ZEPH_SAMPLE_CHANGE_ORDER.pdf

PDF 119 KB Posted

Attached to
BOX HANGARS-Site Development and Construction
Solicitation number
2025-008 - FDOT FM#441915-2-94-01
Issued by
Pasco County, Florida

About this file

The document is an AIA Document G701 Change Order form for a construction project, specifically related to the Box Hangars-Site Development and Construction project in Florida. This standard change order form is designed to document modifications to an existing contract, allowing for adjustments to the contract sum, guaranteed maximum price, or contract time. The form provides a template for detailing specific changes to the original contract, with spaces to outline the original contract sum, previous change orders, and the impact of the current proposed change.

While the specific details of the change order are not filled out in this sample document, the form indicates that it requires signatures from the Architect, Contractor, and Owner to be valid. The change order allows for modifications to the contract sum, contract time, or other critical project parameters, with a note emphasizing that any changes to the contract time or cost must be authorized by Construction Change Directives. The document is part of the standard AIA contract documentation process, providing a formal mechanism for documenting and approving project modifications during the construction process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .