This document provides a federal wage determination for Santa Barbara County in California applicable to the construction type of Building, Heavy, and Highway. The wage determination outlines prevailing wage rates for various construction laborer classifications working on this type of federal contract within the specified geographic area. Key details include classification titles for laborers, applicable wage rates, and effective dates for those rates. Fringe benefit rates or other terms and conditions are not included.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
An o�icial website of the United States government Here’s how you know
You have 2 new alerts
Show / Hide Alerts
Wage Determination
Overview
Document
History
Follow
WAGE DETERMINATIONS
Davis-Bacon Act WD #
CA20230014
States and Counties State California
Counties Santa Barbara
Wage Determination
Modification #
Construction Building, Heavy, Highway
Last Revised Date Aug 11, 2023 javascript:void(0)
Document Print Download
"General Decision Number: CA20230014 08/
Superseded General Decision Number: CA20220014
State: California
Construction Types: Building, Heavy (Heavy and Dre Highway
County: Santa Barbara County in California.
BUILDING, DREDGING (does not include hopper dredge (does not include water well drilling), AND HIGHWA
CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are required to pay at least the applicable minimum wa required under Executive Order 14026 or Executive Please note that these Executive Orders apply to c contracts entered into by the federal government t subject to the Davis-Bacon Act itself, but do not contracts subject only to the Davis-Bacon Related including those set forth at 29 CFR 5.1(a)(2)-(60)
|If the contract is entered |. Executive Order |into on or after January 30, | generally applie |2022, or the contract is | contract.
|renewed or extended (e.g., an |. The contractor m |option is exercised) on or | all covered work |after January 30, 2022: | least $16.20 per | | the applicable w | | listed on this w | | determination, i https://sam.gov/api/prod/wdol/v1/wd/CA20230014/8/download?
| | higher) for all | | spent performing | | contract in 2023 |If the contract was awarded on|. Executive Order |or between January 1, 2015 and| generally applie |January 29, 2022, and the | contract.
|contract is not renewed or |. The contractor m |extended on or after January | covered workers |30, 2022: | $12.15 per hour | | applicable wage | | on this wage det | | if it is higher) | | hours spent perf | | that contract in
The applicable Executive Order minimum wage rate w adjusted annually. If this contract is covered by Executive Orders and a classification considered n performance of work on the contract does not appea wage determination, the contractor must still subm conformance request.
Additional information on contractor requirements protections under the Executive Orders is availabl http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 01/20/2023 3 02/10/2023 4 03/17/2023 5 03/31/2023 6 04/07/2023 7 06/30/2023 8 08/11/2023
ASBE0005-002 07/04/2022
Rates F
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 49.58 Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)...........................$ 32.09
ASBE0005-004 07/04/2022
Rates F
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 23.52
BOIL0092-003 01/01/2021
Rates F
BOILERMAKER......................$ 46.03
BRCA0004-003 05/01/2022
Bricklayer; Marble Setter........$ 45.10
BRCA0018-008 06/01/2022
Rates F
MARBLE FINISHER..................$ 37.87
TILE FINISHER....................$ 32.44
BRCA0018-010 09/01/2022
Rates F
TERRAZZO FINISHER................$ 38.37
TERRAZZO WORKER/SETTER...........$ 46.49
BRCA0018-011 06/01/2022
Rates F
TILE LAYER.......................$ 45.05
CARP0213-001 07/01/2021
Rates F
CARPENTER
(1) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker and acoustical installer...................$ 51.60
(2) Millwright..............$ 52.10
(3) Piledrivermen/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler
(Commercial)................$ 51.73
(4) Pneumatic Nailer, Power Stapler...............$ 51.85
(5) Sawfiler...............$ 51.69
(6) Scaffold Builder.......$ 42.80
(7) Table Power Saw Operator....................$ 51.70
FOOTNOTE: Work of forming in the construction of sewers or storm drains, on operations in which h lagging is used in conjunction with steel H-Beam placed in pre- drilled holes, for that portion o trench against which concrete is poured, namely, substitute for back forms (which work is perform piledrivers): $0.13 per hour additional.
CARP0213-002 07/01/2021
Rates F
Diver
(1) Wet.....................$ 834.40
(2) Standby.................$ 445.84
(3) Tender..................$ 437.84
(4) Assistant Tender........$ 413.84
Amounts in ""Rates' column are per day
CARP0213-004 07/01/2021
Rates F
Drywall
DRYWALL INSTALLER/LATHER....$ 51.60
STOCKER/SCRAPPER............$ 22.16
CARP0721-001 07/01/2021
Modular Furniture Installer......$ 21.85
ELEC0413-001 01/01/2023
Rates F
Electricians:....................$ 48.14 3
CABLE SPLICERS: $2.00 additional per hour.
ALL WORK AT VANDENBERG AFB: $3.75 additional per
FOOTNOTE: Work from trusses, swinging scaffolds, ladders, scaffolds, bosun's chairs, stacks, or t maintenance of towers or open platforms where th subject to a direct fall or where the worker has from a ladder or other support from a platform w of any direct fall a distance of 50 ft. from the floor or supporting structure: double the regula straight-time rate of pay. Safety nets, if used invalidate this.
ELEC0413-003 12/26/2022
COMMUNICATIONS AND SYSTEMS WORK
Rates F
Communications System Installer...................$ 42.78 3
SCOPE OF WORK:
Installation, testing, service and maintenance o utilizing the transmission and/or transference o sound, vision and digital for commercial, educat security and entertainment purposes for the foll monitoring and surveillance, background-foregrou intercom and telephone interconnect, inventory c systems, microwave transmission, multi-media, mu nurse call systems, radio page, school intercom burglar alarms, fire alarm (see last paragraph b low voltage master clock systems in commercial b Communication Systems that transmit or receive i and/or control systems that are intrinsic to the listed systems; inclusion or exclusion of termin testings of conductors determined by their funct excluding all other data systems or multiple sys include control function or power supply; exclud installation of raceway systems, conduit systems voltage work, and energy management systems. Do cover work performed at China Lake Naval Ordnanc Station. Fire alarm work shall be performed at inside wireman total cost package.
ELEC1245-001 06/01/2022
Rates F
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 64.40
(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment).............$ 50.00
(3) Groundman...............$ 38.23
(4) Powderman...............$ 51.87
HOLIDAYS: New Year's Day, M.L. King Day, Memoria Independence Day, Labor Day, Veterans Day, Thank and day after Thanksgiving, Christmas Day
ELEV0018-001 01/01/2023
ELEVATOR MECHANIC................$ 63.95 37.
FOOTNOTE:
a. PAID VACATION: Employer contributes 8% of re rate as vacation pay credit for employees with m years of service, and 6% for 6 months to 5 years
b. PAID HOLIDAYS: New Year's Day, Memorial Day, Day, Labor Day, Veterans' Day, Thanksgiving Day, after Thanksgiving, and Christmas Day.
ENGI0012-003 07/01/2022
Rates F
OPERATOR: Power Equipment (All Other Work)
GROUP 1....................$ 51.90
GROUP 2....................$ 52.68
GROUP 3....................$ 52.97
GROUP 4....................$ 54.46
GROUP 5....................$ 48.96
GROUP 6....................$ 54.68
GROUP 8....................$ 54.79
GROUP 9....................$ 49.29
GROUP 10....................$ 54.91
GROUP 11....................$ 49.41
GROUP 12....................$ 55.08
GROUP 13....................$ 55.18
GROUP 14....................$ 55.21
GROUP 15....................$ 55.29
GROUP 16....................$ 55.41
GROUP 17....................$ 55.58
GROUP 18....................$ 55.68
GROUP 19....................$ 55.79
GROUP 20....................$ 55.91
GROUP 21....................$ 56.08
GROUP 22....................$ 56.18
GROUP 23....................$ 56.29
GROUP 24....................$ 56.41
GROUP 25....................$ 56.58
OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting)
GROUP 1....................$ 53.25
GROUP 2....................$ 54.03
GROUP 3....................$ 54.32
GROUP 4....................$ 54.46
GROUP 5....................$ 54.68
GROUP 6....................$ 54.79
GROUP 7....................$ 54.91
GROUP 8....................$ 55.08
GROUP 9....................$ 55.25
GROUP 10....................$ 56.25
GROUP 11....................$ 57.25
GROUP 12....................$ 58.25
GROUP 13....................$ 59.25
OPERATOR: Power Equipment (Tunnel Work)
GROUP 1....................$ 54.53
GROUP 2....................$ 54.82
GROUP 3....................$ 54.96
GROUP 4....................$ 55.18
GROUP 5....................$ 55.29
GROUP 6....................$ 55.41
GROUP 7....................$ 55.71
PREMIUM PAY:
$3.75 per hour shall be paid on all Power Equipm work on the followng Military Bases: China Lake Reserve, Vandenberg AFB, Point Arguello, Seely N Fort Irwin, Nebo Annex Marine Base, Marine Corp Base Yermo, Edwards AFB, 29 Palms Marine Base an Pendleton
Workers required to suit up and work in a hazard environment: $2.00 per hour additional. Combina and compressor operator on gunite work shall be as a concrete mobile mixer operator.
SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator Witch, with seat or similar type equipment; Elev operator-inside; Engineer Oiler; Forklift operat (includes loed, lull or similar types under 5 to Generator operator; Generator, pump or compresso operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse ta Concrete mixer operator-skip type; Conveyor oper Fireman; Forklift operator (includes loed, lull types over 5 tons; Hydrostatic pump operator; oi (asphalt or concrete plant); Petromat laydown ma side dum jack; Screening and conveyor machine op similar types); Skiploader (wheel type up to 3/4 without attachment); Tar pot fireman; Temporary plant operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat o type (Skid steer); Equipment greaser (rack); For (with dragtype attachments); Helicopter radioman Stationary pipe wrapping and cleaning machine op
GROUP 4: Asphalt plant fireman; Backhoe operator similar type); Boring machine operator; Boxman o (asphalt or concrete); Chip spreading machine op Concrete cleaning decontamination machine operat Concrete Pump Operator (small portable); Drillin operator, small auger types (Texoma super econom similar types - Hughes 100 or 200 or similar typ drilling depth of 30' maximum); Equipment grease truck); Guard rail post driver operator; Highlin signalman; Hydra-hammer-aero stomper; Micro Tunn
(above ground tunnel); Power concrete curing mac operator; Power concrete saw operator; Power-dri form setter operator; Power sweeper operator; Ro Saw/Trencher; Roller operator (compacting); Scre (asphalt or concrete); Trenching machine operato ft.); Vacuum or much truck
GROUP 5: Equipment Greaser (Grease Truck/Multi Shi
GROUP 6: Articulating material hauler; Asphalt p engineer; Batch plant operator; Bit sharpener; C joint machine operator (canal and similar type);
planer operator; Dandy digger; Deck engine opera Derrickman (oilfield type); Drilling machine ope bucket or auger types (Calweld 100 bucket or sim
- Watson 1000 auger or similar types - Texoma 33 600 auger or similar types - drilling depth of 4 maximum); Drilling machine operator; Hydrographi machine operator (straw, pulp or seed), Jackson maintainer, or similar type; Kalamazoo Switch ta similar type; Machine tool operator; Maginnis in slab vibrator, Mechanical berm, curb or gutter(c asphalt); Mechanical finisher operator (concrete Clary-Johnson-Bidwell or similar); Micro tunnel (below ground); Pavement breaker operator (truck Road oil mixing machine operator; Roller operato or finish), rubber-tired earth moving equipment engine, up to and including 25 yds. struck); Sel tar pipelining machine operator; Skiploader oper (crawler and wheel type, over 3/4 yd. and up to including 1-1/2 yds.); Slip form pump operator ( driven hydraulic lifting device for concrete for Tractor operator-bulldozer, tamper-scraper (sing up to 100 h.p. flywheel and similar types, up to including D-5 and similar types); Tugger hoist o drum); Ultra high pressure waterjet cutting tool operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator finishing); Asphalt paving machine operator (Bar or similar type); Asphalt-rubber distribution op Backhoe operator (up to and including 3/4 yd.), Case or similar; Cast-in-place pipe laying machi operator; Combination mixer and compressor opera work); Compactor operator (self-propelled); Conc operator (paving); Crushing plant operator; Dril Drilling machine operator, Bucket or auger types 150 bucket or similar types - Watson 1500, 2000 or similar types - Texoma 700, 800 auger or simi drilling depth of 60' maximum); Elevating grader Grade checker; Gradall operator; Grouting machin Heavy-duty repairman; Heavy equipment robotics o Kalamazoo balliste regulator or similar type; Ko loader and similar type; Le Tourneau blob compac similar type; Loader operator (Athey, Euclid, Si similar types); Mobark Chipper or similar; Ozzie similar types; P.C. slot saw; Pneumatic concrete machine operator (Hackley-Presswell or similar t Pumpcrete gun operator; Rock Drill or similar ty drill operator (excluding caisson type); Rubber-earth-moving equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar typ and all attachments over 25 yds. up to and inclu yds. struck); Rubber-tired earth-moving equipmen (multiple engine up to and including 25 yds. str Rubber-tired scraper operator (self-loading padd type-John Deere, 1040 and similar single unit);
propelled curb and gutter machine operator; Shut Skiploader operator (crawler and wheel type over up to and including 6-1/2 yds.); Soil remediatio operator; Surface heaters and planer operator; T compressor drill combination operator; Tractor o (any type larger than D-5 - 100 flywheel h.p. an similar-bulldozer, tamper, scraper and push trac engine); Tractor operator (boom attachments), Tr pipe wrapping, cleaning and bendng machine opera Trenching machine operator (over 6 ft. depth cap manufacturer's rating); trenching Machine with R attachment (over 6 ft depth capacity): Ultra hig waterjet cutting tool system mechanic; Water pul
(compaction) operator
GROUP 9: Heavy Duty Repairman
GROUP 10: Drilling machine operator, Bucket or a (Calweld 200 B bucket or similar types-Watson 30 auger or similar types-Texoma 900 auger or simil types-drilling depth of 105' maximum); Dual drum dynamic compactor LDC350 (or similar types); Mon locomotive operator (diesel, gas or electric); M patrol-blade operator (single engine); Multiple tractor operator (Euclid and similar type-except cat.); Rubber-tired earth-moving equipment opera engine, over 50 yds. struck); Pneumatic pipe ram and similar types; Prestressed wrapping machine Rubber-tired earth-moving equipment operator (si engine, over 50 yds. struck); Rubber tired earth equipment operator (multiple engine, Euclid, cat and similar over 25 yds. and up to 50 yds. struc crane repairman; Tractor loader operator (crawle type over 6-1/2 yds.); Woods mixer operator (and Pugmill equipment)
GROUP 11: Heavy Duty Repairman - Welder Combinat Certified.
GROUP 12: Auto grader operator; Automatic slip f Drilling machine operator, bucket or auger types auger 200 CA or similar types - Watson, auger 60 similar types - Hughes Super Duty, auger 200 or types - drilling depth of 175' maximum); Hoe ram with compressor; Mass excavator operator less th yards; Mechanical finishing machine operator; Mo traveler operator; Motor patrol operator (multi- Pipe mobile machine operator; Rubber-tired earth equipment operator (multiple engine, Euclid, Cat and similar type, over 50 cu. yds. struck); Rubb self- loading scraper operator (paddle-wheel-aug self-loading - two (2) or more units)
GROUP 13: Rubber-tired earth-moving equipment op operating equipment with push-pull system (singl up to and including 25 yds. struck)
GROUP 14: Canal liner operator; Canal trimmer op Remote- control earth-moving equipment operator a second piece of equipment: $1.00 per hour addi Wheel excavator operator (over 750 cu. yds.)
GROUP 15: Rubber-tired earth-moving equipment op operating equipment with push-pull system (singl Caterpillar, Euclid, Athey Wagon and similar typ and all attachments over 25 yds. and up to and i yds. struck); Rubber-tired earth-moving equipmen operating equipment with push-pull system (multi engine-up to and including 25 yds. struck)
GROUP 16: Rubber-tired earth-moving equipment op operating equipment with push-pull system (singl over 50 yds. struck); Rubber-tired earth-moving operator, operating equipment with push-pull sys (multiple engine, Euclid, Caterpillar and simila yds. and up to 50 yds. struck)
GROUP 17: Rubber-tired earth-moving equipment op operating equipment with push-pull system (multi Euclid, Caterpillar and similar, over 50 cu. yds Tandem tractor operator (operating crawler type tandem - Quad 9 and similar type)
GROUP 18: Rubber-tired earth-moving equipment op operating in tandem (scrapers, belly dumps and s types in any combination, excluding compaction u single engine, up to and including 25 yds. struc
GROUP 19: Rotex concrete belt operator (or simil Rubber-tired earth-moving equipment operator, op tandem (scrapers, belly dumps and similar types combination, excluding compaction units - single Caterpillar, Euclid, Athey Wagon and similar typ and all attachments over 25 yds.and up to and in
cu. yds. struck); Rubber-tired earth-moving equi operator, operating in tandem (scrapers, belly d similar types in any combination, excluding comp units - multiple engine, up to and including 25
GROUP 20: Rubber-tired earth-moving equipment op operating in tandem (scrapers, belly dumps and s types in any combination, excluding compaction u single engine, over 50 yds. struck); Rubber-tire earth-moving equipment operator, operating in ta (scrapers, belly dumps, and similar types in any combination, excluding compaction units - multip Euclid, Caterpillar and similar, over 25 yds. an yds. struck)
GROUP 21: Rubber-tired earth-moving equipment op operating in tandem (scrapers, belly dumps and s types in any combination, excluding compaction u multiple engine, Euclid, Caterpillar and similar 50 cu. yds. struck)
GROUP 22: Rubber-tired earth-moving equipment op operating equipment with the tandem push-pull sy (single engine, up to and including 25 yds. stru
GROUP 23: Rubber-tired earth-moving equipment op operating equipment with the tandem push-pull sy (single engine, Caterpillar, Euclid, Athey Wagon similar types with any and all attachments over up to and including 50 yds. struck); Rubber-tire earth-moving equipment operator, operating with push-pull system (multiple engine, up to and inc yds. struck)
GROUP 24: Rubber-tired earth-moving equipment op operating equipment with the tandem push-pull sy (single engine, over 50 yds. struck); Rubber-tir earth-moving equipment operator, operating equip the tandem push-pull system (multiple engine, Eu
Caterpillar and similar, over 25 yds. and up to struck)
GROUP 25: Concrete pump operator-truck mounted;
earth-moving equipment operator, operating equip the tandem push-pull system (multiple engine, Eu Caterpillar and similar type, over 50 cu. yds. s
CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIF
GROUP 1: Engineer oiler; Fork lift operator (inc lull or similar types)
GROUP 2: Truck crane oiler
GROUP 3: A-frame or winch truck operator; Ross c operator (jobsite)
GROUP 4: Bridge-type unloader and turntable oper Helicopter hoist operator
GROUP 5: Hydraulic boom truck; Stinger crane (A or similar type); Tugger hoist operator (1 drum)
GROUP 6: Bridge crane operator; Cretor crane ope operator (Chicago boom and similar type); Lift m operator; Lift slab machine operator (Vagtborg a types); Material hoist and/or manlift operator;
gantry crane operator; Self Climbing scaffold (o type); Shovel, backhoe, dragline, clamshell oper 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist
GROUP 7: Pedestal crane operator; Shovel, backho clamshell operator (over 5 cu. yds. mrc); Tower repair; Tugger hoist operator (3 drum)
GROUP 8: Crane operator (up to and including 25 capacity); Crawler transporter operator; Derrick operator (up to and including 25 ton capacity);
operator, stiff legs, Guy derrick or similar typ and including 25 ton capacity); Shovel, backhoe, clamshell operator (over 7 cu. yds., M.R.C.)
GROUP 9: Crane operator (over 25 tons and up to 50 tons mrc); Derrick barge operator (over 25 to and including 50 tons mrc); Highline cableway op Hoist operator, stiff legs, Guy derrick or simil (over 25 tons up to and including 50 tons mrc);
operator; Polar crane operator; Self erecting to operator maximum lifting capacity ten tons
GROUP 10: Crane operator (over 50 tons and up to including 100 tons mrc); Derrick barge operator tons up to and including 100 tons mrc); Hoist op stiff legs, Guy derrick or similar type (over 50 and including 100 tons mrc), Mobile tower crane (over 50 tons, up to and including 100 tons M.R.
crane operator and tower gantry
GROUP 11: Crane operator (over 100 tons and up t including 200 tons mrc); Derrick barge operator tons up to and including 200 tons mrc); Hoist op stiff legs, Guy derrick or similar type (over 10 to and including 200 tons mrc); Mobile tower cra (over 100 tons up to and including 200 tons mrc)
GROUP 12: Crane operator (over 200 tons up to an 300 tons mrc); Derrick barge operator (over 200 and including 300 tons mrc); Hoist operator, sti Guy derrick or similar type (over 200 tons, up t including 300 tons mrc); Mobile tower crane oper 200 tons, up to and including 300 tons mrc)
GROUP 13: Crane operator (over 300 tons); Derric operator (over 300 tons); Helicopter pilot; Hois stiff legs, Guy derrick or similar type (over 30 Mobile tower crane operator (over 300 tons)
TUNNEL CLASSIFICATIONS
GROUP 1: Skiploader (wheel type up to 3/4 yd. wi attachment)
GROUP 2: Power-driven jumbo form setter operator
GROUP 3: Dinkey locomotive or motorperson (up to including 10 tons)
GROUP 4: Bit sharpener; Equipment greaser (greas Slip form pump operator (power-driven hydraulic device for concrete forms); Tugger hoist operato Tunnel locomotive operator (over 10 and up to an 30 tons)
GROUP 5: Backhoe operator (up to and including 3 Small Ford, Case or similar; Drill doctor; Grout operator; Heading shield operator; Heavy-duty re Loader operator (Athey, Euclid, Sierra and simil Mucking machine operator (1/4 yd., rubber-tired, track type); Pneumatic concrete placing machine (Hackley-Presswell or similar type); Pneumatic h shield (tunnel); Pumpcrete gun operator; Tractor drill combination operator; Tugger hoist operato Tunnel locomotive operator (over 30 tons)
GROUP 6: Heavy Duty Repairman
GROUP 7: Tunnel mole boring machine operator
ENGINEERS ZONES
$1.00 additional per hour for all of IMPERIAL Coun portions of KERN, RIVERSIDE & SAN BERNARDINO Count defined below:
That area within the following Boundary: Begin in Bernardino County, approximately 3 miles NE of the of I-15 and the California State line at that poin the NW corner of Section 1, T17N,m R14E, San Berna Meridian. Continue W in a straight line to that p the SW corner of the northwest quarter of Section R42E, Mt. Diablo Meridian. Continue North to the with the Inyo County Boundary at that point which corner of the western half of the northern quarter 6, T25S, R42E, MDM. Continue W along the Inyo and Bernardino County boundary until the intersection County, as that point which is the SE corner of Se T24S, R40E, MDM. Continue W along the Inyo and Ke boundary until the intersection with Tulare County point which is the SW corner of the SE quarter of T24S, R37E, MDM. Continue W along the Kern and Tu boundary, until that point which is the NW corner R32E, MDM. Continue S following R32E lines to the T31S, R32E, MDM. Continue W to the NW corner of T MDM. Continue S to the SW corner of T32S, R31E, M W to SW corner of SE quarter of Section 34, T32S, Continue S to SW corner of T11N, R17W, SBM. Conti south boundary of T11N, SBM to SW corner of T11N, Continue S to SW corner of T9N, R7W, SBM. Continu south boundary of T9N, SBM to SW corner of T9N, R1 Continue S along west boundary of R1E, SMB to Rive line at the SW corner of T1S, R1E, SBM. Continue boundary of T1s, SBM (Riverside County Line) to SW T1S, R10E, SBM. Continue S along west boundary of Imperial County line at the SW corner of T8S, R10E Continue W along Imperial and Riverside county lin corner of T9S, R9E, SBM. Continue S along the bou Imperial and San Diego Counties, along the west ed SBM to the south boundary of Imperial County/Calif line. Follow the California state line west to Ar line, then north to Nevada state line, then contin to start at the point which is the NW corner of Se
T17N, R14E, SBM
$1.00 additional per hour for portions of SAN LUIS KERN, SANTA BARBARA & VENTURA as defined below:
That area within the following Boundary: Begin ap miles north of the community of Cholame, on the Mo and San Luis Obispo County boundary at the NW corn
R16E, Mt. Diablo Meridian. Continue south along t of R16E to the SW corner of T30S, R16E, MDM. Cont corner of T30S, R17E, MDM. Continue S to SW corne R17E, MDM. Continue E to SW corner of T31S, R18E, Continue S along West side of R18E, MDM as it cros Bernardino Meridian numbering area and becomes R30 the west side of R30W, SBM to the SW corner of T9N Continue E along the south edge of T9N, SBM to the Barbara County and Ventura County boundary at that is the SW corner of Section 34.T9N, R24W, SBM, con the Ventura County line to that point which is the the SE quarter of Section 32, T7N, R24W, SBM. Co along the south edge of T7N, SBM to the SE corner SBM. Continue N along East side of R21W, SBM to V and Kern County boundary at the NE corner of T8N, Continue W along the Ventura County and Kern Count the SE corner of T9N, R21W. Continue North along of R21W, SBM to the NE corner of T12N, R21W, SBM.
West along the north edge of T12N, SBM to the SE c T32S, R21E, MDM. [T12N SBM is a think strip betwee and T32S MDM]. Continue North along the East side to the Kings County and Kern County border at the T25S, R21E, MDM, continue West along the Kings Cou County Boundary until the intersection of San Luis County. Continue west along the Kings County and Obispo County boundary until the intersection with County. Continue West along the Monterey County a Obispo County boundary to the beginning point at t of T25S, R16E, MDM.
$2.00 additional per hour for INYO and MONO Counti Northern portion of SAN BERNARDINO County as defin
That area within the following Boundary: Begin at intersection of the northern boundary of Mono Coun California state line at the point which is the ce Section 17, T10N, R22E, Mt. Diablo Meridian. Cont SE along the entire western boundary of Mono Count reaches Inyo County at the point which is the NE c
Western half of the NW quarter of Section 2, T8S, Continue SSE along the entire western boundary of until the intersection with Kern County at the poi the SW corner of the SE 1/4 of Section 32, T24S, R Continue E along the Inyo and Kern County boundary intersection with San Bernardino County at that po the SE corner of section 34, T24S, R40E, MDM. Con the Inyo and San Bernardino County boundary until which is the NE corner of the Western half of the Section 6, T25S, R42E, MDM. Continue S to that po the SW corner of the NW quarter of Section 6, T27S Continue E in a straight line to the California an state border at the point which is the NW corner o T17N, R14E, San Bernardino Meridian. Then continu the state line to the starting point, which is the Section 18, T10N, R22E, MDM.
REMAINING AREA NOT DEFINED ABOVE RECIEVES BASE RAT
ENGI0012-004 08/01/2022
Rates F
OPERATOR: Power Equipment
(DREDGING)
(1) Leverman................$ 61.60
(2) Dredge dozer............$ 55.63
(3) Deckmate................$ 55.52
(4) Winch operator (stern winch on dredge)............$ 54.97
(5) Fireman-Oiler, Deckhand, Bargeman, Leveehand...................$ 54.43
(6) Barge Mate..............$ 55.04
IRON0433-006 01/01/2023
IRONWORKER
Fence Erector...............$ 41.28 Ornamental, Reinforcing and Structural..............$ 46.20
PREMIUM PAY:
$9.00 additional per hour at the following locatio
China Lake Naval Test Station, Chocolate Mountains Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irw Center-Goldstone, San Clemente Island, San Nichola Susanville Federal Prison, 29 Palms - Marine Corps Base - Barstow, U.S. Naval Air Facility - Sealey, Army Defense Language Institute - Monterey, Fallon Naval Post Graduate School - Monterey, Yermo Marin Logistics Center Port Hueneme, Port Mugu, U.S. Coast Guard Station
LABO0220-001 07/01/2022
Rates F
LABORER (TUNNEL)
GROUP 1.....................$ 45.68
GROUP 2.....................$ 46.00
GROUP 3.....................$ 46.46
GROUP 4.....................$ 47.15
LABORER
GROUP 1.....................$ 36.39
GROUP 2.....................$ 36.94
GROUP 3.....................$ 37.49
GROUP 4.....................$ 39.04
GROUP 5.....................$ 39.39
LABORER CLASSIFICATIONS
GROUP 1: Cleaning and handling of panel forms; C screeding for rough strike-off; Concrete, water Demolition laborer, the cleaning of brick if per worker performing any other phase of demolition the cleaning of lumber; Fire watcher, limber, br piler and debris handler; Flag person; Gas, oil water pipeline laborer; Laborer, asphalt-rubber loader; Laborer, general or construction; Labore clean-up; Laborer, landscaping; Laborer, jetting temporary water and air lines; Material hose ope (walls, slabs, floors and decks); Plugging, fill bolt holes; Dry packing of concrete; Railroad ma repair track person and road beds; Streetcar and construction track laborers; Rigging and signali Slip form raiser; Tar and mortar; Tool crib or t laborer; Traffic control by any method; Window c Wire mesh pulling - all concrete pouring operati
GROUP 2: Asphalt shoveler; Cement dumper (on 1 mixer and handling bulk cement); Cesspool digger installer; Chucktender; Chute handler, pouring c the handling of the chute from readymix trucks, walls, slabs, decks, floors, foundation, footing gutters and sidewalks; Concrete curer, imperviou and form oiler; Cutting torch operator (demoliti grader, highways and street paving, airport, run similar type heavy construction; Gas, oil and/or pipeline wrapper - pot tender and form person; G chaser; Headerboard person - asphalt; Laborer, p steel and pans; Membrane vapor barrier installer broom sweeper (small); Riprap stonepaver, placin wet sacked concrete; Roto scraper and tiller; Sa (pot tender); Septic tank digger and installer(l scaler and cleaner; Tree climber, faller, chain operator, Pittsburgh chipper and similar type br shredder; Underground laborer, including caisson
GROUP 3: Buggymobile person; Concrete cutting to pile cutter; Driller, jackhammer, 2-1/2 ft. dril longer; Dri-pak-it machine; Gas, oil and/or wate wrapper, 6-in. pipe and over, by any method, ins out; High scaler (including drilling of same); H and similar type; Impact wrench multi-plate; Ket pot person and workers applying asphalt, lay-kol creosote, lime caustic and similar type material (""applying"" means applying, dipping, brushing of such materials for pipe wrapping and waterpro Operator of pneumatic, gas, electric tools, vibr machine, pavement breaker, air blasting, come-al similar mechanical tools not separately classifi Pipelayer's backup person, coating, grouting, ma joints, sealing, caulking, diapering and includi gasket joints, pointing and any and all other se Rock slinger; Rotary scarifier or multiple head chipping scarifier; Steel headerboard and guidel Tamper, Barko, Wacker and similar type; Trenchin hand-propelled
GROUP 4: Asphalt raker, lute person, ironer, asp person, and asphalt spreader boxes (all types);
core cutter (walls, floors or ceilings), grinder Concrete saw person, cutting walls or flat work, old or new concrete; Cribber, shorer, lagging, s trench bracing, hand-guided lagging hammer; Head slinger; Laborer, asphalt- rubber distributor bo Laser beam in connection with laborers' work; Ov concrete vibrator operator, 70 lbs. and over; Pi performing all services in the laying and instal pipe from the point of receiving pipe in the dit completion of operation, including any and all f tubular material, whether pipe, metallic or non-conduit and any other stationary type of tubular used for the conveying of any substance or eleme water, sewage, solid gas, air, or other product and without regard to the nature of material fro tubular material is fabricated; No-joint pipe an of same; Prefabricated manhole installer; Sandbl (nozzle person), water blasting, Porta Shot-Blas
GROUP 5: Blaster powder, all work of loading hol and blasting of all powder and explosives of wha regardless of method used for such loading and p Driller: All power drills, excluding jackhammer, core, diamond, wagon, track, multiple unit, and other types of mechanical drills without regard of motive power; Toxic waste removal
TUNNEL LABORER CLASSIFICATIONS
GROUP 1: Batch plant laborer; Changehouse person person; Dump person (outside); Swamper (brake pe switch person on tunnel work); Tunnel materials person; Nipper; Pot tender, using mastic or othe (for example, but not by way of limitation, shot etc.);
GROUP 2: Bull gang mucker, track person; Chuckte Cabletender; Concrete crew, including rodder and Loading and unloading agitator cars; Vibrator pe hammer, pneumatic tools (except driller)
GROUP 3: Blaster, driller, powder person; Chemic person; Cherry picker person; Grout gun person;
person; Grout pump person; Jackleg miner; Jumbo Kemper and other pneumatic concrete placer opera tunnel (hand or machine); Nozzle person; Operati troweling and/or grouting machines; Powder perso house); Primer person; Sandblaster; Shotcrete pe form raiser and setter; Timber person, retimber wood or steel; Tunnel Concrete finisher
GROUP 4: Diamond driller; Sandblaster; Shaft and r
LABO0220-004 07/01/2022
Brick Tender.....................$ 37.32
LABO0300-005 08/01/2022
Rates F
Asbestos Removal Laborer.........$ 39.23
SCOPE OF WORK: Includes site mobilization, init cleanup, site preparation, removal of asbestos-c material and toxic waste, encapsulation, enclosu disposal of asbestos- containing materials and t by hand or with equipment or machinery; scaffold fabrication of temporary wooden barriers and ass decontamination stations.
LABO0345-001 07/01/2022
Rates F
LABORER (GUNITE)
GROUP 1.....................$ 48.50
GROUP 2.....................$ 47.55
GROUP 3.....................$ 44.01
FOOTNOTE: GUNITE PREMIUM PAY: Workers working Bosn'n's Chair or suspended from a rope or cabl receive 40 cents per hour above the foregoing ap classification rates. Workers doing gunite and shotcrete work in a tunnel shall receive 35 cen above the foregoing applicable classification ra on a portal-to-portal basis. Any work performe above any smoke stack, silo, storage elevator or type of structure, when such structure is in ex 75'-0"" above base level and which work must be whole or in part more than 75'-0"" above base le work performed above the 75'-0"" level shall be for at 35 cents per hour above the applicable classification wage rate.
GUNITE LABORER CLASSIFICATIONS
GROUP 1: Rodmen, Nozzlemen
GROUP 2: Gunmen
GROUP 3: Reboundmen
LABO1184-001 07/01/2022
Rates F
Laborers: (HORIZONTAL
DIRECTIONAL DRILLING)
(1) Drilling Crew Laborer...$ 40.69
(2) Vehicle Operator/Hauler.$ 40.86
(3) Horizontal Directional Drill Operator..............$ 42.71
(4) Electronic Tracking Locator.....................$ 44.71 Laborers: (STRIPING/SLURRY
SEAL)
GROUP 1.....................$ 41.90
GROUP 2.....................$ 43.20
GROUP 3.....................$ 45.21
GROUP 4.....................$ 46.95
LABORERS - STRIPING CLASSIFICATIONS
GROUP 1: Protective coating, pavement sealing, i repair and filling of cracks by any method on an in parking lots, game courts and playgrounds; ca operation of all related machinery and equipment repair technician
GROUP 2: Traffic surface abrasive blaster; pot t removal of all traffic lines and markings by any (sandblasting, waterblasting, grinding, etc.) an preparation of surface for coatings. Traffic co person: controlling and directing traffic throug conventional and moving lane closures; operation related machinery and equipment
GROUP 3: Traffic delineating device applicator:
application of pavement markers, delineating sig and traffic bars, adhesives, guide markers, othe delineating devices including traffic control. T category includes all traffic related surface pr (sandblasting, waterblasting, grinding) as part application process. Traffic protective delineat installer: removes, relocates, installs, permane affixed roadside and parking delineation barrica fencing, cable anchor, guard rail, reference sig monument markers; operation of all related machi equipment; power broom sweeper
GROUP 4: Striper: layout and application of traf and markings; hot thermo plastic; tape traffic s markings, including traffic control; operation o related machinery and equipment
LABO1414-003 08/03/2022
Rates F
LABORER
PLASTER CLEAN-UP LABORER....$ 38.92
PLASTER TENDER..............$ 41.47
Work on a swing stage scaffold: $1.00 per hour add
Work at Military Bases - $3.00 additional per hou Coronado Naval Amphibious Base, Fort Irwin, Mari Station-29 Palms, Imperial Beach Naval Air Stati Corps Logistics Supply Base, Marine Corps Pickle Mountain Warfare Training Center, Naval Air Facility-Seeley, North Island Naval Air Station, AFB.
* PAIN0036-002 07/01/2023
Rates F
Painters: (Including Lead Abatement)
(1) Journeyman Painter......$ 36.44
(2) Repaint.................$ 26.40
(3) Iron & Steel............$ 33.12
(4) High Iron & Steel.......$ 35.12
(5) All Other Work..........$ 36.44
REPAINT:
Repaint of any structure with the exception of wor the aerospace industry, breweries, commercial recr facilities, hotels which operate commercial establ part of hotel service, and sports facilities, tena improvement work not included in conjunction with construction of the building and all repainting of improvement projects.
HIGH IRON & STEEL:
Aerial towers, towers, radio towers, smoke stacks, (any flag poles that can be finished from the grou ladder excluded), elevated water towers, steeples their entirety and any other extremely high and ha cooning steel, bos'n chair, or other similar devic in other high hazardous work shall be classified a steel
PAIN0036-008 09/01/2022
Rates F
DRYWALL FINISHER/TAPER...........$ 46.28
PAIN0036-015 01/01/2020
GLAZIER..........................$ 43.45
FOOTNOTE: Additional $1.25 per hour for work in from the third (3rd) floor and up Additional $1 hour for work on the outside of the building fr stage or any suspended contrivance, from the gro
PAIN1247-002 01/01/2023
Rates F
SOFT FLOOR LAYER.................$ 41.60
PLAS0200-006 08/03/2022
Rates F
PLASTERER........................$ 47.37
VANDENBURG AFB: $3.00 additional per hour.
PLAS0500-002 07/01/2020
Rates F
CEMENT MASON/CONCRETE FINISHER...$ 38.50
PLUM0016-004 09/01/2022
Rates F
PLUMBER/PIPEFITTER
Vandenburg Air Force Base...$ 59.68 Work ONLY on new additions and remodeling of bars, restaurants, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space.................$ 53.51 Work ONLY on strip malls, light commercial, tenant improvement and remodel work........................$ 40.95 All other work except work on new additions and remodeling of bars, restaurant, stores and commercial buildings not to exceed 5,000 sq. ft. of floor space and work on strip malls, light commercial, tenant improvement and remodel work........................$ 55.18
PLUM0345-001 09/01/2022
Rates F
PLUMBER
Landscape/Irrigation Fitter.$ 38.20 Sewer & Storm Drain Work....$ 42.29
ROOF0036-002 08/01/2022
Rates F
ROOFER...........................$ 43.47
FOOTNOTE: Pitch premium: Work on which employees to pitch fumes or required to handle pitch, pitc pitch impregnated products, or any material cont tar pitch, the entire roofing crew shall receive hour ""pitch premium"" pay.
SFCA0669-014 04/01/2023
Rates F
SPRINKLER FITTER.................$ 44.32
SHEE0273-002 08/01/2019
Rates F
SHEET METAL WORKER...............$ 45.48
HOLIDAYS: New Year's Day, Martin Luther King Day Day, Good Friday, Memorial Day, Indepdendence Da Day, Veterans Day,Thankisgiving Day & Friday aft Christmas Day
TEAM0011-002 07/01/2022
Rates F
TRUCK DRIVER
GROUP 1....................$ 36.19
GROUP 2....................$ 36.34
GROUP 3....................$ 36.47
GROUP 4....................$ 36.66
GROUP 5....................$ 36.69
GROUP 6....................$ 36.72
GROUP 7....................$ 36.97
GROUP 8....................$ 37.22
GROUP 9....................$ 37.42
GROUP 10....................$ 37.72
GROUP 11....................$ 38.22
GROUP 12....................$ 38.65
WORK ON ALL MILITARY BASES:
PREMIUM PAY: $3.00 per hour additional.
[29 palms Marine Base, Camp Roberts, China Lake, El Centro Naval Facility, Fort Irwin, Marine Cor Logistics Base at Nebo & Yermo, Mountain Warfare Center, Bridgeport, Point Arguello, Point Conc Vandenberg AFB]
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Truck driver
GROUP 2: Driver of vehicle or combination of veh axles; Traffic control pilot car excluding movin equipment permit load; Truck mounted broom
GROUP 3: Driver of vehicle or combination of veh axles; Boot person; Cement mason distribution tr truck driver; Water truck - 2 axle; Dump truck, 16 yds. water level; Erosion control driver
GROUP 4: Driver of transit mix truck, under 3 yd truck, less than 6-1/2 yds. water level
GROUP 5: Water truck, 3 or more axles; Truck gre person ($0.50 additional for tire person); Pipel utility working truck driver, including winch tr plastic fusion, limited to pipeline and utility Slurry truck driver
GROUP 6: Transit mix truck, 3 yds. or more; Dump 6-1/2 yds. water level and over; Vehicle or comb vehicles - 4 or more axles; Oil spreader truck;
16 yds. to 25 yds. water level
GROUP 7: A Frame, Swedish crane or similar; Fork Ross carrier driver
GROUP 8: Dump truck, 25 yds. to 49 yds. water le repair person; Water pull - single engine; Welde
GROUP 9: Truck repair person/welder; Low bed dri or over
GROUP 10: Dump truck - 50 yds. or more water lev pull - single engine with attachment
GROUP 11: Water pull - twin engine; Water pull -with attachments; Winch truck driver - $1.25 add when operating winch or similar special attachme
GROUP 12: Boom Truck 17K and above
WELDERS - Receive rate prescribed for craft perfor operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Pai for Federal Contractors applies to all contracts s Davis-Bacon Act for which the contract is awarded solicitation was issued) on or after January 1, 20 contract is covered by the EO, the contractor must employees with 1 hour of paid sick leave for every they work, up to 56 hours of paid sick leave each Employees must be permitted to use paid sick leave own illness, injury or other health-related needs, preventive care; to assist a family member (or per like family to the employee) who is ill, injured, health-related needs, including preventive care; o resulting from, or to assist a family member (or p like family to the employee) who is a victim of, d violence, sexual assault, or stalking. Additional on contractor requirements and worker protections is available at https://www.dol.gov/agencies/whd/government-contra
Unlisted classifications needed for work not inclu the scope of the classifications listed may be add award only as provided in the labor standards cont (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the clas and wage rates that have been found to be prevaili cited type(s) of construction in the area covered determination. The classifications are listed in a order of ""identifiers"" that indicate whether the rate is a union rate (current union negotiated rat a survey rate (weighted average rate) or a union a (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifi in dotted lines beginning with characters other th ""UAVG"" denotes that the union classification and prevailing for that classification in the survey.
PLUM0198-005 07/01/2014. PLUM is an abbreviation i the union which prevailed in the survey for this classification, which in this example would be Plu indicates the local union number or district counc where applicable, i.e., Plumbers Local 0198. The n 005 in the example, is an internal number used in the wage determination. 07/01/2014 is the effectiv most current negotiated rate, which in this exampl 2014.
Union prevailing wage rates are updated to reflect changes in the collective bargaining agreement (CB this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier no one rate prevailed for this classification in t the published rate is derived by computing a weigh rate based on all the rates reported in the survey classification. As this weighted average rate inc rates reported in the survey, it may include both non-union rates. Example: SULA2012-007 5/13/2014.
the rates are survey rates based on a weighted ave calculation of rates and are not majority rates. L the State of Louisiana. 2012 is the year of survey these classifications and rates are based. The nex in the example, is an internal number used in prod wage determination. 5/13/2014 indicates the survey date for the classifications and rates under that
Survey wage rates are not updated and remain in ef new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier that no single majority rate prevailed for those classifications; however, 100% of the data reporte classifications was union data. EXAMPLE: UAVG-OH-0 08/29/2014. UAVG indicates that the rate is a weig average rate. OH indicates the state. The next num the example, is an internal number used in produci determination. 08/29/2014 indicates the survey com for the classifications and rates under that ident
A UAVG rate will be updated once a year, usually i each year, to reflect a weighted average of the cu negotiated/CBA rate of the union locals from which based.
WAGE DETERMINATION APPEALS PROC
1.) Has there been an initial decision in the matt be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a a wage determination matter
* a conformance (additional classification and ra
On survey related matters, initial contact, includ for summaries of surveys, should be with the Wage National Office because National Office has respon the Davis-Bacon survey program. If the response fr initial contact is not satisfactory, then the proc in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for t process described here, initial contact should be Branch of Construction Wage Determinations. Write
Branch of Construction Wage Determinat Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, t interested party (those affected by the action) ca review and reconsideration from the Wage and Hour (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statem interested party's position and by any information payment data, project description, area practice m etc.) that the requestor considers relevant to the
History
Aug 11, 2023 CA20230014 - Modification 8
Aug 11, 2023 CA20230014 - Modification 7
Jun 30, 2023 CA20230014 - Modification 6
Apr 07, 2023 CA20230014 - Modification 5
3.) If the decision of the Administrator is not fa interested party may appeal directly to the Admini Review Board (formerly the Wage Appeals Board). W
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Boa
END OF GENERAL DECISIO"
https://sam.gov/wage-determination/CA20230014/7 https://sam.gov/wage-determination/CA20230014/6 https://sam.gov/wage-determination/CA20230014/5
Mar 31, 2023 CA20230014 - Modification 4
Mar 17, 2023 CA20230014 - Modification 3
Feb 10, 2023 CA20230014 - Modification 2
Jan 20, 2023 CA20230014 - Modification 1
Jan 13, 2023 CA20230014 - Modification 0
Our Website
Our Partners
Policies
Customer Service
General Services Administration This is a U.S. General Services Administration Federal Government computer system that is "FOR OFFICIAL USE ONLY." This system is subject to https://sam.gov/wage-determination/CA20230014/4 https://sam.gov/wage-determination/CA20230014/3 https://sam.gov/wage-determination/CA20230014/2 https://sam.gov/wage-determination/CA20230014/1 https://sam.gov/wage-determination/CA20230014/0 https://www.gsa.gov/ monitoring. Individuals found performing unauthorized activities are subject to disciplinary action including criminal prosecution.
File details come from the government source that posted it. Updated .