Bid Tabs - Salt Gulch Bridge.pdf
PDF 681 KB Posted
- Attached to
- CA FS 1038(1), Salt Gulch Bridge Federal contract opportunity
- Solicitation number
- 6982AF20B000006
About this file
This bid tabulation document summarizes bids received for the CA FS 1038(1) Salt Gulch Bridge project. The project includes bridge abutment repair and replacement of approximately 20 culverts located in Siskiyou County, California within the Klamath National Forest. Major work elements involve drilled shaft construction, a temporary bridge support structure, structural concrete, and corrugated metal pipes ranging in size from 36 to 96 inches. Engineer's estimate for total project cost is between $1 to $2 million. Construction is scheduled from August 2020 through late October/early November 2020. Bids were received from seven contractors and ranged from $978,712 to $1,830,650 for the base schedule. The apparent low bid was submitted by West Coast Contractors, Inc. at $978,712.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary - Salt Gulch Bridge.pdf | ||
| QnA 7 10 2020 Salt Gulch.pdf | ||
| QnA 7 8 2020 Salt Gulch Bridge.pdf | ||
| Amendment-A002-Original Bridge Plans.pdf | ||
| Amendment A001-Wage Decision .pdf | ||
| 07.08.2020 Interested Vendors List - Salt Gulch.pdf | ||
| QnA 6 25 2020 Salt Gulch.pdf | ||
| Plans Final-CA FS 1038(1) .pdf | ||
| CA FS 1038(1) Salt Gulch - Final Hydraulics Memo - 04.16.2020.pdf | ||
| IFB - CA FS 1038(1) SALT GULCH BRIDGE.pdf | ||
| FP14.pdf | ||
| Signed Plan Cover sheet .pdf | ||
| CA.FTFS.46N50.Salt Gulch Bridge.FINAL 4-20-2020_signatures.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 07/20/20
1 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Contractor Responsive?
Engineer's Estimate
Hooker Creek, Inc.
Maloney Construction
McCullough Construction Inc.
T. L. Peterson, Inc.
TSI Engineering
West Coast Contractors, Inc.
Base Schedule A
$710,700.00
$1,390,760.00
$1,830,650.00
$1,318,418.00
$1,611,917.00
$1,206,724.00
$978,712.00
Option: X
$397,475.00
$460,635.00
$625,815.00
$392,400.00
$708,133.00
$391,405.00
$328,525.00
Option: Y
$455,903.50
$550,800.50
$451,310.00
$441,821.50
$572,000.00
$398,416.00
$396,714.50
Contractor Responsive?
Engineer's Estimate
Hooker Creek, Inc.
Maloney Construction
McCullough Construction Inc.
T. L. Peterson, Inc.
TSI Engineering
West Coast Contractors, Inc.
Total Base Schedule A and Option(s): X
$1,108,175.00
$1,851,395.00
$2,456,465.00
$1,710,818.00
$2,320,050.00
$1,598,129.00
$1,307,237.00
Total Base Schedule A and Option(s): XY
$1,564,078.50
$2,402,195.50
$2,907,775.00
$2,152,639.50
$2,892,050.00
$1,996,545.00
$1,703,951.50
Total Base Schedule A and Option(s): Y
$1,166,603.50
$1,941,560.50
$2,281,960.00
$1,760,239.50
$2,183,917.00
$1,605,140.00
$1,375,426.50
2 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF20B000006
Division: Central Federal Lands
State: CA County: Siskiyou
Federal Land: Klamath National Forest Opened at: Lakewood
Opened by: Jorey Deml
Date: 07/14/20
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
West Coast Contractors, Inc. $978,712.00 61050 Highway 101 Coos Bay, OR 97420
TSI Engineering $1,206,724.00 4600 Rosevill Road North Highlands, CA 95660
McCullough Construction Inc. $1,318,418.00 57 Alder Grove Road Arcata, CA, CA 95521
Hooker Creek, Inc. $1,390,760.00 1015 Anderson St.
Red Bluff, CA 96080
T. L. Peterson, Inc. $1,611,917.00
Maloney Construction $1,830,650.00 7120 Redwood Blvd. Suite A Novato, CA 94945
Engineer's Estimate $710,700.00
3 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
West Coast Contractors, Inc. Lump Sum $263,102.00 TSI Engineering Lump Sum $110,000.00 McCullough Construction Inc. Lump Sum $130,000.00 Hooker Creek, Inc. Lump Sum $138,000.00 T. L. Peterson, Inc. Lump Sum $161,000.00 Maloney Construction Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $65,000.00
A0040 15214-1000 SURVEY AND STAKING, BRIDGE
West Coast Contractors, Inc. Lump Sum $15,000.00 TSI Engineering Lump Sum $65,000.00 McCullough Construction Inc. Lump Sum $25,000.00 Hooker Creek, Inc. Lump Sum $20,000.00 T. L. Peterson, Inc. Lump Sum $5,500.00 Maloney Construction Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $7,500.00
A0060 15301-0000 CONTRACTOR QUALITY CONTROL
West Coast Contractors, Inc. Lump Sum $54,400.00 TSI Engineering Lump Sum $116,000.00 McCullough Construction Inc. Lump Sum $70,000.00 Hooker Creek, Inc. Lump Sum $125,000.00 T. L. Peterson, Inc. Lump Sum $87,000.00 Maloney Construction Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
A0080 15401-0000 CONTRACTOR TESTING
West Coast Contractors, Inc. Lump Sum $18,000.00 TSI Engineering Lump Sum $55,000.00 McCullough Construction Inc. Lump Sum $50,000.00 Hooker Creek, Inc. Lump Sum $39,000.00 T. L. Peterson, Inc. Lump Sum $12,000.00 Maloney Construction Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $26,100.00
A0100 15501-0000 CONSTRUCTION SCHEDULE
West Coast Contractors, Inc. Lump Sum $2,500.00 TSI Engineering Lump Sum $17,500.00 McCullough Construction Inc. Lump Sum $20,000.00 Hooker Creek, Inc. Lump Sum $7,500.00 T. L. Peterson, Inc. Lump Sum $5,200.00 Maloney Construction Lump Sum $6,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
4 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
West Coast Contractors, Inc. $15.00 $6,000.00 TSI Engineering $18.00 $7,200.00 McCullough Construction Inc. $8.00 $3,200.00 Hooker Creek, Inc. $6.00 $2,400.00 T. L. Peterson, Inc. $9.00 $3,600.00 Maloney Construction $12.00 $4,800.00 Engineer's Estimate 400 LNFT $5.00 $2,000.00
A0140 20304-2000 REMOVAL OF BRIDGE (PARTIAL)
West Coast Contractors, Inc. Lump Sum $95,000.00 TSI Engineering Lump Sum $66,000.00 McCullough Construction Inc. Lump Sum $80,000.00 Hooker Creek, Inc. Lump Sum $100,000.00 T. L. Peterson, Inc. Lump Sum $163,000.00 Maloney Construction Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00
A0160 20435-2000 BACKFILL, GRANULAR
West Coast Contractors, Inc. $160.00 $12,000.00 TSI Engineering $360.00 $27,000.00 McCullough Construction Inc. $330.00 $24,750.00 Hooker Creek, Inc. $280.00 $21,000.00 T. L. Peterson, Inc. $500.00 $37,500.00 Maloney Construction $450.00 $33,750.00 Engineer's Estimate 75 CUYD $175.00 $13,125.00
A0180 20720-0300 REINFORCEMENT GEOSYNTHETIC, TYPE 3
West Coast Contractors, Inc. $7.00 $3,780.00 TSI Engineering $45.00 $24,300.00 McCullough Construction Inc. $11.00 $5,940.00 Hooker Creek, Inc. $6.50 $3,510.00 T. L. Peterson, Inc. $8.80 $4,752.00 Maloney Construction $10.00 $5,400.00 Engineer's Estimate 540 SQYD $10.00 $5,400.00
A0200 20801-0000 STRUCTURE EXCAVATION
West Coast Contractors, Inc. $50.00 $6,500.00 TSI Engineering $750.00 $97,500.00 McCullough Construction Inc. $750.00 $97,500.00 Hooker Creek, Inc. $900.00 $117,000.00 T. L. Peterson, Inc. $91.00 $11,830.00 Maloney Construction $400.00 $52,000.00 Engineer's Estimate 130 CUYD $200.00 $26,000.00
5 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0220 30203-2140 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 6-INCH DEPTH
West Coast Contractors, Inc. $50.00 $7,500.00 TSI Engineering $164.00 $24,600.00 McCullough Construction Inc. $61.00 $9,150.00 Hooker Creek, Inc. $33.00 $4,950.00 T. L. Peterson, Inc. $41.00 $6,150.00 Maloney Construction $60.00 $9,000.00 Engineer's Estimate 150 SQYD $17.00 $2,550.00
A0240 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
West Coast Contractors, Inc. $2,000.00 $144,000.00 TSI Engineering $1,300.00 $93,600.00 McCullough Construction Inc. $2,319.00 $166,968.00 Hooker Creek, Inc. $2,600.00 $187,200.00 T. L. Peterson, Inc. $3,000.00 $216,000.00 Maloney Construction $7,900.00 $568,800.00 Engineer's Estimate 72 CUYD $2,200.00 $158,400.00
A0260 55235-0000 EXPANSION JOINTS
West Coast Contractors, Inc. $300.00 $6,600.00 TSI Engineering $212.00 $4,664.00 McCullough Construction Inc. $650.00 $14,300.00 Hooker Creek, Inc. $300.00 $6,600.00 T. L. Peterson, Inc. $500.00 $11,000.00 Maloney Construction $125.00 $2,750.00 Engineer's Estimate 22 LNFT $100.00 $2,200.00
A0280 55401-1000 REINFORCING STEEL
West Coast Contractors, Inc. $2.00 $14,400.00 TSI Engineering $4.50 $32,400.00 McCullough Construction Inc. $2.00 $14,400.00 Hooker Creek, Inc. $3.00 $21,600.00 T. L. Peterson, Inc. $2.35 $16,920.00 Maloney Construction $2.50 $18,000.00 Engineer's Estimate 7,200 LB $3.00 $21,600.00
A0300 55401-2000 REINFORCING STEEL, EPOXY COATED
West Coast Contractors, Inc. $3.00 $8,100.00 TSI Engineering $7.20 $19,440.00 McCullough Construction Inc. $3.00 $8,100.00 Hooker Creek, Inc. $5.00 $13,500.00 T. L. Peterson, Inc. $3.65 $9,855.00 Maloney Construction $2.50 $6,750.00 Engineer's Estimate 2,700 LB $6.00 $16,200.00
6 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0320 55601-0900 BRIDGE RAILING, STEEL
West Coast Contractors, Inc. $500.00 $12,500.00 TSI Engineering $1,168.00 $29,200.00 McCullough Construction Inc. $350.00 $8,750.00 Hooker Creek, Inc. $1,500.00 $37,500.00 T. L. Peterson, Inc. $470.00 $11,750.00 Maloney Construction $300.00 $7,500.00 Engineer's Estimate 25 LNFT $125.00 $3,125.00
A0340 56202-0000 TEMPORARY SUPPORT STRUCTURE
West Coast Contractors, Inc. Lump Sum $94,000.00 TSI Engineering Lump Sum $290,000.00 McCullough Construction Inc. Lump Sum $180,000.00 Hooker Creek, Inc. Lump Sum $200,000.00 T. L. Peterson, Inc. Lump Sum $344,000.00 Maloney Construction Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00
A0360 56401-1000 BEARING DEVICE, ELASTOMERIC
West Coast Contractors, Inc. $265.00 $530.00 TSI Engineering $7,500.00 $15,000.00 McCullough Construction Inc. $40,000.00 $80,000.00 Hooker Creek, Inc. $3,500.00 $7,000.00 T. L. Peterson, Inc. $3,000.00 $6,000.00 Maloney Construction $3,000.00 $6,000.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00
A0380 56501-0400 DRILLED SHAFT, 36-INCH DIAMETER
West Coast Contractors, Inc. $2,400.00 $182,400.00 TSI Engineering $695.00 $52,820.00 McCullough Construction Inc. $3,740.00 $284,240.00 Hooker Creek, Inc. $3,800.00 $288,800.00 T. L. Peterson, Inc. $5,700.00 $433,200.00 Maloney Construction $3,000.00 $228,000.00 Engineer's Estimate 76 LNFT $1,200.00 $91,200.00
A0400 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
West Coast Contractors, Inc. $140.00 $2,800.00 TSI Engineering $215.00 $4,300.00 McCullough Construction Inc. $157.00 $3,140.00 Hooker Creek, Inc. $148.00 $2,960.00 T. L. Peterson, Inc. $229.00 $4,580.00 Maloney Construction $175.00 $3,500.00 Engineer's Estimate 20 HOUR $170.00 $3,400.00
7 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0420 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY
West Coast Contractors, Inc. $100.00 $2,000.00 TSI Engineering $225.00 $4,500.00 McCullough Construction Inc. $185.00 $3,700.00 Hooker Creek, Inc. $190.00 $3,800.00 T. L. Peterson, Inc. $186.00 $3,720.00 Maloney Construction $170.00 $3,400.00 Engineer's Estimate 20 HOUR $190.00 $3,800.00
A0440 62201-2750 MOTOR GRADER
West Coast Contractors, Inc. $125.00 $2,500.00 TSI Engineering $300.00 $6,000.00 McCullough Construction Inc. $197.00 $3,940.00 Hooker Creek, Inc. $200.00 $4,000.00 T. L. Peterson, Inc. $350.00 $7,000.00 Maloney Construction $200.00 $4,000.00 Engineer's Estimate 20 HOUR $220.00 $4,400.00
A0460 62201-3000 HYDRAULIC EXCAVATOR
West Coast Contractors, Inc. $125.00 $2,500.00 TSI Engineering $290.00 $5,800.00 McCullough Construction Inc. $197.00 $3,940.00 Hooker Creek, Inc. $213.00 $4,260.00 T. L. Peterson, Inc. $206.00 $4,120.00 Maloney Construction $225.00 $4,500.00 Engineer's Estimate 20 HOUR $300.00 $6,000.00
A0480 62301-0000 GENERAL LABOR
West Coast Contractors, Inc. $100.00 $4,000.00 TSI Engineering $105.00 $4,200.00 McCullough Construction Inc. $86.00 $3,440.00 Hooker Creek, Inc. $79.00 $3,160.00 T. L. Peterson, Inc. $71.00 $2,840.00 Maloney Construction $125.00 $5,000.00 Engineer's Estimate 40 HOUR $90.00 $3,600.00
A0500 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
West Coast Contractors, Inc. $100.00 $4,000.00 TSI Engineering $215.00 $8,600.00 McCullough Construction Inc. $137.00 $5,480.00 Hooker Creek, Inc. $175.00 $7,000.00 T. L. Peterson, Inc. $290.00 $11,600.00 Maloney Construction $150.00 $6,000.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
8 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0520 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
West Coast Contractors, Inc. $100.00 $4,000.00 TSI Engineering $175.00 $7,000.00 McCullough Construction Inc. $137.00 $5,480.00 Hooker Creek, Inc. $150.00 $6,000.00 T. L. Peterson, Inc. $355.00 $14,200.00 Maloney Construction $200.00 $8,000.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00
A0540 62511-2000 SEEDING, HYDRAULIC METHOD
West Coast Contractors, Inc. $4.00 $2,400.00 TSI Engineering $7.50 $4,500.00 McCullough Construction Inc. $8.00 $4,800.00 Hooker Creek, Inc. $5.00 $3,000.00 T. L. Peterson, Inc. $12.00 $7,200.00 Maloney Construction $5.00 $3,000.00 Engineer's Estimate 600 SQYD $3.00 $1,800.00
A0560 62516-2000 MULCHING, HYDRAULIC METHOD
West Coast Contractors, Inc. $1.50 $900.00 TSI Engineering $6.50 $3,900.00 McCullough Construction Inc. $7.00 $4,200.00 Hooker Creek, Inc. $5.00 $3,000.00 T. L. Peterson, Inc. $5.50 $3,300.00 Maloney Construction $5.00 $3,000.00 Engineer's Estimate 600 SQYD $3.50 $2,100.00
A0580 63308-0000 OBJECT MARKER
West Coast Contractors, Inc. $200.00 $400.00 TSI Engineering $350.00 $700.00 McCullough Construction Inc. $500.00 $1,000.00 Hooker Creek, Inc. $380.00 $760.00 T. L. Peterson, Inc. $455.00 $910.00 Maloney Construction $250.00 $500.00 Engineer's Estimate 2 EACH $250.00 $500.00
A0600 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
West Coast Contractors, Inc. $75.00 $600.00 TSI Engineering $350.00 $2,800.00 McCullough Construction Inc. $200.00 $1,600.00 Hooker Creek, Inc. $430.00 $3,440.00 T. L. Peterson, Inc. $110.00 $880.00 Maloney Construction $250.00 $2,000.00 Engineer's Estimate 8 EACH $400.00 $3,200.00
9 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0620 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
West Coast Contractors, Inc. $350.00 $6,300.00 TSI Engineering $400.00 $7,200.00 McCullough Construction Inc. $300.00 $5,400.00 Hooker Creek, Inc. $490.00 $8,820.00 T. L. Peterson, Inc. $295.00 $5,310.00 Maloney Construction $500.00 $9,000.00 Engineer's Estimate 18 EACH $250.00 $4,500.00
Total Schedule - All Items
West Coast Contractors, Inc. $978,712.00 TSI Engineering $1,206,724.00 McCullough Construction Inc. $1,318,418.00 Hooker Creek, Inc. $1,390,760.00 T. L. Peterson, Inc. $1,611,917.00 Maloney Construction $1,830,650.00 Engineer's Estimate $710,700.00
10 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF20B000006
Division: Central Federal Lands
State: CA County: Siskiyou
Federal Land: Klamath National Forest Opened at: Lakewood
Opened by: Jorey Deml
Date: 07/14/20
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
West Coast Contractors, Inc. $328,525.00 61050 Highway 101 Coos Bay, OR 97420
TSI Engineering $391,405.00 4600 Rosevill Road North Highlands, CA 95660
McCullough Construction Inc. $392,400.00 57 Alder Grove Road Arcata, CA, CA 95521
Hooker Creek, Inc. $460,635.00 1015 Anderson St.
Red Bluff, CA 96080
Maloney Construction $625,815.00 7120 Redwood Blvd. Suite A Novato, CA 94945
T. L. Peterson, Inc. $708,133.00
Engineer's Estimate $397,475.00
11 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0010 15101-0000 MOBILIZATION
West Coast Contractors, Inc. Lump Sum $43,000.00 TSI Engineering Lump Sum $24,000.00 McCullough Construction Inc. Lump Sum $60,000.00 Hooker Creek, Inc. Lump Sum $45,000.00 Maloney Construction Lump Sum $35,000.00 T. L. Peterson, Inc. Lump Sum $70,000.00 Engineer's Estimate ALL LPSM Lump Sum $36,000.00
X0030 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
West Coast Contractors, Inc. $1,000.00 $9,000.00 TSI Engineering $2,000.00 $18,000.00 McCullough Construction Inc. $970.00 $8,730.00 Hooker Creek, Inc. $1,075.00 $9,675.00 Maloney Construction $3,500.00 $31,500.00 T. L. Peterson, Inc. $1,515.00 $13,635.00 Engineer's Estimate 9 EACH $900.00 $8,100.00
X0050 15301-0000 CONTRACTOR QUALITY CONTROL
West Coast Contractors, Inc. Lump Sum $18,000.00 TSI Engineering Lump Sum $45,000.00 McCullough Construction Inc. Lump Sum $50,000.00 Hooker Creek, Inc. Lump Sum $18,500.00 Maloney Construction Lump Sum $25,000.00 T. L. Peterson, Inc. Lump Sum $20,250.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
X0070 15401-0000 CONTRACTOR TESTING
West Coast Contractors, Inc. Lump Sum $15,000.00 TSI Engineering Lump Sum $6,200.00 McCullough Construction Inc. Lump Sum $40,000.00 Hooker Creek, Inc. Lump Sum $30,000.00 Maloney Construction Lump Sum $10,000.00 T. L. Peterson, Inc. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
X0090 15501-0000 CONSTRUCTION SCHEDULE
West Coast Contractors, Inc. Lump Sum $2,500.00 TSI Engineering Lump Sum $4,500.00 McCullough Construction Inc. Lump Sum $5,000.00 Hooker Creek, Inc. Lump Sum $1,000.00 Maloney Construction Lump Sum $1,000.00 T. L. Peterson, Inc. Lump Sum $4,750.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00
12 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0110 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
West Coast Contractors, Inc. $15.00 $13,500.00 TSI Engineering $8.00 $7,200.00 McCullough Construction Inc. $8.00 $7,200.00 Hooker Creek, Inc. $5.50 $4,950.00 Maloney Construction $12.00 $10,800.00 T. L. Peterson, Inc. $8.00 $7,200.00 Engineer's Estimate 900 LNFT $5.00 $4,500.00
X0130 20301-1900 REMOVAL OF PIPE CULVERT
West Coast Contractors, Inc. $600.00 $4,800.00 TSI Engineering $2,050.00 $16,400.00 McCullough Construction Inc. $2,500.00 $20,000.00 Hooker Creek, Inc. $580.00 $4,640.00 Maloney Construction $5,500.00 $44,000.00 T. L. Peterson, Inc. $8,000.00 $64,000.00 Engineer's Estimate 8 EACH $1,000.00 $8,000.00
X0150 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
West Coast Contractors, Inc. $165.00 $22,275.00 TSI Engineering $190.00 $25,650.00 McCullough Construction Inc. $160.00 $21,600.00 Hooker Creek, Inc. $240.00 $32,400.00 Maloney Construction $680.00 $91,800.00 T. L. Peterson, Inc. $750.00 $101,250.00 Engineer's Estimate 135 CUYD $225.00 $30,375.00
X0170 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4
West Coast Contractors, Inc. $200.00 $9,000.00 TSI Engineering $205.00 $9,225.00 McCullough Construction Inc. $170.00 $7,650.00 Hooker Creek, Inc. $250.00 $11,250.00 Maloney Construction $415.00 $18,675.00 T. L. Peterson, Inc. $900.00 $40,500.00 Engineer's Estimate 45 CUYD $350.00 $15,750.00
X0190 30203-2140 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 6-INCH DEPTH
West Coast Contractors, Inc. $35.00 $14,000.00 TSI Engineering $25.00 $10,000.00 McCullough Construction Inc. $40.00 $16,000.00 Hooker Creek, Inc. $43.00 $17,200.00 Maloney Construction $185.00 $74,000.00 T. L. Peterson, Inc. $100.00 $40,000.00 Engineer's Estimate 400 SQYD $17.00 $6,800.00
13 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0210 60201-1000 36-INCH PIPE CULVERT
West Coast Contractors, Inc. $200.00 $80,000.00 TSI Engineering $300.00 $120,000.00 McCullough Construction Inc. $135.00 $54,000.00 Hooker Creek, Inc. $420.00 $168,000.00 Maloney Construction $335.00 $134,000.00 T. L. Peterson, Inc. $520.00 $208,000.00 Engineer's Estimate 400 LNFT $250.00 $100,000.00
X0230 60201-1100 42-INCH PIPE CULVERT
West Coast Contractors, Inc. $250.00 $12,500.00 TSI Engineering $335.00 $16,750.00 McCullough Construction Inc. $145.00 $7,250.00 Hooker Creek, Inc. $730.00 $36,500.00 Maloney Construction $510.00 $25,500.00 T. L. Peterson, Inc. $475.00 $23,750.00 Engineer's Estimate 50 LNFT $300.00 $15,000.00
X0250 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
West Coast Contractors, Inc. $1,000.00 $2,000.00 TSI Engineering $350.00 $700.00 McCullough Construction Inc. $250.00 $500.00 Hooker Creek, Inc. $510.00 $1,020.00 Maloney Construction $1,200.00 $2,400.00 T. L. Peterson, Inc. $398.00 $796.00 Engineer's Estimate 2 EACH $800.00 $1,600.00
X0270 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
West Coast Contractors, Inc. $725.00 $11,600.00 TSI Engineering $750.00 $12,000.00 McCullough Construction Inc. $600.00 $9,600.00 Hooker Creek, Inc. $655.00 $10,480.00 Maloney Construction $1,300.00 $20,800.00 T. L. Peterson, Inc. $701.00 $11,216.00 Engineer's Estimate 16 EACH $1,225.00 $19,600.00
X0290 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT
West Coast Contractors, Inc. $2,000.00 $4,000.00 TSI Engineering $850.00 $1,700.00 McCullough Construction Inc. $1,000.00 $2,000.00 Hooker Creek, Inc. $1,400.00 $2,800.00 Maloney Construction $1,600.00 $3,200.00 T. L. Peterson, Inc. $1,500.00 $3,000.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00
14 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0310 60212-1000 ELBOW, 36-INCH
West Coast Contractors, Inc. $650.00 $3,900.00 TSI Engineering $1,200.00 $7,200.00 McCullough Construction Inc. $1,500.00 $9,000.00 Hooker Creek, Inc. $370.00 $2,220.00 Maloney Construction $1,800.00 $10,800.00 T. L. Peterson, Inc. $410.00 $2,460.00 Engineer's Estimate 6 EACH $1,800.00 $10,800.00
X0330 60230-0000 DEBRIS RACK
West Coast Contractors, Inc. $2,500.00 $20,000.00 TSI Engineering $600.00 $4,800.00 McCullough Construction Inc. $1,000.00 $8,000.00 Hooker Creek, Inc. $940.00 $7,520.00 Maloney Construction $1,700.00 $13,600.00 T. L. Peterson, Inc. $1,300.00 $10,400.00 Engineer's Estimate 8 EACH $4,000.00 $32,000.00
X0350 60602-0900 PIPE ANCHOR ASSEMBLY, 36-INCH
West Coast Contractors, Inc. $250.00 $1,000.00 TSI Engineering $1,195.00 $4,780.00 McCullough Construction Inc. $1,500.00 $6,000.00 Hooker Creek, Inc. $760.00 $3,040.00 Maloney Construction $835.00 $3,340.00 T. L. Peterson, Inc. $1,200.00 $4,800.00 Engineer's Estimate 4 EACH $1,200.00 $4,800.00
X0370 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
West Coast Contractors, Inc. $140.00 $2,800.00 TSI Engineering $180.00 $3,600.00 McCullough Construction Inc. $157.00 $3,140.00 Hooker Creek, Inc. $148.00 $2,960.00 Maloney Construction $175.00 $3,500.00 T. L. Peterson, Inc. $229.00 $4,580.00 Engineer's Estimate 20 HOUR $170.00 $3,400.00
X0390 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY
West Coast Contractors, Inc. $100.00 $2,000.00 TSI Engineering $190.00 $3,800.00 McCullough Construction Inc. $185.00 $3,700.00 Hooker Creek, Inc. $190.00 $3,800.00 Maloney Construction $170.00 $3,400.00 T. L. Peterson, Inc. $216.00 $4,320.00 Engineer's Estimate 20 HOUR $190.00 $3,800.00
15 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0410 62201-2750 MOTOR GRADER
West Coast Contractors, Inc. $125.00 $2,500.00 TSI Engineering $240.00 $4,800.00 McCullough Construction Inc. $197.00 $3,940.00 Hooker Creek, Inc. $200.00 $4,000.00 Maloney Construction $200.00 $4,000.00 T. L. Peterson, Inc. $349.00 $6,980.00 Engineer's Estimate 20 HOUR $220.00 $4,400.00
X0430 62201-3000 HYDRAULIC EXCAVATOR
West Coast Contractors, Inc. $125.00 $2,500.00 TSI Engineering $225.00 $4,500.00 McCullough Construction Inc. $197.00 $3,940.00 Hooker Creek, Inc. $213.00 $4,260.00 Maloney Construction $225.00 $4,500.00 T. L. Peterson, Inc. $206.00 $4,120.00 Engineer's Estimate 20 HOUR $300.00 $6,000.00
X0450 62301-0000 GENERAL LABOR
West Coast Contractors, Inc. $100.00 $4,000.00 TSI Engineering $105.00 $4,200.00 McCullough Construction Inc. $86.00 $3,440.00 Hooker Creek, Inc. $79.00 $3,160.00 Maloney Construction $125.00 $5,000.00 T. L. Peterson, Inc. $71.00 $2,840.00 Engineer's Estimate 40 HOUR $90.00 $3,600.00
X0470 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
West Coast Contractors, Inc. $100.00 $4,000.00 TSI Engineering $130.00 $5,200.00 McCullough Construction Inc. $137.00 $5,480.00 Hooker Creek, Inc. $175.00 $7,000.00 Maloney Construction $150.00 $6,000.00 T. L. Peterson, Inc. $225.00 $9,000.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
X0490 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
West Coast Contractors, Inc. $100.00 $4,000.00 TSI Engineering $110.00 $4,400.00 McCullough Construction Inc. $137.00 $5,480.00 Hooker Creek, Inc. $150.00 $6,000.00 Maloney Construction $200.00 $8,000.00 T. L. Peterson, Inc. $343.00 $13,720.00 Engineer's Estimate 40 HOUR $250.00 $10,000.00
16 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0510 62511-2000 SEEDING, HYDRAULIC METHOD
West Coast Contractors, Inc. $4.00 $10,000.00 TSI Engineering $4.50 $11,250.00 McCullough Construction Inc. $5.50 $13,750.00 Hooker Creek, Inc. $2.20 $5,500.00 Maloney Construction $5.00 $12,500.00 T. L. Peterson, Inc. $2.50 $6,250.00 Engineer's Estimate 2,500 SQYD $3.00 $7,500.00
X0530 62516-2000 MULCHING, HYDRAULIC METHOD
West Coast Contractors, Inc. $1.50 $3,750.00 TSI Engineering $4.50 $11,250.00 McCullough Construction Inc. $4.00 $10,000.00 Hooker Creek, Inc. $2.20 $5,500.00 Maloney Construction $5.00 $12,500.00 T. L. Peterson, Inc. $1.50 $3,750.00 Engineer's Estimate 2,500 SQYD $3.50 $8,750.00
X0550 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
West Coast Contractors, Inc. $75.00 $600.00 TSI Engineering $200.00 $1,600.00 McCullough Construction Inc. $200.00 $1,600.00 Hooker Creek, Inc. $430.00 $3,440.00 Maloney Construction $250.00 $2,000.00 T. L. Peterson, Inc. $175.00 $1,400.00 Engineer's Estimate 8 EACH $400.00 $3,200.00
X0570 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
West Coast Contractors, Inc. $350.00 $6,300.00 TSI Engineering $150.00 $2,700.00 McCullough Construction Inc. $300.00 $5,400.00 Hooker Creek, Inc. $490.00 $8,820.00 Maloney Construction $500.00 $9,000.00 T. L. Peterson, Inc. $287.00 $5,166.00 Engineer's Estimate 18 EACH $250.00 $4,500.00
Total Schedule - All Items
West Coast Contractors, Inc. $328,525.00 TSI Engineering $391,405.00 McCullough Construction Inc. $392,400.00 Hooker Creek, Inc. $460,635.00 Maloney Construction $625,815.00 T. L. Peterson, Inc. $708,133.00 Engineer's Estimate $397,475.00
17 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: Y
Schedule Type: Options
Solcitation No: 6982AF20B000006
Division: Central Federal Lands
State: CA County: Siskiyou
Federal Land: Klamath National Forest Opened at: Lakewood
Opened by: Jorey Deml
Date: 07/14/20
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
West Coast Contractors, Inc. $396,714.50 61050 Highway 101 Coos Bay, OR 97420
TSI Engineering $398,416.00 4600 Rosevill Road North Highlands, CA 95660
McCullough Construction Inc. $441,821.50 57 Alder Grove Road Arcata, CA, CA 95521
Maloney Construction $451,310.00 7120 Redwood Blvd. Suite A Novato, CA 94945
Hooker Creek, Inc. $550,800.50 1015 Anderson St.
Red Bluff, CA 96080
T. L. Peterson, Inc. $572,000.00
Engineer's Estimate $455,903.50
18 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0010 15101-0000 MOBILIZATION
West Coast Contractors, Inc. Lump Sum $52,000.00 TSI Engineering Lump Sum $35,000.00 McCullough Construction Inc. Lump Sum $50,000.00 Maloney Construction Lump Sum $35,000.00 Hooker Creek, Inc. Lump Sum $53,000.00 T. L. Peterson, Inc. Lump Sum $55,669.50 Engineer's Estimate ALL LPSM Lump Sum $42,000.00
Y0030 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
West Coast Contractors, Inc. $2,000.00 $6,000.00 TSI Engineering $2,000.00 $6,000.00 McCullough Construction Inc. $1,130.00 $3,390.00 Maloney Construction $3,500.00 $10,500.00 Hooker Creek, Inc. $1,250.00 $3,750.00 T. L. Peterson, Inc. $1,850.00 $5,550.00 Engineer's Estimate 3 EACH $900.00 $2,700.00
Y0050 15301-0000 CONTRACTOR QUALITY CONTROL
West Coast Contractors, Inc. Lump Sum $28,000.00 TSI Engineering Lump Sum $14,500.00 McCullough Construction Inc. Lump Sum $50,000.00 Maloney Construction Lump Sum $25,000.00 Hooker Creek, Inc. Lump Sum $18,250.00 T. L. Peterson, Inc. Lump Sum $15,500.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
Y0070 15401-0000 CONTRACTOR TESTING
West Coast Contractors, Inc. Lump Sum $15,000.00 TSI Engineering Lump Sum $2,100.00 McCullough Construction Inc. Lump Sum $40,000.00 Maloney Construction Lump Sum $15,000.00 Hooker Creek, Inc. Lump Sum $25,500.00 T. L. Peterson, Inc. Lump Sum $5,200.00 Engineer's Estimate ALL LPSM Lump Sum $7,500.00
Y0090 15501-0000 CONSTRUCTION SCHEDULE
West Coast Contractors, Inc. Lump Sum $2,500.00 TSI Engineering Lump Sum $1,500.00 McCullough Construction Inc. Lump Sum $5,000.00 Maloney Construction Lump Sum $1,000.00 Hooker Creek, Inc. Lump Sum $1,000.00 T. L. Peterson, Inc. Lump Sum $2,600.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00
19 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0110 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
West Coast Contractors, Inc. $15.00 $7,500.00 TSI Engineering $8.00 $4,000.00 McCullough Construction Inc. $8.00 $4,000.00 Maloney Construction $12.00 $6,000.00 Hooker Creek, Inc. $5.40 $2,700.00 T. L. Peterson, Inc. $8.00 $4,000.00 Engineer's Estimate 500 LNFT $5.00 $2,500.00
Y0130 20301-1900 REMOVAL OF PIPE CULVERT
West Coast Contractors, Inc. $600.00 $1,800.00 TSI Engineering $3,800.00 $11,400.00 McCullough Construction Inc. $2,500.00 $7,500.00 Maloney Construction $6,000.00 $18,000.00 Hooker Creek, Inc. $1,770.00 $5,310.00 T. L. Peterson, Inc. $14,150.00 $42,450.00 Engineer's Estimate 3 EACH $1,000.00 $3,000.00
Y0150 25101-0600 PLACED RIPRAP, METHOD A, CLASS 6
West Coast Contractors, Inc. $165.00 $41,910.00 TSI Engineering $260.00 $66,040.00 McCullough Construction Inc. $164.00 $41,656.00 Maloney Construction $330.00 $83,820.00 Hooker Creek, Inc. $205.00 $52,070.00 T. L. Peterson, Inc. $380.00 $96,520.00 Engineer's Estimate 254 CUYD $350.00 $88,900.00
Y0170 30203-2140 ROADWAY AGGREGATE, METHOD 2, SURFACE COURSE, 6-INCH DEPTH
West Coast Contractors, Inc. $35.00 $8,225.00 TSI Engineering $54.00 $12,690.00 McCullough Construction Inc. $40.00 $9,400.00 Maloney Construction $70.00 $16,450.00 Hooker Creek, Inc. $28.00 $6,580.00 T. L. Peterson, Inc. $60.00 $14,100.00 Engineer's Estimate 235 SQYD $17.00 $3,995.00
Y0190 60201-1200 48-INCH PIPE CULVERT
West Coast Contractors, Inc. $275.00 $90,750.00 TSI Engineering $340.00 $112,200.00 McCullough Construction Inc. $185.00 $61,050.00 Maloney Construction $230.00 $75,900.00 Hooker Creek, Inc. $495.00 $163,350.00 T. L. Peterson, Inc. $454.00 $149,820.00 Engineer's Estimate 330 LNFT $400.00 $132,000.00
20 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0210 60202-1500 90-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT (103 X 71 ARCH PIPE CULVERT)
West Coast Contractors, Inc. $365.00 $16,790.00 TSI Engineering $1,100.00 $50,600.00 McCullough Construction Inc. $525.00 $24,150.00 Maloney Construction $765.00 $35,190.00 Hooker Creek, Inc. $1,155.00 $53,130.00 T. L. Peterson, Inc. $875.00 $40,250.00 Engineer's Estimate 46 LNFT $1,030.00 $47,380.00
Y0230 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT
West Coast Contractors, Inc. $1,500.00 $9,000.00 TSI Engineering $400.00 $2,400.00 McCullough Construction Inc. $1,500.00 $9,000.00 Maloney Construction $2,000.00 $12,000.00 Hooker Creek, Inc. $1,500.00 $9,000.00 T. L. Peterson, Inc. $1,580.00 $9,480.00 Engineer's Estimate 6 EACH $2,200.00 $13,200.00
Y0250 60212-1200 ELBOW, 48-INCH
West Coast Contractors, Inc. $700.00 $2,100.00 TSI Engineering $350.00 $1,050.00 McCullough Construction Inc. $1,100.00 $3,300.00 Maloney Construction $2,000.00 $6,000.00 Hooker Creek, Inc. $500.00 $1,500.00 T. L. Peterson, Inc. $1,255.00 $3,765.00 Engineer's Estimate 3 EACH $2,400.00 $7,200.00
Y0270 60230-0000 DEBRIS RACK (SPECIAL 96-INCH)
West Coast Contractors, Inc. $3,500.00 $3,500.00 TSI Engineering $3,600.00 $3,600.00 McCullough Construction Inc. $10,000.00 $10,000.00 Maloney Construction $7,000.00 $7,000.00 Hooker Creek, Inc. $47,750.00 $47,750.00 T. L. Peterson, Inc. $8,500.00 $8,500.00 Engineer's Estimate 1 EACH $15,000.00 $15,000.00
Y0290 60233-1500 METAL HEADWALL FOR 90-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
West Coast Contractors, Inc. $32,000.00 $64,000.00 TSI Engineering $15,400.00 $30,800.00 McCullough Construction Inc. $40,000.00 $80,000.00 Maloney Construction $28,000.00 $56,000.00 Hooker Creek, Inc. $34,000.00 $68,000.00 T. L. Peterson, Inc. $38,000.00 $76,000.00 Engineer's Estimate 2 EACH $13,000.00 $26,000.00
21 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0310 60602-1100 PIPE ANCHOR ASSEMBLY, 48-INCH
West Coast Contractors, Inc. $2,800.00 $8,400.00 TSI Engineering $1,395.00 $4,185.00 McCullough Construction Inc. $1,500.00 $4,500.00 Maloney Construction $1,100.00 $3,300.00 Hooker Creek, Inc. $1,050.00 $3,150.00 T. L. Peterson, Inc. $2,060.00 $6,180.00 Engineer's Estimate 3 EACH $2,500.00 $7,500.00
Y0330 60706-0000 CLEANING DRAINAGE STRUCTURE
West Coast Contractors, Inc. $5,600.00 $11,200.00 TSI Engineering $3,500.00 $7,000.00 McCullough Construction Inc. $2,500.00 $5,000.00 Maloney Construction $780.00 $1,560.00 Hooker Creek, Inc. $1,400.00 $2,800.00 T. L. Peterson, Inc. $1,750.00 $3,500.00 Engineer's Estimate 2 EACH $1,750.00 $3,500.00
Y0350 62201-0050 DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY
West Coast Contractors, Inc. $140.00 $1,400.00 TSI Engineering $200.00 $2,000.00 McCullough Construction Inc. $157.00 $1,570.00 Maloney Construction $175.00 $1,750.00 Hooker Creek, Inc. $148.00 $1,480.00 T. L. Peterson, Inc. $269.00 $2,690.00 Engineer's Estimate 10 HOUR $170.00 $1,700.00
Y0370 62201-0750 WHEEL LOADER, 0.4 CUBIC YARD MINIMUM RATED CAPACITY
West Coast Contractors, Inc. $100.00 $1,000.00 TSI Engineering $210.00 $2,100.00 McCullough Construction Inc. $185.00 $1,850.00 Maloney Construction $170.00 $1,700.00 Hooker Creek, Inc. $190.00 $1,900.00 T. L. Peterson, Inc. $186.00 $1,860.00 Engineer's Estimate 10 HOUR $190.00 $1,900.00
Y0390 62201-2750 MOTOR GRADER
West Coast Contractors, Inc. $125.00 $1,250.00 TSI Engineering $240.00 $2,400.00 McCullough Construction Inc. $197.00 $1,970.00 Maloney Construction $200.00 $2,000.00 Hooker Creek, Inc. $200.00 $2,000.00 T. L. Peterson, Inc. $389.00 $3,890.00 Engineer's Estimate 10 HOUR $220.00 $2,200.00
22 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0410 62201-3000 HYDRAULIC EXCAVATOR
West Coast Contractors, Inc. $125.00 $1,250.00 TSI Engineering $250.00 $2,500.00 McCullough Construction Inc. $197.00 $1,970.00 Maloney Construction $225.00 $2,250.00 Hooker Creek, Inc. $213.00 $2,130.00 T. L. Peterson, Inc. $206.00 $2,060.00 Engineer's Estimate 10 HOUR $300.00 $3,000.00
Y0430 62301-0000 GENERAL LABOR
West Coast Contractors, Inc. $100.00 $4,000.00 TSI Engineering $105.00 $4,200.00 McCullough Construction Inc. $86.00 $3,440.00 Maloney Construction $125.00 $5,000.00 Hooker Creek, Inc. $79.00 $3,160.00 T. L. Peterson, Inc. $71.00 $2,840.00 Engineer's Estimate 40 HOUR $90.00 $3,600.00
Y0450 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
West Coast Contractors, Inc. $100.00 $2,000.00 TSI Engineering $130.00 $2,600.00 McCullough Construction Inc. $137.00 $2,740.00 Maloney Construction $150.00 $3,000.00 Hooker Creek, Inc. $175.00 $3,500.00 T. L. Peterson, Inc. $225.00 $4,500.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00
Y0470 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
West Coast Contractors, Inc. $100.00 $2,000.00 TSI Engineering $110.00 $2,200.00 McCullough Construction Inc. $137.00 $2,740.00 Maloney Construction $200.00 $4,000.00 Hooker Creek, Inc. $150.00 $3,000.00 T. L. Peterson, Inc. $225.00 $4,500.00 Engineer's Estimate 20 HOUR $250.00 $5,000.00
Y0490 62511-2000 SEEDING, HYDRAULIC METHOD
West Coast Contractors, Inc. $4.00 $5,556.00 TSI Engineering $4.50 $6,250.50 McCullough Construction Inc. $5.50 $7,639.50 Maloney Construction $5.00 $6,945.00 Hooker Creek, Inc. $2.25 $3,125.25 T. L. Peterson, Inc. $2.00 $2,778.00 Engineer's Estimate 1,389 SQYD $3.00 $4,167.00
23 out of 23
Project No: CA FS 1038(1)
Project Name: Salt Gulch Bridge
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0510 62516-2000 MULCHING, HYDRAULIC METHOD
West Coast Contractors, Inc. $1.50 $2,083.50 TSI Engineering $4.50 $6,250.50 McCullough Construction Inc. $4.00 $5,556.00 Maloney Construction $5.00 $6,945.00 Hooker Creek, Inc. $2.25 $3,125.25 T. L. Peterson, Inc. $1.50 $2,083.50 Engineer's Estimate 1,389 SQYD $3.50 $4,861.50
Y0530 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
West Coast Contractors, Inc. $75.00 $300.00 TSI Engineering $150.00 $600.00 McCullough Construction Inc. $200.00 $800.00 Maloney Construction $250.00 $1,000.00 Hooker Creek, Inc. $430.00 $1,720.00 T. L. Peterson, Inc. $110.00 $440.00 Engineer's Estimate 4 EACH $400.00 $1,600.00
Y0550 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
West Coast Contractors, Inc. $400.00 $7,200.00 TSI Engineering $125.00 $2,250.00 McCullough Construction Inc. $200.00 $3,600.00 Maloney Construction $500.00 $9,000.00 Hooker Creek, Inc. $490.00 $8,820.00 T. L. Peterson, Inc. $293.00 $5,274.00 Engineer's Estimate 18 EACH $250.00 $4,500.00
Total Schedule - All Items
West Coast Contractors, Inc. $396,714.50 TSI Engineering $398,416.00 McCullough Construction Inc. $441,821.50 Maloney Construction $451,310.00 Hooker Creek, Inc. $550,800.50 T. L. Peterson, Inc. $572,000.00 Engineer's Estimate $455,903.50
| 2020-07-20T08:34:38-0600 | |
| JOREY M DEML |
File details come from the government source that posted it. Updated .