WSMR Visitor Control Program June 2021.pdf

PDF 315 KB Posted

Attached to
Repair-Replace Flooring Bldg. 1330 Federal contract opportunity
Solicitation number
W911SG22B0006
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This memorandum outlines new access control policies and procedures for White Sands Missile Range in New Mexico. Effective immediately, all personnel requesting access to the installation must comply with screening, vetting, escorting and credentialing procedures detailed in Annexes A through D. The policies are intended to enhance security, protect personnel and resources, and ensure compliance with Department of Defense and Army regulations regarding Common Access Card credentialing and installation access. A solicitation is being issued for repair and replacement of flooring at Building 1330 on White Sands Missile Range. The firm-fixed-price construction contract valued between $500,000 and $1,000,000 will be set aside for Service-Disabled Veteran Owned Small Businesses. The 160-day period of performance will begin after award by the Mission and Installation Contracting Command out of Fort Bliss, Texas. Interested SDVOSBs should review the attached solicitation and documents or coordinate bid drop-off with the point of contact.

View the file

Other files for this federal contract opportunity

Other files attached to Repair-Replace Flooring Bldg. 1330, newest first.
File Type Posted
Abstract of Offerors OF_1419 W911SG22B0006 2 OF 2.pdf PDF
Abstract of Offerors OF_1419 W911SG22B0006 1 OF 2.pdf PDF
SITE VISIT PICTURES Repair-Replace Flooring Bldg. 1330 W911SG22B0006.pdf PDF
Conform Copy AMENDMENT SOLICITATION Replace-Repair Flooring Bldg.1330 W911SG22B0006 0001.pdf PDF
DPW062282P DRAWINGS REPAIR-REPLACE FLOORING IN BLDG. 1330 W911SG22B0006 REV.pdf PDF
09 3000 Tiling W911SG22B0006 REV.pdf PDF
Wood Base Board Profiles_ Schematic and Supplementary Drawing W911SG22B0006.pdf PDF
SOLICITATION AMENDMENT Replace-Repair Flooring Bldg.1330 W911SG22B0006 0001.pdf PDF
09 6813 Modular Carpet Tile W911SG22B0006 REV.pdf PDF
MICC Replace-Repair Flooring Bldg 1330 Pre Bid Slides.pdf PDF
SITE VISIT SIGN IN SHEET W911SG22B0006.pdf PDF
DPW062282P DRAWINGS REPAIR-REPLACE FLOORING IN BLDG.1330 W911SG22B0006.pdf PDF
09 6813 Modular Carpet Tile W911SG22B0006.pdf PDF
Garrison Policy 39 - Uprange Access Control and Travel Policy.pdf PDF
Wage Determination Replace-Repair Flooring Bldg. 1330 W911SG22B0005.pdf PDF
Solicitation Replace-Repair Flooring Bldg.1330 W911SG22B0006.pdf PDF
09 3000 Tiling W911SG22B0006.pdf PDF
Building 1330 Flooring Repair Photos W911SG22B0006.pdf PDF
B1330 Room Numbers W911SG22B0006.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

U.S. ARMY GARRISON WHITE SANDS MISSILE RANGE

100 HEADQUARTERS AVENUE

WHITE SANDS MISSILE RANGE, NEW MEXICO 88002

AMIM-WSG-ZA 04 June 2021

MEMORANDUM FOR SEE DISTRIBUTION

SUBJECT: White Sands Missile Range Visitor/Access Control Policy

1. References

a. HQDA EXORD 033-15, Installation Access (Directed Actions) 7 November 2014.

b. Army Directive 2014-05, Policy and Implementation Procedures for Common Access Card Credentialing and Access for Uncleared Contractors

c. AR 190-13, The Army Physical Security Program, 27 June 2019

d. IMCOM OPORD 15-031: Implement Access Control Procedures at IMOCM Installations, 211313Z NOV14

2. Situation:

The Secretary of the Army (SecArmy) directed the Office of the Provost Marshal General (OPMG), G2, Army Audit Agency, and the Inspector General to assess the Army’s overall protection posture concerning Common Access Card (CAC) Credentialing and Access Control. Prior to their final reports, SecArmy published Army Directive 2014- 05, reference b. Directing Army Installations to review and implement policies concerning the issuance and control of CAC credentials and minimum standards for accessing Army installations.

3. Mission:

Effective immediately, U.S. Army Garrison White Sands (USAG-WS) will conduct actions to implement an Installation access control policy and procedures, in order to enhance security and protection of personnel, resources and Installations.

4. Commander’s Intent:

The purpose of this program is to reinforce compliance of current DoD and Army policies and standards for access control, and to ensure CAC credentialing is met in accordance with (IAW) established laws and regulations. It is my intent that USAG- WSL, Directorate of Emergency Services reviews and complies with the guidance in references (a) thru (d) and adheres to the listed requirements. I consider this an enduring mission.

AMIM-WSG-ZA

SUBJECT: White Sands Missile Range Visitor/Access Control Policy

5. Effective this date, all personnel requesting access to WSMR will comply with all aspects of this program, its Annexes and references.

6. The point of contact for this program is Mr. Richard Koehler, Installation Physical Security Officer at 678-8602, email address: richard.m.koehler.civ@mail.mil.

M. RYAN HOWELL

COL, AR

Commanding

DISTRIBUTION:

A, B, C, D, E, F, G, and H

ANNEXES:

A – Screening, Vetting, Escorting and Credentialing Procedures B - Additional Access Control Procedures C – Installation Access Control Waiver Process D – Installation Access Control Waiver Access Packet mailto:richard.m.koehler.civ@mail.mil

2021-06-04T14:43:27-0600
HOWELL.MATTHEW.RYAN.1114537108

File details come from the government source that posted it. Updated .