This document is a comprehensive bid set of construction drawings for the Zephyrhills Municipal Airport Box Hangars project, prepared by Jacobs Engineering Group Inc. and Mohsen Design Group Incorporated for the City of Zephyrhills, Florida. The project involves constructing one new aircraft storage hangar with a second hangar as an additive alternate, along with related site work and apron improvements at the municipal airport located at 39450 South Avenue. The bid set is dated May 5, 2025, and includes detailed civil, architectural, structural, mechanical, electrical, and landscape plans covering site layout, grading, drainage, utilities, building design, and site improvements.
The project is designed for a Group S-1 occupancy with a moderate-hazard storage classification, featuring a Type IIB construction type and a single-story hangar approximately 5,995 square feet in size. The total project area encompasses approximately 47,433 square feet, with site improvements including new pavement, apron, access roads, sidewalks, utilities, a dumpster enclosure, and landscaping. The design incorporates wind load considerations for 138 mph ultimate wind speeds, with specific attention to airport safety regulations, including FAA Advisory Circulars for operational safety, foreign object debris prevention, and airspace protection. Funding and specific budget details are not explicitly outlined in the provided documents, but the comprehensive nature of the drawings suggests a fully developed infrastructure project prepared for municipal procurement.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
C
B
A
1 2 3 4 5 6
Issue Date:
PLOT DATE/TIME:
Drawing No.:
Project Title:
Drawing Title:
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
J a c o b s E n g in e e ri n g G ro u p I n c
A
L L R
IG
H
T S
R E
S E
R V
E D
AT: ZEPHYRHILLS MUNICIPAL AIRPORT
BID SET
39450 SOUTH AVE, ZEPHYRHILLS, FL 33542
Project #:
Drawn By:
Checked By:
REVISIONS
DESCRIPTION DATEMARK
MOHSEN DESIGN GROUP INCORPORATED
2202 N. WEST SHORE BLVD., SUITE 200
TAMPA, FL 33618
ZEPHYRHILLS AIRPORT
HANGARS
05/05/2025
NOT FOR CONSTRUCTION
5401 W. KENNEDY BLVD. #900
TAMPA, FLORIDA 33609
P: 813-282-3500 www.Jacobs.com
5/2/2025 9:55:55 AM Autodesk Docs://US FL_D3779504_City of Zephyrhills_Airport Hangars/ZAH_ARCH_v23.rvt
D3779504
G-001
COVER SHEET
OV/BM
MK
ZEPHYRHILLS AIRPORT HANGARS
39450 SOUTH AVE, ZEPHYRHILLS, FL 33542
BID SET
LOCATION MAP: CONTACTS:
CLIENT:
NATHAN COLEMAN, DIRECTOR,
ZEPHYRHILLS AIRPORT
ARCHITECT:
JACOBS, KEVIN REGALADO, RA
3150 SW 38th ST., SUITE 700
MIAMI, FL 32801
TEL: 305.392.2453
SITE CIVIL:
MDG, ZIBA MOHAMMADI, PE
2202 N WESTSHORE BLVD, SUITE 200
TAMPA, FL 33607
TEL: 727.410.0391
LANDSCAPE ARCHITECT:
JACOBS, CHRISTINE CRESPO, RLA
5401 W KENNEDY BLVD, STE 300,
TAMPA, FL 33609
TEL: 813.281.7722
STRUCTURAL ENGINEER:
JACOBS, ADAM WARGA, PE
200 S ORANGE AVE, SUITE 900
ORLANDO, FL 32801
TEL: 407.903.5001
MECHANICAL ENGINEER:
JACOBS, ABEL VALIENTE, PE
643 SW 4TH AVE, GAINESVILLE, FL 32601
TEL: 352.384.7212
FIRE PROTECTION ENGINEER:
JACOBS, JACOB WATKINS, PE
1100 GLEBE RD. SUITE 500
ARLINGTON, VA 22201
TEL: 571.218.1663
PLUMBING ENGINEER:
JACOBS, BRANDON RUSSAKIS, PE
643 SW 4TH AVE, GAINESVILLE, FL 32601
TEL: 352.384.7151
ELECTRICAL ENGINEER:
JACOBS, BEMEN MAKARYOUS, PE
200 S ORANGE AVE, SUITE 900,
ORLANDO, FL 32801
TEL: 407.903.5001
SCOPE OF WORK:
THE SCOPE OF WORK FOR THIS PROJECT CONSISTS OF ONE NEW AIRCRAFT STORAGE
HANGAR, RELATED SITE WORK AND APRON IMPROVEMENTS AT THE MUNICIPAL
AIRPORT IN ZEPHYRHILLS FL. A SECOND NEW AIRCRAFT STORAGE HANGAR IS AN
ADDITIVE ALTERNATE.
SITE DATA:
SITE LOCATION: ZEPHYRHILLS MUNICIPAL AIRPORT
ADDRESS: 39450 SOUTH AVENUE, ZEPHYRHILLS, FL 33542
AUTHORITIES HAVING JURISDICTION: CITY OF ZEPHYRHILLS, PASCO COUNTY, FLORIDA
ZONING CLASSIFICATION: AP1 AIRPORT
SHEET NUMBER SHEET NAME
GENERAL
G-001 COVER SHEET
G-002 GENERAL NOTES
G-010 LIFE SAFETY CODE ANALYSIS
G-011 LIFE SAFETY PLAN
CIVIL
C001 COVER SHEET
C002 GENERAL NOTES AND ABBREVIATIONS
C020 PROJECT LAYOUT PLAN
C025 SHEET KEY MAP
C050 SAFETY AND SECURITY NOTES
C051 SAFETY AND SECURITY DETAILS
C052 AIRSPACE PROTECTION PLAN
C060 BORING LOCATION PLAN
C061 GEOTECHNICAL BORING LOG
C101 EXISTING CONDITIONS
C102 EXISTING CONDITIONS
C103 EXISTING CONDITIONS
C201 DEMOLITION PLAN
C202 DEMOLITION PLAN
C203 DEMOLITION PLAN
C301 SITE AND GEOMETRY PLAN
C302 SITE AND GEOMETRY PLAN
C401 GRADING PLAN
C402 GRADING PLAN
C501 DRAINAGE PLAN
INDEX:
TRUE NORTHPROJECT NORTH
SHEET NUMBER SHEET NAME
C502 DRAINAGE PLAN
C601 UTILITY PLAN
C602 UTILITY PLAN
C701 SECTIONS
C702 SECTIONS
C801 MARKING PLAN
C901 PAVEMENT SECTION AND DETAILS
C902 SITE DETAILS
C903 SITE DETAILS
C904 DUMPSTER ENCLOSURE DETAILS
C905 AIRFIELD STORM INLET AND CONTROL STRUCTURE DETAILS
C906 STORMCEPTOR STANDARD DETAIL
C907 SITE DETAILS
C908 SITE AND WATER DETAILS
C909 WATER DETAILS
C910 SANITARY SEWER DETAILS
C911 APRON MARKING DETAILS
LANDSCAPE
LA-100 LANDSCAPE PLA (OVERALL)
LA-200 PLANTING SCHEDULE AND LANDSCAPE NOTES
STRUCTURAL
S-001 GENERAL NOTES
S-002 ABBREVIATIONS AND SYMBOLS
S-003 WIND PRESSURE SCHEDULES
S-100 OVERALL FOUNDATION PLAN
S-101 FOUNDATION AND SLAB PLAN
SHEET NUMBER SHEET NAME
S-501 TYPICAL SECTIONS AND DETAILS
S-502 TYPICAL SECTIONS AND DETAILS
S-503 TYPICAL SECTIONS AND DETAILS
ARCHITECTURE
A-001 ARCHITECTURAL ABBREVIATIONS, SYMBOLS, AND MATERIAL LEGEND
A-002 STANDARD & ACCESSIBLE MOUNTING HEIGHTS
A-011 SITE PLAN - ARCHITECTURAL
A-101 FLOOR PLAN
A-121 REFLECTED CEILING PLAN
A-151 ROOF PLAN
A-201 EXTERIOR ELEVATIONS
A-301 BUILDING SECTIONS
A-311 WALL SECTIONS
A-401 ENLARGED PLAN, INTERIOR ELEVATIONS, AND TOILET ACCESSORY
SCHEDULE
A-402 ENLARGED REFLECTED CEILING PLAN
A-501 PLAN AND SECTION DETAILS
A-502 ROOF & MISCELLANEOUS DETAILS
A-601 PARTITION TYPES AND DETAILS
A-701 DOOR & FINISH SCHEDULES, DOOR AND WINDOW TYPES, AND DETAILS
FIRE ALARM
FA-001 FIRE ALARM SYSTEM GEN NOTES, SYMBOLS, & ABBREV
FA-101 FIRE ALARM PLAN
FA-501 DETAILS
FA-502 FIRE ALARM MATRIX
SHEET NUMBER SHEET NAME
PLUMBING
P-001 PLUMBING LEGEND
P-101 UNDER SLAB PLAN
P-102 FLOOR PLAN
P-501 DETAILS
P-601 SCHEDULES
P-901 ISOMETRIC VIEWS
MECHANICAL
M-001 MECHANICAL LEGEND
M-101 FLOOR PLAN
M-301 SECTION VIEW
M-601 SCHEDULES AND SEQUENCE OF OPERATION
ELECTRICAL
E-001 LEGEND
E-002 GENERAL NOTES AND ABBREVIATIONS
E-010 SITE POWER PLAN
E-101 FLOOR PLAN - LIGHTING
E-102 FLOOR PLAN - POWER
E-103 LIGHTNING PROTECTION PLAN
E-104 HAZARD CLASSIFICATION PLAN
E-500 DETAILS
E-501 DETAILS
E-600 SINGLE LINE DIAGRAM & SCHEDULES
E-601 GROUNDING RISER DIAGRAM
E-700 PANEL SCHEDULES
D
C
B
A
1 2 3 4 5 6
Issue Date:
PLOT DATE/TIME:
Drawing No.:
Project Title:
Drawing Title:
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
J a c o b s E n g in e e ri n g G ro u p I n c
A
L L R
IG
H
T S
R E
S E
R V
E D
AT: ZEPHYRHILLS MUNICIPAL AIRPORT
BID SET
39450 SOUTH AVE, ZEPHYRHILLS, FL 33542
Project #:
Drawn By:
Checked By:
REVISIONS
DESCRIPTION DATEMARK
MOHSEN DESIGN GROUP INCORPORATED
2202 N. WEST SHORE BLVD., SUITE 200
TAMPA, FL 33618
ZEPHYRHILLS AIRPORT
HANGARS
05/05/2025
NOT FOR CONSTRUCTION
5401 W. KENNEDY BLVD. #900
TAMPA, FLORIDA 33609
P: 813-282-3500 www.Jacobs.com
5/2/2025 9:55:55 AM Autodesk Docs://US FL_D3779504_City of Zephyrhills_Airport Hangars/ZAH_ARCH_v23.rvt
D3779504
G-002
GENERAL NOTES
BM
MK
GENERAL NOTES
1. THE TERMS “CONSTRUCTION CONTRACTOR,” “GENERAL CONTRACTOR,” AND
“CONTRACTOR” SHALL BE UNDERSTOOD TO BE THE SAME UNLESS
SPECIFICALLY NOTED OTHERWISE.
2. CONTRACTOR SHALL MAINTAIN SUPERVISION ON SITE WHENEVER WORK IS
BEING PERFORMED.
3. CONTRACTOR TO SECURE DEMOLITION AND CONSTRUCTION PERMITS
REQUIRED FOR APPROVALS, WITH FEES PAID BY OWNER, PRIOR TO
COMMENCEMENT OF RELATED WORK.
4. EXAMINE THE DRAWINGS CAREFULLY AND PROMPTLY REPORT ANY ERROR OR
INCONSISTENCY, IN WRITING, TO THE ARCHITECT/ENGINEER FOR RESOLUTION.
5. DO NOT SCALE DRAWINGS; NOTED DIMENSIONS GOVERN. PROMPTLY NOTIFY
ARCHITECT/ENGINEER OF DISCREPANCIES, IN WRITING, FOR RESOLUTION.
6. DEVELOP, IMPLEMENT AND FOLLOW A CONSTRUCTION WASTE MANAGEMENT
PLAN THROUGHOUT PROJECT.
7. DEVELOP, IMPLEMENT AND FOLLOW AN INDOOR AIR QUALITY MANAGEMENT
PLAN DURING CONSTRUCTION.
8. PROVIDE A SAFETY PLAN PRIOR TO COMMENCEMENT OF WORK TO DELINEATE
CONSTRUCTION AREAS, SAFETY BARRIERS, EGRESS, EXITS, TRAFFIC CONTROLS,
AND TEMPORARY SIGNAGE THROUGH ALL PHASES OF CONSTRUCTION.
9. IT IS THE CONTRACTORS' RESPONSIBILITY TO BID AND BUILD FROM THE MOST
UP-TO-DATE SET OF COMPLETE CONSTRUCTION DOCUMENTS AVAILABLE.
RELEASE AND USE OF PARTIAL SETS OF CONSTRUCTION DOCUMENTS DURING
BIDDING AND/OR CONSTRUCTION DOES NOT RELIEVE THE CONTRACTOR
FROM SUCH RESPONSIBILITY AND NECESSARY COORDINATION AMONG
TRADES.
10. IT IS THE CONTRACTORS' RESPONSIBILITY TO BE AWARE OF COMMENTS MADE
BY AHJ PERTAINING TO CONSTRUCTION DOCUMENTS FIELD SET AND TO
INCORPORATE SAME IN SCOPE OF WORK, AS WELL AS TO NOTIFY
ARCHITECT/ENGINEER OF FIELD CHANGES ORDERED BY AHJ INSPECTORS.
11. DEVIATIONS FROM CONTRACT DOCUMENTS NECESSITATED BY FIELD
CONDITIONS ARE TO BE BROUGHT TO ARCHITECT/ENGINEER AND OWNER IN
WRITING, FOR RESOLUTION PRIOR TO PROCEEDING WITH WORK.
12. PERFORM SITE VISIT AND VERIFY EXISTING CONDITIONS, WHICH, WHILE
DEPICTED WITH AS MUCH ACCURACY AS POSSIBLE, ARE REPRESENTATIVE AND
MUST BE FIELD VERIFIED PRIOR TO COMMENCEMENT OF WORK.
13. CONSTRUCTION, LABOR, MATERIALS AND INSTALLATIONS MUST COMPLY
WITH APPLICABLE CODES, RULES AND REGULATIONS OF ALL AUTHORITIES
HAVING JURISDICTION. ANY DISCREPANCY, WHICH EXISTS BETWEEN THE
REQUIREMENTS OF THE PLANS, SPECIFICATIONS AND SAID CODES, RULES AND
REGULATIONS, IS TO BE BROUGHT TO THE ATTENTION OF THE
ARCHITECT/ENGINEER IN WRITING FOR RESOLUTION.
14. WORK FOR THE PROJECT IS TO CONFORM TO STANDARDS PUBLISHED BY
RECOGNIZED PROFESSIONAL AND INDUSTRY ORGANIZATIONS.
15. MANUFACTURED PRODUCTS, MATERIALS, AND ELEMENTS ARE TO BE
SUPPLIED, INSTALLED, CONNECTED, USED AND MAINTAINED IN ACCORDANCE
WITH MANUFACTURER’S WRITTEN INSTRUCTIONS UNLESS OTHERWISE SHOWN
OR DIRECTED.
16. SUBMIT SHOP DRAWINGS, WITH CALCULATIONS AS APPLICABLE, FOR
ARCHITECT/ENGINEER REVIEW FOR ALL NEW CONSTRUCTION ASSEMBLIES. NO
RELATED WORK WILL BEGIN WITHOUT RELATED SHOP DRAWING/SUBMITTAL
APPROVALS. COSTS FOR CHANGES REQUIRED TO WORK IN PLACE DUE TO
INSTALLATION PRIOR TO APPROVAL IS THE RESPONSIBILITY OF THE
CONTRACTOR.
17. DIMENSIONS MARKED “CLEAR” OR “CLR” ARE TO BE ACCURATELY MAINTAINED
AND SHALL ALLOW FOR THICKNESS OF WALL FINISHES.
18. WHERE THE TERM “OR EQUAL” IS USED IT IS TO BE UNDERSTOOD THAT THE
REFERENCE IS MADE SUBJECT TO THE JUDGEMENT OF THE
ARCHITECT/ENGINEER AND OWNER. ITEMS PROPOSED AS “EQUAL” SHALL BE
SUBMITTED TO DESIGN TEAM FOR REVIEW AND APPROVAL ALONG WITH
SAMPLES OF THE PROPOSED SUBSTITUTION ITEM/PRODUCT AS REQUESTED.
19. KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIALS OR
RUBBISH CAUSED BY CONSTRUCTION OPERATIONS. AT THE COMPLETION OF
THE WORK, REMOVE ALL WASTE MATERIALS AND RUBBISH FROM AND ABOUT
THE PROJECT AS WELL AS CONTRACTOR’S TOOLS, MACHINERY AND SURPLUS
MATERIALS.
20. PROVIDE TEMPORARY BARRIERS/PARTITIONS AROUND WORK AREAS TO
PREVENT UNAUTHORIZED ENTRY, AND TEMPORARY SIGNAGE IN ACCORDANCE
WITH SUBMITTED SAFETY PLAN.
21. COORDINATE SEQUENCING AND WORK AMONG TRADES AND FACILITATE
REMOVAL / REINSTALLATION / REPAIR OF INSTALLED CONSTRUCTION AS
NECESSARY TO ACCESS WORK AREAS REGARDLESS OF TRADES AFFECTED.
22. WHERE SELECTIVE DEMOLITION IS REQUIRED, FURNISH LABOR AND
MATERIALS REQUIRED TO COMPLETE THE DEMOLITION AND SELECTIVE
REMOVAL AND SUBSEQUENT OFF-SITE DISPOSAL OR STORAGE OF ITEMS AS
REQUIRED AND COORDINATED WITH OWNER.
23. CONTRACTOR RESPONSIBLE FOR ALL CUTTING, FITTING AND PATCHING
REQUIRED TO COMPLETE THE WORK OR TO RESTORE WORK WHICH HAS BEEN
CUT OR REMOVED FROM ITS ORIGINAL CONDITION THAT IS INDICATED TO
REMAIN.
24. VERIFY ROUGH-IN DIMENSIONS FOR EQUIPMENT AND FIXTURES PRIOR TO
INSTALLATION.
25. VERIFY ROUGH OPENINGS PRIOR TO CUTTING OPENING AND INSTALLATION OF
ITEMS.
26. VERIFY LOCATION OF STRUCTURAL MEMBERS PRIOR TO CUTTING OR
CORING. PROVIDE TEMPORARY BRACING AS REQUIRED.
27. PIPE, DUCT, CONDUIT, AND OTHER PENETRATIONS THROUGH FIRE RATED
WALLS OR PARTITIONS SHALL BE PROVIDED WITH CLOSURES EQUAL IN
RATING TO THE WALL BEING PENETRATED.
28. ITEMS NOT LOCATED BY DIMENSION (DOORS, ETC.) MAY BE MOVED
SLIGHTLY TO ACCOMMODATE CONSTRUCTION (SUCH AS CMU COURSING).
NOTIFY ARCHITECT/ENGINEER IF DIFFERENCE IS 2" OR GREATER OR WHERE
UNFORESEEN CONFLICT OCCURS.
29. PLUS/MINUS DIMENSIONS ARE NOT TO VARY BY MORE THAN 2” WITHOUT
APPROVAL OF ARCHITECT/ENGINEER.
30. PROVIDE BASES AND BLOCKING REQUIRED FOR ACCESSORIES, FIXTURES,
MECHANICAL, ELECTRICAL, AND OTHER EQUIPMENT.
31. WALL ANGLES ARE 90 OR 45 DEGREES UNLESS NOTED OTHERWISE.
32. EXAMINE PRIMED SURFACES TO RECEIVE FINISH COATING FOR
COMPATIBILITY. WHERE NON-COMPATIBLE PRIMER EXISTS, A BARRIER COAT
SHALL BE APPLIED PRIOR TO APPLICATION OF FINISH COAT.
33. PROVIDE CAULKING/SEALANT AT TRANSITION JOINTS BETWEEN DIFFERENT
MATERIALS AND WHERE THEY MEET OTHER SURFACES.
34. PENETRATIONS/OPENINGS IN RATED PARTITIONS SHALL BE FIRE-CAULKED
TO MAINTAIN FIRE RATING, TYPICAL THROUGHOUT.
35. DOOR HARDWARE SCHEDULE HAS BEEN DEVELOPED FOR DESIGN INTENT
ONLY. HARDWARE PROVIDER IS RESPONSIBLE FOR VERIFYING THE
FUNCTION AND COMPATIBILITY OF COMPONENTS.
36. PRODUCTS AND SYSTEMS WHICH COMPRISE THE BUILDING ENVELOPE AND
STRUCTURAL FRAME MUST HAVE FLORIDA PRODUCT APPROVAL, OR LOCAL
EQUIVALENT (EG. MIAMI-DADE NOTICE OF APPROVAL), TO COMPLY WITH
THE FBC: PANEL WALLS, EXTERIOR DOORS, ROOFING PRODUCTS,
SKYLIGHTS, EXTERIOR WINDOWS, SHUTTERS/IMPACT PROTECTION
SYSTEMS, AND STRUCTURAL COMPONENTS.
37. DIMENSIONS IN ADA STANDARDS EXPRESSED AS A RANGE (EG.: 34" TO 38")
INHERENTLY ALLOW FOR MINOR STANDARD CONSTRUCTION DEVIATIONS,
THEREFORE, NO DEVIATION OUTSIDE THE STATED RANGE IS PERMITTED.
ADA DIMENSIONS STATED AS MAXIMUM OR MINIMUM MAY NOT DEVIATE
BEYOND THE STATED MAXIMUM OR MINIMUM AND MAY ALSO BE SUBJECT
TO ADA DEFINED REACH RANGES. WHERE FIELD CONDITIONS NECESSITATE
CHANGES TO ELEMENTS GOVERNED BY ADA REQUIREMENTS, CONSULT
WITH ARCHITECT/ENGINEER PRIOR TO IMPLEMENTING CHANGE.
38. BUILDING IS DESIGNED AS A PRE-ENGINEERED METAL BUILDING. SIZES OF
COLUMNS, GIRTS, METAL PANELS, ETC. IF SHOWN OR INDICATED ARE FOR
REFERENCE ONLY. FOOTING LOADS SHOWN ARE REPRESENTATIVE OF THE
BASIS OF DESIGN. FINAL FOOTING DESIGN AND DETAILS MAY BE MODIFIED
TO MEET REQUIREMENTS OF THE PEMB MANUFACTURER. MANUFACTURER
SHALL PROVIDE ENGINEERED SHOP DRAWINGS FOR REVIEW. COMPONENTS
SHALL BE SIZED AS NECESSARY TO MEET PERFORMANCE REQUIREMENTS.
39. DRAWINGS HEREIN PROVIDE DESIGN INTENT FOR MATERIALS, LAYOUT, AND
APPEARANCE OF PEMB. DESIGN RESPONSIBILITY FOR THE FOLLOWING
ENGINEERED SYSTEMS AND COMPONENTS IS DELEGATED TO A QUALIFIED
SPECIALTY ENGINEER LICENSED IN THE STATE OF INSTALLATION AND
RETAINED BY THE CONTRACTOR, TO INCLUDE BUT NOT BE LIMITED TO: PRE-
ENGINEERED METAL BUILDING (PEMB) SYSTEM AND ASSOCIATED ANCHOR
BOLT DESIGN, ROOF/ WALL PANELS AND CONNECTIONS, AND HANGAR
DOOR SYSTEM WHERE APPLICABLE. DELEGATED ENGINEERED SYSTEMS AND
COMPONENTS MUST SATISFY FBC, ASCE 7, AND REQUIREMENTS OF
APPLICABLE MATERIAL-SPECIFIC STANDARDS.
40. SELECTED BUILDING MANUFACTURER TO ASSIST CONTRACTOR IN
OBTAINING PERMITS FOR CONSTRUCTION, TO INCLUDE BUT NOT BE LIMITED
TO PROVIDING SIGNED AND SEALED ENGINEERED DRAWINGS AND
CALCULATIONS FOR A COMPLETE INSTALLATION OF PEMB AND ACCESSORY
COMPONENTS FOR A FULLY FUNCTIONAL STRUCTURE, AND AS REQUIRED
BY AUTHORITIES HAVING JURISDICTION.
41. PROJECT WORK IS IN VICINITY OF ACTIVE AIRFIELD. REFER TO FAA ADVISORY
CIRCULARS AC-150-5210-24A FOR GUIDANCE REGARDING FOREIGN OBJECT
DEBRIS (FOD) PREVENTION AND MANAGEMENT AND AC-150-5370-2G
OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION . ASBESTOS
AND OTHER HAZARDOUS MATERIALS ARE NOT EXPECTED TO BE
ENCOUNTERED DURING THE COURSE OF THIS WORK. IF ASBESTOS OR
OTHER HAZARDOUS MATERIAL IS FOUND, STOP WORK IMMEDIATELY,
CORDON OFF AFFECTED AREA AND NOTIFY OWNER TO PROCURE
ABATEMENT PRIOR TO CONTINUATION OF WORK.
42. IF ANY UNUSUAL ODORS, SOIL STAINS OR BURIED WASTES ARE
ENCOUNTERED, STOP WORK IMMEDIATELY AND NOTIFY OWNER.
43. ASBESTOS IS NOT EXPECTED TO BE ENCOUNTERED DURING THE COURSE OF
THIS WORK. IF ASBESTOS IS FOUND, STOP WORK IMMEDIATELY, CORDON
OFF AFFECTED AREA AND NOTIFY OWNER TO PROCURE ASBESTOS
ABATEMENT PRIOR TO CONTINUATION OF WORK.
44. CONTRACTOR SHALL WARRANT AND GUARANTEE ALL WORK AND
INSTALLED MATERIALS FOR A MINIMUM PERIOD OF ONE YEAR FROM DATE
OF COMPLETION AS ESTABLISHED BY OWNER/ARCHITECT, OR AS PROVIDED
IN CONTRACT/DIVISION 1 SPECIFICATIONS.
TD = XX
DE = XX
CP = XX
X
Y
W
Z
TRAVEL DISTANCE (MEASURED IN FEET)
MAXIMUM PERMITTED
STORAGE: 200 FEET
COMMON PATH (MEASURED IN FEET)
MAXIMUM PERMITTED
STORAGE: 50 FEET
DEAD END CORRIDOR (MEASURED IN FEET)
MAXIMUM PERMITTED (MOST RESTRICTIVE)
STORAGE: 50 FEET
EGRESS CAPACITY
W = EXIT CAPACITY FACTOR (IN/PERSON)
X = OCCUPANTS USING EXIT (PERSONS)
Y = EXIT CAPACITY (PERSONS)
Z = EXIT CLEAR WIDTH (IN)
FIRE EXTINGUISHERS FE
D
C
B
A
1 2 3 4 5 6
Issue Date:
PLOT DATE/TIME:
Drawing No.:
Project Title:
Drawing Title:
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
J a c o b s E n g in e e ri n g G ro u p I n c
A
L L R
IG
H
T S
R E
S E
R V
E D
AT: ZEPHYRHILLS MUNICIPAL AIRPORT
BID SET
39450 SOUTH AVE, ZEPHYRHILLS, FL 33542
Project #:
Drawn By:
Checked By:
REVISIONS
DESCRIPTION DATEMARK
MOHSEN DESIGN GROUP INCORPORATED
2202 N. WEST SHORE BLVD., SUITE 200
TAMPA, FL 33618
ZEPHYRHILLS AIRPORT
HANGARS
05/05/2025
NOT FOR CONSTRUCTION
5401 W. KENNEDY BLVD. #900
TAMPA, FLORIDA 33609
P: 813-282-3500 www.Jacobs.com
5/2/2025 10:46:21 AM Autodesk Docs://US FL_D3779504_City of Zephyrhills_Airport Hangars/ZAH_FP_v23.rvt
3779504
G-010
LIFE SAFETY CODE
ANALYSIS
MO
JW
LIFE SAFETY GENERAL NOTESLIFE SAFETY ABBREVIATIONSLIFE SAFETY SYMBOLS
AFF
AHJ
AVG
CP
ELEV
FBC
FPDOR
FT
IN
LSC
MIN
NFPA
NP
NC
NIC
NTS
OLF
SQFT
TD
UNO
ABOVE FINISHED FLOOR
AUTHORITY HAVING JURISDICTION
AVERAGE
COMMON PATH
ELEVATION
FLORIDA BUILDING CODE
FIRE PROTECTION DESIGNER OF RECORD
FOOT
INCH
LIFE SAFETY CODE
MINIMUM
NATIONAL FIRE PROTECTION ASSOCIATION
NOT PERMITTED
NONCOMBUSTIBLE
NOT IN CONTRACT
NOT TO SCALE
OCCUPANT LOAD FACTOR
SQUARE FEET
TRAVEL DISTANCE
UNLESS NOTED OTHERWISE
APPLICABLE CODES:
- FLORIDA BUILDING CODE (2023 EDITION)
- FLORIDA FIRE PREVENTION CODE
- NFPA 1, FIRE CODE, FLORIDA EDITION (2021 EDITION)
- NFPA 101FL LIFE SAFETY CODE, FLORIDA EDITION (2021 EDITION)
- NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS (2018 EDITION)
- NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR CONDITIONING VENTILATION SYSTEMS (2021 EDITION)
- NFPA 70, NATIONAL ELECTRICAL CODE (2020 EDITION)
- NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE (2019 EDITION)
- NFPA 409, STANDARD ON AIRCRAFT HANGARS (2016 EDITION)
CONSTRUCTION TYPE: TYPE IIB
OCCUPANCY: GROUP S-1: MODERATE HAZARD STORAGE
HANGAR CLASSIFICATION: GROUP III
SPRINKLERED: NO
FIRE ALARM: YES
STANDPIPE: NO
FIRE EXTINGUISHERS: YES
ALLOWABLE HEIGHT: GROUP S-1: 2 STORIES / 55 FT
ACTUAL HEIGHT: 1 STORY/30 FT
ALLOWABLE AREA: GROUP S-1: 17,500 SF
ACTUAL AREA: 5,995 SQFT
REQUIRED FIRE
RESISTANCE RATINGS:
BUILDING ELEMENT FIRE RESISTANCE RATING
STRUCTURAL FRAME 0 HOUR
BEARING WALLS
EXTERIOR 0 HOUR
INTERIOR 0 HOUR
NONBEARING WALLS/
PARTITIONS
EXTERIOR 0 HOUR
INTERIOR 0 HOUR
FLOOR CONSTRUCTION 0 HOUR
ROOF CONSTRUCTION 0 HOUR
EGRESS
REQUIREMENTS: BASED ON FBC CHAPTER 10 AND NFPA 101 CHAPTER 7
MINIMUM NUMBER OF EXITS: 2
MAXIMUM TRAVEL DISTANCE: GROUP S = 200 FEET (FFCP NFPA 101FL TABLE 42.2.6)
MAXIMUM DEAD-END: GROUP S = 50 FEET (FFCP NFPA 101FL TABLE 42.2.5)
MAXIMUM COMMON PATH: GROUP S = 50 FEET (FFCP NFPA 101FL TABLE 42.2.5)
MINIMUM EGRESS WIDTH 32 INCHES (FFCP NFPA 101FL 7.2.1.2.3.2)
DOORS:
DOOR EGRESS CAPACITY: 0.2 IN/OCC (FFCP NFPA 101FL TABLE 7.3.3.1)
0.2
0.2
0.2
CP = 13' 4"
T D
HANGAR # 20
OFFICE
RESTROOM
48.55 SF
TD = 36' 6"
T D
TD = 46' 10"
TD = 55' 7"
FEFE
FE
LIFE SAFETY OCCUPANT DATA
OCCUPANT LOAD
TOTAL FLOOR AREA: 5,878 SQFT
TOTAL STORAGE USE AREA: 5,721 SQFT
TOTAL BUSINESS USE AREA: 157 SQFT
BUSINESS OCCUPANT LOAD FACTOR: 150 GROSS SQFT PER OCCUPANT
BUSINESS OCCUPANT LOAD: 2 PERSONS
STORAGE OCCUPANT LOAD: 12 PERSONS
TOTAL OCCUPANT LOAD: 14 PERSONS
MEANS OF EGRESS CAPACTIY AND EXITS
THREE EXTERIOR EXIT DOORS ARE PROVIDED WITH A TOTAL CUMULATIVE CLEAR WIDTH OF 102 IN.
TOTAL EXIT CAPACITY: 510 PERSONS
0 8' 16' 24'2' 4'
GRAPHIC SCALE: 1/8" = 1'-0"
D
C
B
A
1 2 3 4 5 6
Issue Date:
PLOT DATE/TIME:
Drawing No.:
Project Title:
Drawing Title:
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
J a c o b s E n g in e e ri n g G ro u p I n c
A
L L R
IG
H
T S
R E
S E
R V
E D
AT: ZEPHYRHILLS MUNICIPAL AIRPORT
BID SET
39450 SOUTH AVE, ZEPHYRHILLS, FL 33542
Project #:
Drawn By:
Checked By:
REVISIONS
DESCRIPTION DATEMARK
MOHSEN DESIGN GROUP INCORPORATED
2202 N. WEST SHORE BLVD., SUITE 200
TAMPA, FL 33618
ZEPHYRHILLS AIRPORT
HANGARS
GENERAL NOTES:
KEY NOTES:
GRAPHIC SCALE:
TRUE
NORTH
05/05/2025
NOT FOR CONSTRUCTION
5401 W. KENNEDY BLVD. #900
TAMPA, FLORIDA 33609
P: 813-282-3500 www.Jacobs.com
5/2/2025 10:46:22 AM Autodesk Docs://US FL_D3779504_City of Zephyrhills_Airport Hangars/ZAH_FP_v23.rvt
3779504
G-011
LIFE SAFETY PLAN
MO
JW
1/8" = 1'-0"
LIFE SAFETY PLAN1
NON-BUSINESS LIFE SAFETY OCCUPANT SCHEDULE
NUMBER NAME AREA OLF SF/P
OCCUPANT
LOAD
101 HANGAR 5721 SF 500 12
TOTAL (NON-BUSINESS): 12
A. REFER TO SHEET G-010 FOR LIFE SAFETY GENERAL NOTES,
SYMBOLS, AND ABBREVIATIONS.
B. BUSINESS LOAD IS CUMULATIVE FOR RESTROOMS, OFFICES,
AND ADMINISTRATIVE AREAS.
PROJECT AREA
LOCATION MAP VICINITY MAP
1"=1 MILE
PROJECT AREA
BID SET
C001
ZEPHYRHILLS AIRPORT HANGARS
MDG PROJECT # JAC23007
DATE: 05/05/2025
Prepared For:
ZEPHYRHILLS MUNICIPAL AIRPORT
Prepared By:
CITY OF ZEPHYRHILLS
AT
REVISIONS
MARK DESCRIPTION DATEBY
MOHSEN DESIGN GROUP INCORPORATED
2202 N WESTSHORE BLVD, SUITE 200
TAMPA, FL 33607
5401 W. KENNEDY BLVD., #900
TAMPA, FL 33609
DIMENSION INFORMATION SHOULD NOT BE OBTAINED BY SCALING THE PLANS.
DIMENSION INFORMATION NOT PROVIDED HEREIN CAN BE OBTAINED BY CONTACTING
MOHSEN DESIGN GROUP.
AutoCAD SHX Text Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac23007-box hangar development\05-drawings\JAC23007-C001-COV.dwg 5/6/2025 4:23 PM - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac23007-box hangar development\05-drawings\JAC23007-C001-COV.dwg 5/6/2025 4:23 PM - Yan 5/6/2025 4:23 PM - Yan5/6/2025 4:23 PM - Yan - YanYan
C002
GENERAL NOTE AND
ABBREVIATIONS
05/05/2025
JAC23007
YZY
ZM
5401 W. KENNEDY BLVD., #900
TAMPA, FL 33609
p:813-282-3500 www.Jacobs.com
D
C
B
A
1 2 3 4 5 6
Issue Date:
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
Ja co bs
E ng in ee rin g
G ro up In c.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
AT: ZEPHYRHILLS MUNICIPAL AIRPORT
BID SET
39450 SOUTH AVE, ZEPHYRHILLS, FL 33542
Project #:
Drawn By:
Checked By:
REVISIONS
DESCRIPTION DATEMARK
ZEPHYRHILLS AIRPORT
HANGARS
MOHSEN DESIGN GROUP INCORPORATED
2202 N. WEST SHORE BLVD., SUITE 200
TAMPA, FL 33607
Drawing No.:
Drawing Title:
GENERAL NOTES
1. THE OWNER SHALL HAVE THE AUTHORITY TO SUSPEND THE WORK WHOLLY, OR IN PART, FOR SUCH A PERIOD OR PERIODS AS HE/SHE
MAY DEEM NECESSARY. THIS MAY BE DUE TO UNSUITABLE WEATHER OR ANY OTHER CONDITION THAT MAY BE CONSIDERED UNFAVORABLE FOR THE EXECUTION OF THE WORK, OR FOR SUCH TIME AS IS NECESSARY DUE TO THE FAILURE ON THE PART OF THE
CONTRACTOR TO CARRY OUT OR PERFORM AND/OR ALL PROVISIONS OF THE CONTRACT.
2. IT IS THE CONTRACTOR’S RESPONSIBILITY TO REPORT TO THE ENGINEER OF RECORD ANY DISCREPANCIES BETWEEN SURVEY, REPORTS, HISTORICAL DOCUMENTS, AND THE CURRENT DESIGN DOCUMENTS AND SPECIFICATIONS, COMPARED TO THE ACTUAL FIELD CONDITIONS, FAILURE TO DO SO PRIOR TO PROCEEDING WITH ANY ACTIVITY MAY RESULT IN FORFEITURE OF ANY CONTRACTOR CLAIM
FOR TIME, COST AND OTHER EXPENSES.
3. THE CONTRACTOR IS RESPONSIBLE FOR STAKING THE CONSTRUCTION SITE PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER OF ANY DISCREPANCY BETWEEN THE DESIGN DRAWINGS AND FIELD CONDITIONS. THE COST OF CONSTRUCTION STAKING AND MEASUREMENTS SHALL BE INCLUDED IN THE UNIT PRICE FOR ITEM P-103
SURVEY AND STAKEOUT.
4. THE QUANTITIES SHOWN ON THE BID DOCUMENTS ARE APPROXIMATE AND ARE FOR THE SOLE PURPOSE OF COMPARING BIDS. THE CONTRACTOR SHALL BE PAID FOR ACTUAL QUANTITIES MEASURED IN THE FIELD AND APPROVED BY THE OWNER.
5. THE CONTRACTOR SHALL PERFORM HIS/HER OWN QUANTITY TAKE OFF PRIOR TO ORDERING MATERIALS. ANY DISCREPANCY BETWEEN BID QUANTITY AND MEASURED QUANTITY SHALL BE IDENTIFIED TO THE RESIDENT PROJECT REPRESENTATIVE IMMEDIATELY. ORDERING INSUFFICIENT MATERIALS SHALL NOT BE SUFFICIENT GROUNDS FOR EXTENDING THE CONTRACT TIME TO AVOID LIQUIDATED DAMAGES.
THE CONTRACTOR SHALL NOT BE REIMBURSED FOR OVER ORDERING OF MATERIALS BASED ON BID SCHEDULE QUANTITIES.
6. THE CONTRACTOR SHALL DESIGNATE A PROJECT MANAGER OR SUPERINTENDENT TO THIS PROJECT AND SUBMIT HIS/HER RESUME AND QUALIFICATIONS TO THE OWNER FOR REVIEW AND APPROVAL TWO (2) WEEKS PRIOR TO THE PRE-CONSTRUCTION MEETING. THE PROJECT MANAGER OR SUPERINTENDENT SHALL BE ON THE JOB SITE AT ALL TIMES WHEN CONSTRUCTION WORK IS BEING CONDUCTED
BY THE CONTRACTOR OR HIS/HER SUBCONTRACTORS.
7. THE OWNER AND ENGINEER WILL NOT BE RESPONSIBLE FOR THE CONTRACTOR'S MEANS, METHODS, TECHNIQUES, SEQUENCES OR
PROCEDURES OF CONSTRUCTION OR SAFETY PRECAUTIONS.
8. THE CONTRACTOR WILL ENSURE ALL THE CONSTRUCTION PERSONNEL HAVE IN THEIR POSSESSION, AT ALL TIMES WHILE WORKING
WITH IN THE AIRPORT OPERATIONS AREA, A VALID STATE ISSUED I.D.
9. THE CONTRACTOR SHALL OBTAIN ALL THE PERMITS AND LICENSES REQUIRED FOR CONSTRUCTION. THE COST FOR THESE PERMITS SHALL BE INCLUDED IN THE UNIT PRICE FOR MOBILIZATION. NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS ITEM.
10. THE CONTRACTOR SHALL EXAMINE EXISTING ACCESS ROADS, TAXIWAYS, AND OTHER PAVEMENTS TO DETERMINE IF THEY ARE CAPABLE OF SUSTAINING LOADS FROM VEHICLES AND CONSTRUCTION EQUIPMENT. ANY DAMAGE TO EXISTING PAVEMENTS TO BE PROTECTED
SHALL BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.
11. EXISTING PAVEMENT OR OTHER EXISTING WORK NOT SPECIFIED FOR REMOVAL WHICH IS TEMPORARILY REMOVED, DAMAGED, OR IN ANY WAY DISTURBED OR ALTERED BY WORK UNDER THIS CONTRACT SHALL BE REPAIRED, PATCHED, OR REPLACED TO THE COMPLETE
SATISFACTION OF THE ENGINEER AT NO EXPENSE TO THE OWNER.
12. DAMAGE TO OTHER AIRPORT FACILITIES SUCH AS LIGHTING, SIGNAGE, NAVIGATIONAL AIDS, FAA CABLES, AND OTHER UTILITIES SHALL BE IMMEDIATELY REPORTED TO THE OWNER AND THE FAA AS WELL AS ANY COST FOR REPAIR, BY CONTRACTOR OR OTHERS, WILL BE
BORNE BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER.
13. THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH OTHER CONTRACTORS WHO MIGHT BE WORKING CONCURRENTLY AT THE AIRPORT. ANY CONFLICTS IN PERFORMING WORK SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE OWNER FOR
RESOLUTION.
14. THE CONTRACTOR SHALL MEET ALL APPLICABLE LOCAL AND FEDERAL LAWS WHEN DISPOSING ANY OILS OR OTHER FLUIDS REMOVED FROM EQUIPMENT BEING SERVICED ON AIRPORT PROPERTY. CONTRACTOR SHALL IMMEDIATELY CLEAN ANY SPILLS AND DISPOSE OF
THE MATERIAL OFF AIRPORT PROPERTY AT APPROVED DESIGNATED AREAS.
15. ALL CONSTRUCTION WASTE SHALL BE DISPOSED OF OFF AIRPORT PROPERTY OR AT APPROVED DESIGNATED AREAS. THE CONTRACTOR SHALL ACQUIRE ANY REQUIRED PERMITS FOR DISPOSAL OF THIS MATERIAL AT NO EXPENSE TO THE OWNER.
16. IF THE CONTRACTOR ENCOUNTERS SOIL STAINS, UNUSUAL ODORS, OR BURIED WASTE, WORK SHALL BE STOPPED AND THE OWNER
SHALL BE NOTIFIED IMMEDIATELY.
17. CONSTRUCTION OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER AS TO REDUCE EROSION TO THE PRACTICABLE MINIMUM AND TO PREVENT DAMAGING SILTATION OF WATER COURSES, STREAMS, LAKES OR RESERVOIRS. THE SURFACE AREA OF ERODIBLE LAND, EITHER ON OR OFF THE AIRPORT SITE, EXPOSED TO THE ELEMENTS BY CLEARING, GRUBBING OR GRADING OPERATIONS, INCLUDING GRAVEL PITS, WASTE OR DISPOSAL AREAS, AND HAUL ROADS, AT ANY ONE TIME, FOR THIS CONTRACT, SHALL BE SUBJECT TO APPROVAL OF THE OWNER AND THE DURATION OF SUCH EXPOSURE PRIOR TO FINAL TRIMMING AND FINISHING OF THE AREAS SHALL BE HELD TO THE MINIMUM PRACTICAL. THE OWNER OR ITS REPRESENTATIVE SHALL HAVE FULL AUTHORITY TO ORDER THE SUSPENSION OF GRADING AND OTHER OPERATIONS PENDING ADEQUATE AND PROPER PERFORMANCE OF FINISHING AND MAINTENANCE WORK OR TO
RESTRICT THE TRIMMING OF ERODIBLE LAND EXPOSED TO THE ELEMENTS.
18. THE DISTURBANCE OF LANDS AND WATERS THAT ARE OUTSIDE THE LIMITS OF CONSTRUCTION IS PROHIBITED, EXCEPT AS FOUND
NECESSARY AND APPROVED BY THE OWNER.
19. THE CONTRACTOR SHALL CONDUCT HIS/HER WORK IN SUCH A MANNER AS TO PREVENT THE ENTRY OF FUELS, OILS, BITUMINOUS MATERIALS, CHEMICALS, SEWAGE, OR OTHER HARMFUL MATERIALS INTO STREAMS, RIVERS, LAKES OR RESERVOIRS.
20. MINIMUM POSSIBLE AREAS OF OPEN GRADING, BORROW OR AGGREGATE EXCAVATION SHALL BE EXPOSED AT ONE TIME, CONSISTENT
WITH THE PROGRESS OF THE WORK.
21. WHEN NECESSARY, CERTAIN OPERATIONS SHALL BE DELAYED UNTIL PROPER WIND OR CLIMATIC CONDITIONS EXIST TO DISSIPATE OR
INHIBIT POTENTIAL POLLUTANTS TO THE SATISFACTION OF REGULATORY AGENCIES.
22. UPON THE COMPLETION OF THE WORK AND BEFORE ACCEPTANCE AND FINAL PAYMENT WILL BE MADE, THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL MACHINERY, EQUIPMENT, SURPLUS AND DISCARDED MATERIALS, RUBBISH, TEMPORARY STRUCTURES, AND STUMPS OR PORTIONS OF TREES. CUT ALL BRUSH AND WOODS WITHIN THE LIMITS INDICATED AND SHALL LEAVE THE SITE IN A NEAT AND PRESENTABLE CONDITION. MATERIAL CLEARED FROM THE SITE AND DEPOSITED ON ADJACENT PROPERTY WILL NOT BE CONSIDERED AS HAVING BEEN DISPOSED OF SATISFACTORILY, UNLESS THE CONTRACTOR HAS OBTAINED THE WRITTEN PERMISSION
OF SUCH PROPERTY OWNER.
23. ALL DIMENSIONS ARE IN FEET UNLESS OTHERWISE NOTED.
24. ANY DEWATERING, DEWATERING PERMITS AND FEES SHALL BE CONSIDERED INCIDENTAL TO MOBILIZATION. NO SEPARATE
MEASUREMENT OR PAYMENT WILL BE MADE FOR THIS ITEM.
25. DURING THE USE OF CRANE, A NOTAM MUST BE ISSUED AND THE RUNWAY 5-23 MUST BE CLOSED.
AG ---
BGV ---
BRL ---
C ---
CB ---
CF ---
CL, C ---
CLF ---
CO ---
CONC ---
CMP ---
CMON ---
CSH ---
CSL ---
CSSO ---
CY ---
DIA ---
DRM ---
DWG ---
E ---
EA ---
EC ---
EL, ELEV ---
ENG ---
EP ---
EVC ---
EOP ---
EQ ---
EX, EXIST, (E) ---
EXC ---
EXP JT ---
FAA ---
FAR ---
FCIR ---
FG ---
HGL ---
HP ---
HOR ---
HYD ---
ID ---
INV ---
LB ---
LF ---
LONG ---
LP ---
LS ---
LT ---
MAX ---
MH ---
MIN ---
MISC ---
MON ---
MULT ---
MSL ---
N ---
NIC ---
NO ---
NTS ---
OC ---
OD ---
OFA ---
OFZ ---
PACS ---
PC ---
PCC ---
PI ---
PL ---
PVC ---
PSI ---
PSM ---
R ---
RC ---
RCP ---
REF ---
REINF ---
RPZ ---
RSA ---
RT ---
RWY, R/W ---
S ---
SACS ---
SCIR ---
SD ---
SEC ---
SF ---
SS ---
STA ---
STD ---
S.W.P.P.P.---
SY ---
TOPO ---
TRAV ---
TSA ---
TWY, T/W ---
TYP ---
VERT ---
W ---
WPB ---
ABBREVIATIONS
ABOVE GROUND
BELOW GROUND VAULT
BUILDING RESTRICTION LINE
CONDUIT
CATCH BASIN
CUBIC FEET
CENTERLINE
CHAIN LINK FENCE
CLEANOUT
CONCRETE
CORRUGATED METAL PIPE
CONCRETE MONUMENT
CORE SAMPLE TEST HOLE
CONCRETE SLAB
CONSTRUCTION SAFETY & SECURITY OFFICER
CUBIC YARD
DIAMETER
DEEP ROD MONUMENT
DRAWING
EAST, EASTING
EACH
END OF CURVE
ELEVATION
ENGINEER, ENGINEERING
EDGE OF PAVEMENT
END OF VERTICAL CURVE
EDGE OF PAVEMENT
EQUAL
EXISTING
EXCAVATION
EXPANSION JOINT
FEDERAL AVIATION ADMINISTRATION
FEDERAL AVIATION REGULATION
FOUND CAPPED IRON ROD
FINISHED GRADE
HYDRAULIC GRADE LINE
HIGH POINT
HORIZONTAL
HYDRAULIC
INSIDE DIAMETER
INVERT ELEVATION
LICENSED BUSINESS
LINEAR FEET
LONGITUDINAL
LOW POINT
LUMP SUM
LEFT
MAXIMUM
MANHOLE
MINIMUM
MISCELLANEOUS
MONUMENT
MULTIPLE
MEAN SEA LEVEL
NORTH, NORTHING
NOT IN CONTRACT
NUMBER
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OBJECT FREE AREA
OBSTACLE FREE ZONE
PRIMARY AIRPORT CONTROL STATION
POINT OF CURVATURE
PORTLAND CEMENT CONCRETE
POINT OF INTERSECTION
PROPERTY LINE
POLYVINYL CHLORIDE
POUNDS PER SQUARE INCH
PROFESSIONAL SURVEYOR AND MAPPER
RADIUS
REINFORCED CONCRETE
REINFORCED CONCRETE PIPE
REFERENCE
REINFORCED, REINFORCEMENT
RUNWAY PROTECTION ZONE
RUNWAY SAFETY AREA
RIGHT
RUNWAY
SOUTH
SECONDARY AIRPORT CONTROL STATION
SET 5/8" CAPPED IRON ROD OSM TRAV. PT
STORM DRAIN
SECTION
SQUARE FEET
SANITARY SEWER
STATION
STANDARD
STORM WATER POLLUTION PREVENTION PLAN
SQUARE YARD
TOPOGRAPHY
TRAVERSE
TAXIWAY SAFETY AREA
TAXIWAY
TYPICAL
VERTICAL
WEST
WIRE PULL BOX
SURVEY NOTES:
1. THIS IS A TOPOGRAPHIC SURVEY AS DEFINED IN CHAPTER 5J-17, FLORIDA
ADMINISTRATIVE CODE. SAID SURVEY MEETS THE "STANDARDS OF PRACTICE" FOR
SURVEYING AND MAPPING, AS SET FORTH BY THE FLORIDA BOARD OF PROFESSIONAL
SURVEYORS AND MAPPERS IN CHAPTER 5J-17, FLORIDA ADMINISTRATIVE CODE,
PURSUANT TO SECTION 472.027, FLORIDA STATUTES.
2. THE TOPOGRAPHIC INFORMATION IS BASED UPON A GROUND SURVEY, FIELD WORK
COMPLETED ON DECEMBER 13, 2023. THE CONTOUR INTERVAL IS ONE HALF FOOT.
3. HORIZONTAL DATA IS BASED UPON THE NORTH AMERICAN DATUM 1983, 2011
ADJUSTMENT, FLORIDA STATE PLANE COORDINATE SYSTEM, WEST ZONE. BEARINGS
ARE GRID NORTH. HORIZONTAL POSITIONING WAS DERIVED UTILIZING THE PRIMARY AND
SECONDARY AIRPORT CONTROL STATIONS (PACS) AND (SACS) DEPICTED HEREON.
4. THE ELEVATIONS SHOWN HEREON ARE REFERENCED TO THE NORTH AMERICAN
VERTICAL DATUM OF 1988 (NAVD88) AND ARE BASED UPON TO FOLLOWING NATIONAL
GEODETIC SURVEY BENCHMARKS:
(NGS DL7543) "K 736", STEEL DEEP ROD MONUMENT; ELEVATION 80.37 (NAVD88).
(NGS AL7876) "ZEPHYRPORT", STEEL DEEP ROD MONUMENT; ELEVATION 80.76 (NAVD88).
5. THIS SURVEY WAS PERFORMED UTILIZING A COMBINATION OF G.P.S. (R.T.K.),
TERRESTRIAL SCANNING, ROBOTIC TOTAL STATION AND DIGITAL LEVELING EQUIPMENT
WITH REDUNDANT MEASUREMENTS. THE RELATIVE VERTICAL ACCURACY OF PAVEMENT
AND HARD SURFACES OBSERVED ARE ESTIMATED AT +/- 0.03 FEET AND GROUND
SURFACES AT +/- 0.1 FEET AT 95% CONFIDENCE LEVEL. THE RELATIVE HORIZONTAL
ACCURACY OF FEATURES LOCATED ARE ESTIMATED TO BE WITHIN 0.1 FEET.
6. ALL COORDINATES AND DISTANCES SHOWN HEREON ARE IN U.S. SURVEY FEET AND
DECIMALS THEREOF.
7. THIS SURVEY IS NOT VALID WITHOUT THE SIGNATURE AND SEAL OF A FLORIDA LICENSED
SURVEYOR AND MAPPER.
8. ADDITIONS OR DELETIONS TO THIS SURVEY MAP OR REPORT BY OTHERS THAN THE
SIGNING PARTY OR PARTIES IS PROHIBITED WITHOUT THE WRITTEN CONSENT OF THE
SIGNING PARTY OR PARTIES.
Sheet List Table Sheet Number Sheet Title
C001 COVER SHEET
C002 GENERAL NOTE AND ABBREVIATIONS
C020 PROJECT LAYOUT PLAN
C025 SHEETS KEY MAP
C050 SAFETY AND SECURITY NOTES
C051 SAFETY AND SECURITY DETAILS
C052 AIRSPACE PROTECTION PLAN
C060 BORING LOCATION PLAN
C061 GEOTECHNICAL BORING LOG
C101 EXISTING CONDITIONS
C102 EXISTING CONDITIONS
C103 EXISTING CONDITIONS
C201 DEMOLITION PLAN
C202 DEMOLITION PLAN
C203 DEMOLITION PLAN
C301 SITE AND GEOMETRY PLAN
C302 SITE AND GEOMETRY PLAN
C401 GRADING PLAN
C402 GRADING PLAN
C501 DRAINAGE PLAN
C502 DRAINAGE PLAN
C601 UTILITY PLAN
C602 UTILITY PLAN
C701 SECTIONS
C702 SECTIONS
C801 MARKING PLAN
C901 PAVEMENT SECTION AND DETAILS
C902 SITE DETAILS
C903 SITE DETAILS
C904 DUMPSTER ENCLOSURE DETAILS
C905 AIRFIELD STORM INLET AND CONTROL STRUCTURE DETAILS
C906 STORMCEPTOR STANDARD DETAIL
C907 SITE DETAILS
C908 SITE AND WATER DETAILS
C909 WATER DETAILS
C910 SANITARY SEWER DETAILS
C911 APRON MARKING DETAILS
Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac23007-box hangar development\05-drawings\JAC23007-C002-GNA.dwg - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac23007-box hangar development\05-drawings\JAC23007-C002-GNA.dwg - Yan - YanYan
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
XXXXXXXXXX
XX
TO
E
TO
E
TOE
TOBTOBTOBTOBTOBTOBTOB
TO
B
TOB TOB TOB TOB TOB TOB TOB
TO
B
TOB
TOB
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
BRL BRL BRL BRL
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
SA
N
FM
ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA ROFA
OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ OFZ
O
FZ
O
FZ
O
FZ
O
FZ
RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA RSA
RS
A
RS
A
RO
FA
RO
FA
TSA TSA TSA TSA
TSA
TOFA TOFA TOFA TOFA
TOFA
TSA TSA TSA TSA TSA
TSATOFA TOFA TOFA TOFA
TOFA
CONTRACTOR
STAGING AREA
CONSTRUCTION HAUL ROUTE
CONSTRUCTION ACCESS GATE
TA
XI
W
AY
B
TAXIWAY F
DITCH
EXISTING T-HANGARS
EXISTING HANGAR
GOLF COURSE POND
PROJECT LIMITS
BOX
HANGAR
AP
R
O N
BOX
HANGAR
ACCESS ROAD
RUNWAY 5-23
SERVICE ROAD
DUMPSTER
52' 63.5'
76.8' 95.2'
LIFT STATION
AIRPORT PROPERTY LINE
PONDPOND
DITCH
5401 W. KENNEDY BLVD., #900
TAMPA, FL 33609
p:813-282-3500 www.Jacobs.com
D
C
B
A
1 2 3 4 5 6
Issue Date:
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
Ja co bs
E ng in ee rin g
G ro up In c.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
AT: ZEPHYRHILLS MUNICIPAL AIRPORT
BID SET
39450 SOUTH AVE, ZEPHYRHILLS, FL 33542
Project #:
Drawn By:
Checked By:
REVISIONS
DESCRIPTION DATEMARK
ZEPHYRHILLS AIRPORT
HANGARS
MOHSEN DESIGN GROUP INCORPORATED
2202 N. WEST SHORE BLVD., SUITE 200
TAMPA, FL 33607
Drawing No.:
Drawing Title:
C020
PROJECT LAYOUT PLAN
05/05/2025
JAC23007
YZY
ZM
0' 200'100'
AIRPORT PROPERTY LINE
PROJECT LIMITS
EXISTING HANGAR BUILDING
EXISTING PAVEMENT
EXISTING TAXIWAY OBJECT FREE AREA
EXISTING RUNWAY OBJECT FREE AREA
EXISTING RUNWAY SAFETY AREA
EXISTING OBSTACLE FREE ZONE
EXISTING AIRPORT FENCE
EXISTING WATER MAIN
EXISTING FORCE MAIN
EXISTING RECLAIMED WATER MAIN
NEW SIDEWALK
NEW PAVEMENT
STAGING AREA
NEW BOX HANGAR BUILDING
HAUL ROUTES/CONSTRUCTION ACCESS
BUILDING RESTRICTION LINE
TAXIWAY OBJECT FREE AREA
TAXIWAY SAFETY AREA
NEW WATER MAIN
NEW FORCE MAIN
NEW SANITARY SEWER LINE
LEGEND
OFZ OFZ
X X
TOFA TOFA
RSA RSA
ROFA ROFA
BRL BRL
TSA TSA
TOFA TOFA
FM FM
W W
FM FM
W W
SAN SAN
GENERAL STAGING AREA AND HAUL ROUTE NOTES
1. AT THE CONCLUSION OF EACH WORKDAY, PAVED PORTIONS ON OR ADJACENT TO THE
HAUL ROUTE SHALL BE SWEPT WITH A VACUUM TRUCK AND CHECKED FOR FOREIGN
OBJECT DEBRIS (FOD) PRIOR TO OPENING UP THE TAXILANE OR APRON TO TRAFFIC. THE
CONTRACTOR SHALL MAKE PROVISIONS TO HAVE A VACUUM TRUCK ON SITE AT ALL
TIMES.
2. THE CONTRACTOR SHALL GIVE THE RIGHT OF WAY TO THE PUBLIC WHILE USING PUBLIC
ROADS. THE CONTRACTOR SHALL NOT BLOCK ROADWAYS AND ACCESS TO BUSINESSES.
THE CONTRACTOR SHALL PROVIDE FLAGMEN TO DIRECT TRAFFIC IF TRUCKS OR
VEHICLES ARE TEMPORARILY PARKED ON PUBLIC OR AIRPORT OWNED ROADWAYS.
MAINTENANCE OF TRAFFIC SHALL MEET ALL LOCAL REQUIREMENTS AND GUIDELINES.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY FINES FOR IMPROPER OR ILLEGAL
USE OF PUBLIC OR PRIVATE PROPERTY IN THE PERFORMANCE OF THIS WORK AT
HIS/HER EXPENSE.
4. THE CONTRACTOR SHALL ACQUIRE APPLICABLE PERMITS FROM LOCAL AGENCIES FOR
ANY MODIFICATIONS TO THE STAGING AREA, SUCH AS SECURITY FENCING, GRADING
AND DRAINAGE, OR INSTALLING UTILITIES SUCH AS WATER, SEWER, AND POWER.
STAGING AREA, ACCESS ROADS, AND OTHER AREAS USED BY THE CONTRACTOR SHALL
BE RETURNED TO ITS ORIGINAL CONDITION AFTER THE CONSTRUCTION IS COMPLETE
AND ALL EQUIPMENT, TRAILERS, ETC. ARE REMOVED OFF THE AIRPORT PROPERTY. THE
COST FOR THIS WORK SHALL BE INCLUDED IN THE BID UNIT PRICE FOR MOBILIZATION.
5. THE CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING HIS/HER OWN UTILITIES,
TEMPORARY FENCING, LIGHTING, AND OTHER ITEMS NECESSARY FOR THE STAGING
AREA. THE COST FOR TEMPORARY UTILITIES AND LIGHTING SHALL BE INCLUDED IN THE
BID UNIT PRICE FOR MOBILIZATION.
6. THE CONTRACTOR IS RESPONSIBLE FOR SECURING THEIR STOCKPILE AND STAGING
AREAS, EQUIPMENT, AND MATERIALS LOCATED ON AIRPORT PROPERTY.
7. TEMPORARY ROADS, HAUL ROADS, TRAFFIC AND WORK AREAS SHALL BE STABILIZED
WITH DUST PALLIATIVE, PENETRATION ASPHALT, WOOD CHIPS, OR OTHER APPROVED
MEASURES TO PREVENT DUST POLLUTION.
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text S
Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac23007-box hangar development\05-drawings\JAC23007-C020-PLP.dwg - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac23007-box hangar development\05-drawings\JAC23007-C020-PLP.dwg - Yan - YanYan
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
XXXXXXXXX
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
TO
E
TO
E
TOE
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
CONSTRUCTION ACCESS GATE
TA
XI
W
AY
B
TAXIWAY F
DITCH
DITCH
EXISTING T-HANGARS
EXISTING HANGAR
GOLF COURSE POND
PROJECT LIMITS
BOX
HANGAR
AP
R
O N
BOX
HANGAR
ACCESS ROAD
RUNWAY 5-23
SERVICE ROAD
AIRPORT PROPERTY LINE
PONDPOND
C020 C025 C052
C060 C101 C201 C301 C401 C501 C601
C102 C202 C302 C402 C502
C103 C203 C602
C801
5401 W. KENNEDY BLVD., #900
TAMPA, FL 33609
p:813-282-3500 www.Jacobs.com
D
C
B
A
1 2 3 4 5 6
Issue Date:
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
Ja co bs
E ng in ee rin g
G ro up In c.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
AT: ZEPHYRHILLS MUNICIPAL AIRPORT
BID SET
39450 SOUTH AVE, ZEPHYRHILLS, FL 33542
Project #:
Drawn By:
Checked By:
REVISIONS
DESCRIPTION DATEMARK
ZEPHYRHILLS AIRPORT
HANGARS
MOHSEN DESIGN GROUP INCORPORATED
2202 N. WEST SHORE BLVD., SUITE 200
TAMPA, FL 33607
Drawing No.:
Drawing Title:
C025
SHEETS KEY MAP
05/05/2025
JAC23007
YZY
ZM
0' 200'100'
AIRPORT PROPERTY LINE
PROJECT LIMITS
EXISTING HANGAR BUILDING
EXISTING PAVEMENT
EXISTING AIRPORT FENCE
EXISTING WATER MAIN
EXISTING FORCE MAIN
EXISTING RECLAIMED WATER MAIN
NEW SIDEWALK
NEW PAVEMENT
STAGING AREA
NEW WATER MAIN
NEW FORCE MAIN
NEW SANITARY SEWER LINE
LEGEND
X X
FM FM
W W
SAN SAN
FM FM
W W
Plotted: c:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac23007-box hangar development\05-drawings\JAC23007-C025-KEY.dwg - Yanc:\Users\Yan\mohsen design group dropbox\MDG\Projects\ZPH\jac23007-box hangar development\05-drawings\JAC23007-C025-KEY.dwg - Yan - YanYan
5401 W. KENNEDY BLVD., #900
TAMPA, FL 33609
p:813-282-3500 www.Jacobs.com
D
C
B
A
1 2 3 4 5 6
Issue Date:
REUSE OF DOCUMENTS: THIS DOCUMENT, AND THE IDEAS AND DESIGNS INCORPORATED HEREIN, AS AN INSTRUMENT OF PROFESSIONAL SERVICE, IS THE PROPERTY OF JACOBS AND IS NOT TO BE USED, IN WHOLE OR IN PART, FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF JACOBS.
Ja co bs
E ng in ee rin g
G ro up In c.
A
LL
R
IG
H
TS
R
ES
ER
VE
D
AT: ZEPHYRHILLS MUNICIPAL AIRPORT
BID SET
39450 SOUTH AVE, ZEPHYRHILLS, FL 33542
Project #:
Drawn By:
Checked By:
REVISIONS
DESCRIPTION DATEMARK
ZEPHYRHILLS AIRPORT
HANGARS
MOHSEN DESIGN GROUP INCORPORATED
2202 N. WEST SHORE BLVD., SUITE 200
TAMPA, FL 33607
Drawing No.:
Drawing Title:
C050
SAFETY AND SECURITY
NOTES
05/05/2025
JAC23007
YZY
ZM
AIR OPERATIONS AREA (AOA) - ALL AIRPORT AREAS WHERE AIRCRAFT CAN OPERATE, EITHER UNDER THEIR OWN POWER OR WHILE IN TOW. AIR OPERATIONS AREAS INCLUDE: RUNWAYS, TAXIWAYS, AND APRON
AREAS.
FEDERAL AVIATION ADMINISTRATION (FAA) - THE DIVISION OF THE DEPARTMENT OF TRANSPORTATION THAT INSPECTS AND RATES CIVILIAN AIRCRAFT AND PILOTS, ENFORCES THE RULES OF AIR SAFETY, AND
MAINTAINS AIR-NAVIGATION AND TRAFFIC-CONTROL FACILITIES.
FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) - A DECENTRALIZED AGENCY CHARGED WITH THE ESTABLISHMENT, MAINTENANCE, AND REGULATION OF PUBLIC TRANSPORTATION IN THE STATE OF FLORIDA.
MEAN SEA LEVEL (MSL) - THE SEA LEVEL HALFWAY BETWEEN THE MEAN LEVELS OF HIGH AND LOW WATER
(TIDE).
FOREIGN OBJECT DEBRIS (FOD) - A SUBSTANCE, DEBRIS OR ARTICLE ALIEN TO THE VEHICLE OR SYSTEM
WHICH WOULD POTENTIALLY CAUSE DAMAGE.
NOTICE TO AIRMEN (NOTAM) - A WRITTEN NOTIFICATION ISSUED TO PILOTS BEFORE A FLIGHT, ADVISING
THEM OF CIRCUMSTANCES RELATING TO THE STATE OF FLYING.
OBJECT FREE AREA (OFA) - AN AREA ON THE GROUND CENTERED ON THE RUNWAY, TAXIWAY, OR TAXILANE CENTERLINE PROVIDED TO ENHANCE SAFETY OF AIRCRAFT OPERATIONS BY HAVING THE AREA FREE OF OBJECTS EXCEPT FOR THOSE OBJECTS THAT NEED TO BE LOCATED IN THE OFA FOR AIR NAVIGATION OR
AIRCRAFT GROUND MANEUVERING PURPOSES.
OBSTACLE-FREE ZONE (OFZ) - THE AIRSPACE BELOW 150 FEET (45M) ABOVE THE ESTABLISHED AIRPORT ELEVATION AND ALONG THE RUNWAY AND EXTENDED RUNWAY CENTERLINE THAT IS REQUIRED TO BE CLEAR OF ALL OBJECTS, EXCEPT FOR FRANGIBLE VISUAL NAVAIDS THAT NEED TO BE LOCATED IN THE OFZ BECAUSE OF THEIR FUNCTION, IN ORDER TO PROVIDE CLEARANCE PROTECTION FOR AIRCRAFT LANDING
OR TAKING OFF FROM THE RUNWAY AND FOR MISSED APPROACHES.
PART 77 SURFACES - IMAGINARY SURFACES WITH THE PRIMARY SURFACES CENTERED ALONG THE RUNWAY CENTERLINE PLUS TRANSITIONAL SURFACES THAT LIMIT THE HEIGHTS OF OBSTRUCTIONS, INCLUDING
CONSTRUCTION EQUIPMENT.
RUNWAY PROTECTION ZONE (RPZ) - AN AREA OFF THE RUNWAY END TO ENHANCE THE PROTECTION OF
PEOPLE AND PROPERTY ON THE GROUND.
RUNWAY OBJECT FREE AREA (ROFA) - AN AREA ON THE GROUND CENTERED ON A RUNWAY, CENTERLINE PROVIDED TO ENHANCE THE SAFETY OF AIRCRAFT OPERATIONS BY HAVING THE AREA FREE OF OBJECTS, EXCEPT FOR OBJECTS THAT NEED TO BE LOCATED IN THE OFA FOR AIR NAVIGATION OR AIRCRAFT GROUND
MANEUVERING PURPOSES.
RUNWAY SAFETY AREA (RSA) - A DEFINED SURFACE SURROUNDING THE RUNWAY PREPARED OR SUITABLE FOR REDUCING THE RISK OF DAMAGE TO AIRPLANES IN THE EVENT OF AN UNDERSHOOT, OVERSHOOT OR
EXCURSION FROM THE RUNWAY.
TAXIWAY OBJECT FREE AREA (TOFA) - AN AREA ON THE GROUND CENTERED ON A TAXIWAY OR TAXILANE CENTERLINE PROVIDED TO ENHANCE THE SAFETY OF AIRCRAFT OPERATIONS BY HAVING THE AREA FREE OF OBJECTS, EXCEPT FOR OBJECTS THAT NEED TO BE LOCATED IN THE OFA FOR AIR NAVIGATION OR
AIRCRAFT GROUND MANEUVERING PURPOSES.
TAXIWAY SAFETY AREA (TSA) - A DEFINED SURFACE ALONGSIDE THE TAXIWAY PREPARED OR SUITABLE FOR REDUCING THE RISK OF DAMAGE TO AN AIRPLANE UNINTENTIONALLY DEPARTING THE TAXIWAY.
THRESHOLD - THE BEGINNING OF THAT PORTION OF THE RUNWAY AVAILABLE FOR LANDING. IN SOME
INSTANCES, THE LANDING THRESHOLD MAY BE DISPLACED.
DEFINITIONS:
SAFETY NOTES:
1. THE CONTRACTOR SHALL BE FAMILIAR WITH THE FOLLOWING FAA SAFETY PROVISIONS AND
IMPLEMENT THESE REQUIREMENTS DURING CONSTRUCTION. THE LATEST COPIES OF THESE
GUIDELINES CAN BE OBTAINED ON-LINE AT (HTTP://WWW.FAA.GOV/REGULATIONS_POLICIES)
2. THE CONTRACTOR SHALL COMPLY WITH THE SAFETY PLAN ASSOCIATED WITH THE
CONSTRUCTION PROJECT AND ENSURE THAT CONSTRUCTION PERSONNEL ARE FAMILIAR WITH
SAFETY PROCEDURES AND REGULATIONS OF THE AIRPORT.
3. THE CONTRACTOR SHALL PROVIDE A POINT OF CONTACT WHO WILL COORDINATE AN IMMEDIATE
RESPONSE TO CORRECT ANY CONSTRUCTION-RELATED ACTIVITY THAT MAY ADVERSELY
AFFECT THE OPERATIONAL SAFETY OF THE AIRPORT.
4. THE CONTRACTOR SHALL PROVIDE A SAFETY OFFICER/CONSTRUCTION INSPECTOR FAMILIAR
WITH AIRPORT SAFETY TO MONITOR CONSTRUCTION ACTIVITIES.
5. THE CONTRACTOR SHALL RESTRICT MOVEMENT OF CONSTRUCTION VEHICLES TO
CONSTRUCTION AREAS BY FLAGGING AND BARRICADING OR ERECTING TEMPORARY FENCING,
AS APPROPRIATE.
6. THE CONTRACTOR SHALL ENSURE THAT NO EMPLOYEES, EMPLOYEES OF
SUBCONTRACTORS/SUPPLIERS, OR OTHER PERSONS ENTER ANY PART OF THE AOA FROM THE
CONSTRUCTION SITE UNLESS AUTHORIZED OR ESCORTED BY AN AUTHORIZED INDIVIDUAL.
7. THE CONTRACTORS EMPLOYEES SHALL PARK AND SERVICE ALL CONSTRUCTION VEHICLES IN AN
AREA DESIGNATED BY THE OWNER OUTSIDE THE RUNWAY SAFETY AREAS (RSA) AND OBSTACLE
FREE ZONE (OFZ) AND NEVER ON A CLOSED TAXIWAY OR RUNWAY. EMPLOYEES SHALL ALSO
PARK CONSTRUCTION VEHICLES OUTSIDE THE OBJECT FREE AREA (OFA) WHEN NOT IN USE BY
CONSTRUCTION PERSONNEL (E.G., OVERNIGHT, ON WEEKENDS, OR DURING OTHER PERIODS
WHEN CONSTRUCTION IS NOT ACTIVE). PARKING AREAS MUST NOT OBSTRUCT ANY RUNWAY
VISUAL AIDS, SIGNS, OR NAVIGATIONAL AIDS.
8. CONTRACTOR PERSONNEL ENGAGED IN ACTIVITIES INVOLVING UNESCORTED OPERATION ON
AOA SHALL OBSERVE THE PROPER PROCEDURES FOR COMMUNICATIONS, INCLUDING USING
APPROPRIATE RADIO FREQUENCIES OR ESCORT.
9. NO CONSTRUCTION MAY OCCUR WITHIN THE RSA UNLESS THE RUNWAY IS CLOSED.
10. THE CONTRACTOR SHALL PROMINENTLY MARK OPEN TRENCHES AND EXCAVATIONS AT THE
CONSTRUCTION SITE WITH RED OR ORANGE FLAGS, AS APPROVED BY THE OWNER, AND LIGHT
THEM WITH RED LIGHTS DURING HOURS OF RESTRICTED VISIBILITY OR DARKNESS.
11. OPEN TRENCHES OR EXCAVATIONS ARE NOT PERMITTED WITHIN THE RSA WHILE THE RUNWAY IS
OPEN. IF THE RUNWAY MUST BE OPENED BEFORE EXCAVATIONS ARE BACKFILLED, COVER THE
EXCAVATIONS APPROPRIATELY. COVERINGS FOR OPEN TRENCHES OR EXCAVATIONS MUST BE
OF SUFFICIENT STRENGTH TO SUPPORT THE WEIGHT OF THE HEAVIEST AIRCRAFT OPERATING
ON THE RUNWAY.
12. CONSTRUCTION WITHIN THE TAXIWAY SAFETY AREA (TSA) AND TAXIWAY OBJECT FREE AREA
(TOFA) SHALL NOT BE PERMITTED UNLESS THE TAXIWAY IS CLOSED.
13. THE CONTRACTOR SHALL SEPARATE THE CONSTRUCTION SITE AND NON-MOVEMENT AREAS, IN
WHICH NO PART OF AN AIRCRAFT MAY ENTER BY USING LOW PROFILE BARRICADES. ALL
BARRICADES SHALL BE SECURED IN PLACE TO PREVENT MOVEMENT BY PROP WASH, JET BLAST, OR HIGH WINDS. BARRICADES SHALL BE SECURED TO PREVENT INGESTION BY JET ENGINES OR
DAMAGE BY PROPELLER WASH.
14. STOCKPILED MATERIALS AND EQUIPMENT STORAGE ARE NOT PERMITTED WITHIN THE RSA AND
OFZ OF AN OPERATIONAL RUNWAY. THE CONTRACTOR SHALL ENSURE STOCKPILED MATERIALS
AND EQUIPMENT ADJACENT TO THESE AREAS ARE PROMINENTLY MARKED AND LIGHTED DURING
HOURS OF RESTRICTED VISIBILITY OR DARKNESS. THIS INCLUDES DETERMINING AND VERIFYING
THAT MATERIALS ARE STORED AT AN APPROVED LOCATION TO PREVENT FOD AND ATTRACTION
OF WILDLIFE.
15. THE CONTRACTOR SHALL NOT USE OPEN-FLAME WELDING OR TORCHES UNLESS ADEQUATE
FIRE SAFETY PRECAUTIONS ARE PROVIDED AND THE OWNER HAS APPROVED THEIR USE.
16. FOD IS CAPABLE OF CAUSING DAMAGE TO AIRCRAFT LANDING GEARS, PROPELLERS, AND JET
ENGINES. THE CONTRACTOR SHALL NOT LEAVE OR PLACE FOD ON OR NEAR AIRCRAFT
MOVEMENT AREAS. MATERIALS TRACKED ONTO THESE AREAS MUST BE CONTINUALLY REMOVED
THROUGHOUT CONSTRUCTION. THE CONTRACTOR SHALL CAREFULLY CONTROL AND
CONTINUOUSLY REMOVE FOD AND WASTE MATERIAL THAT MAY ATTRACT WILDLIFE.
17. THE CONTRACTOR SHALL NOT CONDUCT ANY CONSTRUCTION ACTIVITY WITHIN NAVIGATIONAL
AID RESTRICTED AREAS WITHOUT PRIOR APPROVAL FROM THE OWNER. NAVIGATIONAL AIDS
INCLUDE INSTRUMENT LANDING SYSTEM COMPONENTS, SUCH AS THE LOCALIZER, THE
GLIDESLOPE, APPROACH LIGHTS, PAPIS, ETC. THESE RESTRICTED AREAS ARE DEPICTED ON
THE CONSTRUCTION PLANS.
18. ALL VEHICLES AND MOBILE EQUIPMENT OPERATING IN THE AOA SHALL BE IDENTIFIED BY A
THREE-FOOT (3') SQUARE ORANGE AND WHITE FLAG. ADDITIONALLY, ALL VEHICLES AND
MOBILE EQUIPMENT SHALL HAVE THE CONTRACTOR'S OR SUBCONTRACTOR'S NAME CLEARLY
AFFIXED ON EACH SIDE OF THE VEHICLE AND MOBILE EQUIPMENT. DURING THE HOURS
BETWEEN SUNSET AND SUNRISE AS WELL AS TIMES WHEN VISIBILITY IS IMPAIRED, ALL
VEHICLES AND MOBILE EQUIPMENT SHALL BE EQUIPPED WITH A REVOLVING YELLOW BEACON
LIGHT MOUNTED ON THE TOP OF THE VEHICLE OR EQUIPMENT. THE BEACON LIGHT SHALL
PROVIDE:
19. NO CRANE SHALL BE ALLOWED ON THE WORK SITE UNTIL THE EQUIPMENT AND ITS INTENDED
OPERATION ARE APPROVED BY THE OWNER.
20. DURING PERIODS OF SEVERE WEATHER CONDITIONS OR OTHER OPERATIONAL EMERGENCIES, THE OWNER MAY DIRECT THE CONTRACTOR TO RELINQUISH AREAS UNDER CONSTRUCTION
AND TO PREPARE THE AREAS FOR AIRCRAFT OPERATIONS. IN THIS EVENT THE ENGINEER WILL
DIRECT THE CONTRACTOR TO EVACUATE THE AREA AND THE ENGINEER WILL SPECIFY THE
LIMITS OF THE AREA TO BE EVACUATED, THE TERM OF EVACUATION, AND THE CONDITIONS
GOVERNING THE RESTORATION WORK NECESSARY TO PREPARE THE AREA FOR AIRCRAFT
OPERATION. THE CONTRACTOR SHALL PROMPTLY AND FULLY COMPLY WITH THE ENGINEER'S
DIRECTIVE. THE CONTRACTOR WILL BE REIMBURSED FOR EXTRA WORK SHOULD THE
DIRECTIVE, AS DETERMINED BY THE ENGINEER, ENTAIL EXTRA WORK UNDER THE CONTRACT.
THE CONTRACTOR MAY BE GRANTED AN EXTENSION OF TIME SHOULD THE DIRECTIVE, AS
DETERMINED BY THE ENGINEER, ENTAIL A DELAY IN THE COMPLETION OF THE CONTRACT OR
ANY DEFINED SUBDIVISION OF THE CONTRACT.
21. VEHICULAR TRAFFIC SHALL NOT CROSS ACTIVE AIRCRAFT MOVEMENT AREAS (RUNWAYS,
TAXIWAYS, OR AIRCRAFT PARKING APRON) WITHOUT RADIO COMMUNICATIONS OR AIRPORT
VEHICLE ESCORT.
22. THE CONTRACTOR SHALL BE RESPONSIBLE FOR…