Signed Plan Cover sheet .pdf

PDF 945 KB Posted

Attached to
CA FS 1038(1), Salt Gulch Bridge Federal contract opportunity
Solicitation number
6982AF20B000006
Issued by
Department of Transportation Federal Highway Administration

About this file

This document outlines a federal contract opportunity for bridge repair and culvert replacement work on California Forest Service Route 1038 in Siskiyou County, California. The project scope includes drilled shaft construction, temporary bridge support structure, approximately 80 cubic yards of structural concrete, and replacement of around 1,000 linear feet of corrugated metal pipe culverts ranging in size from 36 to 96 inches. The engineer's estimate for the total project cost is between $1 million and $2 million. Interested contractors are invited to bid on the work with anticipated award in mid-to-late July 2020. Construction should be completed between August and late October/early November 2020. The solicitation was issued by the United States Department of Transportation Federal Highway Administration.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CA FS 1038( 1)

SALT GULCH BRIDGE

PROJECT LOCATION

KEY MAP OF CALIFORNIA

TYPE OF CONSTRUCTION:

Bridge repair and culvert replacement

DESIGN DESIGNATIONS:

ADT (2019) ----------- <400

ADT (2039) ----------- <400

D HV ------------------ SO

D -------------------- 50% V -------------------- 25 mph

U.S. CUSTOMARY DIMENSIONS:

Slopes are expressed as RISE:RUN

SPECIFICATIONS:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

PLANS FOR PROPOSED

CA FS 1038(1)

SALT GULCH BRIDGE

KLAMATH NATIONAL FOREST

SISKIYOU COUNTY

LENGTH 0.1 miles

SCHEDULE A - SALT GULCH BRIDGE OVER HORSE CREEK REPAIR

OPTION X - 9 CULVERT REPLACEMENT SITES, ROUTE 46NS0

OPTION Y - 3 CULVERT REPLACEMENT SITES,

ROUTES 46NS0, 47N70 AND 47N72

CA FS 1038(1)

CULVERT REPAIR

OPTIONX

OPTION Y

Klamath National Forest

SHEET

Al

A2-A3

A4

A5

A6-A7

A8

Bl

B2

B3

B4

BS-B6

Cl

Dl-D9

Dl0-D12

El

Gl

51-516

Tl-TS

T9

T10-T13

STATE

CA

PROJECT

CA FS 1038(1)

SALT GULCH BRIDGE

INDEX TO SHEETS

DESCRIPTION

TITLE SHEET

CONVENTIONAL PLAN SYMBOLS & ABBREVIATIONS

VICINITY MAP

SITE MAP

SURVEY CONTROL

TYPJCAL SECTIONS

SUMMARY OF QUANTITIES - SCHEDULE A

SUMMARY OF QUANTITIES - OPTION X

SUMMARY OF QUANTITIES - OPTION Y

DRAJNAGE SUMMARY

MISCELLANEOUS SUMMARIES

SCHEDULE A - SALT GULCH BRIDGE PLAN

OPTION X - CULVERT PLAN & PROFILE SHEETS

OPTION Y - CULVERT PLAN & PROFILE SHEETS

EROSION CONTROL - FIBER ROLL DETAIL

PLACED RIPRAP AT CULVERT OUTLETS DETAIL

RG3163 SALT GULCH BRIDGE DRAWINGS

DRAJNAGE DETAILS

PERMANENT SIGNING - OBJECT MARKERS

SIGNING AND TRAFFIC CONTROL STANDARDS

CA FS 1038(1)

"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS

AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"

SALT GULCH BRIDGE

SCHEDULE A

PROJECT MANAGER

� HENWOOD

LEAD DESIGNER

LOCKHART

19 miles Happy Camp

Know what's below.

Call before you dig.

www.call811.com

No Scale

30 miles Williams Creek 1-5 interchange

APPROVED:

PLANS PREPARED BY

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

DENVER, COLORADO

________________ DATE:

CHIEF OF ENGINEERING

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

SHEET

NO.

Al

05/20/2020

2020-05-20T14:45:06-0600
CURTIS R SCOTT

File details come from the government source that posted it. Updated .