Blri 2024 rehab bluff's septic
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140P5324R0006
- Agency
-
Southeast Region
National Park Service, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238990 All Other Specialty Trade Contractors
- Place of performance
- 45338 Blue Ridge Pkwy Laurel Springs, North Carolina, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks firm fixed price construction services to repair and improve an existing 33 foot by 10.5 foot concrete block septic tank and lift station located at the Doughton Park Visitor Center and Bluffs Restaurant along the Blue Ridge Parkway near milepost 239 in Laurel Springs, North Carolina. The National Park Service Southeast Region is seeking a contractor to rehabilitate the septic tank, which holds approximately 28,000 gallons of liquid effluent. Key dates include an optional site visit on January 16, 2024, questions due by January 26, 2024, and quotes due by February 5, 2024. The period of performance is from February 12, 2024 to April 26, 2025.
This requirement has a 100% small business set-aside designation with NAICS code 238990 for specialty trade contractors and a size standard of $19 million. The estimated value is between $100,000 and $250,000. Offerors must register in the System for Award Management and meet all mandatory registration requirements. The place of performance is 45338 Blue Rdg Pkwy, Laurel Springs, NC 28644.
Notice text
3 versions
Update #3 · Latest ·
Amendment 2 is issued to post site visit attendance and Q&A. Due date for proposals remains Feb 5, 2024, at 5pm EST.
Amendment 1 is issued to re-schedule site visit due to weather. Site visit scheduled for January 23, 2024 - Tuesday - 1pm.
Meet south of the work site at the local Parkway Maintenance Yard (49800 Blue Ridge Parkway, Laurel Springs, NC 28644 at 1 pm and drive together as a group using backroads to the work site which is a 10 minute drive). Due date for proposals remain February 5, 2024.
The National Park Service (NPS), Blue Ridge Parkway, is issuing combined sol/synopsis for the constructing repairs and improvements to the existing concrete block septic tank / lift station located at the Doughton Park Visitor Center / Bluffs Restaurant septic tank/lift station located along the Blue Ridge Parkway near mile post 239 (45338 Blue Ridge Pkwy, Laurel Springs, NC 28644). The tank is approximately 33 ft. by 10.5 ft. in plan view and 10 ft. deep. It holds approximately 28,000 gallons of liquid effluent.
TYPE OF CONTRACT: Firm Fixed Price
100% small business set-aside procurement.
The NAICS code is 238990 All other Specialty Trade Contractors and the size standard is $19 million.
In accordance with FAR Subpart 36.204, the magnitude of this requirement is estimated to be between $100,000 and $250,000
Period of Performance 2/12/2024 to 4/26/2025
SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Interested Offerors are encouraged to ensure that they are registered in SAM prior to submitting their quote. THESE REGISTRATIONS WILL BE COMPLETED BEFORE TIME OF AWARD.
Site Visit: Site visit scheduled for January 23, 2024 - Tuesday - 1pm. Meet south of the work site at the local Parkway Maintenance Yard (49800 Blue Ridge Parkway, Laurel Springs, NC 28644 at 1 pm and drive together as a group using backroads to the work site which is a 10 minute drive). Please send email to Ashley_Warcewicz@nps.gov to confirm attendance.
Vendor Questions cut-off date: January 26, 2024, 5:00 EST send via-email to Ashley_Warcewicz@nps.gov
Request for Quotes closes February 5, 2024, 2023, 5:00PM EST send via-email all quotes to Ashley_Warcewicz@nps.gov
The contracting office will not provide hardcopies or email copies of solicitation.
No Phone calls, please.
Update #2 ·
Amendment 1 is issued to re-schedule site visit due to weather. Site visit scheduled for January 23, 2024 - Tuesday - 1pm.
Meet south of the work site at the local Parkway Maintenance Yard (49800 Blue Ridge Parkway, Laurel Springs, NC 28644 at 1 pm and drive together as a group using backroads to the work site which is a 10 minute drive). Due date for proposals remain February 5, 2024.
The National Park Service (NPS), Blue Ridge Parkway, is issuing combined sol/synopsis for the constructing repairs and improvements to the existing concrete block septic tank / lift station located at the Doughton Park Visitor Center / Bluffs Restaurant septic tank/lift station located along the Blue Ridge Parkway near mile post 239 (45338 Blue Ridge Pkwy, Laurel Springs, NC 28644). The tank is approximately 33 ft. by 10.5 ft. in plan view and 10 ft. deep. It holds approximately 28,000 gallons of liquid effluent.
TYPE OF CONTRACT: Firm Fixed Price
100% small business set-aside procurement.
The NAICS code is 238990 All other Specialty Trade Contractors and the size standard is $19 million.
In accordance with FAR Subpart 36.204, the magnitude of this requirement is estimated to be between $100,000 and $250,000
Period of Performance 2/12/2024 to 4/26/2025
SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Interested Offerors are encouraged to ensure that they are registered in SAM prior to submitting their quote. THESE REGISTRATIONS WILL BE COMPLETED BEFORE TIME OF AWARD.
Site Visit: Site visit scheduled for January 23, 2024 - Tuesday - 1pm. Meet south of the work site at the local Parkway Maintenance Yard (49800 Blue Ridge Parkway, Laurel Springs, NC 28644 at 1 pm and drive together as a group using backroads to the work site which is a 10 minute drive). Please send email to Ashley_Warcewicz@nps.gov to confirm attendance.
Vendor Questions cut-off date: January 26, 2024, 5:00 EST send via-email to Ashley_Warcewicz@nps.gov
Request for Quotes closes February 5, 2024, 2023, 5:00PM EST send via-email all quotes to Ashley_Warcewicz@nps.gov
The contracting office will not provide hardcopies or email copies of solicitation.
No Phone calls, please.
Update #1 ·
The National Park Service (NPS), Blue Ridge Parkway, is issuing combined sol/synopsis for the constructing repairs and improvements to the existing concrete block septic tank / lift station located at the Doughton Park Visitor Center / Bluffs Restaurant septic tank/lift station located along the Blue Ridge Parkway near mile post 239 (45338 Blue Ridge Pkwy, Laurel Springs, NC 28644). The tank is approximately 33 ft. by 10.5 ft. in plan view and 10 ft. deep. It holds approximately 28,000 gallons of liquid effluent.
TYPE OF CONTRACT: Firm Fixed Price
100% small business set-aside procurement.
The NAICS code is 238990 All other Specialty Trade Contractors and the size standard is $19 million.
In accordance with FAR Subpart 36.204, the magnitude of this requirement is estimated to be between $100,000 and $250,000
Period of Performance 2/12/2024 to 4/26/2025
SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Interested Offerors are encouraged to ensure that they are registered in SAM prior to submitting their quote. THESE REGISTRATIONS WILL BE COMPLETED BEFORE TIME OF AWARD.
Site Visit: Site visit scheduled for Tuesday, January 16, 2024 at 1:00PM EST, at Doughton Park Visitor Center and Bluffs Restaurant¿s, 45338 Blue Ridge Pkwy, Laurel Springs, NC 28644. Please send email to Ashley_Warcewicz@nps.gov to confirm attendance.
Vendor Questions cut-off date: January 26, 2024, 5:00 EST send via-email to Ashley_Warcewicz@nps.gov
Request for Quotes closes February 5, 2024, 2023, 5:00PM EST send via-email all quotes to Ashley_Warcewicz@nps.gov
The contracting office will not provide hardcopies or email copies of solicitation.
No Phone calls, please.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Blue Ridge Parkway 2024 REHAB BLUFF'S SEPTIC, NC | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Jennifer Brown (COW) | Indian Health Service | Total Small Business | |
| Oconaluftee Waterline Replacement | Forest Service | Total Small Business | |
| Septic Toilet Pumping for Chippewa National Forest | Forest Service | Total Small Business | |
| YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity