DPW062282P DRAWINGS REPAIR-REPLACE FLOORING IN BLDG.1330 W911SG22B0006.pdf
PDF 2 MB Posted
- Attached to
- Repair-Replace Flooring Bldg. 1330
- Solicitation number
- W911SG22B0006
About this file
This document provides details for a federal construction solicitation to replace and repair flooring at Building 1330 at White Sands Missile Range in New Mexico. The solicitation number is W911SG-22-B-0006 and is being issued by the Mission and Installation Contracting Command at Fort Bliss, Texas on behalf of the United States Army Directorate of Public Works located at White Sands Missile Range. The contractor will furnish all labor, materials, equipment, transportation, performance and payment bonds to complete the project. The project consists of replacing and repairing flooring and has an anticipated period of performance of 160 calendar days from contract award. The procurement will be set aside as 100% for Service Disabled Veteran Owned Small Businesses. The contract type will be firm-fixed price between $500,000 and $1,000,000. Bids are due by contacting the contracting officer via email for coordination of bid drop off.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING#
WS-1330-2022-G-000-0 1
WS-1330-2022-G-100-02
WS-1330-2022-D-100-03
WS-1330-2022-A-100-04
DIRECTORATE OF
ENGINEERING
PUBLIC WORKS
DIVISION
WHITE SANDS MISSILE RANGE, NEW MEXICO
•.• •"L• • •
-1:
REPAIR/REPLACE FLOORING IN B1330
TITLE
COVER SHEET/INDEX
PROJECT LOCATION
BLDG. 1330 DEMOLITION FLOORING PLAN
BLDG. 1330 NEW FLOORING PLAN
CONCURRENCES
Go.rrison Sa.fety Dote
Physicol Security Dote
Fire Depo.rtMent Dote
DP\,/ EnvlronMentol Dote
Antl-TerrorisM/Force Protection Dote
InforMo. tlon Mo.no.geMent Dote
Opera. tlons o.nci Ma.lntena.nce Division Dote
CustoMer 1
CustoMer 2
Dote
Dote
NO. DATE DESCRIPTION BY APPROVED
REVISIONS
WIDTE SANDS MISSILE RANGE, NEW MEXICO
DIRECTORATE OF PUBLIC WORKS
ENGINEERING SERVICES DIVISION
DRAWN BY
TONY SAENZ
DESIGNED CHECKED
TONY SAENZ
SUBMITTED
JIM STEPHENSON
PROJEe I MANAGm
RECOMMENDED
RAFAEL ACOSTA
BRANCH CHIEF
REPAIR/ REPLACE
FLOORING IN B1330
COVER/INDEX SHEET
APPROVED DRAWING NUMBER SHEET
JQHN MQRGAN WS-1330-2022-G-000-01
CHIEF, ENGINEERING DIVISION
DA1E 20/07/22 SCALE X/X"=1 '-0"
SHEET SIZE
ARC I J 01
SHEET : _ OF 04
LAS CRUCES GATE ENTRANCE
CANTONMENT AREA
N s
FRONTIER CLUB
BUILDING 1330 PROJECT LOCATION
NTS
w I rn z w
N s
CANTONMENT AREA
CUTTING AREAS SHALL BE
APPROVED BY COR BEFORE
CONSTRUCTION STARTS.
STAGING
AREA
AT OLD ____.__.,_
TENNIS
URTS
FROM 1100 TO 1300 HOURS
CONTRACTOR SHALL NOT
DO ANY CUTTINGS
FRONTIER CLUB
PROJECT LOCATION IS
APPROXIMATELY 1/2 MILE
FROM WSMR
CANTONMENT AREA
NO. DATE
DRAWN BY
TONY SAENZ
DESIGNED
DESCRIPTION BY
REVISIONS
WHITE SANDS MISSILE RANGE, NEW MEXICO
DIRECTORATE OF PUBLIC WORKS
ENGINEERING SERVICES DIVISION
CHECKED
APPROVED
TONY SAENZ
SUBMITTED
JIM STEPHENSON
PROJECT MANAGER
RECOMMENDED
REPAIR/ REPLACE
FLOORING IN B1330
PROJECT LOCATION
RAFAEL ACOSTA
BRANCH CHIEF
APPROVED
JQHN MQRGAN
CHIEF, ENGINEERING DMSION
DATE 20/07/22 SCALE X/X'"=1'-0'"
DRAWING NUMBER SHEET
WS-1330-2022-G-100-02
SHEET SIZE
,F'I I- -
SHEET OF 04
PHASE1A
STORAGE
I 116 ?
�UTDOOR
STORAGE
STORAGE
1, �[ .115 �-
1.\ .. -----f-
�0
SOUTH BALLROOM
I 120C I
CD
WJ.F.
L
POT WASH
1 124 1
Jl__
W.LC#2. _
1 121 1
W.I.C.#1
1 12a 1 •.. __
DISHWASHING
1 123 1
KITCHEN
1 126 1
OFFICE/STORAGE
1 129 1 0}1 3
GRILL LINE
1 122 1
I
I
®i
I
I I
I I
I
I
I
I
I
I
I
I
I
I
MIDDLE BALLROOM
I 120B I
CD
FLAG ROOM
I 120A I
I
I
I
�5 STORllGE W.I.C. ®IJ I•.
t:::'.::::::::::'.:::::::::::'.::::'.::::'.::::;::::::'.;:====t='\..V = I 131 I I 130 I 5 L >
MEC H ROOM 'n
CD
I �2 I l /1�• �--,,.-..-------:rl c....,, r'\
L_ � � ��: 11 2 � , �1�;:,,_iiiiiiiiiiiii1;/..;I ==;;--------;;==�1-iiiiiiiiiiiiiv·�-
CORRAL LOUNGE
---i I 135 I
CD
I I
GODDARD ROOM
I 136 I
I
CD
CORRIDOR
1 141 1
,I
OFFICE VESTIBULE
142 I I 143 I I \
FLAG STORAGE ROOM
1 121 1
AZTEC
MEETING ROOM
1 139 1
CD
CD
l CD JANITOR
I 140 I I
BLDG. 1330 DEMOLITION FLOORING PLAN
SCALE: 3/32" = 1'-0"
D f/!
-\: /7
I/ r \
I
OFFICE
I 103 I
7 0
II
II II
OUTDOOR PATIO
□ □ :ciJ [=]
LOBBY
® 1 101 1
CD
I
OFFICE
1 102 1
CD
J
(1)
VESTIBULE
I mo I
MAIN
ENTRY
VON BRAUN ROOM
1 10a 1
CD
(:'\ CORRIDOR
\ \. 1 ) 1 101 1
SUPPLIES
1 104 1
STORAGE
1 105 1
POWDER
ROOM
1 108 1
CD
PHASE 2
7-
LIMITS OF CONSTRUCTION FOR WORK
UNDER THIS CONTRACT
I
WOMENS
I 109 I
I
LJ
SANTA FE SOUTH ROOM
1 111 1
CD
D
PHASE1B
STORAGE
1 113 1
CD
:ciJ
MECH ROOM
1 114 g i-- -----------,' -�
SANTA FE NORTH ROOM
MENS
110 I
1 112 1
CD
fl_
E<(--f---
GENERAL DEMOLITION NOTES
1. CONTRACTOR SHALL TEST ALL MATERIALS TO BE DEMOLISHED AND ALL VISIBLE MATERIALS THAT WILL BE SEEN ONCE EXISTING CARPET SYSTEM, WOOD AND RUBBER BASE BOARDS, CERAMIC/PORCELAIN TILE, VINYL TILE, AND LAMINATED VINYL PLANKS ARE DEMOLISHED. TESTING SHALL BE PER SOW PART 10-HAZARDOUS BUILDING MATERIALS
ABATEMENT, CONTRACTOR SHALL FOLLOW GUIDELINES.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ABATING ALL HAZARDOUS BUILDING MATERIALS FOUND IN THE WORK AREA. ABATEMENT OF HAZARDOUS MATERIALS (INCLUDING ASBESTOS CONTAINING MATERIAL (ACM), LEAD BASED PAINT (LBP), OR MOLD SHALL TAKE PLACE PRIOR TO PERFORMING OTHER WORK OF THIS PROJECT.
3, THE CONTRACTOR SHALL BE RESPONSIBLE TO PERFORM ABATEMENT AND DISPOSAL OF ALL HAZARDOUS BUILDING MATERIALS IN ACCORDANCE WITH ALL APPLICABLE LAWS, RULES ANO REGULATIONS. THE CONTRACTOR SHALL COORDINATE WITH MR. RAY DURAN, RAYMOUND.B.DURAN.CIV@ARMY.MIL, (575) 678-4641, AT THE HAZARDOUS WASTE
MANAGEMENT CENTER FOR DISPOSAL OF ALL HAZARDOUS WASTE
4, THE CONTRACTOR SHALL NOT DAMAGE ANY FIXED PROPERTY AND PROVIDE TEMPORARY PROTECTIVE COVERS IN A MANNER ACCEPTABLE TO THE GOVERNMENT. THE CONTRACTOR PRIOR TO STARTING REMOVAL OF EXISTING CARPET SYSTEM, WOOO AND RUBBER BASE BOARDS, CERAMIC/PORCELAIN TILE, VINYL TILE, AND LAMINATED VINYL PLANKS SHALL MOVE AND COVER ANY FIXED FURNITURE OR FIXED EQUIPMENT WITH FULL COVERS. THE CONTRACTOR SHALL COORDINATE WITH THE COR TO TAKE PICTURES OF THE EXISTING CONDITIONS BEFORE WORK STARTS.
5, CONTRACTOR SHALL DEMOLISH EXISTING CARPET SYSTEM, WOOD AND RUBBER BASE BOARDS, CERAMIC/PORCELAIN TILE, VINYL TILE, AND LAMINATED VINYL PLANKS IN THE DESIGNATED AREAS SHOWN IN THE DRAWINGS, WHICH INCLUDES: BROADLOOM CARPET, PADDING, ADHESIVES, TACK STRIPS, TRANSITION STRIPS, DOOR THRESHOLDS, EDGING TRIMS, AND ANY OTHER COMPONENTS ASSOCIATED WITH THE EXISTING CARPET AND TILING SYSTEMS. THE CONTRACTOR SHALL FIELD VERIFY EXISTING MATERIAL TYPES, QUANTITIES, SQUARE FOOTAGE AREAS AND ALL
DIMENSIONS.
6. THE EXISTING CARPET SYSTEM, WOOD AND RUBBER BASE BOAROS, CERAMIC/PORCELAIN TILE, VINYL TILE, AND LAMINATED VINYL PLANKS. CARPET PADDING. ADHESIVE. TACK STRIPS. ETC. SHALL BE REMOVED, AND PROPERLY DISPOSED OF OFF-BASE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CLEANUP AND DISPOSAL OF WASTE AND DEBRIS GENERATED DURING AND AT THE COMPLETION OF THIS PROJECT IN GENERAL, THE WASTE AND DEBRIS SHALL BE DISPOSED OF IAW ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS. SPECIFICALLY, THE WASTE AND DEBRIS SHALL BE DISPOSED OF IAW THE JURISDICTION HAVING AUTHORITY, INCLUDING, ANY DISPOSAL SITE OUTSIDE THE STATE OF NEW MEXICO. THE CONTRACTOR SHALL ENSURE THAT ALL WASTE AND DEBRIS IS CONTAINERIZED IAW THE U.S. DEPARTMENT OF TRANSPORTATION AND THE JURISDICTION HAVING AUTHORITY LAWS AND REGULATIONS. THE CONTRACTOR SHALL ENSURE THAT ALL WASTE IS CONTAINERIZED IN A MANNER TO PREVENT
UNCONTROLLED AND IMPROPER SPILLS, LEAKS, AND RELEASES
7. EXISTING WOOD BASE BOARDS SHALL BE REMOVED AND REPLACE FOR THE SAME TYPE AT EACH PARTICULAR AREA
(MATCH EXISTING). PREPARE FOR NEW CONSTRUCTION.
8. CONTRACTOR SHALL CLEAN AND PREPARE THE EXISTING CONCRETE FLOOR AREAS AFTER DEMOLISHING EXISTING CARPET SYSTEM, WOOD AND RUBBER BASE BOARDS, CERAMIC/PORCELAIN TILE, VINYL TILE, AND LAMINATED VINYL
PLANKS.
9. EXISTING FURNITURE WILL BE REMOVED AND RETURNED TO THE ORIGINAL POSITION BY USER AFTER THE INSTALLATION OF THE NEW MODULAR CARPET TILE AND PORCELAIN TILE SYSTEMS. COORDINATE WITH COR AT THE
PRE-CONSTRUCTION MEETING
10. EXISTING BUILT-IN FURNITURE WILL REMAIN IN PLACE AND SHALL BE PROTECTED DURING ENTIRE CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE OF ANY DAMAGES.
11. THE CONTRACTOR SHALL REMOVE THE TILE ALONG WITH THE TILE BASE BOARD AT THE MAIN ENTRANCE (VESTIBULE
100), AND PREPARE THE WALL SURFACE FOR NEW CONSTRUCTION
DEMOLITION KEYED NOTES
1. AREAS WHERE CARPET SYSTEM AND WOOD BASE BOARDS ARE TO BE DEMOLISHED, THE CONTRACTOR SHALL FIELD VERIFY AND/OR USE THE SCALED DRAWINGS FOR ALL THE QUANTITIES OF THE CARPET, WOOD BASE SIZES, TYPES &
FORMS.
2. CONTRACTOR SHALL FIELD VERIFY QUANTITIES WITH PORCELAIN AND/OR CERAMIC TILE THAT ARE TO BE DEMOLISHED.
3. CONTRACTOR SHALL FIELD VERIFY QUANTITIES WITH VINYL TILE AND RUBBER BASE BOARD THAT ARE TO BE
DEMOLISHED.
4 CONTRACTOR SHALL FIELD VERIFY QUANTITIES WITH VINYL PLANKS THAT ARE TO BE DEMOLISHED.
5, NO WORK IN THIS AREA. GRAY SHADED AREA IS NOT PART OF THE SCOPE OF WORK
4. AREAS WITH EXPOSED CONCRETE TO BE PREPARED TO RECEIVE FLOORING MATERIAL
5, FIXED FURNITURE OR FIXED EQUIPMENT TO BE REMOVED AND SALVAGED TO BE RE-INSTALLED AFTER FLOORING INSTALLATION IS COMPLETED. DISCONNECT AND RE�ONNECT PLUMBING, ELECTRICAL, AND DATA IF IS NEEDED.
6. FIXED FURNITURE OR FIXED EQUIPMENT TO REMAIN IN PLACE AND TO BE PROTECTED DURING ENTIRE CONSTRUCTION
7. CONTRACTOR SHALL FIELD VERIFY QUANTITIES WITH CARPET AND RUBBER BASE BOARD THAT ARE TO BE
DEMOLISHED.
NO. DATE DESCRIPTION BY
REVISIONS
WHITE SANDS MISSILE RANGE, NEW MEXICO
DIRECTORATE OF PUBLIC WORKS
ENGINEERING SERVICES DIVISION
DRAWN BY
TONY SAENZ
APPROVED
DESIGNED CHECKED
TONY SAENZ
SUBMITTED
JIM STEPHENSON
PROJECT MANAGER
RECOMMENDED
RAFAEL ACOSTA
REPAIR/ REPLACE
FLOORING IN B1330
DEMOLITION FLOORING
PLAN
BRANCH CHIEF
APPROVED DRAWING NUMBER SHEET
JOHN MORGAN
CHIEF, ENGINEERING DMSION WS-1330-2022-D-100-03
DATE 2Q/Q7/22 SCALE X/X
=1 '-0
SHEET SIZE 03
SHEET I - OF 04
PHASE1A
L
POT WASH
W.I.F.
1 124 1
W.I.C#2.�
1 127 1
W.I.C.#1
1 12a 1
Jl
Z_
C
'----.::::::::=1;;_;::;:::;;=u ===:::'Jo
DISHWASHING
1 123 1
KITCHEN
1 126 1
OFFICE/STORAGE
1 129 1
L STORAGE
I 131 I
MEC H ROOM I
I 2 I
- BAR
\ I 133
W.I.C.
I 130 I
/ I \ l �
CORRAL LOUNGE
1 135 1 □�--, > 0
GODDARD ROOM
I I 136 i 0□ □
GRILL LINE
1 122 1
JI
I
I ct: -
STORAGE /4
117H
; !. /J
I I
I
(D
I>>
I
I
I
STORAGE
1 116 1
SOUTH BALLROOM
I 120C I
MIDDLE BALLROOM
I 120B I
FLAG ROOM
I 120A I
FLAG STORAGE ROOM
1 121 1§� 8 ""'"---------
0 V
MENS
1 131 1
OUTDOOR
STORAGE
\iaAO,
· 115 '.
I I
I
WOMENS
1 130 1
AZTEC
MEETING ROOM
1 139 1
CORRIDOR 0
I 141 I
.:\ 1/1
OFFICE VESTIBULE JANITOR
I 142 I I 143 I I 140 1' ' l '
@J 0 11 /\
BLDG. 1330 NEW FLOORING PLAN
SCALE: 3/32" = 1'--0"
I=
;(D
I= l= s l=
:::J u
OFFICE
I 103 I
OUTDOOR PATIO
LOBBY
01 101 1 1
OFFICE
1 102 1
MAIN
ENTRY
cj cj cl LciJ
J
VON BRAUN ROOM
I 106 I
STORAGE
I 105 I
PHASE 2
LIMITS OF CONSTRUCTION FOR WORK
UNDER THIS CONTRACT.
LciJ
MENS
I 110 I
WOMENS
I 109 I fl
LciJ
D
SANTA FE SOUTH ROOM
1 111 1
J
SANTA FE NORTH ROOM
1 112 1
PHASE 18
STORAGE
I 113 I
MECH ROOM
I 114 I --l�h
J□ I/ 1 \ I'\ !._I
E�---+--
,--,_J
D
[7
L
GENERAL NOTES
1. CONTRACTOR SHALL CLEAN AND PREPARE ALL THE CONCRETE FLOOR SURFACE AREAS TO RECEIVE THE
INSTALLATION OF THE NEW PORCELAIN TILE, AND MODULAR CARPET TILES.
2. THE AREAS SHADED GRAY WILL REMAIN UNDISTURBED. CONTRACTOR SHALL PROTECT THESE AREAS DURING THE
ENTIRE CONSTRUCTION
3. CONTRACTOR SHALL INSTALL NEW PORCELAIN TILE SYSTEM. CONTRACTOR SHALL USE THE BASIS-OF-DESIGN FROM "DAL TILE" MANUFACTURER, MODELS: "GRAVEL ROAD-SD86 & GRAVEL ROAD (XT) - SD86" IN ORDER TO COMPLY WITH
ALL THE REQUIREMENTS, (SEE SPECIFICATIONS ATTACHED TO SOW).
4. CONTRACTOR SHALL INSTALL NEW MODULAR CARPET TILE SYSTEM. CONTRACTOR SHALL USE THE BASIS-OF-DESIGN FROM INTERFACE, INC.- MODEL: "CUBIC" CARPET TILE MANUFACTURER IN ORDER TO COMPLY WITH ALL THE
REQUIREMENTS, (SEE SPECIFICATIONS ATTACHED TO SOW).
5. THE FINAL COLORS SELECTION FOR THE NEW PORCELAIN TILE, MODULAR CARPET TILE, AND ALL ITS COMPONENTS SUCH AS GROUT, TRANSITION STRIPS, DOOR THRESHOLDS, EDGING TRIMS, BASE BOARDS, ETC. SHALL BE SELECTED AND APPROVED BY DPW AND THE FACILITY USER (COORDINATE WITH COR). THE CONTRACTOR SHALL PROVIDE A MINIMUM OF SIX (6) PHYSICAL STANDARD SIZE PORCELAIN TILE SAMPLES, AND FOUR (4) CARPET TILE SAMPLES BEFORE THE INSTALLATION FOR FINAL APPROVAL. (SEE SPECIFICATIONS FOR THE SELECTED COLORS).
6. INSTALL NEW ADA COMPLIANT DOOR THRESHOLDS, TRANSITION STRIPS, EDGING TRIMS AS REQUIRED AROUND EXISTING FIXED FURNITURE AND OTHER PLACES REQUIRED TO COVER GAPS, AND ANY OTHER REQUIRED COMPONENTS ASSOCIATED WITH THE NEW PORCELAIN TILE, AND THE NEW MODULAR CARPET TILE SYSTEMS (MATCH ALL COMPONENT ITEMS TO EXISTING). THE CONTRACTOR SHALL FIELD VERIFY THE EXISTING MATERIAL TYPES, FORMS, QUANTITIES, SQUARE FOOTAGE AREAS, AND ALL DIMENSIONS AS PER SCALED DRAWINGS.
7. MODULAR CARPET TILE SHALL BE FREE OF VISUAL BLEMISHES, STREAKS, POORLY DYED AREAS, FUZ2ING OF PILE
8.
9.
YARN, SPOTS OR STAINS, AND OTHER PHYSICAL AND MANUFACTURING DEFECTS. CARPET MATERIALS AND TREATMENTS SHALL BE REASONABLY NON-ALLERGENIC AND FREE OF OTHER RECOGNIZED HEALTH HAZARDS. THE MODULAR CARPET TILE BACKING SHALL MEET ALL THE REQUIREMENTS FOR A HIGH QUALITY BACKING SYSTEM THAT
PROVIDES SOFT AND RESILIENT RUBBER TILE BACKING (SEE SPECIFICATIONS IN SOW)
PORCELAIN TILE SHALL BE FREE OF ANY DENTS OR CRACKS, AND OTHER PHYSICAL AND MANUFACTURING DEFECTS.
ADHESIVE FOR MODULAR CARPET TILE SHALL BE AS RECOMMENDED BY THE CARPET MANUFACTURER. ADHESIVES FLASHPOINT SHALL BE MINIMUM 60 DEGREES C (140 DEGREES F) IN ACCORDANCE WITH ASTM D 3278. ADHESIVE
MUST CONTAIN ANTIMICROBIAL PRESERVATIVE AND HAVE "ZERO' CALCULATED VOC'S.
10. VINYL/RUBBER TRANSITION STRIPS SHALL BE HEAVY-DUTY AND DESIGNED FOR THE TYPE OF CARPET BEING INSTALLED. INSTALL TRANSITION STRIPS WHERE THE NEW MODULAR CARPET ABUTS NEW PORCELAIN TILE.
11. PORCELAIN TILE AND MODULAR CARPET TILE SHALL NOT BE INSTALLED ON SURFACES THAT ARE UNSUITABLE AND WILL PREVENT A PROPER INSTALLATION. HOLES, CRACKS, DEPRESSIONS, OR ROUGH AREAS SHALL BE REPAIRED USING MATERIAL RECOMMENDED BY THE PORCELAIN TILE THIN-SET MANUFACTURER, AND THE MODULAR CARPET OR ADHESIVE MANUFACTURERS. FLOOR SHALL BE FREE OF ANY FOREIGN MATERIALS AND SWEPT BROOM CLEAN.
BEFORE BEGINNING WORK, SUBFLOOR SHALL BE TESTED WITH GLUE AND CARPET TO DETERMINE "OPEN TIME" AND
BOND.
12. INSTALLATION OF MODULAR CARPET SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS AND CRI 104. EDGES OF MODULAR CARPET TILE MEETING HARD SURFACE FLOORING SHALL BE PROTECTED WITH MANUFACTURER'S RECOMMENDED TRANSITION MOLDING. INSTALLATION SHALL BE IN ACCORDANCE WITH THE
MOLDING MANUFACTURER'S INSTRUCTIONS
13. MODULAR CARPET TILES SHALL BE INSTALLED WITH "ZERO" VOC'S ADHESIVE AND SHALL BE SNUGLY JOINTED TOGETHER. TILES SHALL BE LAID IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDED INSTALLATION
GUIDELINES AND CRI 104, WITH ACCESSIBILITY TO THE SUBFLOOR WHERE REQUIRED
14. CONTRACTOR SHALL CUT AND FIT PORCELAIN TILE, AND MODULAR CARPET TILES TO BUTT TIGHTLY TO VERTICAL SURFACES, PERMANENT FIXTURES, AND BUil T-IN FURNITURE INCLUDING CABINETS, PIPES, OUTLETS, EDGINGS, TRANSITION STRIPS, DOOR THRESHOLDS, WALL BASE BOARDS. BIND OR SEAL CUT EDGES AS RECOMMENDED BY
THE PORCELAIN TILE AND THE MODULAR CARPET TILE MANUFACTURERS.
15. IF THE CONTRACTOR SPILLS ANY ADHESIVE, THIN-SET, OR IN ANY WAY SOILS THE WALLS OR OTHER FURNISHINGS, OR DAMAGES ANY FURNISHINGS, THE CONTRACTOR SHALL CLEAN UP AND MAKE REPAIRS USING A SPECIALIST AT
THE CONTRACTOR'S EXPENSE.
16. AFTER INSTALLATION OF THE MODULAR CARPET TILE, DEBRIS, SCRAPS, AND OTHER FOREIGN MATTER SHALL BE REMOVED. SOILED SPOTS AND ADHESIVE SHALL BE REMOVED FROM THE FACE OF THE CARPET WITH APPROPRIATE SPOT REMOVER. PROTRUDING FACE YARN SHALL BE CUT OFF AND REMOVED. NEW MODULAR CARPET TILE SYSTEM
SHALL BE VACUUMED CLEAN .
17. FOLLOWING COMPLETION OF PORCELAIN TILE AND THE CARPET REPLACEMENT, THE CONTRACTOR SHALL REMOVE
COVERS, CLEAN THE FIXTURES WITH APPROVED METHOD.
18. THE CONTRACTOR SHALL PROVIDE TO THE GOVERNMENT COR EXTRA PORCELAIN TILE AND MODULAR CARPET TILES IN ORDER TO BE STORED BY THE USER. THE QUANTITIES FOR EACH MATERIAL SHALL BE BASED ON 10 PERCENT OF
THE TOTAL SQUARE FOOTAGE OF EACH MATERIAL FOR THIS PROJECT.
19. THE CONTRACTOR SHALL MATCH THE EXISTING WOOD BASE BOARDS DESIGN FORM AT EACH SPACE, AND AT THE SPACES WHERE THERE IS RUBBER BASE AND TILE BASE (VESTIBULE 100); PREPARE EXISTING WALL SURFACE AND INSTALL NEW 3 INCH HIGH WOOD BASE BOARD. CONTRACTOR SHALL COORDINATE WITH DPW-COR FOR THE SELECTED DESIGN FORM OF THE NEW WOOD BASE BOARD AT THE SPACES WHERE THERE IS NOT AN EXISTING WOOD BASE BOARD. THE WOOD BASE BOARD SHALL BE STAINED AND SEALED TO MATCH EXISTING AT EACH SPACE.
20. THE CONTRACTOR SHALL INSTALL THE THRESHOLDS AT DOOR OPENINGS ACCORDING TO THE INSTRUCTIONS IN
THE SPECIFICATIONS FOR THIS PROJECT. (SEE THE SPECIFICATIONS ATTACHED TO SOW)
21. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION PHASING PLAN FOR THE DWP COR AND THE USER APPROVAL.
0 KEYED NOTES
1. AREAS WHERE NEW PORCELAIN TILE SYSTEM WILL BE INSTALLED (SEE SPECIFICATIONS)
2. AREAS WHERE NEW CARPET SYSTEM WILL BE INSTALLED
3. GRAY SHADED AREA IS NOT PART OF THE SCOPE OF WORK, PROTECT
DURING CONSTRUCTION
NO. DATE DESCRIPTION BY APPROVED
DRAWN BY
TONY SAENZ
DESIGNED
REVISIONS
WHITE SANDS MISSILE RANGE, NEW MEXICO
DIRECTORATE OF PUBLIC WORKS
ENGINEERING SERVICES DMSION
CHECKED
TONY SAENZ
SUBMITTED
JIM STEPHENSON
PROJECT MANAGER
RECOMMENDED
REPAIR/ REPLACE
FLOORING IN B1330
NEW FLOORING PLAN
RAFAEL ACOSTA
BRANCH CHIEF
APPROVED DRAWING NUMBER SHE.ET
JOHN MORGAN WS-1330-2022-A-100-04
CHIEF, ENGINEERING DMSION
DATE 20/07/22 SCALE X/X"=1 '-Q"
SHEET SIZE 04
SHEET OF 04
| 01 COVER PAGE |
| SHEET 02 BLDG PROJECT LOCATION_REVISED 09 AUG 22 |
| 03 DEMO PLAN |
| 04 NEW FLOORING LAN |
File details come from the government source that posted it. Updated .