BOX_HANGARS-Site_Development_and_Construction_(Addendum_#3_Revision).pdf
PDF 421 KB Posted
- Attached to
- BOX HANGARS-Site Development and Construction
- Solicitation number
- 2025-008 - FDOT FM#441915-2-94-01
- Issued by
- Pasco County, Florida
About this file
This bid document is for the City of Zephyrhills Municipal Airport's Box Hangars Site Development and Construction project, funded through FDOT Grant FM#441915-2-94-01. The project involves constructing one (1) Pre-engineered Metal Building (PEMB) hangar with a potential second hangar, each approximately 6,300 square feet with concrete floors. The pre-bid conference is scheduled for June 6, 2025, at 10 a.m. at City Hall, with a subsequent site tour at the airport office. The project has a 210-calendar day completion timeline from the Notice to Proceed and an estimated budget of $2,500,000.
The bid includes a comprehensive pricing proposal with 68 line items covering various construction elements such as site preparation, utilities, pavement work, stormwater management, signage, and hangar construction. A 10% contingency is required for additional materials or labor, which must be approved through a written change order. The bid requires several mandatory certifications, including a bid bond, drug-free workplace certification, E-Verify compliance, and various federal and state regulatory adherence documents. Bidders must also provide references for similar projects completed within the last five years and demonstrate compliance with equal employment opportunity, environmental, and civil rights regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ZPH_Hangars_SPECS_BID_SET_-_May_2025.pdf | ||
| ZAH_PLANS_Comb_BIDSET_250505.pdf | ||
| 2025_Box_Hangars-Aerial_Location.pdf | ||
| ZEPH_SAMPLE_CHANGE_ORDER.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF ZEPHYRHILLS
2025-008 - FDOT FM#441915-2-94-01
BOX HANGARS-SITE DEVELOPMENT AND CONSTRUCTION
AN EQUAL OPPORTUNITY EMPLOYER
FLORIDA TAX EXEMPT #85-8012740166C-4
FEDERAL IDENTIFICATION NUMBER #59-6000455
I. BID REQUIREMENTS
II. INSTRUCTIONS TO BIDDERS
III. PRELIMINARY MATTERS
IV. CORRELATION, INTERPRETATION, AND INTENT OF CONTRACT DOCUMENTS
V. CONTRACTOR'S RESPONSIBILITIES
VI. SCOPE OF WORK
VII. PRICING PROPOSALS
VIII. VENDOR RESPONSE
Attachments:
A - ZEPH SAMPLE CHANGE ORDER
B - 2025 Box Hangars-Aerial Location
C - ZAH_PLANS_Comb_BIDSET_250505
D - ZPH Hangars_SPECS_BID SET - May 2025
1. BID REQUIREMENTS
Bid documents, plans, and addendums can be viewed and downloaded from the eProcurement
Portal. A link to the eProcurement Portal can be found on the City’s Website, www.ci.zephyrhills.fl.us, Government, Purchasing, Vendor Information, click on the link for
OpenGov. It is your responsibility to ensure you have downloaded all addendums published before the bid opening. Click on "Follow" on the Public Project Page to receive notifications regarding addenda, notices, and questions and answers. You must be a registered vendor for the
City of Zephyrhills. Registration is FREE. Should you have questions concerning this site, please contact OpenGov customer service. Your response and all required documentation are to be submitted via the eProcurement Portal (before the deadline listed in the Time Table) to the
City of Zephyrhills.
Each bid must be submitted through the eProcurement Portal and must be accompanied by a certified check on a solvent bank or trust company in accordance with Section 255.051, Florida
Statutes, made payable to the City of Zephyrhills, Florida in an amount not less than 5%
(percent) of the total bid or a bid bond of like amount, on a form set forth in the contract documents, as a guarantee that if the bid proposal is accepted, the bidder will execute and fill in the proposed contract and furnish a Payment and Performance Bond at least equal to one hundred percent (100%) of the contract price within ten (10) days after Notice of Award of the contract. Please note, the bid bond amount needs to be spelled out and in numeric amounts. It is not allowed to put in 5% on the bid bond form.
The bid package language accommodates for all types of services and/or purchases.
Bid Bond: A bid bond shall accompany each bid response. The bid bond shall be for an amount not less than five percent (5%) of the total bid price and shall be made payable to the
City as a guarantee that the Bidder will not withdraw his bid for a period of sixty (60) days after bid closing time. The Bid Bond is to be included in their eProcurement response (electronically).
Payment and Performance Bond and All Insurance Shall be Secured from or Countersigned by an Agency or Surety Company Recognized in Good Standing and Authorized to do Business in the State of Florida. If at any time the Owner for justifiable cause shall be or become dissatisfied with any Surety, then upon the Performance of Payment Bonds, the Contractor shall within five
(5) days after notice from the Owner, substitute an acceptable bond (or Bonds) in such form and sum and signed by such other Surety or Sureties as may be satisfactory to the Owner. The premiums on such bond shall be paid by the Contractor. No further payments shall be deemed due and shall not be made until new Surety or Sureties shall have furnished such an acceptable bond to the Owner.
Insurance: The Contractor shall, prior to commencement of work, take out and maintain in full force and effect minimum insurance coverage as specified.
The policy’s expiration date shall exceed the length of the named project/contract. It shall be the responsibility of the Contractor to insure that all subcontractors comply with the following insurance requirements:
Insurance Requirements for Subcontractors: Due to the recent difficulties in the insurance market which often makes it impossible for smaller subcontractors to meet the requirements accepted by the general contractor, the following program is now in effect:
A. The general contractor will continue to provide insurance coverage as required by the
City.
https://procurement.opengov.com/portal/zephyrhillsfl/projects/171601 https://procurement.opengov.com/portal/zephyrhillsfl/projects/171601 http://www.ci.zephyrhills.fl.us/ https://procurement.opengov.com/portal/zephyrhillsfl/projects/171601
B. The general contractor will continue to sign a standard Hold Harmless / Indemnification clause.
C. The contract/bid document will simply state that the contractor is responsible for insuring that his/her subcontractors are adequately insured and that any action taken against the
City would be covered under the contractor’s signed Hold Harmless/Indemnification clause.
D. An exception to #C would be in the case of any subcontractor whose work has a value of
50% of the total project cost, the subcontractor will be required to meet the same insurance requirements imposed upon the general contractor.
E. The City retains the right to require any subcontractor to provide proof of insurance coverage and to request modifications when deemed necessary.
The insurance certificate shall be endorsed by the Contractor’s insurance carrier. All certificates of insurance must be approved by the City of Zephyrhills, Florida and name the City as an additional insured.
Hold Harmless Clause: Contractor/vendor shall pay, indemnify and save harmless the City of
Zephyrhills, its agents, guests, invitees and employees, from all suits, actions, claims, demands, damages, losses, expenses, including attorney’s fees, costs and judgments of every kind and description to which the City, its agents, guests, invitees, or employees may be subjected to by reason of injury to persons or death or property damage, resulting from or growing out of any act of commission, omission, negligence or fault of the contractor, its agents or employees, committed in connection with this contract, contractor’s performance hereof, or any work performed hereunder notwithstanding the negligence of the City. Contractor shall indemnify and save harmless the City of Zephyrhills, its agents or employees, from and against all claims, demands, actions, suits, damages, losses, expenses, costs, including attorney’s fees, and judgments of every kind and description arising from, based upon, or growing out of the violation of any federal, state or county law, by-law, ordinance or regulation by the contractor, its agents, trainees, invitees, servants or employees.
Exparte Communication: Please note that to insure the proper and fair evaluation of a bid proposal, the City of Zephyrhills prohibits exparte communication (i.e., unsolicited) initiated by a bidder to the City official or employee evaluating or considering the bids prior to the time a bid decision has been made. Any communication between bidder and the City will be initiated by the appropriate City official or employee in order to obtain information or clarification needed to develop a proper and accurate evaluation of the bid. Any exparte communication may be grounds for disqualifying the offending bidder from consideration or award of the proposal then in evaluation or any future proposal.
2. INSTRUCTIONS TO BIDDERS
2.1. Proposals
Sealed Proposals should be uploaded through OPENGOV before the time designated in
“Invitation to Bid” for furnishing all transportation, labor, material, and equipment, and performing all operations required for the purchase, construction and completion of the work herein specified and shown on the drawings.
2.2. Additional Information or Clarification
Requests for additional information or clarifications must be submitted through the eProcurement Portal. Requests for additional information or clarification must be received in writing no later than Monday, June 23, 2025, 10:00 am.
2.3. Equivalent Brand Names
When the City does not wish to rule out other competitor’s brands or makes, the phrase “OR
EQUIVALENT” is specified. Whenever a material, article or piece of equipment is identified on the plans or in the specifications by reference to manufactures’ or vendors’ names, trade names, catalogue numbers, etc, it is intended merely to establish a standard; and, any material, article or equipment of other manufacturers and vendors that will perform adequately the duties imposed by the general design and will be considered equally acceptable provided the material, article or equipment so proposed, is, in the opinion of the Architect/Engineer, of equal substance and function. It shall not be purchased or installed by the Contractor without the
Architect/Engineer’s written approval. However, if a product other than the specified bid, it is the bidder’s responsibility to identify such product in its bid, and prove to the City that said product is equal to or better than the product specified. The City shall have the sole and absolute discretion to determine whether the product identified by the bidder is equal to or better than the product specified by the City. Manufacturers’ certificates of specifications conformance of materials may be required by the City; these certificates shall be furnished at no cost to the
City. Unless otherwise specified, evidence in the form of samples may be requested if the proposed brand is other than specified by the City. If samples should be requested, such samples must be received by the City within the time specified after a formal request is made. Any items which fall into this category are to be submitted to the City for review and approval no later than 10:00 am, on Monday, June 23, 2025.
2.4. Bidder
A bidder is an individual, firm, or corporation submitting a Proposal to the City for the work contemplated.
2.5. Bid Bond
The Bid Bond shall be submitted with the electronic response through the eProcurement
Portal. Should you have questions on the eProcurement Portal, contact the OpenGov Support
Team via the Support Bubble on the bottom right or email at procurement-support@opengov.com. Bidder will not withdraw his bid for a period of (60) sixty days after bids are received unless a different period is stated in the Bidding Requirements or Contract
Conditions.
2.6. Familiarity with Laws
The bidder is assumed to be familiar with all Federal, State and local laws, ordinances, rules and regulations that in any manner affect the work. Ignorance on the part of the bidder will in no way relieve him from responsibility.
2.7. Examination of Drawings, Specifications and Site of Work
The bidder shall visit the site of the proposed work and familiarize himself with the nature and extent of the work and all local conditions that may in any manner affect the work to be done and the equipment, materials and labor required. By submitting his bid, the bidder acknowledges that he has visited the site and that he is otherwise familiar with the nature and extent of the work and all local conditions that may in any manner affect the work to be done and the equipment, mailto:procurement-support@opengov.com mailto:procurement-support@opengov.com material and labor required. He is required to examine carefully the drawings and specifications and Form of Agreement and Bond and to inform himself accurately and completely regarding any and all conditions and requirements contained herein that may in any manner affect the work to be performed.
2.8. Qualifications of Bidder
The contract(s), if awarded, will be awarded only to a responsible contractor/vendor who is qualified by experience to do/supply the work specified herein. The bidder shall submit with his
Proposal evidence satisfactory to the City, of his experience in like work and when requested he shall show he has prepared the necessary organization, capital, equipment and machinery to complete the work to the satisfaction of the City within the time limit stated in the Contract
Documents.
2.9. Disqualification of Bidders
No bidder shall submit more than one proposal. Should the City have reasonable grounds for believing a bidder has interests/input in more than one Proposal for the same work will cause rejection of ALL proposals in which such bidder or bidders are believed to be involved. Any or all Proposals will be rejected if there is reason to believe Collusion exists among the bidders and no participants in such collusion will be considered in future Proposals for the same work.
2.10. Right to Reject Proposal
Right is reserved to reject any or all Proposals and to disregard technical errors.
2.11. Return of Proposal Guaranty
As soon as the bids have been compared, the City may, at its discretion, return the guaranty deposit accompanying such Proposals as in its judgment would not likely be considered in making the award. All other proposal guaranties will be held until the Agreement and Bond have been executed, after which they will be returned to the respective bidders.
2.12. Execution of the Agreement
The individual, firm or corporation to which the contract has been awarded shall sign the necessary Agreement with the City, and return it to the City within ten (10) days. No contract shall be considered binding upon the City until it has been properly executed.
2.13. Failure to Execute the Agreement
Failure on the part of the successful bidder to execute the Agreement as required will be just cause for the annulment of the award, and in the event of the annulment of the award, the Bidder shall forfeit his bid bond. This forfeiture shall not be construed as a penalty, but as reasonable, fixed and liquidated damages because of the Bidder’s failure to enter into Agreement with the
City. The award may then be made to the next lowest acceptable bidder, or the work re-advertised as the City may elect
2.14. Withdrawal of Proposal
A bidder may withdraw his Proposal without prejudice to himself, not later than the day and hour set for opening of bids, by clicking on "Unsubmit Proposal" via eProcurement Portal.
2.15. Interest of Member of or Delegate to Congress
No member of or Delegate to Congress, or Resident Commissioner, shall be admitted to any share or part of this contract or any benefit that may arise therefrom, but this provision shall be construed to extend to this contract if made with a corporation for its general benefit.
2.16. Basis of Award
Considerations will be given to price, experience of the bidder in this type of work, and their conformity with the specifications. Awards will be made to the lowest responsible bidder. The quality of the material to be supplied, their suitability to requirements, and guarantee clauses shall be taken into consideration. No significant deviation for the term of this specification is acceptable. The City of Zephyrhills reserves the right to reject any or all bids as authorized by law, to accept in whole or in part any such bid, and to award the contract to other than the lowest bidder at its discretion, if the best interest of the City of Zephyrhills is thereby served.
2.17. Award of Contract
Considerations will be given to price, experience of the bidder in this type of work, and their conformity with the specifications. Awards will be made to the lowest responsible bidder. The quality of the material to be supplied, their suitability to requirements, and guarantee clauses shall be taken into consideration. No significant deviation for the term of this specification is acceptable. The City of Zephyrhills reserves the right to reject any or all bids as authorized by law, to accept in whole or in part any such bid, and to award the contract to other than the lowest bidder at its discretion, if the best interest of the City of Zephyrhills is thereby served.
In the event the contract is awarded to this Bidder, he will enter into a formal written agreement with the City in accordance with the accepted bid within ten (10) calendar days after said contract is submitted to him. The Bidder further agrees that in the event of the Bidder’s default or breach of any of the agreements of this proposal, the said bid deposit shall be forfeited as liquidated damages.
If awarded this contract, It is hereby understood and mutually agreed, by and between the
Contractor and the Owner, that the date of beginning and the time for completion as specified in the contract of the work to be done hereunder are ESSENTIAL CONDITIONS of this contract;
and it is further mutually understood and agreed that the work embraced in this contract shall be commenced on a date to be specified in the "Notice to Proceed."
It is further agreed where under the contract an additional time is allowed for the completion of any work, the time limit fixed by such extension shall be of the essence of this contract. Provided, that the Contractor shall not be charged with liquidated damages or any excess cost when the Owner determines that the Contractor is without fault and the Contractor's reason for the time extension is acceptable to the Owner: Provided, further, that the Contractor shall not be charged with liquidated damages or any excess cost when the delay in completion of the work is due:
(a) To any preference, priority or allocation order duly issued by the Government.
(b) To any delays of Subcontractors or suppliers occasioned by any of the causes specified in subsection (a).
Provided, further, that the Contractor shall, within ten (10) days from the beginning of such delay, unless the Owner shall grant a further period of time prior to the date of final settlement of the contract, notify the Owner, in writing, of the causes of the delay, who shall ascertain the facts and extent of the delay and notify the Contractor within a reasonable time of its decision in the matter.
The Contractor agrees that said work shall be prosecuted regularly, diligently, and uninterrupted at such rate of progress as will ensure full completion thereof within the time specified. It is expressly understood and agreed, by and between the Contractor and the Owner, that the time for the completion of the work described herein is a reasonable time for the completion of the same, taking into consideration the average climatic range and usual industrial conditions prevailing in this locality. The Bidder agrees to supply all materials within thirty (30) days after successful agreement has been signed by both parties and after contract has been submitted to them and receipt of Notice to Proceed. If the said Contractor shall neglect, fail or refuse to complete the work within the time herein specified, or any proper extension thereof granted by the Owner, then the Contractor does hereby agree, as a part consideration for the awarding of this contract, to pay to the Owner the amount specified in the contract, not as a penalty but as liquidated damages for such breach of contract as hereinafter set forth, for each and every calendar day that the Contractor shall be in default after the time stipulated in the contract for completing the work
Should the contractor/vendor fail to substantially complete and supply the materials listed under this contract and make it available for beneficial use on or before the date stipulated for completion (or such later date as may result from extension of time granted by City), he shall pay the City, as liquidated damages, the sum of $2700.00 for each consecutive calendar day that terms of the contract remain unfulfilled beyond date allowed by the contract, which sum is agreed upon as a reasonable and proper measure of damages which City will sustain per diem by failure of Contractor/vendor to supply the materials within the time stipulated; it being recognized by City and Contractor/vendor that the injury to City which could result from a failure of Contractor/vendor to complete on schedule is uncertain and cannot be computed exactly. In no way shall costs for liquidated damages be construed as a penalty.
Any notice to any Contractor from the Owner relative to any part of this contract shall be in writing and considered delivered and the service thereof completed, when said notice is posted, by certified or registered mail, to the said Contractor at his last given address or delivered in person to the said Contractor or his authorized representative on the work.
2.18. Conditions
The bidder shall list on a separate sheet of paper any variations from, or exceptions to, the conditions and specifications of this bid. This sheet shall be labeled “Exceptions to Bid
Conditions and Specifications”, and shall be attached to the bid. Any variations or exceptions shall meet or exceed the plans and specifications.
2.19. Quantities
An estimate of the quantities of work to be done and/or materials to be furnished is given in the specifications. It is the result of the City’s calculations and is believed to be correct. It is given only as a basis of comparison of bids and the City does not expressly or by implication agree that the actual quantities involved will correspond exactly therewith; nor shall the bidder plead misunderstanding or deception because of such estimates of quantities, or of the character, location, or other conditions pertaining to the work performed or materials furnished in accordance with the plans and specifications. It is understood that the quantities may be increased or decreased without in any way invalidating the unit bid prices.
2.20. Public Records
In accordance with 119.0701 F.S. Contractor shall:
IF CONSULTANT OR CONTRACTOR HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONSULTANT’S
OR CONTRACTOR’S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS
AGREEMENT OR CONTRACT, THEY SHALL CONTACT THE CUSTODIAN OF
PUBLIC RECORDS AT:
RICARDO QUINONES, CITY CLERK
CITY OF ZEPHYRHILLS
5335 8TH STREETH
ZEPHYRHILLS, FLORIDA 33542
RQUINONES@CI.ZEPHYRHILLS.FL.US
813-780-0000
2.21. Correction of Work
All work, all materials, whether incorporated in the work or not, all processes of manufacture, and all methods of construction shall be at all times and places subject to the inspection of the
Architect/Engineer who shall be the final judge of the quality and suitability of the work, materials, processes of manufacture, and methods of construction for the purposes for which they are used. Should they fail to meet his approval they shall be forthwith reconstructed, made good replaced and/or corrected, as the case may be by the Contractor at his own expense. Rejected materials shall immediately be removed from the site. If, in the opinion of the
Architect/Engineer, it is undesirable to replace any defective or damaged materials or to reconstruct or correct any portion of the work injured or not performed in accordance with the
Contract Documents, the compensation to be paid to the Contractor hereunder shall be reduced by such amount as in the judgment of the Architect/Engineer shall be equitable.
2.22. Subsurface Conditions Found Different
Should the Contractor encounter sub-surface and/or latent conditions at the site materially differing from those shown on the Plans or indicated in the Specifications, the Contractor shall immediately give notice to the Architect/Engineer of such conditions before they are disturbed.
The Architect/Engineer will thereupon promptly investigate the conditions, and if he finds that they materially differ from those shown on the Plans or indicated in the specifications he will at once make such changes in the Plans and/or Specification, as the Contractor may find necessary, any increase or decrease of cost resulting from such changes to be adjusted in the manner provided in Paragraph 17 of the General Conditions.
2.23. Claims for Extra Cost
No claim for extra work or cost shall be allowed unless the same was done in pursuance of a written order of the Architect/Engineer approved by the Owner, as aforesaid, and the claim presented with the first estimate after the changed or extra work is done. When work is performed under the terms of subparagraph 17 of the General Conditions, the Contractor shall furnish satisfactory bills, payrolls, and vouchers covering all items of cost and when requested by the Owner, give the Owner access to accounts relating thereto.
mailto:LHILLMAN@CI.ZEPHYRHILLS.FL.US
2.24. Termination (Cause and/or Convenience)
A. This contract may be terminated in whole or in part in writing by either party in the event of substantial failure by the other party to fulfill its obligations under this contract through no fault of the terminating party, provided that no termination may be effected unless the other party is given (1) not less than ten (10) calendar days written notice
(delivered by certified mail, return receipt requested) of intent to terminate and (2) an opportunity for consultation with the terminating party prior to termination.
B. This contract may be terminated in whole or in part in writing by the local government for its convenience, provided that the other party is afforded the same notice and consultation opportunity specified in 1(a) above.
C. If termination for default is affected by the local government, an equitable adjustment in the price for this contract shall be made, but (1) no amount shall be allowed for anticipated profit on unperformed services or other work, and (2) any payment due to the contractor at the time of termination may be adjusted to cover any additional costs to the local government because of the contractor's default.
If termination for convenience is affected by the local government, the equitable adjustment shall include a reasonable profit for services or other work performed for which profit has not already been included in an invoice.
For any termination, the equitable adjustment shall provide for payment to the contractor for services rendered and expenses incurred prior to receipt of the notice of intent to terminate, by the contractor relating to commitments (e.g., suppliers, subcontractors) which had become firm prior to receipt of the notice of intent to terminate.
D. Upon receipt of a termination action under paragraphs (a) or (b) above, the contractor shall (1) promptly discontinue all affected work (unless the notice directs otherwise) and
(2) deliver or otherwise make available to the local government all data, drawings, reports specifications, summaries and other such information, as may have been accumulated by the contractor in performing this contract, whether completed or in process.
E. Upon termination, the local government may take over the work and may award another party a contract to complete the work described in this contract.
F. If, after termination for failure of the contractor to fulfill contractual obligations, it is determined that the contractor had not failed to fulfill contractual obligations, the termination shall be deemed to have been for the convenience of the local government. In such event, adjustment of the contract price shall be made as provided in paragraph (c) above.
3. PRELIMINARY MATTERS
Delivery of Bonds: Simultaneously with the execution and delivery of the Agreement, the
Contractor shall deliver to the City the required executed Bonds. Additional copies will be furnished, upon request, at the cost of reproduction.
Before Starting Work: Before starting the work at the site, the Contractor shall furnish the City with certificates of insurance and schedules as required by the City and a conference will be held to review the above schedules, to establish procedures for handling Applications for Payment and to establish a working understanding between the parties as to the Project. Present at the conference will be the City and its representative, the Contractor and his Superintendent.
Before undertaking the Work, the Contractor shall carefully study and compare the Contract
Documents and check and verify all figures shown thereon and all field measurements. He shall at once report in writing to the City any conflict, error or discrepancy which he may discover. The Contractor assumes full responsibility for having familiarized himself with the nature and extent of the Contract Documents, Work, locality and local conditions that may in any manner affect the Work to be done and represents that he has visited the site.
The City shall give the Contractor a written Notice to Proceed, stating a date on which it is expected that the Contractor will start the work. No work shall be done prior to the date on which the Work is to start.
The Contractor Time shall commence to run on the date of the Notice to Proceed.
4. CORRELATION, INTERPRETATION, AND INTENT OF CONTRACT
DOCUMENTS
4.1. Construction
It is the intent of the Specifications and Drawings to describe a complete Project to be constructed in accordance with the Contract Documents. The Contract Documents comprise the entire Agreement between the City and the Contractor/Vendor. They may be altered only by a
Modification. The Contract Documents cover, with explicit provisions, all matters relating to the work which the Contractor/Vendor undertakes to construct or perform in full compliance with such provisions. It is understood that the Contractor/Vendor has, by personal examination and inquiry, if necessary, satisfied himself as to all local conditions and as to the meaning, requirements and reservations of the Contract Documents. No deviation will be allowed from the City’s interpretation thereof. The intent of the Contract Documents is to include all labor, materials, equipment, and transportation necessary for the proper execution of the work. The
Contractor/Vendor shall make plural and complete all work which, to avoid needless repetition or for the sake of brevity, has been shown singly or partially indicated. The Contractor/Vendor shall follow the Drawings and execute all work in strict accordance therewith and with the kind and quality of materials indicated and specified. Materials or work described in words which, when so applied, have a well-known technical or trade meaning shall be held to refer to such recognized standards. Any deviation from Specifications, which may be required by the exigencies of construction, shall in all cases conform to written instructions of the City. The applicable provisions of the Contract Documents shall apply with equal force to all work, including extra work, performed under this Contract, whether performed either directly by the
Contractor/Vendor or by any Subcontractor.
The Contract Documents are complementary; what is called for by one is as binding as if called for by all. If the Contractor/Vendor finds a conflict, error or discrepancy in the Contract
Documents, he shall call it to the City’s attention in writing before proceeding with the Work affected thereby. In resolving such conflicts, errors and discrepancies, the documents shall be given precedence in the following order: Agreement, Special Conditions, General Conditions, Specifications, including any Addenda, Drawings, Invitation to Bid and Contractors/Vendors
Bid. Any work that may reasonably be inferred from the Specifications or Drawings as being required to produce the intended result shall be supplied whether or not it is specifically called for. Work, materials or equipment described in words which so applied have a well-known technical or trade meaning shall be deemed to refer to such recognized standards.
4.2. Insurance
Prior to beginning any work hereunder or allowing any Subcontractor to begin any work, the
Contractor/Vendor shall procure, at its sole cost and expense, procure and maintain throughout the term of the contract, Comprehensive General Liability and Worker’s Compensation insurance, including Employer Liability insurance, with minimum policy limits of $1,000,000
(this could be $2,000,000 depending on the amount of the contract) combined Single Limits, or to the extent and in such amounts as required and authorized by Florida law, and will provide endorsed certificates of insurance generated and executed by a licensed insurance broker, brokerage or similar licensed insurance professional evidencing such coverage, and naming the
City of Zephyrhills as a named, additional insured, as well as furnishing the City of Zephyrhills with a certified copy, or copies, of said insurance policies. Certificates of insurance and certified copies of these insurance policies must accompany the signed contract. Said insurance coverages procured by the contractor/vendor as required herein shall be considered, and the contractor/vendor agrees that said insurance coverages it procures as required herein shall be considered, as primary insurance over and above any other insurance, or self-insurance, available to the City of Zephyrhills, and that any other insurance, or self-insurance available to the City of
Zephyrhills shall be considered secondary to, or in excess of, the insurance coverage(s) procured by the contractor/vendor as required.
Nothing shall be construed to extend the City of Zephyrhills’s liability beyond that provided in section 768.28, Florida Statutes.
4.3. Builders’ Risk Coverage
If this solicitation includes: (1) construction of a new above-ground structure or structures, or (2) any addition(s), improvement(s), alteration(s), or repair(s), to an existing above-ground structure or structures, or (3) the installation of machinery or equipment into an existing structure or structures, the Contractor shall provide, in a policy acceptable to the City, “all risk” (i.e., Special
Form) property insurance on any such construction, additions, machinery or equipment. The amount of the insurance shall be no less than the estimated replacement value at the time of the
City’s final acceptance of such new structures, addition(s), improvement(s), alternation(s), repair(s), machinery or equipment. The coverage shall not be subject to any restriction with respect to occupancy or use by the City and, subject to thirty (30) days’ prior written notice to the City shall remain in full effect until final acceptance by the City. In addition, the City, the
Professional, and the Contractor’s subcontractors of any tier, shall be additional insureds on this policy. The insurance shall include a deductible no greater than one percent (1%) of the Contract amount, or $25,000, whichever is smaller, for which the Contractor shall be responsible. The risk of loss whether insured or not shall remain with the Contractor until final acceptance. Upon request, Contractor shall furnish to the City complete copies of the insurance policy.
Liens: The Contractor/vendor shall indemnify and save harmless the City from all claims, demands, causes of action, suits of whatever nature arising out of the services, labor, and materials furnished by the Contractor/vendor or its Subcontractors under this Contract, and from all laborers’, materialmen’s and mechanics’ liens upon the property which the work is located arising out of the services, labor, and materials furnished by the Contractor/vendor or any of its
Subcontractors under this Contract; and shall keep said property free and clear of all liens, claims, and encumbrances arising from the performance of this Contract by the
Contractor/vendor or its Subcontractors; the Contractor/vendor hereby waiving all rights to claim such lien on the City’s properties.
If required, the Contractor shall furnish at the City’s option either (a) a good and sufficient release or waiver of lien from itself, every subcontractor, materialman, laborer, and other person furnishing services, labor, or materials in connection with the work or (b) receipts in full, together with an affidavit that the receipts cover all the services, labor, and materials furnished by the Contractor or its Subcontractors for which a lien might be filed except as covered by the releases and waivers of liens; but if any Subcontractor, laborer, materialman, or other person refuses to furnish a waiver or release a receipt in full, the Contractor may furnish a Bond satisfactory to the City to indemnify the City against any claim or lien or otherwise. (c) Surety
Bond may be furnished by the Contractor or his Surety as a guarantee that he will execute the work in accordance with the terms of the Contract, and that he shall make all payments for all labor, materials and supplies directly or indirectly for the work. If Surety Bond is required by the City, Contract price will be increased by an amount equal to the cost of securing said Bond.
Definitions: The following terms are respectively defined as follows:
• Contractor: A person, firm or corporation with whom the contract is made by the
Owner/City.
• Subcontractor: A person, firm or corporation supplying labor and materials or only labor for at the site of the project for, and under separate contract or agreement with the
Contractor.
• Work on (at) the Project: Work to be performed at the location of the project, including the transportation of materials and supplies to or from the location of the project by employees of the Contractor and any subcontractor.
• Owner: Can represent the City of Zephyrhills and/or property/business owners
5. CONTRACTOR'S RESPONSIBILITIES
Supervision and Superintendence: The Contractor shall supervise and direct the Work efficiently and with his best skill and attention. He shall be solely responsible for the means, methods, techniques, sequences and procedures of construction. The Contractor shall be responsible to see that the finished Work complies accurately with the Contract Documents. The
Contractor shall accept full responsibility for the work until final acceptance. He shall protect the work against all loss or damage sustained during the progress of the work and promptly repair any damage done from any cause whatsoever. After acceptance of the work, Contractor’s responsibility shall extend to defective or faulty work as later defined in these specifications.
The Contractor shall keep on the Work site at all times during its progress, a competent resident superintendent who shall not be replaced without written consent of the City, under extraordinary circumstances. The Superintendent will be the Contractor’s representative at the Site and shall have the authority to act on behalf of the Contractor. He shall be present at the pre-construction conference. All communications given to the Superintendent shall be as binding as if given to the Contractor.
Labor, Materials, Equipment, and Manufactured Articles: The Contractor shall provide competent, suitably qualified personnel to survey and lay out the Work and perform construction as required by the Contract Documents. He shall at all times maintain good discipline and order at the site.
The Contractor shall furnish all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water and sanitary facilities, and all other facilities and incidentals necessary for the execution, testing, and initial operation and completion of the Work. Any work necessary to be performed after regular working hours, on Sunday or legal holiday, shall be performed without additional expense to the
City.
All materials and equipment shall be new, except as otherwise provided in the Contract
Documents. If required by the City, the Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. All material and workmanship shall in every respect, be in accordance with what, in the opinion of the City, is in conformity with approved modern practice.
Contractor’s Title to Materials: No materials or supplies for the work shall be purchased by the Contractor or by any Subcontractor subject to any chattel mortgage or under a conditional sale contractor or other agreement by which an interest is retained by the seller. The Contractor warrants that he has good title to all materials and supplies used by him in the work, free from all liens, claims or encumbrances.
Use of Premises: The Contractor shall confine his equipment, the storage of materials and equipment and the operations of his workmen to areas permitted by law, ordinances, or permits and shall not unreasonably encumber the premises with materials or equipment. Materials stored without proper permits shall be promptly relocated upon request by the City at the Contractor’s expense.
Record Drawings: The Contractor shall keep one record copy of all Specifications, As-built
Drawings, Addenda, Modifications and Shop Drawings at the site in good order and annotated to show all changes made during the construction process. These shall be available to the RPR and the Engineer. As-builts shall be delivered to them for the City and Engineer upon completion of the Project. Release of retainage shall be contingent upon delivery of red-lined “as-builts”.
Supplementary Drawings: When, in the opinion of the City, it becomes necessary to explain more fully the work to be done, or to illustrate the work further, or to show any changes which may be required, drawings, known as supplementary drawings, with specifications pertaining thereto, will be prepared by the Engineer.
The additional drawings and instructions supplied to the Contractor will coordinate with the
Contract Documents and will be prepared that they can be reasonably interpreted. The
Contractor shall carry out the work in accordance with the additional detail drawings and instructions. The Contractor and the Architect/Engineer will prepare jointly: (a) a schedule, fixing the dates at which special detail drawings will be required, such drawings, if any, to be furnished by the Architect/Engineer in accordance with said schedule, and (b) a schedule fixing the respective dates for the submission of shop drawings; the beginning of manufacture, testing and installation of materials, supplies and equipment; and the completion of the various parts of the work; each such schedule to be subject to change from time to time in accordance with the progress of the work
The supplementary drawings shall be binding upon the Contractor with the same force as the drawings. Where such supplementary drawings require either less or more than the estimated quantities of work, credit to the City or compensations therefore to the Contractor shall be subject to the terms of the agreement.
Shop or Setting Drawings: The Contractor shall submit promptly to the Architect/Engineer four (4) copies of each shop or setting drawing prepared in accordance with the schedule predetermined as aforesaid. After examination of such drawings by the Architect/Engineer and the return thereof, the Contractor shall make such corrections to the drawings as have been indicated and shall furnish the Architect/Engineer with four (4) corrected copies. If requested by the Architect/Engineer the Contractor must furnish additional copies. Regardless of corrections made in or approval given to such drawings by the Architect/Engineer, the Contractor will nevertheless be responsible for the accuracy of such drawings and for their conformity to the
Plans and Specifications, unless he notifies the Architect/Engineer in writing of any deviations at the time he furnishes such drawings.
Architect/Engineer’s Authority: The Architect/Engineer shall give all orders and direction contemplated under the contract and specifications, relative to the execution of the work. The
Architect/Engineer shall determine the amount, quality, acceptability, and fitness of the several kinds of work and materials that are to be paid for under this contract and shall decide all questions which may arise in relation to said work and the construction thereof. The
Architect/Engineer’s estimates and decisions shall be final and conclusive, except as herein otherwise expressly provided. In case any question shall arise between the parties hereto relative to said contract or specifications; the determination or decision of the Architect/Engineer shall be a condition precedent to the Contractors to receive any money or payment for work under this contract affected in any manner or to any extent by such question.
The Architect/Engineer shall decide the meaning and intent of any portion of the specifications and of any plans or drawings where the same may be found obscure or be in dispute. Any differences or conflicts in regard to their work that may arise between the contractor under this contract and other Contractors performing work for the City shall be adjusted and determined by the Architect/Engineer.
Safety and Protection: The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. He shall take all necessary precautions for the safety of and shall provide the necessary protection to prevent damage, injury or loss to:
• All employees on the Work and other persons who may be affected thereby.
• All the Work and all materials or equipment to be incorporated therein, whether in storage on or off the site.
Other property, including City property, at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. The Contractor shall replace or make good any such damage, loss or injury unless such be caused directly by errors contained in the contract or by the City, or his duly authorized representatives. He shall notify the
Architect/Engineer immediately. Any claim for compensation by the Contractor shall be promptly submitted to the Architect/Engineer for approval.
The Contractor shall designate a responsible member of his organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor’s Superintendent unless otherwise designated in writing by the Contractor to the City.
SAFETY PLAN
A. It is the contractor's responsibility to comply with OSHA standards and all regulations pertaining to the work including confined space entry.
B. Precaution shall be exercised at all times for the protection of persons and property. The safety provisions of applicable laws, and existing building and construction codes shall be guarded in accordance with the safety provisions of the Manual of Accident
Prevention in Construction, published by the Associated General Contractor of America, and OSHA’s Safety and Health Standards (29 CFR 1926/1910) U.S. Department of
Labor, to the extent that such provisions are not in contravention of applicable law.
C. Safety Requirements:
A. The Contractor shall provide documentation on Means of Egress, Emergency Evacuation, Confined Space Entry, Lock Out – Tag Out, Hot Work Permit, Hurricane Preparedness, Right-to-Know / MSDS Sheets to the satisfaction of the City prior to commencement of any single job.
B. A Contractor Process Safety Management Briefing will be held at the Pre-Construction
Conference. The Contractor will be required to attend this briefing and sign a form so stating that he has been briefed. A copy of this form is included in the Forms section of this package.
Emergencies: In emergencies affecting the safety of persons or the Work or property at the site or adjacent thereto, the Contractor, without special instruction or authorization from the City, is obligated to act, at his discretion, to prevent threatened damage, injury or loss.
Assignability. The Contractor shall not assign the whole or any part of this contract or any monies due or to become due hereunder without written consent of the Owner. In case the
Contractor assigns all of any part of any monies due or to become due under this contract, the instrument of assignment shall contain a clause substantially to the effect that it is agreed that right of the assignee in and to any monies due or to become due to the Contractor shall be subject to prior claims of all persons, firms and corporations of services rendered or materials supplied for the performance of the work called for in this contract.
Mutual Responsibility of Contractors. If, through acts of neglect on the part of the Contractor, any other Contractor or any subcontractor shall suffer loss or damage on the work, the Contractor agrees to settle with such other Contractor or subcontractor by agreement or arbitration if such other Contractor or subcontractor will so settle. If such other Contractor or subcontractor shall assert any claim against the Owner or account of any damage alleged to have been sustained, the
Owner shall notify the contractor, who shall indemnify and save harmless the Owner against any such claim.
Subcontractors: The Contractor shall not employ any Subcontractor against whom the City may have reasonable objection, nor will the Contractor be required to employ any Subcontractor against whom he has reasonable objection. Within 30 calendar days after the date of the Award of Contract and before the City shall make any partial payments to the Contractor, the Contractor shall furnish to the City in writing for acceptance by the City a list of the names of the
Subcontractors proposed for the principal portions of the work. The Contractor shall not make any substitution for any Subcontractor who has been accepted by the City, unless the City determines that there is good cause for doing so.
The Contractor shall be fully responsible for all acts and omissions of his Subcontractors and of persons directly or indirectly employed by them and of persons for whose acts any of them may be liable to the same extent that he is responsible for the acts and omissions of persons directly employed by him. Nothing in the Contract Documents shall create any contractual relationship between any Subcontractor and the City or any obligation on the part of the City to pay or to see to the obligation on the part of the City to pay or to see to the payment of any moneys due any
Subcontractor, except as may otherwise be required by law. The City may furnish to any
Subcontractor, to the extent practicable, evidence of amounts paid to the Contractor on account of specific work done in accordance with schedule of values.
The divisions and sections of the Specifications and the identifications of any…