B262 Repair Corrosion Control Fire Suppression System
Closed Solicitation Posted
- Solicitation number
- FA302223R0007
- Agency
-
Air Education and Training Command
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Columbus, Mississippi 39710, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to repair the corrosion control and fire suppression systems at Building B262 on Columbus Air Force Base in Mississippi. The Department of the Air Force Air Education and Training Command is procuring demolition and installation of new sprinkler piping, heads, and valves. The contractor must follow all specifications, drawings, codes and references to complete the work within 120 days of the notice to proceed. Questions are due by July 17th and proposals are due July 31st. The work will be evaluated on technical approach, past performance and price.
The requirement has been set aside for total small business and the NAICS code is 238210. The place of performance is Columbus, MS. No incumbent or budget is listed. The 6,863 square foot system supports an office area and must be transferred upon completion. Responses were provided to clarify design requirements, permitting needs, and protection of components during the work.
Notice text
4 versions
Update #4 · Latest ·
Amendment 3: The purpose of this amendment FA302223R000700002 is to change the period of perfomance from mandatory to negotiable. All other terms and conditions remain unchanged.
Amendment 2: The purpose of this amendment is to change the period of perfomance on SF 1442 solicitation number FA302223R0007 to 120 days. Additionally as-builts have been added to the drawings file available by request and will be droppped of via DoDSAFE. The proposal due date has been changed to COB CST Monday 31 July 2023.
Amendment 1: The answers to RFIs submitted through 18 July 2023 have been posted in the attachments. The Solicitation has been changed to reflect an extention to the Proposal Due Date by 4 calendar days from 20 July 2023 to 24 July 2023. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email.
The subject requirement is to Repair Corrosion Control Fire Suppression System at B262. The Contractor shall provide all plant, labor, equipment, transportation, and tools required to demolish and install new fire suppression systems, sprinkler heads, and piping. In addition, the Contractor shall perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
IAW Air Force Controlled Unclassified Information regulations all pertinent drawings are by request only, and will be sent Via DoD SAFE.
The Government is offering a site visit opportunity on 13 July 2023 at 11:00 AM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 4:30 PM CST on Tuesday, 11 July 2023. If you do not contact the POC by 4:30 PM CST on 11 July 2023, you will not be able to attend the site visit. All RFIs must be submitted NLT 11:59 PM CST on 17 July 2023.
Update #3 ·
Amendment 2: The purpose of this amendment is to change the period of perfomance on SF 1442 solicitation number FA302223R0007 to 120 days. Additionally as-builts have been added to the drawings file available by request and will be droppped of via DoDSAFE. The proposal due date has been changed to COB CST Monday 31 July 2023.
Amendment 1: The answers to RFIs submitted through 18 July 2023 have been posted in the attachments. The Solicitation has been changed to reflect an extention to the Proposal Due Date by 4 calendar days from 20 July 2023 to 24 July 2023. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email.
The subject requirement is to Repair Corrosion Control Fire Suppression System at B262. The Contractor shall provide all plant, labor, equipment, transportation, and tools required to demolish and install new fire suppression systems, sprinkler heads, and piping. In addition, the Contractor shall perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
IAW Air Force Controlled Unclassified Information regulations all pertinent drawings are by request only, and will be sent Via DoD SAFE.
The Government is offering a site visit opportunity on 13 July 2023 at 11:00 AM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 4:30 PM CST on Tuesday, 11 July 2023. If you do not contact the POC by 4:30 PM CST on 11 July 2023, you will not be able to attend the site visit. All RFIs must be submitted NLT 11:59 PM CST on 17 July 2023.
Update #2 ·
Amendment 1: The answers to RFIs submitted through 18 July 2023 have been posted in the attachments. The Solicitation has been changed to reflect an extention to the Proposal Due Date by 4 calendar days from 20 July 2023 to 24 July 2023. There have been no other changes to this requirement. If you have any questions about this change, please contact the POC via email.
The subject requirement is to Repair Corrosion Control Fire Suppression System at B262. The Contractor shall provide all plant, labor, equipment, transportation, and tools required to demolish and install new fire suppression systems, sprinkler heads, and piping. In addition, the Contractor shall perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
IAW Air Force Controlled Unclassified Information regulations all pertinent drawings are by request only, and will be sent Via DoD SAFE.
The Government is offering a site visit opportunity on 13 July 2023 at 11:00 AM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 4:30 PM CST on Tuesday, 11 July 2023. If you do not contact the POC by 4:30 PM CST on 11 July 2023, you will not be able to attend the site visit. All RFIs must be submitted NLT 11:59 PM CST on 17 July 2023.
Update #1 ·
The subject requirement is to Repair Corrosion Control Fire Suppression System at B262. The Contractor shall provide all plant, labor, equipment, transportation, and tools required to demolish and install new fire suppression systems, sprinkler heads, and piping. In addition, the Contractor shall perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
IAW Air Force Controlled Unclassified Information regulations all pertinent drawings are by request only, and will be sent Via DoD SAFE.
The Government is offering a site visit opportunity on 13 July 2023 at 11:00 AM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 4:30 PM CST on Tuesday, 11 July 2023. If you do not contact the POC by 4:30 PM CST on 11 July 2023, you will not be able to attend the site visit. All RFIs must be submitted NLT 11:59 PM CST on 17 July 2023.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 | Air Force Sustainment Center | Total Small Business | |
| Fire Alarm/Suppression Inspection, Testing, and Maintenance | Air Force Research Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity