This document consists of detailed construction drawings issued for bidding in June 2026 by the Dutchess County Water and Wastewater Authority (DCWWA) for the West Dorsey Lane Water Main Extension project located in Hyde Park, New York. The project involves extending water service from the Hyde Park Water Treatment facility along Route 9 to West Dorsey Lane by constructing approximately 1,361 linear feet of new water main infrastructure. The work includes installation of 12-inch and 8-inch high-density polyethylene (HDPE) water mains, gate valves, hydrant assemblies, water service connections, and associated appurtenances. The complete drawing set comprises 17 sheets and includes plan/profile views divided into four stations (0+00 to 13+61), miscellaneous construction details, and New York State Department of Transportation standard traffic control sheets. The drawings were prepared by Tighe & Bond Engineering and Landscape Architecture, P.C., and issued for bidding on June 12, 2026, with project oversight provided by DCWWA staff including Jason Teed, PE, as Project Manager.
The project specifications require contractors to comply with extensive technical standards including AWWA C-901 and C-906 for HDPE pipe installation at a working pressure of 105 PSI and minimum 5-foot cover depth (with 2-inch rigid foam insulation where cover is reduced to 3 feet due to bedrock conditions). Critical construction requirements include notification to UDIG NY (now Notify 811) at least 48 hours before ground disturbance, hydrostatic and bacteriological pressure testing per AWWA standards, disinfection procedures maintaining 25 mg/L free chlorine for 24 hours, traffic control implementation per MUTCD standards and NYSDOT specifications, and restoration of all disturbed surfaces to existing or proposed conditions. Funding sources and specific contract award information are not detailed in this drawing package; however, the project is coordinated under Dutchess County Environmental Health Services Division requirements with approval valid for five years from the date of issuance. Contractors are responsible for all permits, site safety, utility coordination, and compliance with local, state, and federal environmental and safety regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| West Dorsey Lane Water Main Extension-FINAL BID DOCS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
below.
before you dig.Call
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
TOWN OF HYDE PARK,
DUTCHESS COUNTY WATER AND WASTE
WEST DORSEY L
WATER MAIN EXTEN
ISSUED FOR BIDDIN
JUNE 2026
LIST OF DRAWINGS
SHEET NO. DRAWING NO. DRAWING TITLE
1 G-000 COVER SHEET
2 G-001 GENERAL NOTES
3 G-002 LEGEND & ABBREVIATIONS
4 C-101 WEST DORSEY LANE WATER MAIN PLAN/PROFILE STA 0+00 - STA 2+48
5 C-102 WEST DORSEY LANE WATER MAIN PLAN/PROFILE STA 2+48 - STA 7+39
6 C-103 WEST DORSEY LANE WATER MAIN PLAN/PROFILE STA 7+39 - STA 12+65
7 C-104 WEST DORSEY LANE WATER MAIN PLAN/PROFILE STA 12+65 - STA 13+61
8 C-501 MISCELLANEOUS DETAILS - 1
9 C-502 MISCELLANEOUS DETAILS - 2
10 C-503 MISCELLANEOUS DETAILS - 3
NYSDOT STANDARD SHEETS FOR TRAFFIC CONTROL
11 608-03
RESIDENTIAL AND MINOR COMMERCIAL DRIVEWAYS (SHEET 2 OF 9)
(ISSUED UNDER EB 16-012, APPROVED MARCH 07, 2016)
WORK ZONE TRAFFIC CONTROL TWO-LANE TWO-WAY ROADWAY LANE
12 619-308 CLOSURE WITH FLAGGERS PRIOR TO INTERSECTION (SHEET 1 OF 2)
(ISSUED UNDER EI 25-001, APPROVED JANUARY 10, 2025)
WORK ZONE TRAFFIC CONTROL TWO-LANE TWO-WAY ROADWAY LANE
13 619-308 CLOSURE WITH FLAGGERS PRIOR TO INTERSECTION (SHEET 2 OF 2)
(ISSUED UNDER EI 25-001, APPROVED JANUARY 10, 2025)
WORK ZONE TRAFFIC CONTROL NON-FREEWAY SHOULDER CLOSURE
14 619-310 (SHEET 1 OF 2) ( ISSUED UNDER EI 21-028, APPROVED DECEMBER 2,
2021)
WORK ZONE TRAFFIC CONTROL NON-FREEWAY SHOULDER CLOSURE
15 619-310 (SHEET 2 OF 2) ( ISSUED UNDER EI 21-028, APPROVED DECEMBER 2,
2021)
WORK ZONE TRAFFIC CONTROL MULTI LANE UNDIVIDED ROADWAY
16 619-317 SINGLE LANE CLOSURE (SHEET 1 OF 2) (ISSUED UNDER EI 21-028,
APPROVED DECEMBER 2, 2021)
WORK ZONE TRAFFIC CONTROL MULTI LANE UNDIVIDED ROADWAY
17 619-317 SINGLE LANE CLOSURE (SHEET 2 OF 2) (ISSUED UNDER EI 21-028,
APPROVED DECEMBER 2, 2021)
PROJECT
LOCATION
LOCATION MAP
SCALE: 1" = 1,500'
STATE ROAD RIGHT-OF-WAY
ROAD: US 9
SPEED LIMIT: 45 MPH
AADT: 19,934
FUNCTIONAL CLASS: PRINCIPAL ARTERIAL
N
R
Know what's
ERVICES PROVIDED IN NEW YORK BY T&B ENGINEERING AND LANDSCAPE ARCHITECTURE, P.C.
NAUTHORIZED ALTERNATIONS TO THIS DOCUMENT IS A VIOLATION OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
ERIN
MOORE
84665
06/12/2026 06/12/2026
Ti gh e
B on d:
J:
\D \D
D C W
W A \0
7- O n C al l\
7H W es t
D or se y
W at er M ai n
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \D
-0 7H
-G -0
_1
0_
_2
5.
dw g
NY
WATER AUTHORITY
ANE
SION
G
PREPARED BY:
La st
S av ed : 6
/1 1/
Pl ot te d
O n:
Ju n
-5 :3
4p m
B y:
D
TS
ec he
PREPARED FOR:
DUTCHESS COUNTY WATER & WASTEWATER
AUTHORITY (DCWWA)
1 LAGRANGE AVENUE
POUGHKEEPSIE, NY 12603
DUTCHESS COUNTY WATER & WASTERWATER AUTHORITY BOARD
THOMAS LEGRAND, CHAIRPERSON
RUDY VAVRA, VICE-CHAIRPERSON
LAWRENCE KNAPP, TREASURER
DALE BORCHERT, SECRETARY
JENNIFER CANNELL, MEMBER
DUTCHESS COUNTY WATER & WASTEWATER AUTHORITY BOARD
JONATHAN CHURINS, EXECUTIVE DIRECTOR
JESSICA MCMAHON, CPA, DEPUTY DIRECTOR, TREASURER
RICHARD WINCHESTER, DIRECTOR OF OPERATIONS
JASON TEED, PE, PROJECT MANAGER
COMPLETE SET 17 SHEETS
S U
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
BASE PLAN NOTES
1. THE EXISTING CONDITIONS INFORMATION SHOWN ON THE DRAWINGS IS BASED ON THE FOLLOWING:
· GENERAL LOCATION AND TOPOGRAPHIC SURVEY DRAWINGS, TITLED "TOPOGRAPHIC & LOCATION SURVEY ALBANY POST ROAD (ROUTE 9) WEST DORSEY/OLD DORSEY LN", PROVIDED BY CONTROL POINT ASSOCIATES, INC. P.C., DATED OCTOBER 2024
· EASEMENT BOUNDARY SURVEY DRAWINGS, TITLED "MAP OF SURVEY PREPARED FOR DCWWA", PROVIDED BY LABELLA ASSOCIATES D.P.C., DATED FEBRUARY 2026
2. UTILITY LOCATIONS SHOWN WERE PLOTTED FROM DATA OBTAINED FROM FIELD SURVEYS, UTILITY MARK OUTS, AND ABOVE GROUND STRUCTURES THAT WERE VISIBLE AND ACCESSIBLE IN THE FIELD. THE ACCURACY AND COMPLETENESS OF SUBSURFACE INFORMATION SHOWN ON THESE DRAWINGS IS NOT GUARANTEED. DETERMINE THE LOCATIONS AND ELEVATIONS OF ALL UTILITIES WHICH MAY AFFECT CONSTRUCTION OPERATIONS.
3. SUB-SURFACE ROCK DEPTH EXPLORATIONS WERE PERFORMED BY MARTIN GEO-ENVIROMENTAL, LLC ON 9/26/2024. ROCK PROBE LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE AND INFORMATION IS NOT GUARANTEED IN ANY WAY TO REPRESENT EXISTING CONDITIONS. SUB-SURFACE ROCK DEPTH LOGS ARE INCLUDED IN THE PROJECT
MANUAL FOR THE CONTRACTORS INFORMATION ONLY.
4. THE DRAWINGS ARE BASED ON THE FOLLOWING DATUMS: HORIZONTAL NAD83; VERTICAL NAVD88.
5. THE EXISTING CONDITIONS SHOWN ARE APPROXIMATE. FIELD VERIFY EXISTING CONDITIONS.
GENERAL NOTES
1. NOTIFY UDIG NY AT 1-800-962-7962 AND OTHER UTILITY OWNERS IN THE AREA NOT ON THE UDIG NY LIST AT LEAST 72 HOURS PRIOR TO ANY DIGGING, TRENCHING, ROCK REMOVAL, DEMOLITION, BORING, BACKFILLING, GRADING, LANDSCAPING, OR ANY OTHER EARTH MOVING OPERATIONS.
2. LOCATIONS OF EXISTING UTILITIES ARE APPROXIMATE. IN ADDITION, SOME UTILITIES MAY NOT BE SHOWN. DETERMINE THE EXACT LOCATION OF UTILITIES BY TEST PIT OR OTHER METHODS, AS NECESSARY TO PREVENT DAMAGE TO UTILITIES AND/OR INTERRUPTIONS IN UTILITY SERVICE. PERFORM TEST PIT EXCAVATIONS AND OTHER INVESTIGATIONS TO LOCATE UTILITIES, AND PROVIDE THIS INFORMATION TO THE ENGINEER, PRIOR TO CONSTRUCTING THE PROPOSED IMPROVEMENTS. IF FIELD CONDITIONS ARE OBSERVED THAT VARY SIGNIFICANTLY FROM THOSE SHOWN ON THE DRAWINGS, IMMEDIATELY NOTIFY THE ENGINEER IN WRITING FOR RESOLUTION OF THE CONFLICTING INFORMATION. LOCATE ALL EXISTING UTILITIES TO BE CROSSED BY HAND EXCAVATION.
3. NOT ALL OF THE UTILITY SERVICES TO BUILDINGS ARE SHOWN. THE CONTRACTOR SHALL ANTICIPATE THAT EACH PROPERTY HAS SERVICE CONNECTIONS FOR THE VARIOUS
UTILITIES.
4. BOLD TEXT AND LINES INDICATE PROPOSED WORK. LIGHT TEXT AND LINES INDICATE APPROXIMATE EXISTING CONDITIONS.
5. TIGHE & BOND ASSUMES NO RESPONSIBILITY FOR ANY ISSUES, LEGAL OR OTHERWISE, RESULTING FROM CHANGES MADE TO THESE DRAWINGS WITHOUT WRITTEN
AUTHORIZATION FROM TIGHE & BOND.
6. EXCAVATE ADDITIONAL TEST PITS TO LOCATE EXISTING UTILITIES AS DIRECTED OR APPROVED BY THE ENGINEER.
7. NOTIFY THE ENGINEER OF ANY UTILITIES IDENTIFIED DURING CONSTRUCTION THAT ARE NOT SHOWN ON THE DRAWINGS OR THAT DIFFER IN SIZE OR MATERIAL.
8. THE CONTRACTOR IS RESPONSIBLE FOR SITE SAFETY; COORDINATION WITH THE OWNER, ALL SUBCONTRACTORS, AND WITH OTHER CONTRACTORS WORKING WITHIN THE
LIMITS OF WORK; AND THE MEANS AND METHODS OF CONSTRUCTING THE PROPOSED WORK.
9. OBTAIN, PAY FOR, AND COMPLY WITH PERMITS, NOTICES, AND FEES NECESSARY TO COMPLETE THE WORK. ARRANGE AND PAY FOR NECESSARY INSPECTIONS AND APPROVALS
FROM THE JURISDICTIONAL AUTHORITIES.
10. SHORE UTILITY TRENCHES WHERE FIELD CONDITIONS DICTATE AND/OR WHERE REQUIRED BY LOCAL, STATE, AND FEDERAL HEALTH AND SAFETY CODES.
11. PROTECT AND MAINTAIN ALL UTILITIES IN THE AREAS UNDER CONSTRUCTION DURING THE WORK. LEAVE ALL PIPES AND STRUCTURES WITHIN THE LIMITS OF THE CONTRACT IN A CLEAN AND OPERABLE CONDITION AT THE COMPLETION OF THE WORK. TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SAND AND SILT FROM DISTURBED AREAS FROM
ENTERING THE DRAINAGE SYSTEM.
12. NOTIFY THE ENGINEER IN WRITING OF ANY CONFLICT, ERROR, AMBIGUITY, OR DISCREPANCY WITH THE PLANS OR BETWEEN THE PLANS AND ANY APPLICABLE LAW, REGULATION, CODE, STANDARD SPECIFICATION, OR MANUFACTURER'S INSTRUCTIONS.
13. THE CONTRACTOR IS RESPONSIBLE FOR SUPPORT OF EXISTING UTILITIES AND REPAIR OR REPLACEMENT COSTS OF UTILITIES DAMAGED DURING CONSTRUCTION, WHETHER ABOVE OR BELOW GRADE. REPLACE DAMAGED UTILITIES IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER AND AT NO COST TO THE PROPERTY OWNER.
14. TAKE NECESSARY MEASURES AND PROVIDE CONTINUOUS BARRIERS OF SUFFICIENT TYPE, SIZE, AND STRENGTH TO PREVENT ACCESS TO ALL WORK AND STAGING AREAS AT
THE COMPLETION OF EACH DAYS WORK.
15. NO OPEN TRENCHES WILL BE ALLOWED OVER NIGHT. THE USE OF ROAD PLATES TO PROTECT THE EXCAVATION WILL BE CONSIDERED UPON REQUEST, BUT BACKFILLING IS
PREFERRED.
16. THE CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY TRAFFIC CONTROL/SAFETY DEVICES TO ENSURE SAFE VEHICULAR AND PEDESTRIAN ACCESS THROUGH THE WORK AREA, OR FOR SAFELY IMPLEMENTING DETOURS AROUND THE WORK AREA. PERFORM TRAFFIC CONTROL IN ACCORDANCE WITH THE CONTRACTOR'S APPROVED TRAFFIC CONTROL PLAN. TRAFFIC CONTROL PLAN IN ACCORDANCE WITH MUTCD (11TH EDITION), NYS SUPPLEMENT (MOST RECENT EDITION), AND NYSDOT STANDARD SPECIFICATIONS
AND STANDARD SHEETS (MOST RECENT EDITION).
17. MAINTAIN EMERGENCY ACCESS TO ALL PROPERTIES WITHIN THE PROJECT AREA AT ALL TIMES DURING CONSTRUCTION.
18. REMOVE AND DISPOSE OF ALL CONSTRUCTION-RELATED WASTE MATERIALS AND DEBRIS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL LAWS.
19. THE TERM "DEMOLISH" USED ON THE DRAWINGS MEANS TO REMOVE AND DISPOSE OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS.
20. THE TERM "ABANDON" USED ON THE DRAWINGS MEANS TO LEAVE IN PLACE AND TAKE APPROPRIATE MEASURES TO DECOMMISSION AS SPECIFIED OR NOTED ON THE
DRAWINGS.
21. ALL PROPOSED WORK MAY BE ADJUSTED IN THE FIELD BY THE OWNER'S PROJECT REPRESENTATIVE TO MEET EXISTING CONDITIONS.
DUTCHESS COUNTY ENVIRONMENTAL HEALTH AND SAFETY DEPARTMENT STANDARD NOTES
1. THE DESIGN, CONSTRUCTION AND INSTALLATION SHALL BE IN ACCORDANCE WITH THIS PLAN AND GENERALLY ACCEPTED STANDARDS IN EFFECT AT THE TIME OF
CONSTRUCTION WHICH INCLUDE:
"RECOMMENDED STANDARDS FOR WATER WORKS, (TEN STATES)."
"NEW YORK STATE DEPARTMENT OF HEALTH AND DUTCHESS COUNTY ENVIRONMENTAL HEALTH SERVICES DIVISION POLICIES, PROCEDURES AND STANDARDS."
"DUTCHESS COUNTY AND NEW YORK STATE SANITARY CODES."
"DUTCHESS COUNTY ENVIRONMENTAL HEALTH SERVICES DIVISION CERTIFICATE OF APPROVAL LETTER."
2. THIS PLAN IS APPROVED AS MEETING THE APPROPRIATE AND APPLIED TECHNICAL STANDARDS, GUIDELINES, POLICIES, AND PROCEDURES FOR ARRANGEMENT OF WATER
SUPPLY FACILITIES.
3. UPON COMPLETION OF THE FACILITIES, THE FINISHED WORKS SHALL BE INSPECTED, TESTED, AND CERTIFIED COMPLETE TO THE DC EHSD BY THE NEW YORK STATE LICENSED PROFESSIONAL ENGINEER SUPERVISING CONSTRUCTION. NO PART OF THE FACILITIES SHALL BE PLACED INTO SERVICE UNTIL ACCEPTED BY THE DC EHSD.
4. APPROVAL OF ANY PLAN(S) OR AMENDMENT THERETO SHALL BE VALID FOR A PERIOD OF FIVE (5) YEARS FORM THE DATE OF APPROVAL. FOLLOWING THE EXPIRATION OF SAID APPROVAL, THE PLAN(S) SHALL BE RE-SUBMITTED TO THE COMMISSIONER OF HEALTH FOR CONSIDERATION FOR RE-APPROVAL. RE-SUBMISSION OR REVISED SUBMISSION OF PLANS AND/OR ASSOCIATED DOCUMENTS SHALL BE SUBJECT TO COMPLIANCE WITH THE TECHNICAL STANDARDS, GUIDELINES, POLICIES AND PROCEDURES IN EFFECT AT THE
TIME OF THE RE-SUBMISSION.
5. ALL PROPOSED SERVICE LINES ON THIS PLAN ARE ACCESSIBLE FOR INSTALLATION AND PLACEMENT.
6. ALL REQUIRED EROSION & SEDIMENT CONTROL AND STORMWATER POLLUTION PREVENTION WATER QUALITY & QUANTITY CONTROL STRUCTURES, PERMANENT AND
TEMPORARY, ARE INCLUDED ON THE DRAWINGS AND SPECIFICATIONS.
7. ALL SERVICE LINES ARE THE RESPONSIBILITY OF THE OWNER UP TO THE PROPERTY LINE. THE WATER COMPANY SHALL BE RESPONSIBLE FOR ALL VALVES AND PIPES WHICH
ARE NOT THE OWNER'S PROPERTY.
EROSION CONTROL AND RESOURCE AREA PROTECTION NOTES
1. PROVIDE ALL EROSION CONTROL MEASURES SHOWN, SPECIFIED, REQUIRED BY PERMIT, IN ACCORDANCE WITH "NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION CONTROL", AS REVISED, AND AS NECESSARY TO PREVENT TRANSPORTATION OF SEDIMENT FROM THE WORK AREA DOWNSTREAM, AND/OR REQUIRED BY THE ENGINEER PRIOR TO ANY CONSTRUCTION OR IMMEDIATELY UPON REQUEST. MAINTAIN SUCH CONTROL MEASURES UNTIL FINAL SURFACE TREATMENTS ARE IN PLACE AND/OR UNTIL PERMANENT VEGETATION IS ESTABLISHED. INSPECT AFTER EACH RAINSTORM AND DURING MAJOR STORM EVENTS TO CONFIRM THAT ALL SEDIMENTATION AND
EROSION CONTROL MEASURES REQUIRED ARE IN PLACE AND EFFECTIVE.
2. INSTALL SILT SACKS OR OTHER APPROVED SEDIMENTATION BARRIERS IN/AT ALL CATCH BASINS IN THE PROJECT AREA.
3. COMPACT, STABILIZE, AND LOAM AND SEED SIDE SLOPES, SHOULDER AREAS AND DISTURBED VEGETATED AREAS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND AS REQUIRED BY PERMITS. GRADE SIDE SLOPES, SHOULDER AREAS AND DISTURBED VEGETATED AREAS TO A MAXIMUM SLOPE OF 3 HORIZONTAL TO 1 VERTICAL (3H:1V), WHERE POSSIBLE. PROVIDE BIODEGRADABLE EROSION CONTROL BLANKETS TO PREVENT EROSION WHERE SLOPES ARE STEEPER THAN 3H:1V.
4. SETTLE OR FILTER ALL SILT-LADEN WATER FROM DEWATERING ACTIVITIES IN A SEDIMENTATION OR FILTER BAG TO REMOVE SEDIMENTS PRIOR TO RELEASE USING A
SEDIMENTATION OR FILTER BAG LOCATED DOWN-GRADIENT OF THE DEWATERED AREA.
5. REMOVE AND PROPERLY DISPOSE OF SILT TRAPPED AT BARRIERS IN UPLAND AREAS OUTSIDE BUFFER ZONES. REMOVE MATERIALS DEPOSITED IN ANY TEMPORARY SETTLING BASINS AT THE COMPLETION OF THE PROJECT. RESTORE ALL DISTURBED AREAS TO THEIR PRECONSTRUCTION CONDITION.
6. SWEEP, COLLECT, REMOVE AND DISPOSE OF ANY SEDIMENT TRACKED ONTO PUBLIC RIGHT-OF-WAYS AT THE END OF EACH DAY.
7. LOAM AND SEED ALL DISTURBED VEGETATED AREAS TO ESTABLISH COVER AND STABILIZATION AS SOON AS POSSIBLE FOLLOWING DISTURBANCE.
8. MAINTAIN AN ADDITIONAL SUPPLY OF EROSION CONTROL MEASURES ON-SITE FOR EMERGENCY REPAIRS.
9. STORE FUEL, OIL, PAINT, OR OTHER HAZARDOUS MATERIALS IN A SECONDARY CONTAINER AND REMOVE TO A SECURE LOCKED AND COVERED AREA DURING NON-WORK
HOURS.
10. PROVIDE A SUPPLY OF ABSORBENT SPILL RESPONSE MATERIALS SUCH AS BOOMS, BLANKETS, AND OIL ABSORBENT MATERIALS AT THE CONSTRUCTION SITE AT ALL TIMES TO CLEAN UP POTENTIAL SPILLS OF HAZARDOUS MATERIALS. IMMEDIATELY REPORT SPILLS OF HAZARDOUS MATERIALS TO THE NEW YORK STATE DEPARTMENT OF
ENVIRONMENTAL CONSERVATION AND THE MUNICIPALITY WHERE THE WORK IS OCCURRING.
SURFACE RESTORATION NOTES
1. ALL PAVEMENT DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE REPLACED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND, IF NOT OTHERWISE SPECIFIED, USING THE
SAME MATERIALS AND THICKNESS AS THE EXISTING PAVEMENT SECTION.
2. PROTECT PROJECT FEATURES (E.G., WALLS, FENCES, MAIL BOXES, SIGNS, SIDEWALKS, CURBING, STAIRS, WALKWAYS, TREES, SHRUBS, PLANTINGS ETC.) FROM DAMAGE DURING
CONSTRUCTION, INCLUDING PROVIDING TEMPORARY SUPPORTS, WHEN APPROPRIATE.
3. RESTORE ALL PAVEMENT MARKING DISTURBED BY CONSTRUCTION. PAVEMENT MARKINGS WITHIN NYSDOT ROW TO BE RESTORED IN ACCORDANCE WITH NYSDOT STANDARD SPECIFICATIONS AND SHEETS. PAVEMENT MARKINGS WITHIN TOWN OF HYDE PARK ROW TO BE RESTORED IN ACCORDANCE WITH TOWN OF HYDE PARK STANDARDS. ALL OTHER
PAVEMENT MARKINGS RESTORE WITH WATERBORNE TRAFFIC PAINT.
4. IF REMOVAL OF PROJECT FEATURES IS REQUIRED IN ORDER TO PERFORM THE PROPOSED WORK, REMOVE THOSE SITE FEATURES ONLY UPON APPROVAL OF ENGINEER. REPLACE ALL REMOVED PROJECT FEATURES; NEW ITEMS SHALL BE EQUAL OR BETTER IN QUALITY AND CONDITION TO THE ITEMS REMOVED.
5. EXISTING SURVEY MONUMENTS DISTURBED BY THE CONTRACTOR SHALL BE REPLACED BY A LAND SURVEYOR LICENSED IN THE STATE IN WHICH THE WORK IS PERFORMED AT NO
ADDITIONAL COST TO THE OWNER.
6. COORDINATE THE ADJUSTMENT OF EXISTING UTILITY STRUCTURES WITH EACH RESPONSIBLE UTILITY OWNER PRIOR TO RECONSTRUCTION AND/OR PAVING OPERATIONS. RAISE ALL
STRUCTURES TO FINISHED GRADES PRIOR TO THE END OF PAVING.
7. REPAIR DISTURBED PAVED OR PORTLAND CEMENT CONCRETE SURFACES PER TEMPORARY TRENCH REPAIR DETAIL AT THE END OF EACH WORK WEEK, UNLESS OTHERWISE
APPROVED/REQUIRED BY THE OWNER.
8. CONTRACTOR IS RESPONSIBLE FOR ADDRESSING TEMPORARY TRENCH REPAIR SETTLEMENT AS NEEDED TO PROVIDE A SMOOTH AND FLUSH TRANSITION BETWEEN EXISTING AND
REPAIRED SURFACES, AT NO ADDITIONAL COST TO THE OWNER.
9. IF EXISTING MAGNETIC OR TRAFFIC LOOP DETECTORS ARE REMOVED IN THE COURSE OF EXCAVATION, REPLACE WITH NEW TRAFFIC LOOP DETECTORS IN ACCORDANCE WITH THE NEW YORK STATE DEPARTMENT OF TRANSPORTATION STANDARDS AND THE CONTRACT DOCUMENTS, UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
10. TRANSFER ALL TEMPORARY BENCHMARKS, AS NECESSARY.
11. ACCOMMODATE PEDESTRIAN TRAFFIC WHERE A SIDEWALK IS TO BE CLOSED FOR SAFETY. “SIDEWALK CLOSED HERE” SIGNS SHALL BE USED AT THE NEAREST SAFE INTERSECTION.
12. RESTORE ALL AREAS DISTURBED BY THE CONTRACTOR BEYOND THE PAYLINE LIMITS TO ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
13. REGRADE ALL UNPAVED AREAS DISTURBED BY THE WORK AS REQUIRED. REPAIR/REPLACE PAVED SURFACES DISTURBED BY THE WORK IN-KIND, UNLESS OTHERWISE NOTED. RESTORE
SURFACES TO EXISTING OR PROPOSED CONDITIONS AS INDICATED ON THE DRAWINGS.
14. PROVIDE A SMOOTH, FLUSH TRANSITION BETWEEN ALL NEW AND EXISTING PAVEMENTS AND WALKING SURFACES.
R
Know what's
ERIN
MOORE
84665
06/12/2026
06/12/2026
West Dorsey Lane Water Main Extension
Dutchess County Water and Wastewater Authority
Hyde Park, New York
SERVICES PROVIDED IN NEW YORK
BY T&B ENGINEERING AND
LANDSCAPE ARCHITECTURE, P.C.
UNAUTHORIZED ALTERATIONS TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
PROJECT NO: D0280-07H
DATE: JUNE 2026
FILE: D0280-07H-G-001.dwg
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
SCALE:
0 ISSUED FOR BIDDING6/12/2026
MARK DATE DESCRIPTION
ISSUED FOR
BIDDING
La st
S av ed
6/
/2
Pl ot te d O n:
Ju n
-5
:3 5p m B y:
D
TS
ec he Ti gh e
B on d:
J:
\D
\D
D
C W
W A \0
7- O n C al l\
7H W es t
D or se y
W at er M ai n
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \D
-0 7H
-G -0
.d w g
DTS/BY
DTS
DFV
GENERAL NOTES
NO SCALE
G-001
SHEET OF 1702
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
W W
R
Know what's
WATER SYSTEM IMPROVEMENTS NOTES
LEGEND ABBREVIATIONS
DESCRIPTION EXISTING PROPOSED ABDN('D) ABANDON(ED)
1. PROPOSED WATER MAINS SHALL BE PROVIDED IN ACCORDANCE WITH THE OWNER'S STANDARDS, AS SPECIFIED, AND AS SHOWN ON THE DRAWINGS. WHERE THERE IS A CONFLICT BETWEEN THE OWNER'S STANDARDS AND THE DRAWINGS AND SPECIFICATIONS, THE OWNER'S STANDARDS SHALL GOVERN.
ROADWAY BASELINE
PROPERTY LINE
AC
BC
BFP
ASBESTOS CEMENT PIPE
BITUMINOUS CURB
BACK FLOW PREVENTOR
2. HORIZONTAL AND VERTICAL LOCATION OF WATER MAINS MAY BE MODIFIED TO FIT EXISTING FIELD CONDITIONS, UPON APPROVAL OF THE ENGINEER. EASEMENT LINE
BIT
BL
BITUMINOUS
BASELINE
TEMP CONSTRUCTION EASEMENT BLDG BUILDING
3. WORKING PRESSURE OF WATER MAIN IN PROJECT AREA IS 105 PSI. BOC BOTTOM OF CURB
INTERMEDIATE CONTOURS BOT BOTTOM
4. HDPE PIPE SHALL BE PE4710, DR 11, PRESSURE CLASS 200 PSI PER AWWA C-901 OR AWWA C-906. INDEX CONTOURS CB
CCW
CATCH BASIN
CEMENT CONCRETE WALK
5. MINIMUM DEPTH OF COVER OVER PROPOSED WATER MAIN SHALL BE 5 FEET, UNLESS OTHERWISE NOTED OR APPROVED BY THE ENGINEER.
SPOT GRADE
STORM DRAIN
CEM
CI
CEMENT
CAST IRON
CL CENTERLINE
6. ALL BELOW GRADE VALVES AND FITTINGS SHALL HAVE MECHANICAL JOINT (MJ) ENDS. RESTRAIN ALL VALVE AND FITTING JOINTS WITH RETAINER GLANDS. GRAVITY SANITARY SEWER
WATER SERVICE
CO
CONC
CLEAN OUT
CONCRETE
7. WHERE A COUPLING IS CALLED FOR ON THE DRAWINGS TO CONNECT A PROPOSED WATER MAIN TO AN EXISTING WATER MAIN PROVIDE A SOLID SLEEVE, IF POSSIBLE. RESTRAIN SOLID SLEEVE TO PIPES WITH RETAINER GLANDS. IF OUTSIDE DIAMETER OF EXISTING WATER MAIN DOES NOT ALLOW INSTALLATION OF SOLID SLEEVE, PROVIDE RESTRAINING TYPE TRANSITION
COUPLING.
POTABLE WATER
NATURAL GAS
CU
CY
DI
DIA
COPPER
CUBIC YARD
DUCTILE IRON
DIAMETER
8. SLEEVES, NIPPLES, AND ACCESSORIES NECESSARY FOR CONNECTION BETWEEN EXISTING AND PROPOSED PIPES, DISINFECTION OR TESTING MAY NOT BE SHOWN ON THE DRAWINGS.
PROVIDE ITEMS NECESSARY FOR CONNECTING TO EXISTING MAINS AND MAKE CONNECTIONS AS INDICATED IN THE CONTRACT DOCUMENTS.
OVERHEAD ELECTRIC
CURB
DMH
E
EG
DRAIN MANHOLE
EAST
EXISTING GRADE
9. RESTRAIN ALL PIPE JOINTS AND FITTINGS.
EDGE OF PAVEMENT
SIDEWALK
EL/ELEV
ELEC
ELEVATION
ELECTRIC
EMH ELECTRIC MANHOLE
10. WATER MAINS CROSSING SEWERS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18 INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE FENCE - UNSPECIFIED EOP EDGE OF PAVEMENT
SEWER. IT IS PREFERRED THAT THE WATER MAIN CROSS ABOVE THE SEWER. AT CROSSINGS, ONE FULL LENGTH OF WATER PIPE SHALL BE LOCATED SO BOTH JOINTS WILL BE AS FAR FROM THE SEWER AS POSSIBLE. WHERE WATER MAIN HAS LESS THAN 5 FEET COVER, 2 INCHES THICK RIGID INSULATION SHALL BE INSTALLED ABOVE THE WATER MAIN.
STORM DRAIN STRUCTURES
SANITARY SEWER STRUCTURES
EW
EXIST
FES
EACH WAY
EXISTING
FLARED END SECTION
FF FINISH FLOOR
11. WHERE THE PROPOSED WATER MAIN IS TO BE INSTALLED BELOW A DRAIN PIPE, MAINTAIN A MINIMUM OF 18 INCHES BETWEEN THE BOTTOM OF THE STORM DRAIN AND THE CROWN OF THE
WATER MAIN. WATER SERVICE STRUCTURES RED HYDRANT TSV CAP THRUST
BLOCK
VALVE FM
FT
FORCE MAIN
FEET
12. OPERATION OF EXISTING VALVES SHALL BE BY THE WATER DISTRIBUTION SYSTEM OWNER, UNLESS OTHERWISE AUTHORIZED. COORDINATE OPERATION OF VALVES WITH THE WATER
ELECTRIC SERVICE STRUCTURES G
GG
GAS
GAS GATE
DISTRIBUTION SYSTEM OWNER. TREELINE/ SHRUBLINE GRAN
GV
GRANITE
GATE VALVE
13. THE WATER DISTRIBUTION SYSTEM OWNER DOES NOT GUARANTEE A TIGHT SHUTDOWN OF ITS EXISTING VALVES. THE CONTRACTOR IS RESPONSIBLE FOR CONTROL OF LEAKAGE AND
DISPOSAL OF WATER UP TO 100 GALLONS PER MINUTE.
TREE HC
HDPE
HANDICAP
HIGH DENSITY
POLYETHYLENE
14. COORDINATE THE ACTIVATION AND DEACTIVATION OF WATER MAINS WITH THE WATER DISTRIBUTION SYSTEM OWNER AND ENGINEER.
HMA
HYD
HOT MIX ASPHALT
HYDRANT
IN INCHES
15. FOR EACH PROPOSED WATER SERVICE, PROVIDE NEW CORPORATION AT THE MAIN, NEW WATER SERVICE PIPING, AND NEW CURB STOP AND BOX. INV INVERT
LP LIGHT POLE
WATER SYSTEM ANTICIPATED SEQUENCE OF CONSTRUCTION LT
MAX
LEFT
MAXIMUM
1. INSTALL EROSION AND SEDIMENT CONTROLS.
MH
MIN
MANHOLE
MINIMUM
MISC MISCELLANEOUS
2. EXCAVATE TEST PITS TO LOCATE UNDERGROUND UTILITIES FOR NEW WATER MAIN CROSSINGS AND CONNECTIONS. MJ MECHANICAL JOINT
3.
4.
INSTALL NEW WATER MAINS, HYDRANTS, AND SERVICE LINES.
FILL, FLUSH, DISINFECT, AND TEST IN ACCORDANCE WITH AWWA C651-14.
LEGEND
DEMOLITION / GEOTECHNICAL
UTILITY TO BE ABANDONED
N
NTS
N/A
OCS
OH
NORTH
NOT TO SCALE
NOT APPLICABLE
OUTLET CONTROL STRUCTURE
OVERHEAD
5. HYDROSTATIC PRESSURE TEST IN ACCORDANCE WITH AWWA C906-21 AND PPI HANDBOOK OF POLYETHYLENE PIPE. UTILITY TO BE DEMOLISHED PERF PERFORATED
PSF POUNDS PER SQUARE FOOT
6. AUTHORIZATION TO PLACE NEW WATER MAIN INTO SERVICE PER HEALTH DEPARTMENT APPROVAL. ITEM TO BE DEMOLISHED PSI
PVC
POUNDS PER SQUARE INCH
POLYVINYLCHLORIDE
BORING R RADIUS
WAIVER REQUESTS
TEST PIT
RCP
RD
REINFORCED CONCRETE PIPE
ROOF DRAIN
1. WAIVER REQUEST - LESS THAN 10 FEET FROM WATER MAINS TO STORMWATER PIPING SYSTEM AND CATCH BASINS. CATCH BASIN INLET PROTECTION
RED
REV
REDUCER
REVISION
ROW RIGHT OF WAY
1.1. JUSTIFICATION - DUE TO ALL OTHER EXISTING UTILITIES, PROPERTY LINES, AND NYS ROADWAYS, IT IS NOT POSSIBLE TO MEET THE MINIMUM 10-FOOT HORIZONTAL SEPARATION RT RIGHT
BETWEEN WATER MAIN AND STORMWATER COLLECTION SYSTEMS. S SOUTH
SAN SANITARY
1.2. MITIGATION - ALL WATER MAINS SHALL BE BUTT-FUSED HDPE PIPE, AS PREVIOUSLY AGREED UPON WITH THE SUPERVISING PUBLIC HEALTH ENGINEER, AND PRESSURE TESTED TO SCH SCHEDULE
200 PSI OR 1.5X THE WORKING PRESSURE, WHICHEVER IS GREATER. SF SQUARE FOOT
SMH SEWER MANHOLE
2. WAIVER REQUEST - MINIMUM OF 5 FEET OF COVER ABOVE WATER MAINS. SQ
SS
SQUARE
STAINLESS STEEL
2.1. JUSTIFICATION - DUE TO THE PRESENCE OF ROCK ALONG THE PROPOSED WATER MAIN ROUTE AND SHALLOW DEPTH OF ROCK, IT IS NOT POSSIBLE TO MEET THE MINIMUM 5-FOOT
COVER ABOVE THE WATER MAIN AT ALL LOCATIONS.
STA
STL
STRM
STATION
STEEL
STORM
TYP TYPICAL
2.2. MITIGATION - ALL WATER MAINS WITH LESS THAN 5-FEET OF COVER SHALL BE INSTALLED WITH A MINIMUM OF 2-INCH THICK RIGID FOAM INSULATION ABOVE THE WATER MAIN TSV TAPPING SLEEVE & VALVE
AND IN NO CASE SHALL COVER ABOVE THE WATER MAIN BE LESS THAN 3-FOOT. UP UTILITY POLE
WATER MAIN TESTING REQUIREMENTS
W
WG
WATER
WATER GATE
1. PRESSURE TESTING:
1.1. RUN PRESSURE TEST AND LEAKAGE TEST SIMULTANEOUSLY IN ACCORDANCE WITH
ANSI/AWWA C600.
2.3. AT A POINT NOT MORE THAN 10 FEET DOWNSTREAM FROM THE BEGINNING OF THE
NEW MAIN, WATER ENTERING THE NEW MAIN SHALL RECEIVE A DOSE OF CHLORINE
FED AT A CONSTANT RATE SUCH THAT THE WATER WILL NOT HAVE LESS THAN 25
MG/L (PPM) FREE CHLORINE THROUGHOUT THE ENTIRE SECTION OF PIPE TO BE
CHLORINATED.
3.4. FLUSHING SHALL BE DONE IN STRICT CONFORMANCE WITH ALL APPLICABLE LOCAL,
STATE AND FEDERAL REGULATIONS. NO DISCHARGE OF CHLORINATED WATER TO
ANY STORM SEWER OR NATURAL WATERCOURSE WILL BE ALLOWED.
4. BACTERIOLOGICAL SAMPLING
WSV
WSO
WV
XFMR
WATER SHUT OFF VALVE
WATER SHUT OFF
WATER VALVE
TRANSFORMER
1.2. TEST PRESSURE SHALL NOT BE LESS THAN 200 PSI OR 1.5 TIMES THE WORKING
PRESSURE AT THE HIGHEST POINT ALONG THE TEST SECTION AND NOT LESS THAN
200 PSI OR 1.5 TIMES THE WORKING PRESSURE AT THE LOWEST ELEVATION OF THE
TEST SECTION IN ACCORDANCE WITH AWWA C600. TEST PRESSURE SHALL NOT
EXCEED PIPE OR THRUST-RESTRAINT DESIGN PRESSURES.
2.4. THE CHLORINATED WATER IS TO REMAIN IN THE NEW PIPELINE FOR AT LEAST
24-HOURS. AFTER A CONTACT TIME OF 24-HOURS THERE SHOULD BE A FREE
CHLORINE CONCENTRATION OF NOT LESS THAN 10 MG/L (PPM). DURING THIS
PERIOD, PROPER PRECAUTIONS ARE TO BE TAKEN TO PREVENT THIS CHLORINATED
WATER FROM FLOWING BACK INTO THE EXISTING SYSTEM.
4.1.
4.2.
AFTER THE 24-HOUR DISINFECTION PERIOD AND ALL CHLORINE SOLUTION HAS BEEN
THOROUGHLY FLUSHED, THE BACTERIOLOGICAL SAMPLING AND ANALYSIS OF THE
REPLACEMENT WATER MAY THEN BE PERFORMED.
BACTERIOLOGICAL SAMPLING SHALL BE MADE BY THE CONTRACTOR'S COMPETENT
1.3. THE HYDROSTATIC TEST SHALL BE OF AT LEAST 2-HOUR DURATION OR UNTIL SUCH
TIME AS THE ENGINEER INDICATES ACCEPTANCE OF THE PIPELINE. 2.5. ALL VALVES AND HYDRANTS WITHIN THE TREATED SECTION SHALL BE OPERATED TO
PERSON(S) IN FULL ACCORDANCE WITH AWWA C651- SECTION 5, BACTERIOLOGICAL
TESTS AND UNDER THE SUPERVISION OF THE ENGINEER.
ENSURE DISINFECTION OF THE APPURTENANCES.
1.4. TEST PRESSURE SHALL NOT VARY BY MORE THAN ±5 PSI (35 MPA OR 0.35 BAR) FOR
THE DURATION OF THE TEST. 3. FLUSHING:
4.3. ANALYSIS SHALL BE PERFORMED BY AN INDEPENDENT COMMERCIAL LABORATORY
CERTIFIED BY THE STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION AND U.S.
ENVIRONMENTAL PROTECTION AGENCY FOR ANALYZING PUBLIC DRINKING WATER
2. DISINFECTION: 3.1. FOLLOWING THE CHLORINATION PERIOD, ALL TREATED WATER SHALL BE FLUSHED
FROM THE LINES AT THEIR EXTREMITIES AND REPLACED WITH WATER FROM THE
SUPPLIES. ALL RESULTS SHALL BE PROVIDED TO THE ENGINEER FOR REVIEW.
2.1. THE CONTRACTOR WILL DETERMINE THE LOCATION OF THE CHLORINATION AND
SAMPLING POINTS IN THE FIELD. THE CONTRACTOR SHALL INSTALL TAPS FOR
CHLORINATING, SAMPLING AND EXPULSION OF AIR AND SHALL UNCOVER, BACKFILL
AND PLUG THE TAPS AS REQUIRED.
3.2.
DISTRIBUTION SYSTEM.
FLUSHING THE MAIN IS TO BE ACCOMPLISHED AT AS HIGH A VELOCITY AS POSSIBLE
CONSISTENT WITH THE ABILITY OF THE CONTRACTOR TO COLLECT THE DISCHARGE
WATER FOR PROPER DISPOSAL.
4.4. TWO CONSECUTIVE SETS OF ACCEPTABLE SAMPLES, TAKEN AT LEAST 16-HOURS
APART ARE REQUIRED PRIOR TO PLACING THE MAIN INTO SERVICE. SAMPLES SHALL
BE COLLECTED EVERY 1,200 FT OF THE NEW WATER MAIN, PLUS ONE SET FROM THE
END OF THE LINE AND AT LEAST ONE FROM EACH BRANCH GREATER THAN ONE PIPE
LENGTH. FAILURE OF ANY ONE OF THE BACTERIOLOGICAL TEST SAMPLES SHALL
2.2. PRIOR TO DISINFECTING THE WATER MAIN, THE MAIN SHALL BE COMPLETELY FILLED
TO REMOVE ALL AIR POCKETS AND THEN FLUSHED TO REMOVE PARTICULATE. THE
FLUSHING VELOCITY IN THE MAIN SHALL NOT BE LESS THAN 2.5 FT/S UNLESS THE
ENGINEER AND/OR OWNER DETERMINE THAT THE CONDITIONS DO NOT PERMIT THE
3.3. ALL TREATED WATER FLUSHED FROM THE LINES SHALL BE DISPOSED OF BY
DISCHARGING TO THE NEAREST SANITARY SEWER OR BY OTHER APPROVED MEANS
PROVIDED IN AWWA C651.
4.5.
REQUIRE RECHLORINATION AND RETESTING BY THE CONTRACTOR.
THE LINE SHALL NOT BE PLACED IN SERVICE UNTIL THE BACTERIOLOGICAL
REQUIREMENTS OF AWWA C651 ARE MET.
REQUIRED FLOW TO BE DISCHARGED TO WASTE.
ERIN
MOORE
84665
06/12/2026
06/12/2026
West Dorsey Lane Water Main Extension
Dutchess County Water and Wastewater Authority
Hyde Park, New York
SERVICES PROVIDED IN NEW YORK
BY T&B ENGINEERING AND
LANDSCAPE ARCHITECTURE, P.C.
UNAUTHORIZED ALTERATIONS TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
PROJECT NO: D0280-07H
DATE: JUNE 2026
FILE: D0280-07H-G-002.DWG
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
0 ISSUED FOR BIDDING6/12/2026
MARK DATE DESCRIPTION
ISSUED FOR
BIDDING
La st
S av ed
6/
/2
Pl ot te d O n:
Ju n
-5
:3 5p m B y:
D
TS
ec he Ti gh e
B on d:
J:
\D
\D
D
C W
W A \0
7- O n C al l\
7H W es t
D or se y
W at er M ai n
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \D
-0 7H
-G -0
.D
W G
DTS/BY
DTS
DFV
LEGEND & ABBREVIATIONS
NO SCALE
G-002
SCALE:
03SHEET OF 17
N before you dig.Call
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
WV
SILT SACK
WV
0+
(TYP)
W
W
W
W
W
45° BEND, RESTRAINED
12" TEE, RESTRAINED
TRENCH EXTENT
12" TEE, RESTRAINED
45° BEND, RESTRAINED
2+
4'
CONNECT TO EXISTING 12"
DI WATER MAIN, RESTRAINED
12" HDPE WATER MAIN
12" GV AND BOX
12" CAP, RESTRAINED
SILT FENCE
12"x8" REDUCER, RESTRAINED
8" GV AND BOX, RESTRAINED
8" HDPE WATER MAIN
W
1+00
SEE SHEET C-102
12" HDPE WATER MAIN
140 140
130 130
120 120
12"x8" REDUCER, RESTRAINED
8" GV AND BOX, RESTRAINED
8" HDPE WATER MAIN
110 110
2+48 2+00 1+50 1+00 0+50 0+00
WEST DORSEY LANE WATER MAIN (1) - STA: 0+00 TO 2+48
R
Know what's
0 20' 40'
SCALE: 1" = 20'
HORIZONTAL SCALE 1" = 20'
0 20' 40'
0 4' 8'
VERTICAL SCALE 1" = 4'
ERIN
MOORE
84665
06/12/2026
06/12/2026
Ti gh e
B on d:
J:
\D \D
D C W
W A \0
7- O n C al l\
7H W es t
D or se y
W at er M ai n
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \D
-0 7H
-C
1_
_1 6_
.d w g
La st
S av ed
6/
/2
Pl ot te d O n:
Ju n
-5
:3 5p m B y:
D
TS
ec he
ISSUED FOR
BIDDING
West Dorsey Lane Water Main Extension
Dutchess County Water and Wastewater Authority
Hyde Park, New York
SERVICES PROVIDED IN NEW YORK
BY T&B ENGINEERING AND
LANDSCAPE ARCHITECTURE, P.C.
UNAUTHORIZED ALTERATIONS TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
0 ISSUED FOR BIDDING6/12/2026
MARK DATE DESCRIPTION
PROJECT NO: D0280-07H
DATE: JUNE 2026
FILE: D0280-07H-C101_10_16_2025.dwg
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DTS/BY
DTS
DFV
WEST DORSEY LANE
WATER MAIN PLAN/PROFILE
STA 0+00 - STA 2+48
AS SHOWN
C-101
04SHEET OF 17
2+00 W W
N below.
before you dig.Call
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
SEE SHEET C-101
4'
19"
Y D
W WW WW WW W
W W
WWWWW
H
3+00 4+00
5+00
6+00
7+
REMOVE TREES AND BRUSH OFFSET WATER MAIN
AS REQUIRED FOR WATER UNDER STORM DRAIN
MAIN INSTALLATION SEE SHEET C-503
SILT SACK
(TYP)
TEST PIT AS NEEDED TO LOCATE EXISTING SANITARY PIPE
CROSSING OLD DORSEY LANE AND DETERMINE PIPE DEPTH
HYDRANT ASSEMBLY
SEE SHEET C-502
OFFSET WATER MAIN UNDER SANITARY PIPE IF NECESSARY,
SEE SHEET C-503
8" HDPE WATER MAIN
45° BEND, RESTRAINED TRENCH
EXTENT
TEMPORARILY SUPPORT
UTILITY POLE AS NECESSARY
TEST PIT TO LOCATE EXISTING GAS MAIN AND DETERMINE PIPE DEPTH
OFFSET WATER MAIN UNDER GAS MAIN IF NECESSARY, SEE SHEET C-503
TEMPORARILY SUPPORT UTILITY POLE AS NECESSARY
CONTACT CHG&E FOR POLE SUPPORT (TYP)
EASEMENT
TEMPORARY
CONSTRUCTION
EASEMENT
8" HDPE WATER MAIN
SEE SHEET C-103
R
Know what's
130 130
120 120
110 110
8" HDPE WATER MAIN
45° BEND, RESTRAINED
HYDRANT ASSEMBLY
100 100
7+39 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+00 2+502+48
WEST DORSEY LANE WATER MAIN (2) - STA: 2+48 TO 7+39
0 20' 40'
SCALE: 1" = 20'
HORIZONTAL SCALE 1" = 20'
0 20' 40'
0 4' 8'
VERTICAL SCALE 1" = 4'
ERIN
MOORE
84665
06/12/2026
06/12/2026
Ti gh e
B on d:
J:
\D \D
D C W
W A \0
7- O n C al l\
7H W es t
D or se y
W at er M ai n
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \D
-0 7H
-C
1_
_1 6_
.d w g
La st
S av ed
6/
/2
Pl ot te d O n:
Ju n
-5
:3 5p m B y:
D
TS
ec he
ISSUED FOR
BIDDING
West Dorsey Lane Water Main Extension
Dutchess County Water and Wastewater Authority
Hyde Park, New York
SERVICES PROVIDED IN NEW YORK
BY T&B ENGINEERING AND
LANDSCAPE ARCHITECTURE, P.C.
UNAUTHORIZED ALTERATIONS TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
0 ISSUED FOR BIDDING6/12/2026
MARK DATE DESCRIPTION
PROJECT NO: D0280-07H
DATE: JUNE 2026
FILE: D0280-07H-C101_10_16_2025.dwg
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DTS/BY
DTS
DFV
WEST DORSEY LANE
WATER MAIN PLAN/PROFILE
STA 2+48 - STA 7+39
AS SHOWN
C-102
05SHEET OF 17
OSW
N below.
before you dig.Call
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
W W
W W
W W
D H Y
W W W
W W
W W
W W
W
W
SEE SHEET C-102
5' MIN
4'
WV
W W W W W
SILT SACK 8" GV AND BOX
(TYP) RESTRAINED
TEMPORARILY SUPPORT
UTILITY POLE AS NECESSARY
EASEMENT WATER SERVICE
CONNECTION
8" HDPE WATER MAIN SEE SHEET C-501
TEMPORARILY SUPPORT HYDRANT ASSEMBLY
UTILITY POLE AS NECESSARY SEE SHEET C-502
TEMPORARY CONSTRUCTION EASEMENT
TRENCH EXTENT
TEMPORARILY SUPPORT
UTILITY POLE AS NECESSARY
EASEMENT
CONSTRUCTION EASEMENT
S
EE S
H
EET C
-104
8+00 9+00
10+00
11+00
12+00
R
Know what's
0 20' 40'
SCALE: 1" = 20'
120 120
110 110
" 28
100 100
HYDRANT ASSEMBLY
8" GV AND BOX, RESTRAINED
8" HDPE WATER MAIN
90 90
12+65 12+50 12+00 11+50 11+00 10+50 10+00 9+50 9+00 8+50 8+00 7+50 7+39
WEST DORSEY LANE WATER MAIN (3) - STA: 7+39 TO 12+65
HORIZONTAL SCALE 1" = 20'
0 20' 40'
0 4' 8'
VERTICAL SCALE 1" = 4'
ERIN
MOORE
84665
06/12/2026
06/12/2026
Ti gh e
B on d:
J:
\D \D
D C W
W A \0
7- O n C al l\
7H W es t
D or se y
W at er M ai n
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \D
-0 7H
-C
1_
_1 6_
.d w g
La st
S av ed
6/
/2
Pl ot te d O n:
Ju n
-5
:3 5p m B y:
D
TS
ec he
ISSUED FOR
BIDDING
West Dorsey Lane Water Main Extension
Dutchess County Water and Wastewater Authority
Hyde Park, New York
SERVICES PROVIDED IN NEW YORK
BY T&B ENGINEERING AND
LANDSCAPE ARCHITECTURE, P.C.
UNAUTHORIZED ALTERATIONS TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
0 ISSUED FOR BIDDING6/12/2026
MARK DATE DESCRIPTION
PROJECT NO: D0280-07H
DATE: JUNE 2026
FILE: D0280-07H-C101_10_16_2025.dwg
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DTS/BY
DTS
DFV
WEST DORSEY LANE
WATER MAIN PLAN/PROFILE
STA 7+39 - STA 12+65
AS SHOWN
C-103
06SHEET OF 17
N before you dig.Call
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
13+00
14+00
14+60
5' MIN
4'
W
W
W
W
W
W
W
WV
W
H Y D
TRENCH EXTENT
8" GV AND BOX, RESTRAINED
8" HDPE WATER MAIN
8" CAP, RESTRAINED
SILT FENCE EASEMENT
TEMPORARY CONSTRUCTION EASEMENT
HYDRANT ASSEMBLY
SEE SHEET C-502
8" HDPE WATER MAIN
8" CAP, RESTRAINED
8" GV AND BOX, RESTRAINED
HYDRANT ASSEMBLY
110 110
100 100
90 90
80 80
15+00 14+50 14+00 13+50 13+00 12+65
WEST DORSEY LANE WATER MAIN (4) - STA: 12+65 TO 15+00
S
EE S
H
EET C
-103
R
Know what's
0 20' 40'
SCALE: 1" = 20'
HORIZONTAL SCALE 1" = 20'
0 20' 40'
0 4' 8'
VERTICAL SCALE 1" = 4'
ERIN
MOORE
84665
06/12/2026
06/12/2026
Ti gh e
B on d:
J:
\D \D
D C W
W A \0
7- O n C al l\
7H W es t
D or se y
W at er M ai n
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \D
-0 7H
-C
1_
_1 6_
.d w g
La st
S av ed
6/
/2
Pl ot te d O n:
Ju n
-5
:3 5p m B y:
D
TS
ec he
ISSUED FOR
BIDDING
West Dorsey Lane Water Main Extension
Dutchess County Water and Wastewater Authority
Hyde Park, New York
SERVICES PROVIDED IN NEW YORK
BY T&B ENGINEERING AND
LANDSCAPE ARCHITECTURE, P.C.
UNAUTHORIZED ALTERATIONS TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
0 ISSUED FOR BIDDING6/12/2026
MARK DATE DESCRIPTION
PROJECT NO: D0280-07H
DATE: JUNE 2026
FILE: D0280-07H-C101_10_16_2025.dwg
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DTS/BY
DTS
DFV
WEST DORSEY LANE
WATER MAIN PLAN/PROFILE
STA 12+65 - STA 13+61
AS SHOWN
C-104
07SHEET OF 17
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
5' M
IN
C O
V
ER
N
O
TE
2' -0
M
A X
VERTICAL PAYLINE IN ROCK CUTS
TYPICAL TRENCH SECTION
NOTES:
1. THE PAYLINE DIMENSIONS SHOWN REPRESENT THE
MAXIMUM PAYLINE LIMITS TO BE PAID. WHEN THE ACTUAL
SURFACE REPAIR OR TRENCH WIDTH IS LESS, THE ACTUAL
WIDTH SHALL BE PAID FOR AT THE APPLICABLE UNIT PRICE.
2. PERMANENT PAVEMENT MAXIMUM SURFACE REPAIR PAY
WIDTHS FOR STATE OWNED ROADS TO CONFORM TO
PERMANENT TRENCH REPAIR DETAILS, NEXT SHEET.
3. INCLUDES TEMPORARY PAVEMENT REPAIRS FOR STREETS,
SIDEWALKS, AND DRIVEWAY.NOTE:
4. INCLUDES PERMANENT REPAIRS FOR STREETS, SIDEWALKS,
DRIVEWAYS, LAWN AREAS (LOAM & SEED), AND CURBS1. WATER MAIN COVER MAY BE REDUCED ON APPROVAL FROM
ENGINEER IN AREAS OF HIGH BEDROCK. IN NO CASE SHALL COVER
ABOVE THE WATER MAIN BE LESS THAN 3' WITH THE ADDITION OF
2" THICK MINIMUM RIGID FOAM INSULATION INSTALLED ABOVE
THE PEASTONE BEDDING AND ACROSS THE ENTIRE TRENCH WIDTH.
2. TRACER WIRE TO BE INSTALLED BELOW WATER MAIN.
8" 6"
EXISTING GRADE SURFACE RESTORATION
AS SPECIFIED
COMPACTED SUBBASE AS
SPECIFIED
UTILITY
IDENTIFICATION
TAPE
(DETECTABLE) SUITABLE NATIVE SOIL OR
STANDARD ORDINARY BORROW
COMPACTED AS SPECIFIED
WATER MAIN NO ROCKS LARGER THAN 4"
PEASTONE BORROW COMPACTED AS
SPECIFIED FOR WATER MAIN TRENCH
IN EARTH IN ROCK
6"
1'-6" 1'-6"
MIN. MIN.
SURFACE REPAIR FOR LOAMING,
SEEDING & PAVEMENT
A
(SEE TABLE A)
TRENCH WIDTH
B
(SEE TABLE B)
2' 2'
OUTSIDE PIPE DIAMETER (D)
D
VERTICAL PAYLINE IN EARTH
PIPE BEDDING
8"
6"
(12" MIN IN ROCK
EXCAVATION)
R
Know what's
5' M
IN
2' -0
M
A X
5' M
IN
TO
F
IN
IS
H
ED
G R A D
E
NOTES:
1. SAND BEDDING MATERIAL TO BE PLACED A MINIMUM OF 1'- 0" OVER THE TOP OF WATER
SERVICE.
2. BEDDING MATERIAL TO BE PLACED ON UNDISTURBED FOUNDATION.
3. REMOVE ANY UNSUITABLE FOUNDATION MATERIAL AND REPLACE WITH COMPACTED
BEDDING MATERIAL.
TYPICAL WATER MAIN TRENCH TRENCH PAYLINES WATER SERVICE TRENCH
DETAIL 1 DETAIL 2 DETAIL 3
NO SCALE NO SCALE NO SCALE- - -
PR
O
PE
R
TY
L
IN
E
TRACER WIRE WRAPPED
AROUND VALVE BOX PER
GATE VALVE DETAIL (TYP)
HDPE TEE
DI GATE VALVE WITH HDPE
CONNECTION AND RESTRAINT HDPE WATER
ATTACHED (TYP) MAIN (TYP.)
ELECTROFUSED TAPPING SADDLE
WITH BRASS BUSHING AND
CORPORATION STOP
PROPOSED HDPE
WATER MAIN D
EP
TH
A S R
EQ
U
IR
ED
N
O T
LE
S S T
H A N
0" U
N
LE
S S O
TH
ER
W
IS
E A
PP
R O
V
ED
MJ RESTRAINT COLLAR
TRACER WIRE
UNDER PIPE (TYP.)
TRACER WIRE UNDER
FITTING OR WRAPPED AT
TERMINATION POINT (TYP.)
THREE WAY CONNECTOR
FOR TRACER WIRE (TYP.)
BEDDING MATERIAL
(12" IN ROCK) HDPE TO MECHANICAL
JOINT ADAPTER
FINISHED GRADE
ADJUSTABLE VALVE BOX
SERVICE LINE TO METER
6"
COPPER SERVICE LINE
PROVIDE 2 CU. FT. OF
PEASTONE BORROW
D
EP
TH
T
O P
IP
E
B O
TT
O
M
SUBGRADE ELEVATION UNDER PAVEMENT:
SEE TYPICAL ROADWAY/PAVEMENT SECTION
OR PAVEMENT REPAIR DETAIL
WARNING TAPE
(AS SPECIFIED)
LIMIT OF UNSUITABLE MATERIAL REMOVAL
AND REPLACEMENT WITH SUITABLE
MATERIAL VARIES, AS DIRECTED BY THE
OWNERS REPRESENTATIVE
TABLE A - MAXIMUM SURFACE REPAIR PAY
WIDTHS (SEE NOTE)
OUTSIDE PIPE DIAMETER
0 - 24" WATER SERVICE
TEMPORARY PERMANENT PAVEMENT,
PAVEMENT LOAMING & SEEDING SAND BEDDING
7'-0"5'-0"
TABLE B - MAXIMUM TRENCH EXCAVATION
PAY WIDTHS (SEE NOTE)
OUTSIDE PIPE DIAMETER
0 - 24"
5'-0"
FINISHED GRADE
HDPE PIPE
BUTT FUSED
JOINT (TYP)
DUCTILE IRONTRACER WIRE
UNDER MAIN
FITTING (TYP.)
COPPER SERVICE LINE
CURB STOP/WSV
WATER SERVICE CONNECTION
TRACER WIRE HDPE TO MECHANICAL JOINT ADAPTER
6DETAIL 4 DETAIL 5 DETAIL
NO SCALE NO SCALE NO SCALE- - -
ERIN
MOORE
84665
06/12/2026
06/12/2026
Ti gh e
B on d:
J:
\D \D
D C W
W A \0
7- O n C al l\
7H W es t
D or se y
W at er M ai n
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \D
-0 7H
-C -5
_1
0_
_2
5.
dw g
La st
S av ed
6/
/2
Pl ot te d O n:
Ju n
-5
:3 5p m B y:
D
TS
ec he
ISSUED FOR
BIDDING
West Dorsey Lane Water Main Extension
Dutchess County Water and Wastewater Authority
Hyde Park, New York
SERVICES PROVIDED IN NEW YORK
BY T&B ENGINEERING AND
LANDSCAPE ARCHITECTURE, P.C.
UNAUTHORIZED ALTERATIONS TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
0 ISSUED FOR BIDDING6/12/2026
MARK DATE DESCRIPTION
PROJECT NO: D0280-07H
DATE: JUNE 2026
FILE: D0280-07H-C-500_10_16_2025.dwg
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DTS/BY
DTS
DFV
MISCELLANEOUS DETAILS - 1
AS SHOWN
C-501
08SHEET OF 17
FLOW
before you dig.Call
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
° 45°
45°
45°
GEOTEX 2130 OR EQUIVALENT
GEOTEXTILE SECURED TO POSTS
WITH METAL CLIPS @ 4" O.C.,
ALTERNATING ORIENTATION
DEPTH=2'
WIDTH=AS REQ.
LENGTH=AS REQ.
ANCHOR FABRIC WITH
CRUSHED STONE OR SOIL
1-1/2" SQUARE HARD WOOD
POSTS 8'-0" O.C. MAXIMUM
PLAN AT TEENOTES:
1. DIMENSIONS SHOWN CALCULATED PER 150 PSI INTERNAL PIPE
PRESSURE; FOR SOIL BEARING LOADS OF 3,000 PSF AND A FACTOR
OF SAFETY OF 1.5. NOTIFY ENGINEER IF CONDITIONS IN THE FIELD
VARY FROM ABOVE AS THEY WILL IMPACT THRUST BLOCK
DIMENSIONS REQUIRED.D
2. CONCRETE THRUST BLOCKS SHALL BE CONSTRUCTED OF 3,000 PSI
CONCRETE AGAINST UNDISTURBED SOIL.
CONCRETE THRUST BLOCK
3. DIMENSIONS L, W, & H MAY BE ADJUSTED TO MEET FIELDAGAINST UNDISTURBED
CONDITIONS PROVIDED THE BEARING AREA REMAINS UNCHANGED.PIPE BEDDING MATERIAL SOIL
SECTION 4. THE HEIGHT OF THE BLOCK (H) SHALL BE LESS THAN OR EQUAL TO
HALF THE TRENCH DEPTH.
5. POLYETHYLENE SHEETING SHALL BE PLACED OVER MJ FITTINGS TO
PREVENT DIRECT CONTACT BETWEEN CONCRETE AND THE FITTING.
CONCRETE THRUST BLOCK
22 1/2° BEND TEE/DEAD END
AREA
45° BEND 90° BEND
BEARINGBEARING BEARING BEARING"L" "H" "W" "L" "H" "W" "L" "H" "W" "L" "H" "W"(OUTSIDE DIA.) AREAAREA AREAD (FT) (FT) (FT) (FT) (FT) (FT) AREA (FT) (FT) (FT) (FT) (FT) (FT)(SQ IN) (SF)(SF) (SF) (SF)
9.12.58" 64.3 1.9 1.3 0.7 2.7 1.8 0.9 4.9 3.6 2.5 1.3 3.1 2.1 1.1 6.4
12" 19.35.3 4.6 3.0 1.5 13.7136.8 2.8 1.9 1.0 4.0 2.6 5.4 3.6 1.81.3 10.5
DUMP STRAP
2'
1" REBAR FOR BAG
REMOVAL FROM INLET
MINIMUM
HYDRANT, SEE NOTE 5
DUMP STRAP BREAKAWAY FLANGE TO BE SET ABOVE
FINISHED GRADE PER MANUFACTURERS
RECOMMENDATIONS
HDPE TEE BUTT FUSE
CONNECTIONS
SILTSACK ® OR
APPROVED EQUAL
SILTSACK MANUFACTURED BY: ACF ENVIRONMENTAL, 2831 CARDWELL ROAD,
RICHMOND, VIRGINIA 23237
CATCH BASIN INLET PROTECTION SILT FENCE
L
VALVE BOX
6" HDPE TO BE
LAID FLAT OR LESS
THAN 0.50% PITCH
HDPE x MJ ADAPTER, BUTT
FUSE TO TEE OR PIPE (TYP)
HDPE x MJ
ADAPTER, BUTT
FUSE TO PIPE (TYP)
6" HDPE
W
6" RESILIENT
WEDGE GATE
VALVE MJ x MJ
CONCRETE THRUST BLOCK TO
SOLID EARTH,
SEE NOTE 4
6" HDPE
NIPPLE CONCRETE THRUST
BLOCK TO SOLIDMJ
EARTH, SEE NOTE 3
PRECAST
CONCRETE PAD
CONCRETE THRUST BLOCK TO
SOLID EARTH,
SEE NOTE 3
6" VALVE MJ X
MJ
ELEVATION
PLAN
CONCRETE THRUST BLOCK AGAINST
UNDISTURBED SOIL
1 CU. YD. PEASTONE AROUND DRAIN
COVER STONE W/POLYETHELYENE
PRESSURE PIPE TEE
L 6" HDPE
HYDRANT, SEE NOTE 5
HDPE TEE
BUTT FUSE
CONNECTIONS
CONCRETE THRUST BLOCK TO
SOLID EARTH, SEE NOTE 4
NOTES:
1. CONCRETE THRUST BLOCKS SHALL BE CONSTRUCTED OF 3,000 PSI CONCRETE AGAINST UNDISTRIBUTED SOIL.
2. ALL MJ JOINTS SHALL HAVE RETAINER GLANDS.
3. CARE SHALL BE TAKEN TO SHIELD HYDRANT BASE DRAIN HOLES DURING PLACEMENT OF THE CONCRETE THRUST BLOCK. DRAIN HOLES
SHALL BE VERIFIED AS OPEN AND FREE OF OBSTRUCTIONS PRIOR TO BACKFILLING.
4. CARE SHALL BE TAKEN TO SHIELD ALL MECHANICAL JOINT GLANDS AND BOLTS DURING PLACEMENT OF CONCRETE THRUST BLOCK. ALL
BOLTS AND GLANDS SHALL BE FREE AND UNOBSTRUCTED BEFORE BACKFILLING.
5. HYDRANT SHALL BE SET PLUMB. VERTICAL HYDRANT EXTENSIONS SHALL BE USED AS NECESSARY TO PROPERLY LOCATE THE BREAKAWAY
FLANGE PER MANUFACTURERS RECOMMENDATIONS.
6. POLYETHYLENE SHEETING SHALL BE PLACED OVER THE FITTING AND/OR HYDRANT BASE TO PREVENT DIRECT CONTACT OF CONCRETE
WITH THE FITTING.
HDPE WATER MAIN HYDRANT INSTALLATION
10DETAIL
NO SCALE -
CONCRETE THRUST BLOCK
FOR HORIZONTAL BENDS AND TEES
DETAIL 9
NO SCALE
R
Know what's
DETAIL 7 DETAIL 8
NO SCALE - NO SCALE -
ERIN
MOORE
84665
06/12/2026
06/12/2026
Ti gh e
B on d:
J:
\D \D
D C W
W A \0
7- O n C al l\
7H W es t
D or se y
W at er M ai n
D es ig n\
D ra w in gs \A ut oC
A D
\S he et \D
-0 7H
-C -5
_1
0_
_2
5.
dw g
La st
S av ed
6/
/2
Pl ot te d O n:
Ju n
-5
:3 5p m B y:
D
TS
BIDDING
West Dorsey Lane Water Main Extension
Dutchess County Water and Wastewater Authority
Hyde Park, New York
SERVICES PROVIDED IN NEW YORK
BY T&B ENGINEERING AND
LANDSCAPE ARCHITECTURE, P.C.
UNAUTHORIZED ALTERATIONS TO THIS DOCUMENT IS A VIOLATION
OF SECTION 7209 OF THE NEW YORK STATE EDUCATION LAW.
0 ISSUED FOR BIDDING6/12/2026
MARK DATE DESCRIPTION
PROJECT NO: D0280-07H
DATE: JUNE 2026
FILE: D0280-07H-C-500_10_16_2025.dwg
DRAWN BY:
DESIGNED/CHECKED BY:
APPROVED BY:
DTS/BY
DTS
DFV
MISCELLANEOUS DETAILS - 2
AS SHOWN
C-502
09SHEET OF 17
NOTIFY 811 AT LEAST FORTY-EIGHT (48) HOURS, EXCLUDING THE DAY OF THE NOTIFICATION, BEFORE ANY GROUND DISTURBANCE AND HAVE THE UNDERGROUND UTILITIES MARKED OUT. WAIT FOR THE AFFECTED UTILITY OPERATORS TO RESPOND, AND THEN
CONFIRM THE UTILITIES HAVE BEEN ACCURATELY LOCATED. RESPECT THE IDENTIFIED LOCATIONS AND DIG ACCORDINGLY, TAKING PRECAUTIONS, ESPECIALLY WITHIN THE KNOWN TOLERANCE ZONE. IN THE EVENT MARK OUTS CANNOT BE MAINTAINED AND/OR
GROUND DISTURBANCE CONTINUES LONGER THAN TEN (10) DAYS, NOTIFY 811 AND REQUEST A REMARK.
18"
MIN
FINISHED GRADE
DRILL HOLE IN VALVE BOX,
INSERT TRACER WIRE AND
COIL 1'-2' OF EXCESS
VALVE BOX AND COVER
WRAP TRACER WIRE AROUND VALVE BOX
GATE VALVE
HDPE TO MJ ADAPTER
BUTT FUSED JOINT
MJ RESTRAINT BEDDING MATERIAL
5' M
IN
NEW WATER MAIN
VERTICAL 45° BEND (USE
WHERE VERTICAL BENDS ARE
REQUIRED TO PROVIDE
MINIMUM CLEARANCE)
SUITABLE NATIVE SOIL
OR ORDINARY BORROW
COMPACTED AS
SPECIFIED (TYP)
5' M
IN
D
EP
TH
V
A R
IE
5'
IN
FINISHED GRADE
24"
R
Know what's
WATER
5-5/8"
5" 8-7/8"
7-5/8"
7-3/8"
6-1/4"
7-3/8"
2"
2"
V A R
IA
B
LE
NOTES
1. SUPPORT THE UTILITY PIPE WHILE INSTALLING WATER MAIN.
2. INSTALL WATER 18" VERTICALLY FROM ANY UTILITY.
3. PIPE SHALL BE FULLY RESTRAINED.
CONTROL DENSITY FILL
(FROM PIPE INVERT TO
CENTERLINE OF CULVERT
OR DRAIN)
DROP LID BOTTOM SECTION TOP SECTION
TRENCH WIDTH
8" 7"
TRENCH WIDTH
GATE VALVE PROFILE OF WATER MAIN INSTALLATION AT UTILITY CROSSING - UNDER UTILITY
VALVE BOX DETAIL
DETAIL 11 DETAIL 12 DETAIL 13
NO SCALE - NO SCALE - NO SCALE -
PERMANENT TRENCH REPAIR
DRIVEWAY/SIDEWALK
DETAIL 16
NO SCALE -
WARM MIX ASPHALT (WMA) - MINOR COMMERCIAL
DRIVEWAY/SIDEWALK
4" TOP COURSE
SAWCUT PAVEMENT TO NEAT
LINE, COAT ALL VERTICAL
JOINTS WITH NYS DOT
WARM MIX ASPHALT (WMA) - TOWN OF HYDE PARK
5" NOMINAL
2" TOP COURSE, NYS DOT #404.0972
WARM MIX ASPHALT (WMA) - MAJOR COMMERCIAL DRIVEWAY
#418.7603 ASPHALT
PAVEMENT JOINT ADHESIVE
3" BINDER COURSE, NYS DOT #404.1979
2" TOP COURSE EXIST.
6" BINDER COURSE DRIVEWAY
WARM MIX ASPHALT (WMA) - ROUTE 9
12.5" NOMINAL
2" TOP COURSE, NYS DOT #404.0972
2.5" BINDER COURSE, NYS DOT #404.1979
8" BASE COURSE, NYS DOT #404.3779 4" TOPSOIL & SEEDING 1
8 " 1 12" R
PER FT.
8" SUBBASE - MINOR COMMERICAL DRIVEWAY/SIDEWALK
12" SUBBASE - MAJOR COMMERCIAL DRIVEWAY
NYS DOT TYPE 2
EXIST. BITUMINOUS
PAVEMENT
BIT. CONCRETE
PAVEMENT
12" SUBBASE
NYS DOT TYPE 2
SUBBASE
ASPHALT EMULSION NYS DOT TYPE 2
TACK COAT
PRECAST OR CAST-IN-PLACE
WATER MAIN CONCRETE CURB, 3,500 PSI
3" BINDER COURSE EXIST. BITUMINOUS PIPE SUITABLE NATIVE SOIL OR
PAVEMENT STANDARD ORDINARY BORROW
COMPACTED AS SPECIFIED
NO ROCKS LARGER THAN 4"
12" SUBBASE
NYS DOT TYPE 2
12" TRENCH WIDTH 12"
M A
TC
H
EX
IS
TI
N G
8"
1' -8
V A R
IA
LE
5-3/4"
7-1/8"
6"8"
6-1/2"
10-1/4" 9-1/2"
6"
18" MIN 18" MIN
UNDISTURBED SUBGRADENOTES
NOTES
1. ALL BACKFILL SHOULD BE PLACED IN 12-INCH MAXIMUM LIFTS AND SHOULD BE COMPACTED TO 95 PERCENT OF THE MAXIMUM DRY
1. ALL BACKFILL SHOULD BE PLACED IN 12-INCH MAXIMUM LIFTS AND SHOULD BE COMPACTED TO 95 DENSITY AS DETERMINED BY THE MODIFIED PROCTOR LABORATORY TEST (ASTM D1557). THINNER LIFTS MAY BE NEEDED
PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR LABORATORY DEPENDING ON THE MATERIAL PLACED AND THE TYPE OF COMPACTOR USED. CRUSHED STONE SHOULD BE PLACED IN LOOSE LIFT TEST (ASTM D1557). THINNER LIFTS MAY BE NEEDED DEPENDING ON THE MATERIAL PLACED AND THICKNESSES OF LESS THAN 12 INCHES AND BE COMPACTED WITH HEAVY COMPACTION EQUIPMENT TO ACHIEVE AN UNYIELDING THE TYPE OF COMPACTOR USED. CRUSHED STONE SHOULD BE PLACED IN LOOSE LIFT THICKNESSES SUBGRADE.
OF LESS THAN 12 INCHES AND BE COMPACTED WITH HEAVY COMPACTION EQUIPMENT TO ACHIEVE AN UNYIELDING…