES

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts B S u m m S

U M

.d

U.S. DEPARTMENT OF TRANSPORTATION

U s e r d a r in .l o c k h a r t_ CA

2158.6

D I R O

N L

Y

.4

IN

C

M P

P C

.5

PT

.0

PC

.9

P T

.8

P C

.8

P T

.2

P C

.5

P T

.9

P O

T

.1

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts C

M L P

P C P

N P

C A S a lt

G u lc h .d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

-1.2%

M a tc h e x is ti n g g r o u n d

V P I

.6

80'40'0

Scale in Feet

1+00 2+00 3+00 4+00 5+00 6+001+50 2+50 3+50 4+50 5+50

2,100

2,120

2,140

2,160

2,180 2,180

2,160

2,140

2,120

2,100

R

R

R

HCL FS 46N50

31.52 RT

2+28.00

24.67 RT

2+35.44

9.55 RT

1+92.63

8.19 LT

1+92.63

130 SQYD

Method 2, 6-inch depth

Place Roadway Aggregate, Install Object Marker, Type 3

OM3-L

10.5 LT

2+28

SCHEDULE A - CA FS 1038(1) SALT GULCH BRIDGE

C1

Install Object Marker, Type 3

OM3-R

2+37, 13.0 RT

Sign (Weight Limit 5 Tons)

Remove and Reset

2+35, 14.0 RT

30 SQYD

Compacted roadway aggregate

See sheet RG3163-K, under bridge approach slab

Method 2, 12.5-inch depth

Place Roadway Aggregate, SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .3

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

1:6 1:4

18%

989.57

995.94

24'34.5'

13.3' 21.2' 24'

36'

46N50 7.33

Remove existing culvert

Install 36" CMP and FES, Lt. and Rt.

Place Riprap, Method A, Class 3 (14'W X 16'L X 3'Depth)

Install debris rack over inlet

5 9

1005 1010

P O

T

.0

P I

.0

P I

.1

P I

.9

P I

.4

P I

.8

P I

.1

P I

.7

P I

.8

P I

.9

P I

.2

988.5

995.7

18 IN CMP

S T

O N

E

D N

A I L

D N

A I L

N M

P .3

26 IN PINE

IN

O

A K

IN

P

IN

E

D N

A I L

36 IN PINE

40'20'0

Scale in Feet

1,000

1,010

1,000

1,010

10+00 11+50 12+00

D1

990 990

OPTION X - 46N50 CULVERT 7.33

FS 46N50

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

to be removed with survey tape and coordinate with the CO.

Before removing any trees, mark the trees that are proposed

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .3

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

4%

1:6 1:4

993.74 994.60

14.8' 18.2' 15.9'

21.4'

15.9'33'

46N50 7.38

Remove existing culvert

Install 36" CMP and FES, Lt. and Rt.

Install Elbow at inlet, see Standard 602-6

Place Outlet Riprap Apron see Detail C251-50

Install debris rack over inlet

P O

T

.0

P I

.2

P I

.6

P I

.1

P I

.1

P I

.0

P O

T

.6

40D NAIL

46N50 M P 7.38

40D NAIL

I

N P I N

E

40'20'0

Scale in Feet

1,000

1,010

1,020

1,000

1,010

1,020

10+00 11+50

D2

FS 46N50

OPTION X - 46N50 CULVERT 7.38

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .4

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

2%

2%

10:1 1:4

1:

980.52

993.44 993.98

5'

.7

27'

22.1'53.8'

46N50 7.48

Remove existing culvert

Install 36" CMP and FES, Lt. and Rt.

Install Elbows and Pipe Anchor Assembly, 36-Inch see Special 606-A

Place Outlet Riprap Apron see Detail C251-50

Install debris rack over inlet

16'

15.5' 11.2' 12.3' 14.8' 19.9'

0 985 9

P O

T

.0

P I

.3

P I

.9

P I

.1

P I

.7

P I

.2

PI

+91 .60

+00

PI

1+ .3

P I

.6

P O

T

.9

I

N O

A K

993.5

994.9

18 IN CMPR

E S E C T

N M

P .4

D N

A

IL

D N

A

IL

D N

A

IL

40'20'0

Scale in Feet

1,000

1,010

1,000

1,010

11+50

D3

OPTION X - 46N50 CULVERT 7.48

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, FS 46N50 to avoid tree and roots.

Adjust location of culvert

NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .6

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

6%

1:4

993.48 995.36

22.7' 41'

31.4'

1:10

13.5'17.9'

1:

1.

46N50 7.63

Remove existing culvert

Install 36" CMP and FES, Lt. and Rt.

Install debris rack over inlet

0P

O T

.0

P I

.2

P I

.2

P I

.5

P I

.1

PI

0+ .1

PI

0+ .5

P I

.7

P I

.8

P I

.5

P I

.2

P I

.5

P O

T

.8

24 IN

PIN

E

28 IN

PIN

E

24 IN

PIN

E 996.3

40D NAIL

18 IN C

MP

998.2

40D NAIL

46N50 MP 7.63

40D NAIL

18 IN

PIN

E

24 IN

D

B

L PIN

E

40'20'0

Scale in Feet

1,000

1,010

1,000

1,010

1,0201,020

10+00 10+50 11+00 11+50 12+00

D4

OPTION X - 46N50 CULVERT 7.63

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, FS 46N50 NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .6

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

8%

1:6

38.3'

21.5'26.4'15.9'

27.5'42.3'

1:4

1:

46N50 7.68

Remove existing culvert

Install 36" CMP and FES, Lt. and Rt.

Do not remove upstream berms

Place Outlet Riprap Apron see Detail C251-50

Install debris rack over inlet

16'

978.25

982.82

P O

T

.0

P I

.7

P I

.4

P I

.4

P O

T

.8

978.6

18 IN CMP

983.9

D N

A I L

N M

P .6

40'20'0

Scale in Feet

10+00 10+50 11+00

OPTION X - 46N50 CULVERT 7.68

D5

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, FS 46N50

NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .7

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

6%

1:5 1:4

1:

1003.62

1005.61 36.3'

15.1' 20.8' 25.4'

33.1'35.9'

46N50 7.77

Remove existing culvert

Install 36" CMP and FES, Lt. and Rt.

Place Outlet Riprap Apron see Detail C251-50

Grade ditch at inlet to drain

Install debris rack over inlet

P O

T

.0

P I

.6

P I

.1

P I

.5

P O

T

.2

1003.4 1008.1

18 IN CMP

N M

P .7

D N

A

IL

I

N P I N

E

I

N P I N

E

39 IN PINE

6+00

40'20'0

Scale in Feet

1,010

1,000

1,010

1,0201,020

1,000

10+00 10+50 11+00

OPTION X - 46N50 CULVERT 7.77

D6

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, FS 46N50 to avoid tree and roots.

Adjust location of culvert

NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .2

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

983.67

994.89

46.

9'

26.5'53.5'

1:

1.

46N50 8.28

Remove existing culvert

Install 42" CMP and FES, Lt. and Rt.

Place Riprap, Method A, Class 4 (16'W X 21'L X 3' Depth)

Install debris rack over inlet

24% 21'

20.7' 32.7' 24.2'

985 9 0 9

P O

T

.0

0 P I

.7

P I

.7

P I

.6

P I

.9

P I

.3

P O

T

.5

IN

P

IN

E

IN

P

IN

E

989.72

IN

P

IN

E

IN

P

IN

E

IN

P

IN

E

IN

D

B L O

A K

18 IN CMP

996.1

IN

P

IN

E

40D NAIL

40D NAIL

46N50 MP 8.28

40D NAIL

IN

P

IN

E

IN

P

IN

E

IN

P

IN

E

IN

P

IN

E

40'20'0

Scale in Feet

1,000

1,010

1,000

1,010

10+00 11+50

OPTION X - 46N50 CULVERT 8.28

D7

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, FS 46N50

NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .6

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

6%

6%

5'

981.85

985.20

958.71

56'

15.7' 11.4' 34.2' 28.2' 35.3'

.5

42.2'89.5'

16'

M at ch ex is ti n g sl op e

M atch existing slope

46N50 9.62

Leave existing 18" pipe in place

Install 18" FES at inlet and outlet of existing 18" CMP

Install debris rack over inlet of 18" CMP

Place Outlet Riprap Apron for 18" culvert see Detail C251-50

Install 36" CMP and FES, Lt. and Rt.

Install Elbows and Pipe Anchor Assembly, 36-Inch see Special 606-A

Place Outlet Riprap Apron for 36" culvert see Detail C251-50

5 9

P O

T

.0

P I

.8

P I

.0

P I

.9

P I

.0

P I

.6

1 1

P I

.2

P O

T

.0

P I

.8

P I

.0

P I

.9

P I

.0

P I

.6

1 1

P I

.2

P I

.6

P I

.5

963.2

18 IN CMP

I

N P I N

E

I

N P I N

E

I

N P I N

E

I

N P I N

E

982.0

18 IN CMP

I

N P I N

E

I

N P I N

E

I

N P I N

E

I

N P I N

E

N M

P .6

0N

A

IL

I

N

I

N

I

N

I

N

D N

A

IL

N A

IL

I

N

I

N

I

N

40'20'0

Scale in Feet

1,000

1,000

10+00 11+00 12+0010+50 11+50

C15

FS 46N50

OPTION X - 46N50 CULVERT 9.62

FS 46N50

to avoid tree and roots.

Adjust location of culvert to avoid tree and roots.

Adjust location of culvert

D8

NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .7

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

20:1 1:6

18%

988.74

995.23

35.8

15.3' 21' 24'

24'36.3'

16'

46N50 9.73

Remove Exisiting 18" CMP

Install 36" CMP and FES, Lt. and Rt.

Outlet Class 3 riprap (14'W X 16'L X 3' Depth)

5 1

P O

T

.0

P I

.8

P I .3

P I .5

P I

.0

P I .9

P I

.5

P I

.8

P I

.1

P I

.1

P I

.4

IN

P

IN

E

IN

C

E D

A R 2

IN

P

IN

E

988.0

I

N P I N

E

I

N P I N

E

N A

IL

18 IN CMP

995.9

I

N P I N

E

N M

P .7

5N A

IL

IN

P

IN

E

I

N P I N

E

N A

IL

IN

P

IN

E

I

N O

A K

I

N O

A K

I

N P I N

E I

N P I N

E

40'20'0

Scale in Feet

1,000

1,010

1,020

1,000

1,010

1,020

10+00 11+0010+50 12+0011+50

OPTION X - 46N50 CULVERT 9.73

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, FS 46N50

D9 to avoid tree and roots.

Adjust location of culvert

NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .4

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

1:6

991.12

40.2'

1:4

989.03

51.1' 17' 23.2'

44.1'68.1'

5.3%

51.5'

46N50 8.4

Remove existing culvert

Install 103" X 71" arch CMP

Install Metal Headwall System for 103 x 71 Arch Pipe Culvert

Place Riprap, Method A, Class 6 (48.5'W X 51.5'L X 4'Depth)

P I

.8

P I

.0

P I

.6

P I

.6

P I

.9

0 P I .3

P I

.1

P I

.0

P I

.6

P I

.7

P O

T

.5

P I

.8

P I

.0

P I

.6

P I

.6

P I

.9

0 P I .3

P I

.1

P I

.0

P I

.6

P I

.7

P O

T

.5

P I

.7

P I

.5

I

N P I N

E

I

N P I N

E

I

N E

L M

I

N E

L M

I

N P I N

E

I

N E

L M

I

N P I N

E

I

N T

R I E

L M

I

N P I N

E

I

N P I N

E

I

N P I N

E

I

N P I N

E

I

N P I N

E

I

N P I N

E

988.9

I

N P I N

E

I

N P I N

E

I

N E

L M

I

N E

L M

I

N T

R I O

A K

48 IN CMP

993.8

I

N P I N

E

I

N P I N

E I

N P I N

E

I

N P I N

E

40D NAIL

I

N O

A K

I

N E

L M

40D NAIL

46N50 M P 8.40

40D NAIL

I

N T

R I O

A K

I

N P I N

E

40'20'0

Scale in Feet

1,000

1,010

1,000

1,010

11+00 12+00 13+0010+50 11+50 12+50

D10

OPTION Y - 46N50 CULVERT 8.40

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, FS 46N50

See Note 2.

NOTE:

Subsection 602.03 and Subsection 725.19.

Stain metal headwall with weathering agent. See SCR coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

to be removed with survey tape and coordinate with the CO.

Before removing any trees, mark the trees that are proposed

5.

4.

3.

2.

1.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .1

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

9%

1.

5:

84.5'54'

950.00

.7

8'

M atch existing slope

986.64

71.3' Culvert B

78.6' Culvert A 52.6' C ulvert B

51.5' C ulvert A

982.56 Culvert B

982.16 Culvert A

47N70 1.12

Remove existing inlet drop structure

Leave existing 66" culvert in place

Clean drainage structure, culvert (2) 36-inch culverts

Install two 48" CMP and FES, Lt. and Rt.

Install elbows and Pipe Anchor Assembly, 48-inch see Special 606-A

Install debris rack (special 96-inch) over 66" culvert inlet see Special 602-A

.6

5 9

1005 10 05P

I

.6

P I

.0

P I

.4

P I

.3

P I

.2

P I

.3

P I

.0

P I

.9

P I

.3

P I

.8

P I

.1

P I

.0

P I

.9

P I

.0

P I

.6

PI

2+ .7

P I

.0

P I

.2

P I

.2

P O

T

.5

102 IN CMP

948.3

32 IN PINE

954.1

954.4

966.1

LARGE CMP

84 IN VERT CMP

980.1

24 IN CPP

986.5

24 IN CMP

T

O

I

N T

O

I

N

36 IN CMP

995.5

995.6

ROCK BEDDED

B N

A

IL

R O

C K B

ED

D

ED

R

ES

EC

T

DIR ONLY

R

ES

EC

T

N M

P .1

D N

A

IL

40'20'0

Scale in Feet

1,000

1,000

1,010 1,010

12+00 13+00 14+0011+50 12+50 13+50

D11

OPTION Y - 47N70 CULVERT 1.12

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, FS 47N70

Clean culverts, 36-inch at culvert inlets

Grade and shape slope over 66-inch culvert

Existing ground over 48-inch culvert 'B'

Existing ground

48-inch culvert 'B'

See Special 602-A

Debris Rack (Special 96-Inch)

NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts D

M in o r P

P D

P

N P

C A

N .7

.d g n

U s e r d a r in .l o c k h a r t_ CA

SALT GULCH BRIDGE

CA FS 1038(1)

38.9'

16.3'21.3'26.1'

37.6'35.7'

9.8%

47N72 1.73

Remove exisiting 24" culvert

Install 48" CMP and FES, Lt. and Rt.

Install 48" debris rack at inlet

Install elbow and Pipe Anchor Assembly, 48-inch see Special 606-A

'995.73

991.93

981.34

P O

T

.0

P I

.0

P I

.6

P O

T

.6

24 IN CMP

980.7998.8

N M

P .7

24 IN CMP 4

N A

IL

40'20'0

Scale in Feet

1,000

1,010

1,000

1,010

10+00 10+50 11+00

D12

OPTION Y - 47N72 CULVERT 1.73

Surface Course 6-inch Depth

Roadway Aggregate, Method 2, FS 47N72

NOTE:

4.

3.

2.

1.

coordinate system with an assumed elevation.

flowline of the drainage channel. Each site is based on local

The stationing, alignment and profile is along the surveyed excavation.

where the road surface is disturbed by culvert installation

Place roadway aggregate matching the existing roadway width that are stabilizing the existing slope.

channel configuration and to avoid damaging trees installing riprap. Adjust riprap layout to match existing

Avoid excavating around base of trees and roots when

See SCR Subsection 107.10.

NOTE:

12" min.

DETAIL APPROVED FOR USE 01/2011

FIBER ROLL

Maximum spacing (ft)

9" Ø Fiber Roll

Flow

12" min.

L im it

C le a r in g

S ta k e

S lo p e

INSTALLATION DETAIL

FIBER ROLL AS PERIMETER CONTROL

uphill side of fiber roll

Place excavated material on

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts E C .d g n

U s e r d a r in .l o c k h a r t_

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U.S. CUSTOMARY DETAIL

DETAIL

AT CULVERT OUTLET

FIBER ROLL

flared end section

Culvert inlet with

AT CULVERT INLET

FIBER ROLL

flared end section

Culvert outlet with Flow

D ire c tio n o f ru n o ff

Flow

FIBER ROLL LAPPING DETAIL

Stagger joints (typ.)

FIBER ROLL JOINT DETAIL

FIBER ROLL SLOPE LAYOUT

spacing table See Fiber Roll along contours

Install fiber rollsWood stakes

Fiber Roll

Slope

Fiber Roll

Pay Limits

Pay Limits overlap 12" (min.)

Fill slope

C157-55 side of fiber roll material on uphill

Place excavated

Flow Flow

54" or larger

Culvert Size

24" or smaller

30" to 48"

9" Ø Fiber Roll length (ft)

FIBER ROLLS AT CULVERTS*

needed due to project-specific conditions.

top of the culvert inlet only. Adjust length as

*Approximate length shown for rolls across the

See note 6 control runoff culvert as needed to

Install fiber rolls below

6.

5.

4.

3.

2.

1.

disturbance.

and all water entering the culvert is crossing the disturbance is on both the road and around the culvert

Place fiber rolls all the way around the inlet when the under it.

water is forced to flow through fiber roll rather than against upstream side of fiber roll to ensure storm with trench bottom and sides. Tamp soil backfill to the contour. Place fiber rolls in continuous contact

For fiber rolls on bare soil, construct trenches parallel

Expose stakes 2" above top of fiber roll.

Drive stakes into undisturbed soil at least 12" deep.

from each end.

2' o.c. max. culverts. Stake fiber rolls 6-inches stakes. Space stakes 4' o.c. max. on slopes and

Stake fiber rolls in place with 1" x 1" or 1" Ø wood vary more than 5% from level.

section of fiber roll, do not allow the fiber roll to

Install fiber rolls along slope contours. For any 20' to installation.

Repair all rills or gullies and properly compact prior

A A

Trench 2" min.

See no te 3

See no te 3

2" min.

Trench table for length requirements

See Fiber Rolls at Culverts culvert inlet

Install fiber rolls around table for length requirements

See Fiber Rolls at Culverts culvert outlet

Install fiber rolls around

Flow

Fiber roll roll 2" min.

Trench fiber

SECTION A-A

REVISED: 12/2017

E1

Flow

NO SCALE

1V:4H or flatter

Slope Gradient

1V:2H or steeper

STAKE DETAIL

uphill side of fiber roll

Place excavated material on

Fill or cut slope

FIBER ROLL SPACING TABLE*

project-specific conditions.

*Approximate spacing shown. Adjust spacing as needed due to

Between 1V:4H and 1V:3H

Between 1V:3H and 1V:2H

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts E C .d g n

U s e r d a r in .l o c k h a r t_ CA

C251-50

CLASS

RIPRAP

SECTION

END

WITH

SECTION

END

WITHOUT

(CY)

QUANTITY

RIPRAP

ESTIMATED

(SY)

QUANTITY

GEOTEXTILE

ESTIMATED

(inches) D

SIZE

CULVERT

(feet) L

APRON

OF

LENGTH

(feet) H

APRON

OF

DEPTH

CLASS

RIPRAP

SECTION

END

WITH

SECTION

END

WITHOUT

PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES

OUTLET WITHOUT DITCH

(CY)

QUANTITY

RIPRAP

ESTIMATED

(SY)

QUANTITY

GEOTEXTILE

ESTIMATED

(inches) D

SIZE

CULVERT

(feet) L

APRON

OF

LENGTH

(feet) H

APRON

OF

DEPTH

PROTECTIVE APRON DIMENSIONS AND ESTIMATED QUANTITIES

OUTLET WITH DITCH

AT CULVERT OUTLETS

PLACED RIPRAP

14.5

12.5

2.5

2.5

1.5

1.5

1.5

2.5

2.5

1.5

1.5

1.5

14.5

12.5

2.5

2.5

1.5

1.5

1.5

2.5

2.5

1.5

1.5

1.5

2'

49.8

38.7

18.5

13.3

5.2

3.2

1.7

44.5

34.1

15.6

10.9

3.9

2.2

2'

38.6

29.9

15.2

10.8

4.5

2.7

1.4

35.6

27.3

13.4

9.3

3.6

0.9

U s e r d a r in .l o c k h a r t_ G1

NO SCALE

C

PLAN VIEW PLAN VIEW

Geotextile

END SECTION

CULVERT WITHOUT STANDARD

SECTION C-C

END SECTION

CULVERT WITH STANDARD

S p a n

D ia o r m in

S p a n

D ia o

L

A A

B B

PLAN VIEW

Variable slope ground Original

Geotextile

END SECTION

CULVERT WITHOUT STANDARD

SECTION B-BSECTION A-A

END SECTION

CULVERT WITH STANDARD

S p a n

D ia o r

S p a n

D ia o r m in

Geotextile

Variable slope ground Original m in

L

D D

D

H

H

D D

D

WITHOUT DITCH

PROTECTIVE APRON AT CULVERT OUTLET

WITH DITCH

PROTECTIVE APRON AT CULVERT OUTLET

L

C C

C

NOTE:

H

Geotextile

SECTION E-ESECTION D-D

Geotextile ground Original m in ditch slope

Match existing

D

H m in ground Original m in

D m in

H ditch slope

Match existing

D D EE

ground

Original

D

W id th

D it c h B o tt o m

W id t h

D it c h B o tt o m

D

4D

PLAN VIEW

or flatter

Sloped 1V:2H will not be measured for payment.

3. Excavation for placement of riprap

Subsection 714.01(a).

2. Furnish geotextile conforming to slopes of less than 10%.

1. Use for aprons serving culverts with

D

D D

Flowline

D

D D

(min.)

(min.)

STATE PROJECT

NO.

SHEET

P

M N C

A F S S a lt G u lc h R o a d w a y C

A D

D S h e e ts G C .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

REVISED:

DETAIL

U.S. CUSTOMARY DETAIL

DETAIL APPROVED FOR USE

U s e r d a r in .l o c k h a r t_ CA

HYDRAULIC DATA

Elev.

WS

ft/sec.

V ft /sec

Q

Q

Q

100Q

Q200

A 1" = 20’-0"B. ROBINSON

C BridgeL

BRIDGE PLAN & ELEVATION

Gutterline (typ.)

S1

PLAN

ELEVATION

existing ground @ C Rdwy.

Approximate location of

L

N

Profile grade

H o r s e C r e e k

35’-0"50’-0"35’-0"

18’-0"

11’-0"

3.500% Grade

Drawing No. Description

BRIDGE DRAWING INDEX

FOUNDATION PLAN

RG3163-A

RG3163-B

BORING LOGS

ABUTMENT BEARINGS

REBAR LIST (1 OF 3)

RG3163-C

RG3163-D

RG3163-E

RG3163-F

RG3163-G

RG3163-J

RG3163-L

RG3163-M

RG3163-N

RG3163-O

RG3163-H

RG3163-I

GENERAL NOTES & ESTIMATE

EXPANSION JOINT

ABUTMENT CAP

RG3163-K

REBAR LIST (2 OF 3)

APPROACH SLAB

EXISTING BRIDGE ABUTMENT 1 REMOVAL

NEW ABUTMENT LAYOUT 1

BRIDGE PLAN AND ELEVATION

(BENT 1)

ABUT. 1

(BENT 2)

PIER 1 (BENT 3)

PIER 2

(ABUT. 4)

ABUT. 2

RG3163-E.

be removed. See

Existing abut. to

S. BELCHER

P C

.8

7PC

.9

P T

.2

Begin New Bridge

Tangent

Existing Bridge

C P ie r

L C P ie r

L

New Approach Slab

(NEW)

WINGWALL A

(NEW)

WINGWALL B

New Abutment Cap

New Guardrail

Abutment Cap

New Wingwall &

Length of Bridge = 120’-0"

(Measured along tangent)

End Existing Bridge

BRIDGE RAILING

C Rdwy.L for details.

See Rdwy. Plans

Object marker (typ.)

EXCAVATION & GRS BACKFILL DETAILS

WINGWALLS

tip EL. 2117.0

R. OWEN

RG3163-P REBAR LIST (3 OF 3)

Q WS El. 2136.4 foundations not performed.

Scour analysis of existing bridge upstream face of bridge.

Notes: Water surface elevations are at

9.1

11.7

12.5

13.2

2132.0

2136.4

2137.2

2138.3

El. 2164.4

Approx. low chord

Begin horizontal curve

PROJECTSTATE

DRAWING NO.DATEBRIDGE DRAWINGPROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BYREVISIONS

BY

DATENO.

REVISIONS

N

C A \F

S a lt G u lc h \B r id g e \R

G

\C

A

F il e s \D

G N

F il e s \r g p e .d g n

RG3163-

CA

KARL EIKERMANN

SISKIYOU COUNTY, CALIFORNIA

SALT GULCH BRIDGE OVER HORSE CREEK REPAIR

GULCH BRIDGE

CA FS 1038(1) SALT

of 16 APRIL 2020

NONE K. EIKERMANN B

Item

ESTIMATE NOTES:

Quantity: Unit:Item No. Notes:

ESTIMATE

All req’d

All req’d

LPSM

LPSM

GENERAL NOTES:

SPECIFICATIONS:

CONSTRUCTION: Federal Highway Administration Standard Specifications for Construction of Roads and Bridges on

CONCRETE: 150 lbs. per cubic foot.

SOIL: 120 lbs. per cubic foot.

DRAINAGE:

STRUCTURAL STEEL: 490 lbs. per cubic foot.

DEAD LOAD:

LATERAL EARTH PRESSURE:

LIVE LOAD:

face of any bar shall be 2 inches, unless noted otherwise on the plans. Minimum splice lengths for all bar sizes shall be as

REINFORCING STEEL:

CONCRETE:

DESIGN CRITERIA:

Survey and Staking, Bridge

Bearing Device, Elastomeric

CUYD

EACH2

15214-1000

20304-2000

55201-0200

55401-2000

56401-1000 shown on the plans. All approach slab reinforcing steel shall be epoxy coated, as noted on the bar list.

LNFT55601-0900

(1)

B. ROBINSON

Federal Highway Projects, FP-14, Dual Units.

HS20. Maximum Dynamic Load Allowance (Impact), IM=33%.

Drilled Shafts, 36-inch diameter56501-0400

Structural concrete, class A(AE)

LNFT

(1)

LB

DESIGN: AASHTO LRFD Bridge Design Specifications, 7th Edition, 2014, with interims through 2016.

EXISTING BRIDGE PLANS:

S2

20801-0000 Structure Excavation

DS

D1

GENERAL NOTES & ESTIMATE

"Salt Gulch Bridge Repair", dated July 1975, prepared by U.S. Forest Service.

Horse Creek Road", dated, February 1958, prepared by Bureau of Public Roads. Also see project 46N500067

For additional information on existing bridge see RG1397 "Salt Gulch Bridge over Horse Creek on

20435-2000

Reinforcing steel, epoxy coated

(5)

(1) (2)

56202-0000 Temporary Support Structure LPSMAll req’d

(4)

CUYD

Serviceability stresses limited to current AASHTO Specification values for reinforced concrete elements.

CONSTRUCTION SEQUENCE:

55235-0000 Expansion Joints LNFT (1)

25Bridge Railing, Steel

20720-0300 SQYD

Backfill, granular 75

Reinforcement geosynthetic, Type III

(6)

(1)(3)

Removal of Bridge (partial)

55401-1000 Reinforcing steel LB

CUYD

(1)

(1)

S. BELCHER

R. OWEN

REDUCED ACTIVE PRESSURE @ GRS BACKFILL: Equivalent to a fluid unit weight of soil = 17 pounds per cubic foot.

forces only.

the long period spectrum acceleration, S = 0.325 g. Site Class = C. Seismic Zone = 3. Seismic data used in computation of connection acceleration, S = 0.546 g. Long period acceleration at 1.0 seconds (S1 = 0.204 g) modified by the Site Coefficient (Fv = 1.596) to give

Short period acceleration at 0.2 seconds (Ss = 0.455 g) modifed by the Site Coefficient (Fa = 1.2) to give the short period spectrum

Peak Ground Acceleration (PGA = 0.195 g), modified by the Site Coefficient (Fpga = 1.2) to give a spectrum acceleration, As = 0.234 g.

SEISMIC:

No allowance for future wearing surface.

(7)

(6)

(5)

(4)

(3)

(2)

(1)

(7) of AASHTO M213.

Flexible cellular joint filler shall meet the requirements of AASHTO M153, closed cell rubber. Expansion joint filler shall meet the requirements inch, unless noted otherwise on the plans. All concrete shall be made with Type II cement. 4 3Chamfer exposed edges of all concrete

All other cast in place concrete shall be structural concrete Class A(AE) with a minimum 28-day compressive strength f’c=4500 psi.

Cast in place concrete for the drilled shafts shall be structural concrete Class C with a minimum 28-day compressive strength f’c=4500 psi.

Drainage pipe shall conform to AASHTO M252.

All reinforcing steel shall conform to AASHTO M31 or M322, Grade 60 deformed. The minimum concrete covering to the to CO for approval.

Contractor may submit an alternate sequence of work

9. Construct bridge railing extension.

8. Construct sleeper slab, approach slab, and expansion joint.

7. Construct drainage system and reinforced soil embankment behind abutment.

6. After placing new bearing pads, remove temporary support structure and transfer loading to new abutment.

5. Construct new concrete cap and wingwall.

4. Construct drilled shaft foundation for new abutment.

3. Remove existing bridge components at abutment 1 as shown in plans.

2. Place temporary support structure.

1. Perform bridge surveying and staking.

Includes material for overlaps.

Includes cost of furnishing granular backfill for the GRS and constructing the geosynthetic reinforced soil abutment fill.

concrete columns, steel beam seat, timber lagging, tie rods, and deadmen as shown in the plans.

Includes removal of existing bridge components at abutment 1, including timber approach beams, steel piles, concrete cap, reinforcing steel (estimated qty. = 3702 lbs.), and testing.

Includes cost of excavation, temporary casing (if required), structural concrete (estimated qty. = 20 cubic yards), Includes cost of backfill.

roadway aggregate for approach slab, & epoxy anchorage of approach slab dowels.

Includes cost of furnishing and installing weepholes, geocomposite sheet drains (est. qty. = 28 square yards), all joint fillers, Contract Quantity

N

C A lt G u lc h \B r id g e \R

G

\C

A e s \D

G N

F il e s \r g g n .d g n

RG3163-

CA

SALT GULCH BRIDGE OVER HORSE CREEK REPAIR

GULCH BRIDGE

P

.8

7PC

.9

C BridgeL

C P ie r

L

35’-0"50’-0"34’-0"

LC

P ie r

End Existing Bridge

2’-0"2’-0"

4’-0"

N

Tangent

Begin New Bridge

L

B.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .